← Back
BuildNYC
Office with commercial, 7-19 stories
Terminal Warehouse
261 11TH AVENUE · BIN 1079184
💬 Discuss this project
1892Year Built
14Stories
O6Building Class
M2-4Zoning
1,161,731 sfGross Floor Area
3Units
LL97 Covered0 Active ViolationsFISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: Terminal Fee Owner · 136,000 sf lot · 8.54 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsEquinoxUnder Construction9 filings
RoofTerminal Warehouse22p · 18 filings
BulkheadColumbia Property Trust7p · 2 filings · 12 docs
Floor 14Terminal Warehouse4 filings · 20 docs
Floor 13Terminal Warehouse2p · 3 filings
Floor 12Concrete placing boom installation2 filings
Floor 11Temporary pipe scaffold installation3 filings
Floor 10Temporary pipe scaffold installation1p · 8 filings
Floor 9Columbia Property Trust5p · 16 filings
Floor 8Terminal Warehouse3p · 15 filings
Floor 7Columbia Property TrustUnder Construction5p · 15 filings
Floor 6Columbia Property TrustUnder Construction5p · 15 filings
Floor 5Columbia Property TrustUnder Construction5p · 15 filings
Floor 4ConveneUnder Construction7p · 16 filings
Floor 3Convene, EquinoxUnder Construction39p · 22 filings · 20 docs
Floor 2Convene, EquinoxUnder Construction38p · 22 filings · 2 docs
Floor 1Terminal Warehouse Cafe, Kennedy +3Under Construction37p · 24 filings · 20 docs
CellarTerminal Warehouse Cafe, Convene +126p · 22 filings
Sub-BasementCap and remove two gas burners2 filings · 11 docs
Site & exteriorThe Mallory, ConveneUnder Construction19 filings · 20 docs
Filed — no permit issuedEquinox2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Waterfront NY Realty72903/21/2026
Terminal Fee Owner23310/13/2026
Columbia Property Trust10807/08/2026
WFNY I503/21/2026
Normandy Real Estate Partners503/21/2026
Bulgroup Colorado403/21/2026
1-10 Bush Terminal303/22/2026
Phoenix303/21/2026
L&L Holding Company103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/23/2018$880.0M—— → —$757/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Codegreen6903/21/2026
AE Design Solution3203/21/2026
Rizzo Group403/21/2026
New York & Company303/21/2026
GC1 Expediting203/21/2026
Howard I Shapiro Associates603/21/2026
Related Companies103/21/2026
A1 Expediting Service2603/21/2026
Eurocelt Expediting4603/21/2026
Lombardo Professional Engineering603/21/2026
Cypher Design403/21/2026
ECC1003/21/2026
Municipal Building Consultants203/21/2026
Construction Permit Services103/21/2026
Aca Associates103/21/2026
Abramson Architects103/21/2026
Lombardo Building Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Platform SolutionsScaffold4607/08/2026
Alba ServicesScaffold1807/08/2026
Nova Construction ServiceScaffold1707/08/2026
KG SprinklerFire Protection1507/08/2026
S&E Bridge & ScaffoldScaffold1507/08/2026
New Line Structures & DevelopmentGeneral Contractor1207/08/2026
FabbricaScaffold1007/08/2026
C C Controlled CombustionGeneral Contractor907/08/2026
Structure ToneGeneral Contractor807/08/2026
Arch MWGeneral Contractor807/08/2026
Desimone BuildersGeneral Contractor709/03/2026
L & Z ConsultingScaffold707/08/2026
Team ElectricElectrical603/22/2026
Consolidated ScaffoldingScaffold603/21/2026
Rip Out Kings & Restorationspecialty_contractor603/21/2026
Skyline Scaffolding GroupScaffold603/21/2026
Phoenix Sutton STRScaffold507/08/2026
Bedrock MechanicalFire Protection307/08/2026
Winick ProductionsGeneral Contractor307/08/2026
Arena Event ServicesGeneral Contractor303/21/2026
