RoofUnder Construction2p · 4 filings · 16 docs
ArchitecturePlumbing
Issued Permit Scope
Protection and Mechanical Methods · Supported Scaffold
INSTALLATION OF ELEVATED ROOF PROTECTION FOR ADJACENT PROPERTY PROTECTION DURING NEW BUILDING CONSTRUCTION, ELEVATED ROOF PROTECTION IS DESIGNED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 361 filing · 2 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 35Under Construction22p · 3 filings · 16 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems · Protection and Mechanical Methods
Herewith for the installation of a fuel storage Tank and related piping, in conjunction with the installation of an emergency generator, as part of NB Application 122745100.
On file for this project
10 documents · 1 drawing sheet
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 342 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 332 filings · 6 docs
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 321p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 311p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 301p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 291p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 281p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 271p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 261p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 251p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 241p · 2 filings · 6 docs
Architecture
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION AND USE OF TEMPORARY MINI CRANE CLIMBER AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents
Floor 232p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 222p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 212p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 202p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 192p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 182p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 172p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 162p · 2 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 2 drawing sheets
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 152p · 3 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 142p · 3 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 131p · 2 filings · 13 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 122p · 3 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 112p · 3 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 10Under Construction2p · 4 filings · 19 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION OF ELEVATED ROOF PROTECTION FOR ADJACENT PROPERTY PROTECTION DURING NEW BUILDING CONSTRUCTION, ELEVATED ROOF PROTECTION IS DESIGNED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 9Under Construction2p · 4 filings · 19 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION OF ELEVATED ROOF PROTECTION FOR ADJACENT PROPERTY PROTECTION DURING NEW BUILDING CONSTRUCTION, ELEVATED ROOF PROTECTION IS DESIGNED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
4 documents
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 82p · 3 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
INSTALLATION AND USE OF SHEAR WALL PLATFORMS AS PER PLANS SUBMITTED. SHEAR WALL PLATFROMS SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
On file for this project
4 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 72p · 2 filings · 11 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 63p · 3 filings · 13 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Installation and use of temporary loading platforms as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
2 documents · 1 drawing sheet
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 52p · 3 filings · 13 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Installation and use of temporary loading platforms as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
2 documents
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 41p · 2 filings · 11 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Installation and use of temporary loading platforms as per plans filed herewith. No change in use, egress, or occupancy.
On file for this project
2 documents
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
Floor 32p · 2 filings · 11 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 2Under Construction2p · 4 filings · 15 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Installation and use of temporary contractor's shed/field office as per plans filed herewith.
On file for this project
2 documents
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 14p · 5 filings · 18 docs
ArchitectureDM
Issued Permit Scope
General Construction · Protection and Mechanical Methods
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Mezzanine1p · 1 filing · 2 docs
DM
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Cellar3p · 4 filings · 14 docs
ArchitectureDMStructural
Issued Permit Scope
General Construction
THIS IS A PARTIAL DEMOLITION AT 255 WEST 34TH STREET, NEW YORK. DEMOLITION IS TO BE PERFORMED USING SMALL MECHANICAL EQUIPMENT AND HAND TOOLS AS APPLICABLE.
On file for this project
9 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
1 drawing sheet
Latest 3 of 4 filings on this floor.
Sub-Cellar1p · 1 filing · 2 docs
Structural
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet