Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects9th Cycle FISP Repair1 filing
9th Cycle FISP Repair; No Change to Use, Egress or Occupancy.
On file for this project
6 documents · 12 drawing sheets
RoofColumbia REIT8p · 9 filings · 14 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
5 documents · 1 drawing sheet
FACADE INSPECTIONS ONLY
On file for this project
3 documents · 1 drawing sheet
General construction modifications taking place on Roof 1 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
PenthouseColumbia REIT1p · 1 filing · 3 docs
Plumbing
Plumbing modifications taking place in the cellar and roof 1 as per drawings filed herewith. No change in use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 13Columbia REIT 218 West 18th Street LLC1 filing · 7 docs
Fire Protection
Issued Permit Scope
Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 13TH FLOOR AND ROOF AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Floor 12Company31p · 6 filings · 14 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modify Existing Sprinkler system, remove heads and install heads as indicated on partial 12th floor. No change to egress, occupancy or use.
On file for this project
6 documents
Conversion of Preaction Sprinkler to Wet Sprinkler System. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Replacement of (2) water cooled air conditioning units on the 12th floor. No change in use egress and occupancy.
On file for this project
9 documents
Latest 3 of 6 filings on this floor.
Floor 11Company31p · 1 filing · 3 docs
Fire Protection
Issued Permit Scope
Sprinklers
Conversion of Preaction Sprinkler to Wet Sprinkler System. No change in use, egress, or occupancy.
On file for this project
3 documents · 1 drawing sheet
Floor 10
Floor 9
Floor 8Meadow Partners12p · 4 filings · 14 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
GENERAL CONSTRUCTION DEMO AND MODIFICATIONS TAKING PLACE FLOORS 6-8 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 6 drawing sheets
Mechanical ductwork and modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Slab infill at existing 8th floor opening
On file for this project
3 documents
Latest 3 of 4 filings on this floor.
Floor 7Meadow PartnersUnder Construction10p · 5 filings · 14 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing core and shell space sprinkler and plumbing fixtures for tenant improvements. No change to use, egress, or occupancy.
On file for this project
5 documents · 4 drawing sheets
GENERAL CONSTRUCTION DEMO AND MODIFICATIONS TAKING PLACE ON THE 7TH FLOOR. AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
Mechanical ductwork and modifications as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 6Meadow Partners5p · 1 filing · 12 docs
ArchitectureElectrical
Issued Permit Scope
General Construction
GENERAL CONSTRUCTION DEMO AND MODIFICATIONS TAKING PLACE FLOORS 6-8 AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 5 drawing sheets
Floor 5
Floor 4SAE Institute10p · 5 filings · 14 docs
ArchitectureDMFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
SPRINKLER MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
8 documents · 5 drawing sheets
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 3
Floor 2Scale AI6p · 5 filings · 14 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
INTERIOR TENANT ALTERATION TO EXISTING OFFICE SUITE. GENERAL CONSTRUCTION OF NON BEARING INTERIOR PARTITIONS AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
MECHANICAL/HVAC WORK IN CONJUNCTION WITH INTERIOR TENANT ALTERATION TO EXISTING 2ND FLOOR OFFICE SUITE. RECONFIGURE DUCTWORK AND DIFFUSERS. GENERAL CONSTRUCTION FILED UNDER SEPARATE APPLICATION M00752644.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 1Universal Music GroupUnder Construction4 filings · 11 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Protection and Mechanical Methods · Sidewalk Shed · Sprinklers
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
herewith file sprinkler plans for the ground floor, adding 13 new pendant heads and 2 concealed heads.
On file for this project
4 documents
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. WORK PLATFORM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
CellarUniversal Music GroupUnder Construction7p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
MECHANICAL FILING DESIGN INCLUDES THE REMOVAL AND REPLACEMENT OF AN EXISITNG FIVE TON WATER SOURCE HEAT PUMP FOR THE SPACE HEATING OF THE COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
On file for this project
7 documents
PLUMBING MODIFICATIONS TAKING PLACE IN THE CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Cellar space: minor partition work to enclose new storage rm, minor dropped drywall ceiling work, minor electrical work, install new door to studio lounge, new carpet tile flooring, existing self leveling concrete floor finish to be cleaned and sealed.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Site & exteriorSidewalk shed, pipe scaffolding, and protection2 filings · 19 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Sidewalk Shed · Supported Scaffold
INSTALLATION OF PIPE SCAFFOLD, ROOF PROTECTION AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
17 documents · 12 drawing sheets
INSTALLATION OF HEAVY DUTY SIDEWALK SHED DURING BUILDING ALTERATION, FILED SEPARATELY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
2 documents · 2 drawing sheets
Filed — no permit issuedMeadow Partners1 filing · 9 docs
ArchitectureDMElectricalGeneralStructural
INSTALLATION OF NEW PROJECTING MARQUEE AT MAIN BUILDING ENTRANCE LOCATED AT WEST 18TH STREET, PROJECTION 9' TOTAL. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. PLUMBING DRAINAGE FOR MARQUEE FILED SEPARATELY.
On file for this project
9 documents · 12 drawing sheets