Advanced Plumbing, Mechanical & SprinklerFire Protection306/28/2026
Jurgen H. Wriedt ElectricElectrical303/21/2026
Schondorf MichaelElectrical303/21/2026
Signs CadSign hanger208/13/2026
Air Stream Air Conditioningspecialty_contractor203/21/2026
Alba ServicesGeneral Contractor204/09/2026
Black Bull BuldersGeneral Contractor207/08/2026
Shawmut Woodworking & SupplyGeneral Contractor204/09/2026
Structuretech New YorkGeneral Contractor203/21/2026
Structuretech New YorkScaffold203/21/2026
A.M.A. HoldingsSign hanger207/08/2026
AMC Electrical ServicesElectrical203/22/2026
A&A PlumbingPlumbing207/08/2026
A & E PlumbingPlumbing207/08/2026
Donato Plumbing GroupPlumbing207/08/2026
Enobrac PlumbingPlumbing207/08/2026
Jada Plumbing & HeatingPlumbing207/08/2026
Cma Plumbing & HeatingFire Protection107/08/2026
Olympic Plumbing & Heating ServicePlumbing107/08/2026
Ace-Atlas Plbing & HeatingPlumbing107/08/2026
Norway ElectricElectrical103/21/2026
Advanced Plumbing MechanicalPlumbing107/08/2026
Advanced Facade Solution*Scaffold107/08/2026
Vertical SolutionsGeneral Contractor107/08/2026
Livoti EnterpriseGeneral Contractor107/08/2026
Hig Electric Assc NYCElectrical103/21/2026
Mer ElectricElectrical103/22/2026
Warren Elevator Service CoElectrical103/21/2026
RNH Electric CompanyElectrical103/21/2026
Delta Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AK Engineering6781707/08/2026
Codegreen5102907/07/2026
Adal Engineering4205106/26/2026
Atlantic Engineeringlabor13811606/18/2024
Robert F. Germain Jr. PE5100906/13/2024
Leo Y Lee Associates2481310/11/2022
Desimone Consulting Engineering5942507/27/2022
Jeremy K McKeon, P.E7263104/20/2021
Atlas ATC Engineering8011104/23/2020
Building Lifecycle
All (300)Filed (75)Permit Issued (67)Signed Off (31)Facade (FISP) (9)Violation (9)Inspection (33)Objection (46)Special Inspection (30)
10/02/2026
Filed — Alteration
INSTALLATION OF ACCESSORY BLADE SIGN BELOW EXISTING MARQUEE
M01453248-I1
10/02/2026
Filed — Alteration
INSTALLATION OF INDIRECT ILLUMINATED ACCESSORY SIGNAGE ON EXISTING MARQUEE ABOVE FIRST FLOOR ENTRANCE.
M01453245-I1
10/01/2026
Filed — Alteration
General construction for louver, storefront door, ramp and associated exterior work as per plans filed herewith on 1st, 3rd and facade. No changes in use, egress or occupancy.
M01273488-P2
09/21/2026
Objection resolved — Addressed
09/17/2026
Objection resolved — Addressed
09/16/2026
Signed off — Alteration
General construction on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
M01334360-I1
09/16/2026
Signed off — Alteration
General construction and associated slab opening and convenience stairs for Convene on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
M01226815-I1
09/16/2026
Violation issued (ECB, closed)
Unknown
09/15/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/12/2026
Objection raised — Other
09/12/2026
Objection raised — Other
09/09/2026
Filed — No Work
M01439283-I1
09/03/2026
Objection resolved — Resolved
09/02/2026
Permit issued — Structural
M01300538-S1-ST
09/02/2026
Permit issued — Mechanical Systems
M01300538-S2-MS
09/02/2026
Permit issued — General Construction
M01300538-I1-GC
08/30/2026
Special inspection requirement — Final
Hannibal Newsom
08/30/2026
Special inspection requirement — Final
Hannibal Newsom
08/27/2026
Filed — Alteration
General construction and associated demo work on floors 1-7 in Block D as per plans filed herewith. No changes in use, egress or occupancy.
