Elevator apt, fireproof with stores
One Sunset
201 25TH STREET · BIN 3429685
💬 Discuss this project
2024Year Built
14.5Stories
D6Building Class
R8AZoning
183,272 sfGross Floor Area
189Units
0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof with stores · Owner of record: 745 4th Avenue · 20,034 sf lot · 9.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsMobile equipment and mini-crane installation and useUnder Construction2 filings
RoofDunkin' / Baskin-RobbinsUnder Construction7p · 4 filings · 10 docs
BulkheadBeb Capital3p · 1 filing
Floor 8Pipe scaffolding installationUnder Construction1 filing
Floor 7Pipe scaffolding installationUnder Construction1 filing
Floor 6Pipe scaffolding installationUnder Construction1 filing
Floor 5Pipe scaffolding installationUnder Construction1 filing
Floor 4745 4th Avenue LLCUnder Construction1p · 2 filings
Floor 3Pipe scaffolding installationUnder Construction1 filing
Floor 2Pipe scaffolding installationUnder Construction3p · 1 filing
Floor 1Dunkin' / Baskin-RobbinsUnder Construction5p · 7 filings · 20 docs
CellarDunkin' / Baskin-RobbinsUnder Construction2 filings · 15 docs
Site & exteriorConstruction fence installationUnder Construction5 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Beb Capital8707/08/2026
731 4 AVE403/21/2026
Fifth Zeet Food403/21/2026
745 4th Avenue103/22/2026
737 4th Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/11/2018$7.2M—Private party → 737 4TH AVENUE, LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Northeast Service Interiors203/21/2026
DVA Advisors3003/21/2026
Hierarch-E403/21/2026
William Vitacco Associates103/21/2026
Domani Consulting803/21/2026
Patuxent Engineering1403/21/2026
Royal Expediting603/21/2026
KD Designs103/21/2026
Platinum Services NY403/21/2026
Lombardo Building Consultants503/21/2026
Green Studio203/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CM and Associates ConstructionGeneral Contractor2807/08/2026
TT MechanicalPlumbing1807/08/2026
Platinum Services NYScaffold1307/08/2026
CM and Associates ConstructionScaffold1107/08/2026
BunlinScaffold1007/08/2026
Advanced Facade Solution*Scaffold807/08/2026
TTM GroupFire Protection507/08/2026
Northeast Specialist GroupScaffold403/21/2026
Moore GroupScaffold307/08/2026
New Line Structures & DevelopmentGeneral Contractor107/08/2026
Michelle KuoGeneral Contractor110/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tan Engineering1291510/16/2026
Cherico King Architect5674409/14/2026
Domani Inspection Service8432406/29/2026
Frank Seta & Associates3095506/29/2026
Leo Y Lee Associates2481107/02/2024
Langan Engineering, Env, Surveyin1265605/09/2024
Rosenwasser/Grossman111505/09/2024
Building Lifecycle
All (288)Filed (72)Permit Issued (65)Signed Off (8)Violation (13)Inspection (17)Objection (80)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
10/20/2026
Permit issued — Plumbing
B01429451-I1-PL
10/16/2026
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MECHANICAL AC SYSTEMS IN NEW RESTAURANT SPACE.
B01428764-P1
10/16/2026
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES FOR A NEW RESTAURANT.
B01429451-P1
10/16/2026
Special inspection requirement — Maintenance information
Roger Tan
10/16/2026
Special inspection requirement — Final
Roger Tan
10/16/2026
Special inspection requirement — Duct leakage testing, insulation and design
Roger Tan
10/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
10/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
10/16/2026
Special inspection requirement — Shutoff dampers
Roger Tan
10/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
10/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2026
Special inspection requirement — Ventilation and air distribution system
Roger Tan
10/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Roger Tan
10/16/2026
Special inspection requirement — Maintenance information
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Roger Tan
10/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
10/16/2026
Special inspection requirement — Mechanical Systems
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
10/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Roger Tan
10/05/2026
Permit issued — General Construction
B01425425-I1-GC
09/14/2026
Filed — Alteration
NEW STORE ON PARTIAL FIRST FLOOR OF AN EXISTING 14-STORY BUILDING. INSTALLATION OF NEW CEILING TILES, LIGHTING, AND WALL FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01425425-I1
09/14/2026
Filed — Alteration
INSTALLATION OF NEW KITCHEN EXHAUST SYSTEM AND MECHANICAL AC SYSTEMS IN NEW RESTAURANT SPACE.
