← Back
BuildNYC
Office with commercial, 7-19 stories
256 WEST 38TH STREET
MANHATTAN · BIN 1014467
💬 Discuss this project
1924Year Built
14Stories
O6Building Class
M1-9AZoning
96,736 sfGross Floor Area
18Units
LL97 Covered5 Active Violations 1 unresolved · 4 paperwork only 1 old, status unconfirmed ▸FISP: UNSAFE
Office with commercial, 7-19 stories · Owner of record: West 38 Holdings · 7,357 sf lot · 13.15 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof3 ton condensing unit replacement9p · 4 filings · 20 docs
Floor 12Office space demolition and restroom renovation, 12th floor31p · 4 filings · 20 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Brickman24p · 4 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Sprinkler system modification7p · 2 filings · 7 docs
Floor 1General construction store front replacementUnder Construction6p · 1 filing · 20 docs
MezzanineGeneral construction store front replacementUnder Construction3p · 1 filing · 20 docs
CellarGeneral construction store front replacementUnder Construction6p · 1 filing · 20 docs
Site & exteriorBrickman AssociatesUnder Construction11p · 5 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Brickman5608/30/2026
American Realty Capital2903/21/2026
Arc NY256380011903/21/2026
Eretz Group1603/21/2026
Garment District Venture1503/21/2026
Thirty Eight Realty Co1503/21/2026
Hakimian1010/16/2026
Chanukka 26503/21/2026
1031 155 5th Ave203/21/2026
Basset Properties203/21/2026
West 38 Holdings103/22/2026
Cache103/21/2026
38 St Realty103/21/2026
Williams Real Estate Co103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/23/2025$21.5M—WEST 38 LL, LLC → CA 38TH STREET HOLDINGS LLC$222/sf building
11/06/2017$63.3M—— → —$654/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service603/21/2026
Gillman Consulting2403/21/2026
AE Design Solution203/21/2026
Right Way Services NYC203/21/2026
Support Buildings of New York203/21/2026
Support Buildings203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Arsenal ScaffoldScaffold1608/30/2026
Swing StagingScaffold1203/21/2026
Tri-Star ConstructionGeneral Contractor707/08/2026
S&E Bridge & ScaffoldScaffold507/08/2026
June ElectricElectrical403/21/2026
Black Hammer ConstructionGeneral Contractor303/21/2026
Elite Restoration Groupspecialty_contractor207/01/2026
Tristate Plumbing ServicesFire Protection207/08/2026
Air Stream Air Conditioningspecialty_contractor203/21/2026
Tristate Plumbing ServicesPlumbing207/08/2026
Absolute Electrical Contracting ofElectrical103/21/2026
JSP Electl CNTNGElectrical103/21/2026
Action Light & PowerElectrical103/21/2026
Cma Plumbing & HeatingFire Protection107/08/2026
PSI PartnersFire Protection107/08/2026
Tri State Plumbing & HeatingPlumbing109/10/2026
Theodore Williams ConstructionGeneral Contractor107/08/2026
Hecan ConstructionGeneral Contractor108/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Lu Engineering Service6575310/15/2026
Soni Engineering Consulting9819205/19/2026
Jose M. Landauro3500103/02/2026
Vincent J. Liotta P. E1974108/23/2023
Jack Green Associates422902/17/2023
Building Lifecycle
All (204)Filed (26)Permit Issued (41)Signed Off (16)Facade (FISP) (17)Violation (60)Objection (14)Special Inspection (30)
10/15/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST FLOOR, MEZ. REPAIRING CEILING, FLOORING, PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01436311-P1
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
09/09/2026
Permit issued — Plumbing
M01436311-S1-PL
09/03/2026
Signed off — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback and added outrigger beam detail
M01368032-I1
08/28/2026
Permit issued — Sidewalk Shed
M00007892-I1-SH
08/05/2026
Permit issued — General Construction
M01436311-I1-GC
08/04/2026
Objection resolved — Addressed
08/04/2026
Objection resolved — Addressed
07/31/2026
Objection raised — Other
07/31/2026
Objection resolved — Addressed
07/31/2026
Objection resolved — Addressed
07/31/2026
Objection resolved — Addressed
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/30/2026
Objection raised — Other
07/28/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST FLOOR, MEZ. REPAIRING CEILING, FLOORING, PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01436311-S1
07/28/2026
Filed — Alteration
PROPOSED INTERIOR RENOVATION AT CELLAR, 1ST FLOOR, MEZ. REPAIRING CEILING, FLOORING, PARTITION. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01436311-I1
07/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
07/27/2026
Special inspection requirement — Air barrier - visual inspection
DONGSHENG LU
07/24/2026
Special inspection requirement — Fire-Resistance Rated Construction
DONGSHENG LU
07/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
