RoofSupported scaffold for worker access2p · 1 filing · 8 docs
ArchitectureOther
Project M00746573Signed-off · 03/20/2023
SUPPORTED SCAFFOLD FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
BulkheadVerizon New York1p · 1 filing · 14 docs
Architecture
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Floor 20Prospect Capital53p · 1 filing · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Project M00943208Signed-off · 02/20/2024
Modification to existing heating, air conditioning, and ventilation systems on 19th and 20th floors as related to the renovation of Penthouse # 7 as per plans. No change in use, egress, or occupancy.
On file for this project
36 documents
Floor 19Prospect Capital49p · 1 filing · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Project M00943208Signed-off · 02/20/2024
Modification to existing heating, air conditioning, and ventilation systems on 19th and 20th floors as related to the renovation of Penthouse # 7 as per plans. No change in use, egress, or occupancy.
On file for this project
36 documents
Floor 18Unit 19C12p · 1 filing · 9 docs
ArchitectureDMGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
Project M01201887Signed-off · 06/04/2026
PLUMBING WORK IN CONJUNCTION WITH THE INTERIOR ALTERATION OF APARTMENT 19C ON THE 018 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
9 documents
Floor 17
Floor 16Unit 17B, Unit 17C15p · 2 filings · 16 docs
ArchitectureElectricalPlumbing
Issued Permit Scope
General Construction · Plumbing
Project M01069888Signed-off · 03/24/2026
Renovate Apt. 17B/C on the 16th floor, work to include general construction, all work is interior. No change to use, egress or occupancy.
On file for this project
14 documents
Project M00632467Signed-off · 02/24/2023
Interior renovation of an existing duplex apartment#1516B on the 15th and 16th floors. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 155p · 1 filing · 5 docs
ArchitectureElectricalMechanicalOther
Issued Permit Scope
General Construction
Project M00632467Signed-off · 02/24/2023
Interior renovation of an existing duplex apartment#1516B on the 15th and 16th floors. Work to include non-structural demolition and general construction as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
5 documents
Floor 14
Floor 13
Floor 12Unit 12AUnder Construction3p · 1 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Project M01055107Permit Issued · 03/03/2026
Minor changes in partitions and new millwork in existing Apartment 12A. Plumbing work to be filed separately. No change in use, occupancy or egress.
On file for this project
2 documents
Floor 11
Floor 10
Floor 9Unit 9CUnder Construction3p · 1 filing · 2 docs
Architecture
Issued Permit Scope
General Construction
Project M01391914Permit Issued · 06/10/2026
PROPOSED INTERIOR RENOVATION OF APARTMENT 9C ON THE 009 FLOOR. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
2 documents
Floor 8
Floor 7Verizon New York, Verizon34p · 4 filings · 14 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00924647Signed-off · 09/09/2024
MECHANICAL WORK TO FURNISH AND INSTALL NEW AIR HANDLING UNIT ON EXISTING CHILLER SYSTEM TO SERVE THE 7TH FLOOR SWITCHROOM TO COMPLY WITH VERIZON STANDARDS TO ACHIEVE REDUNDANCY
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Floor 6Verizon New York, Verizon18p · 3 filings · 14 docs
ArchitectureCivilDMGeneralStructural
Issued Permit Scope
General Construction · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00251312Signed-off · 10/24/2019
INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
On file for this project
7 documents
Floor 5Verizon New York, Verizon17p · 3 filings · 14 docs
ArchitectureCivilGeneralStructural
Issued Permit Scope
General Construction · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00251312Signed-off · 10/24/2019
INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
On file for this project
7 documents
Floor 4Verizon New York, Verizon21p · 3 filings · 14 docs
ArchitectureCivilDMGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00251312Signed-off · 10/24/2019
INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
On file for this project
7 documents
Floor 3Verizon New York, Verizon33p · 5 filings · 14 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00924647Signed-off · 09/09/2024
MECHANICAL WORK TO FURNISH AND INSTALL NEW AIR HANDLING UNIT ON EXISTING CHILLER SYSTEM TO SERVE THE 7TH FLOOR SWITCHROOM TO COMPLY WITH VERIZON STANDARDS TO ACHIEVE REDUNDANCY
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 2Verizon New York, Verizon18p · 3 filings · 14 docs
ArchitectureCivilDMGeneralStructural
Issued Permit Scope
General Construction · Supported Scaffold
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00251312Signed-off · 10/24/2019
INSTALLATION OF TEMPORARY 74' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED) FOR REMEDIAL REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY, PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.