M01274957-P1
08/26/2026
Filed — No Work
M01437711-I1
08/19/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/19/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
James Sullivan Jr
08/19/2026
Special inspection requirement — Final
James Sullivan Jr
08/19/2026
Special inspection requirement — Fire-Resistance Rated Construction
James Sullivan Jr
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Objection resolved — Resolved
08/17/2026
Objection resolved — Resolved
08/14/2026
Special inspection requirement — Final
Ari Kamo
08/12/2026
Filed — Alteration
INSTALL AN EXTERNALLY ILLUMINATED, NON-STRUCTURAL, FABRICATED ALUMINUM ACCESSORY BUSINESS WALL SIGN "B" READING "THE MALLORY," MOUNTED TO EXISTING MARQUEE STRUCTURE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. WORK PER LPC-27-00555.
M01442808-I1
08/12/2026
Filed — Alteration
INSTALL AN EXTERNALLY ILLUMINATED, NON-STRUCTURAL, FABRICATED ALUMINUM ACCESSORY BUSINESS WALL SIGN READING "THE MALLORY," MOUNTED TO EXISTING MARQUEE STRUCTURE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. WORK PER LPC-27-00555.
M01442792-I1
08/12/2026
Permit issued — Sign
M01442808-I1-SG
08/12/2026
Permit issued — Sign
M01442792-I1-SG
08/10/2026
Permit issued — General Construction
M01274957-I1-GC
08/07/2026
Signed off — Alteration
Mechanical modifications associated with Convene on floors 1-3, including kitchen rangehood ventilation system on 003 floor as per plans filed herewith. No changes in use, egress or occupancy.
M01228170-I1
08/07/2026
Signed off — Alteration
Mechanical modifications on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
M01334364-I1
08/07/2026
Special inspection requirement — Final
Ryan Hung
08/07/2026
Special inspection requirement — Final
Ryan Hung
08/03/2026
Signed off — Alteration
Structural modifications and framing on floors 3-4 as per plans filed herewith. No changes in use, egress or occupancy.
M01334361-I1
08/03/2026
Signed off — Alteration
Structural modifications and associated slab opening and convenience stairs for Convene on floors 1-4 as per plans filed herewith. No changes in use, egress or occupancy.
M01226827-I1
07/28/2026
Filed — No Work
M01372415-P1
07/28/2026
Filed — No Work
M01373326-P1
07/28/2026
Filed — No Work
M01373323-P1
07/28/2026
Objection raised — Fire_Protection
07/28/2026
Objection raised — Mechanical
07/28/2026
Special inspection requirement — Public Assembly Emergency Lighting
Ari Kamo
07/27/2026
Signed off — Alteration
Plumbing modifications on floors Cel, 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
M01334367-I1
07/24/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/24/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
07/21/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
07/16/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/16/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/14/2026
Objection raised — Scope
07/13/2026
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
07/09/2026
Special inspection requirement — Sprinkler Systems
James Sullivan Jr
07/09/2026
Special inspection requirement — Post-installed Anchors
James Sullivan Jr
07/09/2026
Special inspection requirement — Final
Ari Kamo
07/09/2026
Special inspection requirement — Mechanical Systems
Ari Kamo
07/09/2026
Special inspection requirement — Sprinkler Systems
Ari Kamo
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
James Sullivan Jr
07/08/2026
Filed — Alteration
Sprinkler modifications associated with Convene on floors 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
M01228174-P1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDesimone Builders09/02/2026
DOB NOWMechanical SystemsPermit IssuedDesimone Builders09/02/2026
DOB NOWStructuralPermit IssuedDesimone Builders09/02/2026