DONGSHENG LU
07/24/2026
Special inspection requirement — Energy Code Compliance Inspections
DONGSHENG LU
07/24/2026
Special inspection requirement — Fenestration air leakage
DONGSHENG LU
07/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
DONGSHENG LU
07/24/2026
Special inspection requirement — Interior lighting power
DONGSHENG LU
07/22/2026
Cycle 9 facade report submitted
07/22/2026
Cycle 9 facade report signed — UNSAFE
06/29/2026
Permit issued — General Construction
M01363224-I1-GC
06/26/2026
Cycle 9 facade inspection completed
06/03/2026
Permit issued — Sidewalk Shed
M00007892-I1-SH
06/01/2026
Objection raised — Other
06/01/2026
Objection resolved — Addressed
05/19/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback and added outrigger beam detail
M01368032-P1
05/19/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
nayan soni
05/19/2026
Special inspection requirement — Post-installed Anchors
nayan soni
04/20/2026
Violation issued (ECB, open)
Local Law
04/02/2026
Permit issued — General Construction
M01363224-I1-GC
03/25/2026
Permit issued — Suspended Scaffold
M01368032-I1-SC
03/23/2026
Objection raised — Other
03/23/2026
Objection resolved — Addressed
03/19/2026
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, change in tieback and added outrigger beam detail
M01368032-I1
03/04/2026
Permit issued — Sidewalk Shed
M00007892-I1-SH
03/02/2026
Filed — Alteration
M01363224-I1
03/02/2026
Special inspection requirement — Air barrier - visual inspection
JOSE LANDAURO
03/02/2026
Special inspection requirement — Masonry
JOSE LANDAURO
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSE LANDAURO
02/23/2026
Special inspection requirement — Final
JOSE LANDAURO
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/22/2025
Signed off — Alteration
M01083150-I1
03/03/2025
Permit issued — Sidewalk Shed
M00007892-I1-SH
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2024
Cycle 9 facade report submitted
11/08/2024
Cycle 9 facade report signed — UNSAFE
10/29/2024
Cycle 9 facade inspection completed
07/26/2024
Permit issued — Suspended Scaffold
M01083150-I1-SC
07/22/2024
Filed — Alteration
M01083150-I1
04/25/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2024
Violation issued (ECB, open)
Local Law
03/13/2024
Permit issued — Sidewalk Shed
M00007892-I1-SH
Latest 60 of 204 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTri State Plumbing & Heating09/09/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold08/28/2026
DOB NOWGeneral ConstructionPermit IssuedHecan Construction08/05/2026
DOB NOWGeneral ConstructionSigned-offElite Restoration Group06/29/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold06/03/2026
DOB NOWGeneral ConstructionSigned-offElite Restoration Group04/02/2026
DOB NOWSuspended ScaffoldSigned-offAtlas Construction of NY03/25/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/04/2026
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/03/2025
DOB NOWSuspended ScaffoldPermit IssuedJepol Construction07/26/2024
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/13/2024
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni08/30/2023
DOB NOWSprinklersSigned-offMora Fire Protection08/02/2023
DOB NOWGeneral ConstructionSigned-offTheodore Williams Construction03/28/2023
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/10/2023
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold12/12/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedSwing Staging10/13/2022
DOB NOWSupported ScaffoldPermit IssuedS&E Bridge & Scaffold04/22/2022
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/19/2022
DOB NOWSupported ScaffoldSigned-offS&E Bridge & Scaffold02/18/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedSwing Staging10/04/2021
DOB NOWMechanical SystemsSigned-offBlack Hammer Construction06/28/2021
DOB NOWGeneral ConstructionSigned-offTri-Star Construction04/30/2021
DOB NOWGeneral ConstructionSigned-offTri-Star Construction04/30/2021
DOB NOWSprinklersSigned-offCma Plumbing & Heating04/27/2021
DOB NOWPlumbingSigned-offTristate Plumbing Services04/26/2021
DOB NOWPlumbingSigned-offTristate Plumbing Services04/26/2021
DOB NOWSprinklersSigned-offTristate Plumbing Services04/26/2021
DOB NOWMechanical SystemsSigned-offTri-Star Construction04/26/2021
DOB NOWSprinklersSigned-offTristate Plumbing Services04/26/2021
DOB NOWMechanical SystemsSigned-offTri-Star Construction04/26/2021
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/22/2021
DOB NOWProtection and Mechanical MethodsPermit IssuedSwing Staging01/15/2021
DOB NOWSupported ScaffoldSigned-offSwing Staging12/18/2020
DOB NOWSupported ScaffoldSigned-offSwing Staging09/24/2020
DOB NOWSupported ScaffoldSigned-offSwing Staging09/17/2020