B01428764-I1
09/14/2026
Filed — Alteration
MODIFICATION OF EXISTING SPRINKLERS IN NEW RESTAURANT SPACE.
B01429462-I1
09/14/2026
Filed — Alteration
INSTALLATION OF NEW PLUMBING FIXTURES FOR A NEW RESTAURANT.
B01429451-I1
07/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Zoltan Saro
07/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Zoltan Saro
07/28/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Protection of exposed foundation insulation
Zoltan Saro
07/28/2026
Special inspection requirement — Air barrier continuity plan testing
JOHN MCMONAGLE
07/28/2026
Special inspection requirement — Insulation placement and R values
Zoltan Saro
07/28/2026
Special inspection requirement — Air barrier - visual inspection
Zoltan Saro
07/28/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Zoltan Saro
07/28/2026
Special inspection requirement — Vestibules
Zoltan Saro
06/29/2026
Filed — New Building
Installation of temporary standpipe system.
B00580365-B5
06/09/2026
Permit issued — Sprinklers
B00580365-S7-EW-SP
04/09/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095940-P2
03/24/2026
Permit issued — Supported Scaffold
B01095940-I1-SF
03/18/2026
Permit issued — General Construction
B00580365-I1-GC
02/12/2026
Permit issued — Construction Fence
B00884552-I1-FN
02/06/2026
Signed off — Alteration
INSTALLATION OF 2 POINT SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095950-I1
02/06/2026
Permit issued — Suspended Scaffold
B01095950-I1-SC
02/05/2026
Signed off — Alteration
INSTALLATION OF 2 POINT SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01095950-S1
02/05/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/23/2026
Permit issued — Suspended Scaffold
B01095950-S1-SC
01/16/2026
Signed off — Alteration
Application for the installation and use of mobile equipment (including mini-cranes) at 201 25th Street, BK (AKA 737 4th Avenue, BK) as per plans filed herein. No change in egress, use, or occupancy.
B01071472-I1
01/14/2026
Permit issued — Standpipe
B00580365-Z2-EW-SD
01/07/2026
Inspection — Pass-Final SD - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2025
Signed off — Alteration
INSTALLATION OF CONSTRUCTION FENCE AS PER PLANS. CONSTRUCTION FENCE SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01018577-S1
12/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/26/2025
Signed off — New Building
Installation of temporary standpipe system.
B00580365-S8
11/20/2025
Signed off — New Building
Installation of temporary standpipe system.