On file for this project
7 documents
Floor 1Verizony, Verizon New York +150p · 10 filings · 14 docs
ArchitectureCivilDMGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Supported Scaffold
Project M01125171Signed-off · 12/09/2024
Remove existing pressure reducing valves (PRV) in the MER room and all associated Pneumatic piping, Replace with new electronic PRV's, Replace existing inside service motorized valve and associated automatic shut off Panel. Provide New Safety Shut off.
On file for this project
2 documents
Project M00973575Signed-off · 10/30/2024
INTERIOR RENOVATION OF OFFICE SPACE ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH
On file for this project
4 documents
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Latest 3 of 10 filings on this floor.
CellarVerizon New York, Verizon41p · 6 filings · 14 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Project M00991140Signed-off · 09/10/2024
Prepare existing 3rd floor space, 7th floor carrier switchroom floor space for new network equipment with cold-aisle containment and in-row cooling. No change to use, egress, or occupancy.
On file for this project
24 documents
Project M00924610Signed-off · 09/10/2024
Minor alterations to building interior on floors 1 thru 7 for interior finish protection, minor interior non-structural demolition, core drilling, construction rigging related to mechanical equipment installation. Cont in comments
On file for this project
4 documents
Project M00924647Signed-off · 09/09/2024
MECHANICAL WORK TO FURNISH AND INSTALL NEW AIR HANDLING UNIT ON EXISTING CHILLER SYSTEM TO SERVE THE 7TH FLOOR SWITCHROOM TO COMPLY WITH VERIZON STANDARDS TO ACHIEVE REDUNDANCY
On file for this project
2 documents
Latest 3 of 6 filings on this floor.
BasementVerizony, Verizon2p · 2 filings · 6 docs
ElectricalMechanicalPlumbing
Project M01125171Signed-off · 12/09/2024
Remove existing pressure reducing valves (PRV) in the MER room and all associated Pneumatic piping, Replace with new electronic PRV's, Replace existing inside service motorized valve and associated automatic shut off Panel. Provide New Safety Shut off.
On file for this project
2 documents
Project M00471397Signed-off · 04/22/2021
structural work for chiller replacement
On file for this project
4 documents
Sub-BasementVerizony6p · 1 filing · 2 docs
Mechanical
Issued Permit Scope
Mechanical Systems
Project M01125171Signed-off · 12/09/2024
Remove existing pressure reducing valves (PRV) in the MER room and all associated Pneumatic piping, Replace with new electronic PRV's, Replace existing inside service motorized valve and associated automatic shut off Panel. Provide New Safety Shut off.
On file for this project
2 documents
Site & exteriorVerizon45p · 8 filings · 14 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Structural · Supported Scaffold
Project M00786388Signed-off · 08/04/2023
SIDEWALK SHED FOR PROTECTION OF PUBLIC IN CONJUNCTION WITH JOB # M00746573-I1. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
4 documents
Project M00746573Signed-off · 03/20/2023
SUPPORTED SCAFFOLD FOR WORKER ACCESS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents
Project M00646862Signed-off · 04/29/2022
REPAIRS & REPLACEMENT OF STRUCTURAL STEEL FRAMING BELOW AIR INTAKE AREAWAY IN 17TH STREET SIDEWALK.
On file for this project
2 documents
Latest 3 of 8 filings on this floor.