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/19/2020
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/21/2019
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold06/11/2018
DOB NOWSidewalk ShedPermit IssuedArsenal Scaffold03/27/2018
+ 51 more permits on file
1 project · most recent 10/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026Permit IssuedHecan ConstructionHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric SXZ-SM72TL 76,000 BTU · Heat Pump Outdoor ×3
MXZ-SM60NL 66,000 BTU · Heat Pump Outdoor ×1
1 project · most recent 10/15/2026
Water/Sanitary
FiledStatusContractorScope
10/15/2026Permit IssuedDW PlumbingWater/Sanitary
4 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedGoodall ElectricGeneral Wiring
04/23/2021Permit IssuedL.E.A. Electric—
02/11/2021CompleteCentennial Elevator IndustriesGeneral Wiring
01/05/2018Permit IssuedNash Electric Services—
1 project · most recent 01/09/2018
Sidewalk Shed
FiledStatusContractorScope
01/09/2018Permit IssuedArsenal ScaffoldSidewalk Shed
1 project · most recent 05/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/19/2026Signed-offAtlas Construction of NYSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
10/14/2026Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
07/27/2026Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
07/27/2026Air barrier - visual inspectionDONGSHENG LUenergy_progress
07/24/2026Fire-Resistance Rated ConstructionDONGSHENG LUprogress
07/24/2026Fenestration and door U-factor and product ratingsDONGSHENG LUenergy_progress
07/24/2026Energy Code Compliance InspectionsDONGSHENG LUprogress
07/24/2026Fenestration air leakageDONGSHENG LUenergy_progress
07/24/2026Fire-Resistant Penetrations and JointsDONGSHENG LUspecial
07/24/2026Interior lighting powerDONGSHENG LUenergy_progress
05/19/2026Alternative Materials - OTCR Buildings Bulletin Numbernayan sonispecial
05/19/2026Post-installed Anchorsnayan sonispecial
03/02/2026Air barrier - visual inspectionJOSE LANDAUROenergy_progress
03/02/2026MasonryJOSE LANDAUROspecial
03/02/2026Energy Code Compliance InspectionsJOSE LANDAUROprogress
02/23/2026FinalJOSE LANDAUROprogress
08/07/2023FinalVincent Liottaprogress
08/07/2023Mechanical SystemsVincent Liottaspecial
02/03/2023Sprinkler SystemsJACK GREENspecial
02/01/2022Maintenance informationJACK GREENenergy_progress
02/01/2022Interior lighting powerJACK GREENenergy_progress
02/01/2022Lighting controlsJACK GREENenergy_progress
02/01/2022Fire-Resistance Rated ConstructionJACK GREENprogress
02/01/2022Interior lighting powerJACK GREENenergy_progress
02/01/2022Maintenance informationJACK GREENenergy_progress
02/01/2022Lighting controlsJACK GREENenergy_progress
Latest 25 of 43.
▾Documents — 1,203 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
09/06/2026M00007892-I1Request digital key ↗
09/03/2026M00506238-I1Request digital key ↗
09/03/2026M00498809-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00398805-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/04/2026M00453750-I1Request digital key ↗
▸Applications & Permits235
▸BISPLAN / WORK APPROVAL APPLICATION139
04/15/2024123531339Open ↗
02/07/2023121744504Open ↗
01/26/2023121744504Open ↗
Showing 3 of 139 on file for this type
▸BISWORK PERMIT APPLICATION94
10/12/2022121744504Open ↗
06/30/2022121924098Open ↗
06/30/2022121560658Open ↗
Showing 3 of 94 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications296
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION118
02/10/2020123855756Open ↗
11/08/2019123366561Open ↗
11/08/2019123366561Open ↗
Showing 3 of 118 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST42
02/10/2020123855756Open ↗
10/30/2018123497493Open ↗
Showing 2 of 42 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT32
09/28/2020140958630Open ↗
02/10/2020123855756Open ↗
10/30/2018123497493Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWProgress Inspector Seal & Signature29
10/17/2026M01436311-S2Open ↗
10/17/2026M01436311-S2Open ↗
10/17/2026M01436311-S2Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
10/17/2026M01436311-P1Open ↗
10/17/2026M01436311-S2Open ↗
09/04/2026M00398805-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/17/2026M01436311-P1Open ↗
10/17/2026M01436311-S2Open ↗
10/17/2026M01436311-S2Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
09/23/2020140955116Open ↗
Showing 1 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
09/28/2020140958630Open ↗
Showing 1 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/23/2020140955116Open ↗
▸Trade Schedules & Equipment92
▸BISSELF-CERT PLUMBING NOTICE32
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 32 on file for this type
▸BISSCHEDULE B - PLUMBING21
01/26/2023121744504Open ↗