DOB NOWSignPermit IssuedSigns Cad08/12/2026
DOB NOWSignPermit IssuedSigns Cad08/12/2026
DOB NOWGeneral ConstructionPermit IssuedDesimone Builders08/10/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing, Mechanical & Sprinkler06/26/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing, Mechanical & Sprinkler06/22/2026
DOB NOWGeneral ConstructionPermit IssuedWinick Productions06/12/2026
DOB NOWPlumbingPermit IssuedAdvanced Plumbing Mechanical05/11/2026
DOB NOWSprinklersPermit IssuedAdvanced Plumbing, Mechanical & Sprinkler05/07/2026
DOB NOWSignSigned-offA.M.A. Holdings05/05/2026
DOB NOWSignSigned-offA.M.A. Holdings05/05/2026
DOB NOWGeneral ConstructionPermit IssuedBlack Bull Bulders04/23/2026
DOB NOWMechanical SystemsPermit IssuedBlack Bull Bulders04/23/2026
DOB NOWStructuralPermit IssuedDesimone Builders04/08/2026
DOB NOWMechanical SystemsPermit IssuedDesimone Builders04/08/2026
DOB NOWGeneral ConstructionPermit IssuedDesimone Builders04/07/2026
DOB NOWStructuralPermit IssuedAlba Services03/23/2026
DOB NOWGeneral ConstructionPermit IssuedC C Controlled Combustion03/19/2026
DOB NOWGeneral ConstructionSigned-offWinick Productions02/25/2026
DOB NOWPlumbingSigned-offA&A Plumbing02/06/2026
DOB NOWStandpipePermit IssuedBedrock Mechanical02/04/2026
DOB NOWStructuralSigned-offStructure Tone02/03/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical02/02/2026
DOB NOWGeneral ConstructionSigned-offStructure Tone01/30/2026
DOB NOWMechanical SystemsSigned-offStructure Tone01/30/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing01/07/2026
DOB NOWSprinklersPermit IssuedBedrock Mechanical01/07/2026
DOB NOWStructuralSigned-offStructure Tone12/15/2025
DOB NOWMechanical SystemsSigned-offStructure Tone12/12/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone12/12/2025
DOB NOWGeneral ConstructionPermit IssuedStructure Tone12/12/2025
DOB NOWStructuralPermit IssuedAlba Services11/13/2025
DOB NOWSprinklersPermit IssuedCma Plumbing & Heating10/27/2025
DOB NOWMechanical SystemsSigned-offShawmut Woodworking & Supply09/11/2025
DOB NOWGeneral ConstructionSigned-offArena Event Services09/09/2025
DOB NOWPlumbingSigned-offJada Plumbing & Heating09/08/2025
DOB NOWGeneral ConstructionSigned-offShawmut Woodworking & Supply08/29/2025
DOB NOWPlumbingSigned-offDonato Plumbing Group06/18/2025
+ 60 more permits on file
3 projects · most recent 07/08/2026
Heating and Air Conditioning Systems Air Conditioning Systems Ventilation Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
07/08/2026Signed-offStructure ToneAir Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Bosch EC 300 7,000 CFM · Wshp ×2
MC 720 22,000 CFM · Wshp ×2
EC300-4VTC-FBTBUC 7,000 CFM ×1
MC720-4VLC-SBFIUC 22,000 CFM ×1
Heat / Cool
— ZRNU363SRAA 31,400 BTU · Fan Coil Indoor ×6
ZRNU123MAAA 11,600 BTU · Fan Coil Indoor ×4
ZRNU243MAAA 23,100 BTU · Fan Coil Indoor ×4
ZRNU073MAAA 2,300 BTU · Fan Coil Indoor ×2
ZRNU153MAAA 13,100 BTU · Fan Coil Indoor ×2
ZRNU243SKSA 18,800 BTU · Fan Coil Indoor ×2
ZRUM264BTE6 264,000 BTU · Condensing Unit ×1
ZRUM264BTE6 (HRU-8 PRHR033C / HRU-9 PRHR043C) 264,000 BTU · Vrf Outdoor ×1
ZRUM264DTE6 (HRU-1 PRHR033C / HRU-2 PRHR033C / HRU-4 PRHR023C / HRU-3 PRHR043C) 264,000 BTU · Vrf Outdoor ×1
ZRUM264DTE6 (HRU-5 PRHR043C / HRU-6 PRHR023C / HRU-7 PRHR023C) 264,000 BTU · Vrf Outdoor ×1
Lg ZRNU423TAAA 38,500 BTU · Vrf Outdoor ×7
ZRUM264DTE6 264,000 BTU · Vrf Outdoor ×2
ZRNU423M2AA 38,500 BTU · Vrf Indoor ×2
ZRNU423TAAA (ZRUM264DTE6) 38,500 BTU · Vrf Indoor ×4
ZRNU123MAAA (ZRUM264DTE6) 11,600 BTU · Vrf Indoor ×2
ZRNU243MAAA (ZRUM264DTE6) 23,100 BTU · Vrf Indoor ×2
ZRNU363SRAA (ZRUM264DTE6) 31,400 BTU · Vrf Indoor ×2
ZRNU073MAAA (ZRUM264DTE6) 2,300 BTU · Vrf Indoor ×1