B00580365-S6
11/20/2025
Objection resolved — Addressed
11/18/2025
Permit issued — General Construction
B00580365-I1-GC
11/17/2025
Objection raised — Other
Latest 60 of 288 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTri State Plumbing & Heating10/20/2026
DOB NOWGeneral ConstructionPermit IssuedMichelle Kuo10/05/2026
DOB NOWSprinklersPermit IssuedTTM Group06/09/2026
DOB NOWSupported ScaffoldPermit IssuedBunlin03/24/2026
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah03/18/2026
DOB NOWConstruction FencePermit IssuedChristopher B. Mesbah02/12/2026
DOB NOWSuspended ScaffoldSigned-offBunlin02/06/2026
DOB NOWSuspended ScaffoldSigned-offBunlin01/23/2026
DOB NOWStandpipePermit IssuedTT Mechanical01/14/2026
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah11/18/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah08/05/2025
DOB NOWSuspended ScaffoldPermit IssuedAdvanced Facade Solution*06/27/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah06/04/2025
DOB NOWGeneral ConstructionSigned-offChristopher B. Mesbah06/02/2025
DOB NOWMechanical SystemsSigned-offChristopher B. Mesbah05/08/2025
DOB NOWSuspended ScaffoldPermit IssuedAdvanced Facade Solution*04/23/2025
DOB NOWProtection and Mechanical MethodsSigned-offAdvanced Facade Solution*04/23/2025
DOB NOWSprinklersPermit IssuedTTM Group04/10/2025
DOB NOWSidewalk ShedSigned-offPlatinum Services NY04/01/2025
DOB NOWConstruction FencePermit IssuedPlatinum Services NY04/01/2025
DOB NOWStandpipePermit IssuedTT Mechanical02/27/2025
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah02/21/2025
DOB NOWConstruction FencePermit IssuedChristopher B. Mesbah02/21/2025
DOB NOWStandpipePermit IssuedTT Mechanical01/16/2025
DOB NOWPlumbingPermit IssuedTT Mechanical01/14/2025
DOB NOWSupported ScaffoldPermit IssuedBunlin12/30/2024
DOB NOWSuspended ScaffoldSigned-offBunlin12/30/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedPlatinum Services NY12/23/2024
DOB NOWSuspended ScaffoldSigned-offBunlin11/13/2024
DOB NOWSupported ScaffoldPermit IssuedBunlin08/14/2024
DOB NOWSuspended ScaffoldSigned-offBunlin08/14/2024
DOB NOWStandpipePermit IssuedTT Mechanical07/31/2024
DOB NOWStandpipePermit IssuedTT Mechanical07/30/2024
DOB NOWStandpipePermit IssuedTTM Group07/26/2024
DOB NOWStandpipePermit IssuedTTM Group07/26/2024
DOB NOWStructuralSigned-offChristopher B. Mesbah07/23/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedMoore Group07/18/2024
DOB NOWSuspended ScaffoldPermit IssuedAdvanced Facade Solution*07/18/2024
DOB NOWGeneral ConstructionPermit IssuedChristopher B. Mesbah07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offAdvanced Facade Solution*06/26/2024
+ 26 more permits on file
2 projects · most recent 10/16/2026
Heating Systems Ventilation Systems Heating and Air Conditioning Systems Air Conditioning Systems Associated Ducts and Piping Cooling Towers
FiledStatusContractorScopeMake / Model / Capacity
10/16/2026——Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NL 48,000 BTU · Heat Pump Outdoor ×2
Heating
Greenheck IDHB SLIP-IN 7 kW · Electric Heater ×2
Ventilation
Greenheck SQ-120-VG 562 CFM · Exhaust Fan ×2
06/29/2026Permit IssuedCM and Associates ConstructionAir Conditioning Systems, Associated Ducts and Piping, Cooling Towers, Heating Systems
Cooling
Samsung AM018NNNDCH/AA 1 tons · Vrf Indoor ×25
AM096BXVGFH/AA 14 tons · Vrf Outdoor ×20
AM007NNNDCH/AA 1 tons · Vrf Indoor ×10
AM012NNNDCH/AA 1 tons · Vrf Indoor ×10
AM048BN4PCH/AA 4 tons · Vrf Indoor ×10
AM072BXVGFH/AA 6 tons · Vrf Outdoor ×10
AC018BXADCH/AA 1 tons · Vrf Indoor ×5
AC024BXADCH/AA 2 tons · Vrf Indoor ×5
AM024FNLDCH/AA 2 tons · Vrf Indoor ×5
AM024NNNDCH/AA 1 tons · Vrf Indoor ×5
AM072BXVGFH/44 6 tons · Vrf Outdoor ×5
AM072BXVGGH/AA 6 tons · Vrf Outdoor ×5
Mitsubishi Electric PUMY 60,000 BTU · Condensing Unit ×6
PUMY-P60NKMU 60,000 BTU · Vrf Outdoor ×6
PEFY-48NHMU-E 4 tons · Vrf Indoor ×2
Aaon RN-015-8-0-K60E-13A 4,000 CFM · Rooftop Unit ×5
RN-016-8-0-EA09-34B 178,000 BTU · Rooftop Unit ×1
Climatemaster TC-012 1 tons · Wshp ×6
TC-024 2 tons · Wshp ×2
TC-015 1 tons · Wshp ×1
TC-030 3 tons · Wshp ×1
TCLV-096 8 tons · Wshp ×1