Showing 1 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE12
09/03/2019123381116Open ↗
Showing 1 of 12 on file for this type
▸BISEQUIPMENT USE PERMITS7
09/09/2020123497493Open ↗
Showing 1 of 7 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA6
03/20/2019123590042Open ↗
Showing 1 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-854
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
08/21/2020123497493Open ↗
Showing 1 of 4 on file for this type
▸BISSPRINKLER SYSTEMS4
06/16/2022121560658Open ↗
06/16/2022121744504Open ↗
06/16/2022121822625Open ↗
Showing 3 of 4 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
03/20/2019123590042Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection16
▸DOB NOWHPD-1: Anti-Harassment Area Checklist15
09/04/2026M00398805-I1Open ↗
09/03/2026M00506238-I1Open ↗
09/03/2026M00498939-I1Open ↗
Showing 3 of 15 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/16/2021140955116Open ↗
▸Environmental & Asbestos84
▸BISASBESTOS: CERTIFICATION (DEP ACP5)45
02/10/2020123855756Open ↗
Showing 1 of 45 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
10/17/2026M01436311-S2Open ↗
10/17/2026M01436311-P1Open ↗
09/03/2026M00506238-I1Open ↗
Showing 3 of 18 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
09/23/2020140955116Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance92
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS55
04/10/2019123366570Open ↗
01/23/2019123531339Open ↗
10/30/2018123497493Open ↗
Showing 3 of 55 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS22
03/08/2023140955116Open ↗
03/02/2023140955116Open ↗
08/21/2020123497493Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.6
09/03/2026M00498779-I1Open ↗
09/02/2026M00498656-I1Open ↗
08/13/2026M00498874-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)4
06/16/2022121560658Open ↗
06/16/2022121744504Open ↗
06/16/2022121822625Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
09/22/2021140955116Open ↗
08/21/2020123497493Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
06/16/2022121560658Open ↗
06/16/2022121822625Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
09/23/2020140955116Open ↗
▸Inspections & Test Reports21
▸BISTECHNICAL REPORT: RESPONSIBILITY15
10/01/2021140955116Open ↗
10/01/2021140955116Open ↗
10/01/2021140955116Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/02/2020140955116Open ↗
09/23/2020140955116Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/02/2023140955116Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/03/2021140958630Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/02/2023140955116Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/02/2023140955116Open ↗
▸Approvals, Objections & Sign-offs87
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST37
04/04/2023123855756Open ↗
03/08/2023140955116Open ↗
02/08/2023121744504Open ↗
Showing 3 of 37 on file for this type
▸BISADMINISTRATIVE OBJECTIONS25
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 25 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
10/12/2022121744504Open ↗
06/30/2022121924098Open ↗
06/30/2022121924098Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL8
04/03/2023123855756Open ↗
04/03/2023123855756Open ↗
03/02/2023140955116Open ↗
Showing 3 of 8 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSUPERSEDING LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership121
▸BISCOST AFFIDAVIT115
03/08/2023140955116Open ↗
02/08/2023121744504Open ↗
09/16/2022121744504Open ↗
Showing 3 of 115 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
04/11/2024123531339Open ↗
05/17/2023104891690Open ↗
09/19/2022121560658Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms112
▸BISEFILING COVER SHEET73
02/10/2020123855756Open ↗
03/20/2019123590042Open ↗
10/30/2018123497493Open ↗
Showing 3 of 73 on file for this type
▸BISADDITIONAL INFORMATION20
04/06/2022123855756Open ↗
03/17/2022123855756Open ↗
02/15/2022123855756Open ↗
Showing 3 of 20 on file for this type
▸BISBOROUGH INTAKE FORM13
10/12/2022121744504Open ↗
06/30/2022121924098Open ↗
06/30/2022121560658Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
09/28/2020140958630Open ↗
09/22/2020140955116Open ↗
Showing 2 of 6 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/12/2022121744504Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/17/2026M01368032-I1Open ↗
08/15/2026M01368032-P1Open ↗
08/13/2026M01368032-I1Open ↗
▸DOB NOWCalculations3
08/17/2026M01368032-I1Open ↗
08/15/2026M01368032-P1Open ↗
08/13/2026M01368032-I1Open ↗
▸BISSupporting Document: Fee Exempt2
09/03/2021122195631Open ↗
09/01/2021122677344Open ↗
▸BISPlot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWIRA Certification1
08/13/2026M01083150-I1Open ↗