ZRNU153MAAA (ZRUM264DTE6) 13,100 BTU · Vrf Indoor ×1
ZRNU243SKSA (ZRUM264DTE6) 18,800 BTU · Vrf Indoor ×1
ZRNU363SRAA (ZRUM264DTE6 31,400 BTU · Vrf Indoor ×1
ZRNU423M2AA (ZRUM264DTE6) 38,500 BTU · Vrf Indoor ×1
ZRUM264BTE6 (HRU-8 PRHR033C / HRU-9 PRHR043C) 264,000 BTU · Vrf Outdoor ×1
ZRUM264DTE6 (HRU-1 PRHR033C / HRU-2 PRHR033C / HRU-4 PRHR023C / HRU-3 PRHR043C) 264,000 BTU · Vrf Outdoor ×1
ZRUM264DTE6 (HRU-5 PRHR043C / HRU-6 PRHR023C / HRU-7 PRHR023C) 264,000 BTU · Vrf Outdoor ×1
Ventilation
Greenheck SQ-16-M2-VG 6,000 CFM · Makeup Air ×1
SQ-18 6,378 CFM · Makeup Air ×1
SQ-7-M1-VG 400 CFM · Makeup Air ×1
AX-103-275-0630-A400 45,000 CFM · Makeup Air ×1
GVS-1X4DP / QEI-16-300-75-6 / GVMAX-21423 5,000 CFM · Exhaust Fan ×1
SQ-16-M2-VG-X 6,000 CFM · Makeup Air ×1
SQ-18-H2-X 6,378 CFM · Makeup Air ×1
— AX-103-275-0630-A400 45,000 CFM · Makeup Air ×1
GVS-1X4DP / QEI-16-300-75-6 / GVMAX-21423 5,000 CFM · Exhaust Fan ×1
N/A NA 400 CFM · Makeup Air ×1
07/08/2026Signed-offStructure ToneHeating and Air Conditioning Systems
Heat / Cool
Lg ZRNU543B8AA (ZRUM264DTE6) 66,000 BTU · Vrf Indoor ×5
ZRNU363M2AA (ZRUM264DTE6) 32,000 BTU · Vrf Indoor ×2
ZRNU963B8AA (ZRUM264DTE6) 863,000 BTU · Vrf Indoor ×2
ZRNU073MAAA (ZRUM264DTE6) 5,500 BTU · Vrf Indoor ×1
ZRNU543B8AA 66,000 BTU · Vrf Outdoor ×5
— ZRNU363M2AA 32,000 BTU · Vrf Indoor ×2
ZRNU963B8AA 863,000 BTU · Vrf Indoor ×2
ZRNU073MAAA 5,500 BTU · Vrf Indoor ×1
03/08/2024Permit IssuedC C Controlled CombustionGenerators
Generators
Mtu MTU 12V2000DS750 750 kW · Generator ×1
4 projects · most recent 07/08/2026
FiledStatusContractorScope
07/08/2026Permit IssuedBedrock Mechanical612 heads
07/08/2026Permit IssuedBedrock Mechanical528 heads, 4 outlets
07/07/2026Permit IssuedAdvanced Plumbing, Mechanical & Sprinkler744 heads
07/24/2025Permit IssuedCma Plumbing & Heating71 heads
5 projects · most recent 07/08/2026
Water/Sanitary Gas
FiledStatusContractorScope
07/08/2026———
07/07/2026Permit IssuedAdvanced Plumbing MechanicalGas, Water/Sanitary
01/26/2026Signed-offA&A PlumbingWater/Sanitary
11/21/2025Permit IssuedA&A PlumbingWater/Sanitary
07/24/2025———
25 projects · most recent 08/25/2026
General Wiring
FiledStatusContractorScope
08/25/2026Permit IssuedSigns Cad—
08/25/2026Permit IssuedSigns Cad—
08/07/2026CompleteMer ElectricGeneral Wiring
06/05/2026Permit IssuedTeam ElectricGeneral Wiring
06/03/2026Permit IssuedShelby Electrical—
05/17/2026Permit IssuedPatriot ElectricGeneral Wiring
05/01/2026Permit IssuedPatriot Electric—
03/06/2026Permit IssuedEnnell Group ElectricGeneral Wiring
01/28/2026Permit IssuedDelta Electrical ContractingGeneral Wiring
01/13/2026CancelledMetropolis ElectricGeneral Wiring
01/03/2026CompleteJam Electrical—
01/03/2026CompleteJam Electrical—
12/22/2025Permit IssuedEnnell Group ElectricGeneral Wiring
11/11/2025CompleteJam Electrical—
09/03/2025CompleteTeam ElectricGeneral Wiring
4 projects · most recent 07/07/2026
Steel Concrete
FiledStatusContractorScope
07/07/2026Permit IssuedDesimone BuildersSteel, Concrete
03/18/2026Permit IssuedAlba ServicesSteel
11/24/2025Signed-offStructure ToneSteel, Concrete
10/15/2025Permit IssuedAlba ServicesSteel
1 project · most recent 04/17/2023
Scaffold
FiledStatusContractorScope
04/17/2023Permit IssuedConsolidated ScaffoldingScaffold
▾Field Inspections (DOB CAP) — 42
DateTypeResultReport
09/15/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/19/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/24/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/21/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/16/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/13/2026Pass-Final SP - Up to 9 Requested FloorsPassView ↗