Heating
Polaris A55SE-IS10-179-TMTL71 1 kW · Heat Exchanger ×12
Ventilation
Renewaire HE-2XINH 2,000 CFM · Erv ×6
Ducts & Piping
N/A n/a 1 kW · Ductwork ×6
Cooling Tower
Baltimore Aircoil S15E-1285-06JN 1 kW · Cooling Tower ×1
2 projects · most recent 09/14/2026
Sprinkler System
FiledStatusContractorScope
09/14/2026———
06/29/2026Permit IssuedTTM GroupSprinkler System
2 projects · most recent 10/16/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
10/16/2026Permit IssuedTri State Plumbing & HeatingWater/Sanitary
06/29/2026Permit IssuedTTM GroupGas, Storm, Water/Sanitary
5 projects · most recent 10/09/2025
General Wiring
FiledStatusContractorScope
10/09/2025Permit IssuedOptimal Electric2 meters, 2 new_meters
09/03/2025CompleteJam Electrical—
03/13/2025Permit IssuedOptimal ElectricGeneral Wiring
12/25/2023CompleteIlluminous Electric—
08/01/2022CompleteIlluminous ElectricGeneral Wiring
1 project · most recent 06/29/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/29/2026Permit IssuedTTM GroupSteel, Concrete, Masonry
5 projects · most recent 04/09/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
04/09/2026Permit IssuedBunlinScaffold
08/20/2025Signed-offPlatinum Services NYFence, Sidewalk Shed
02/21/2024Permit IssuedCM and Associates ConstructionFence
10/20/2022Permit IssuedPlatinum Services NYSidewalk Shed
02/24/2022Permit IssuedNortheast Specialist GroupFence
1 project · most recent 07/02/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
07/02/2024Permit IssuedAdvanced Facade Solution*Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
02/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/07/2026Pass-Final SD - Up to 3 Requested FloorsPassView ↗
12/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/12/2025Pass-Final SD - More than 10 Requested FloorsPassView ↗
09/08/2025Pass-Final SP - Up to 9 Requested FloorsPassView ↗
09/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
09/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/03/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/26/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
07/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
05/07/2024Pass-Final PL - UndergroundPassView ↗
04/06/2024Pass-Final PL - UndergroundPassView ↗
03/28/2024Pass-Final PL - UndergroundPassView ↗
03/21/2024Pass-Final PL - UndergroundPassView ↗
02/01/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/16/2026HVAC-R and service water heating system controlsRoger Tanenergy_progress
10/16/2026Ventilation and air distribution systemRoger Tanenergy_progress
10/16/2026Maintenance informationRoger Tanenergy_progress
10/16/2026Fire-Resistant Penetrations and JointsRoger Tanspecial
10/16/2026Tenant Protection Plan Compliance—special
10/16/2026Energy Code Compliance InspectionsRoger Tanprogress
10/16/2026HVAC-R and service water heating system controlsRoger Tanenergy_progress
10/16/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
10/16/2026Maintenance informationRoger Tanenergy_progress
10/16/2026HVAC-R and service water heating equipmentRoger Tanenergy_progress
10/16/2026Fire-Resistant Penetrations and JointsRoger Tanspecial
10/16/2026Mechanical SystemsRoger Tanspecial
10/16/2026Tenant Protection Plan Compliance—special
10/16/2026Energy Code Compliance InspectionsRoger Tanprogress
10/16/2026FinalRoger Tanprogress
10/16/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
10/16/2026HVAC-R and service water heating equipmentRoger Tanenergy_progress
10/16/2026Duct leakage testing, insulation and designRoger Tanenergy_progress
10/16/2026Shutoff dampersRoger Tanenergy_progress
07/28/2026Air barrier - visual inspectionZoltan Saroenergy_progress
07/28/2026Air barrier continuity plan testingJOHN MCMONAGLEenergy_progress
07/28/2026Protection of exposed foundation insulationZoltan Saroenergy_progress
07/28/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
07/28/2026Wall Panels, Curtain Walls, and VeneersZoltan Sarospecial
07/28/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Dunkin' / Baskin-RobbinsRestaurant / Food ServiceCellar, Floor 1, Roof
Project B01425425 Alteration · Permit Entire · 09/14/2026
Project B01428764 Alteration · Approved · 09/14/2026
Project B01429451 Alteration · Permit Entire · 09/14/2026
Project B01429462 Alteration · Approved · 09/14/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 424 on file (BIS + DOB NOW)
▸Plans & Drawings70
▸DOB NOWPlans/Sketch70
10/13/2026B01429462-I1Request digital key ↗
10/06/2026B01425425-I1Request digital key ↗
10/06/2026B01429451-I1Request digital key ↗
Showing 3 of 70 on file for this type
▸Applications & Permits17
▸BISWORK PERMIT APPLICATION6
06/14/2018321752689Open ↗
06/06/2018321752689Open ↗
12/26/2012320542052Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION5
01/06/2022340827886Open ↗
06/05/2018321752689Open ↗
05/29/2018321722828Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
03/20/2024340827886Open ↗
01/06/2022340827886Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
11/02/2018321752689Open ↗
▸Zoning, Tax Lot & Property Records45
▸DOB NOWRestrictive Declaration/Easement 130
09/01/2026B00580365-B5Open ↗
Showing 1 of 30 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWRestrictive Declaration/Easement 32
09/01/2026B00580365-B5Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWRestrictive Declaration/Easement 22
09/01/2026B00580365-B5Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications195
▸DOB NOWProgress Inspector Seal & Signature74
10/18/2026B01429451-P1Open ↗
10/18/2026B01429451-P1Open ↗
10/18/2026B01428764-P1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature66
10/18/2026B01429451-P1Open ↗
10/18/2026B01428764-P1Open ↗
10/13/2026B01429462-I1Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature49
10/18/2026B01429451-P1Open ↗
10/18/2026B01428764-P1Open ↗
10/14/2026B01429462-I1Open ↗
Showing 3 of 49 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
08/20/2018321722828Open ↗
05/29/2018321722828Open ↗
09/21/2012320542052Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/06/2022340827886Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/21/2012320542052Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/21/2012320542052Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
09/21/2012320542052Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
05/07/2018321752689Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist5
09/01/2026B00580365-B5Open ↗
09/01/2026B00580365-A6Open ↗
Showing 2 of 5 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/06/2022340827886Open ↗
▸BISSTREET TREE CHECKLIST1
05/10/2023340827886Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos24
▸DOB NOWOER: Notice to Proceed19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/05/2018321752689Open ↗
05/29/2018321722828Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION1
05/10/2023340827886Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
01/06/2022340827886Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
09/21/2012320542052Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR4 Plot Diagram2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWTR5 Test Report2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
05/07/2018321752689Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
05/29/2018321722828Open ↗
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
05/29/2018321722828Open ↗
05/07/2018321752689Open ↗
09/21/2012320542052Open ↗
▸BISADDITIONAL INFORMATION2
05/11/2023340827886Open ↗
05/10/2023340827886Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/06/2022340827886Open ↗
▸Other Documents32
▸DOB NOWProperty Ownership Certification6
09/01/2026B00580365-B5Open ↗
09/01/2026B00580365-A6Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWCalculations6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWManufacturer's Specifications6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWSite Survey: Initial5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
09/01/2026B00580365-B5Open ↗
Showing 1 of 5 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/23/2018321722828Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
05/10/2023340827886Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type