07/08/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/15/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 42.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/30/2026FinalHannibal Newsomprogress
08/30/2026FinalHannibal Newsomprogress
08/19/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)James Sullivan Jrspecial
08/19/2026FinalJames Sullivan Jrprogress
08/19/2026Fire-Resistance Rated ConstructionJames Sullivan Jrprogress
08/14/2026FinalAri Kamoprogress
08/07/2026FinalRyan Hungprogress
08/07/2026FinalRyan Hungprogress
07/28/2026Public Assembly Emergency LightingAri Kamoprogress
07/09/2026Post-installed AnchorsJames Sullivan Jrspecial
07/09/2026Sprinkler SystemsJames Sullivan Jrspecial
07/09/2026Sprinkler SystemsAri Kamospecial
07/09/2026Mechanical SystemsAri Kamospecial
07/09/2026Fire-Resistant Penetrations and JointsJames Sullivan Jrspecial
07/09/2026FinalAri Kamoprogress
07/08/2026FinalAri Kamoprogress
07/08/2026Mechanical SystemsAri Kamospecial
07/06/2026Fire-Resistant Penetrations and JointsAri Kamospecial
07/06/2026FinalAri Kamoprogress
07/06/2026Fire-Resistance Rated ConstructionAri Kamoprogress
07/01/2026Sprayed fire-resistant materialsAri Kamospecial
07/01/2026Fire-Resistance Rated ConstructionAri Kamoprogress
07/01/2026Fire-Resistant Penetrations and JointsAri Kamospecial
07/01/2026FinalAri Kamoprogress
06/30/2026Fire-Resistant Penetrations and JointsAri Kamospecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
EquinoxFitness / RecreationCellar, Floors 1–8, Roof
Project M01453245 Alteration · Approved · 10/02/2026
Project M01453248 Alteration · Plan Examiner Review · 10/02/2026
Project M01404701 No Work · Plan Examiner Review · 06/29/2026
Project M01300538 Alteration · Permit Entire · 11/19/2025
The MalloryRetail—
Project M01442792 Alteration · Permit Entire · 08/12/2026
Project M01442808 Alteration · Permit Entire · 08/12/2026
Terminal Warehouse CafeRestaurant / Food ServiceCellar, Floor 1
Project M01409369 Alteration · Permit Entire · 06/09/2026
Project M01338911 Alteration · Permit Entire · 02/17/2026
Project M01338914 Alteration · Permit Entire · 02/13/2026
KennedyOfficeFloor 1
Project M01353145 Alteration · LOC Issued · 02/20/2026
Terminal Building CafeRestaurant / Food ServiceCellar, Floor 1
Project M01338945 Alteration · Approved · 02/13/2026
ConveneEvents & gatheringsCellar, Floors 1–4
Project M01334361 Alteration · LOC Issued · 01/28/2026
Project M01334360 Alteration · LOC Issued · 01/26/2026
Project M01334364 Alteration · LOC Issued · 01/26/2026
Project M01334367 Alteration · LOC Issued · 01/26/2026
Project M01337662 Alteration · Permit Entire · 01/26/2026
Project M01273488 Alteration · Permit Entire · 12/01/2025
Project M01226827 Alteration · LOC Issued · 11/24/2025
Project M01226815 Alteration · LOC Issued · 11/21/2025
Project M01228170 Alteration · LOC Issued · 11/21/2025
Project M01228172 Alteration · Permit Entire · 11/21/2025
Project M01228174 Alteration · Permit Entire · 11/21/2025
Michael KorsRetailFloor 1
Project M01276228 Alteration · Permit Entire · 08/27/2025
Miu MiuRetailFloor 1
Project M01212381 Alteration · LOC Issued · 04/29/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 6,191 on file (BIS + DOB NOW)
▸Plans & Drawings211
▸DOB NOWPlans/Sketch137
10/04/2026M01453245-I1Request digital key ↗
10/04/2026M01453248-I1Request digital key ↗
09/06/2026M01302694-I1Request digital key ↗
Showing 3 of 137 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly21
10/04/2026M01439283-I1Request digital key ↗
09/05/2026M00145938-I1Request digital key ↗
09/05/2026M00160635-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed14
09/05/2026M00213328-P2Request digital key ↗
09/05/2026M00213328-P1Request digital key ↗
09/05/2026M00213328-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸DOB NOWPlans/Sketch - Standpipe9
09/05/2026M00339853-P2Request digital key ↗
09/05/2026M00339853-P4Request digital key ↗
09/05/2026M00339853-P3Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold8
09/04/2026M00468049-I1Request digital key ↗
09/03/2026M00474829-P5Request digital key ↗
09/03/2026M00474829-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler5
09/05/2026M00339853-P3Request digital key ↗
09/05/2026M00339853-P2Request digital key ↗
09/05/2026M00339853-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/05/2026M00332961-P1Request digital key ↗
09/05/2026M00332961-I1Request digital key ↗
09/04/2026M00349072-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00264282-I1Request digital key ↗
09/03/2026M00347579-P1Request digital key ↗
09/03/2026M00347579-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - General Construction1
09/03/2026M00448217-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00467056-I1Request digital key ↗
▸Applications & Permits1,190
▸BISPLAN / WORK APPROVAL APPLICATION629
02/13/2026123490070Open ↗
02/11/2026123490070Open ↗
02/09/2026123490070Open ↗
Showing 3 of 629 on file for this type
▸BISWORK PERMIT APPLICATION476
07/09/2025123490070Open ↗
07/09/2025140920350Open ↗
Showing 2 of 476 on file for this type
▸DOB NOWLPC Approval/Permit74
10/14/2026M01274957-P1Open ↗
10/05/2026M01273488-P2Open ↗
10/04/2026M01453245-I1Open ↗
Showing 3 of 74 on file for this type
▸BISPLACE OF ASSEMBLY11
03/04/2026121968834Open ↗
03/02/2026121968834Open ↗
01/21/2026121968834Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records40
▸BISFLOOD ZONE DESIGN CERTIFICATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISFLOOD ZONE COMPLIANCE16
08/13/2025141022578Open ↗
08/13/2025141022569Open ↗
08/13/2025141022550Open ↗
Showing 3 of 16 on file for this type
▸BISZONING DIAGRAM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Seals & Professional Certifications1,415
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION684
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 684 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature207
10/04/2026M01453245-I1Open ↗
10/04/2026M01453248-I1Open ↗
10/04/2026M01439283-I1Open ↗
Showing 3 of 207 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature132
10/15/2026M00590404-P1Open ↗
10/15/2026M00590404-P1Open ↗
10/15/2026M00590404-P1Open ↗
Showing 3 of 132 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT112
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 112 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST105
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 105 on file for this type
▸DOB NOWProgress Inspector Seal & Signature66
10/15/2026M00590404-P1Open ↗
10/14/2026M01274957-P1Open ↗
10/14/2026M01274957-P1Open ↗
Showing 3 of 66 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISPC FULL REPORT15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment731
▸BISEQUIPMENT USE PERMITS232
02/03/2026123490070Open ↗
02/03/2026123490070Open ↗
02/03/2026123490070Open ↗
Showing 3 of 232 on file for this type
▸BISSELF-CERT PLUMBING NOTICE183
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 183 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT104
02/03/2026123490070Open ↗
02/03/2026123490070Open ↗
02/03/2026123490070Open ↗
Showing 3 of 104 on file for this type
▸BISSCHEDULE B - PLUMBING89
10/31/2025123490070Open ↗
07/11/2025123490070Open ↗
07/10/2025123490070Open ↗
Showing 3 of 89 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8521
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWFDNY: Letter of No Objection5
09/05/2026M00339853-P2Open ↗
09/05/2026M00339853-P1Open ↗
09/05/2026M00339853-P3Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection9
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWTenant Protection Plan3
09/05/2026M00213328-I1Open ↗
09/05/2026M00213328-P2Open ↗
09/05/2026M00213328-P1Open ↗
▸DOB NOWHPD-1: Anti-Harassment Area Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos374
▸BISASBESTOS: CERTIFICATION (DEP ACP5)126
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 126 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report73
10/14/2026M01274957-P1Open ↗
09/06/2026M01302694-I1Open ↗
09/05/2026M00264282-I1Open ↗
Showing 3 of 73 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'59
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 59 on file for this type
▸DOB NOWOER: Notice to Proceed52
10/14/2026M01274957-P1Open ↗
09/02/2026M00728191-I1Open ↗
Showing 2 of 52 on file for this type
▸DOB NOWOER: Notice of Satisfaction49
10/14/2026M01274957-P1Open ↗
Showing 1 of 49 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance118
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISNYCECC EXEMPTION17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports110
▸BISTECHNICAL REPORT: RESPONSIBILITY94
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 94 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISPOST-INSTALLED ANCHORS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Approvals, Objections & Sign-offs701
▸BISLANDMARKS APPROVAL208
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 208 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST174
10/17/2025140920350Open ↗
08/14/2025141022578Open ↗
08/14/2025141022569Open ↗
Showing 3 of 174 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION87
07/11/2025122073004Open ↗
07/11/2025122634239Open ↗
Showing 2 of 87 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE87
02/13/2026123490070Open ↗
02/11/2026123490070Open ↗
02/09/2026123490070Open ↗
Showing 3 of 87 on file for this type
▸BISADMINISTRATIVE OBJECTIONS69
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 69 on file for this type
▸BISFINAL19
10/16/2025140920350Open ↗
08/13/2025141022578Open ↗
08/13/2025141022569Open ↗
Showing 3 of 19 on file for this type
▸BISLANDMARKS SIGNOFF19
10/17/2025140920350Open ↗
09/04/2025140932472Open ↗
Showing 2 of 19 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSUPERSEDING LETTER11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISSHED LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWLandmark Approval4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWDEP Variance (V5) letter2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership457
▸BISCOST AFFIDAVIT443
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 443 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW39
10/17/2025140920350Open ↗
Showing 1 of 9 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
07/09/2025123490070Open ↗
Showing 1 of 5 on file for this type
▸Filing & Intake Forms590
▸BISEFILING COVER SHEET222
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 222 on file for this type
▸BISADDITIONAL INFORMATION201
02/17/2026123490070Open ↗
08/14/2025123490070Open ↗
07/30/2025140932472Open ↗
Showing 3 of 201 on file for this type
▸BISBOROUGH INTAKE FORM121
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 121 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸Other Documents109
▸DOB NOWProof of Historic Building36
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 36 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWAlternate Plan 16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWAlternate Plan 54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 44
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 94
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 102
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type