| Owner | Filings | Most Recent |
|---|---|---|
| 300 C P W APAARTMENTS | 572 | 09/18/2026 |
| SOLSTICE RESIDENTIAL GROUP | 10 | 07/22/2026 |
| PLATINUM SERVICES NY | 12 | 07/08/2026 |
| 300 CPW APT | 10 | 03/22/2026 |
| DYNAMIX SCAFFOLD GROUP LL | 1 | 03/22/2026 |
| 300 CPW APTS CORP SOLSTIC | 1 | 03/22/2026 |
| 300 CENTRAL PARK WEST APT CORPS | 6 | 03/22/2026 |
| 300 CENTRAL WEST | 1 | 03/22/2026 |
| 300 CENTRAL PK W. APTS | 1 | 03/22/2026 |
| 300 CENTRAL PARK WEST | 48 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| B2 ENGINEERING PC | 3 | 07/27/2026 |
| CLAUS F. RADEMACHER, ARCHITECTS | 2 | 07/27/2026 |
| KZ ENGINEERING, P.C | 4 | 07/24/2026 |
| MARINA MAJIC ARCHITECT | 3 | 07/15/2026 |
| POVERO AND COMPANY | 4 | 07/08/2026 |
| PACS ARCHITECTURE | 2 | 03/17/2026 |
| MICHELLE LYNCH | 3 | 12/22/2025 |
| XIAOPENG WANG DESIGN LLC | 2 | 12/08/2025 |
| P.A. COLLINS PE | 1 | 12/04/2025 |
| HANINGTON ENGINEERING CONSULTANTS | 3 | 11/14/2025 |
| ABS ENGINEERING, PLLC | 4 | 10/15/2025 |
| AZA ENGINEERING LLC | 1 | 09/24/2025 |
| RAYMOND NERENBERG PE | 1 | 09/23/2025 |
| ZAIDI CHRISTO DESIGN | 5 | 09/17/2025 |
| A2 ARCHITECT, PC | 10 | 08/25/2025 |
| SPG ARCHITECTS, LLP | 3 | 07/22/2025 |
| NEW AGE ENGINEERING PLLC | 1 | 04/23/2025 |
| KAY LEONG AKERLOF ARCHITECTURE | 10 | 02/26/2025 |
| MICHAEL SCHMITT ARCHITECT PC | 2 | 02/05/2025 |
| HANINGTON ENGINEERING CONSUL, LLC | 1 | 12/27/2024 |
| GRASSO-MENZIUSO ARCHITECTS | 3 | 12/20/2024 |
| RJD ENGINEERING LLC | 6 | 08/14/2024 |
| GEORGIS & MIRGORODSKY ARCHITECTURE | 1 | 08/13/2024 |
| MOHAMMAD AHEAD, PE | 10 | 08/07/2024 |
| POLISE CONSULTING ENGINEERS DPC | 6 | 06/25/2024 |
| Representative | Filings | Most Recent |
|---|---|---|
| RESOLUTION EXPEDITING | 36 | 03/21/2026 |
| BOUTIQKEY | 14 | 03/21/2026 |
| ENKAY DESIGN CONSULTING | 12 | 03/21/2026 |
| JAMES D FERRANTE ARCHITECT | 10 | 03/21/2026 |
| J A EXPEDITING | 20 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 20 | 03/21/2026 |
| AGOUTI CONSTRUCTION CONSULTING | 11 | 03/21/2026 |
| M D SOLUTIONS | 6 | 03/21/2026 |
| MARY TERESA DIPAOLI | 1 | 03/21/2026 |
| KIT MIDDLETON ARCHITECT P C | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TC BROWNE & CO., LLC | General Contractor | 23 | 07/08/2026 |
| DYNAMIC INSTALLATION CORP. | General Contractor | 20 | 07/08/2026 |
| WILLOWFIELD DEVELOPMENT | General Contractor | 12 | 07/08/2026 |
| DONATO PLUMBING, INC | Plumbing | 12 | 07/08/2026 |
| XHEMA OF N.Y. INC | General Contractor | 10 | 06/28/2026 |
| DINO KOLJENOVIC BDC CORP | General Contractor | 9 | 03/21/2026 |
| DYNAMIX SCAFFOLD GROUP LL | General Contractor | 8 | 07/08/2026 |
| MAIN STREET PROPERTIES US | General Contractor | 6 | 09/18/2026 |
| ANTAR GROUP LLC | General Contractor | 5 | 07/08/2026 |
| METROTECH MECHANICAL CORP | Plumbing | 5 | 07/08/2026 |
| BYPASS MECHANICAL CORP | Plumbing | 5 | 07/08/2026 |
| F&S CONTRACTING GROUP INC | General Contractor | 4 | 07/08/2026 |
| HLP CONTRACTING CORP | General Contractor | 4 | 08/21/2026 |
| ALL MAKES HTG & A/C CORP | General Contractor | 4 | 04/09/2026 |
| VASILIOS KALAMBOGIAS | Electrical | 4 | 03/21/2026 |
| A.L.L. CONSTRUCTION AND D | General Contractor | 4 | 07/08/2026 |
| SIGNATURE AUDIO DESIGN LLC | General Contractor | 4 | 03/21/2026 |
| MICHILLI INC | General Contractor | 3 | 07/08/2026 |
| LIT GROUP, INC | General Contractor | 3 | 04/09/2026 |
| HIGHLINE CONSTRUCTION GR | General Contractor | 3 | 07/08/2026 |
| JOHN HUMMEL CUSTOM BLD IN | General Contractor | 3 | 07/08/2026 |
| HUDSON PLMBING & MCH, LLC | Plumbing | 3 | 07/08/2026 |
| VELLA INTERIORS INC | General Contractor | 3 | 07/08/2026 |
| C&G A-PLUS INTERIOR REMOD | General Contractor | 3 | 03/21/2026 |
| C. MIZZI CONSTRUCTION COR | General Contractor | 3 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AA BUILDING & INSPECTION | 1519 | 2 | 07/27/2026 |
| B2 ENGINEERING D.P.C. | 5433 | 3 | 07/27/2026 |
| KZ ENGINEERING, P.C. | 4665 | 2 | 07/24/2026 |
| JACK GREEN ASSOCIATES | 422 | 13 | 07/15/2026 |
| CHOI ENGINEERING PLLC | 2264 | 3 | 12/22/2025 |
| P.A.COLLINS INSPECTIONS P | 2168 | 1 | 12/04/2025 |
| BIZ DESIGNS LLC | 6312 | 1 | 12/01/2025 |
| CHEN ENGINEERING SERVICES | 1826 | 3 | 11/12/2025 |
| ABS ENGINEERING, PLLC | 4835 | 7 | 10/15/2025 |
| AK CONSULTING SERVICES, I | 6198 | 2 | 09/24/2025 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | MAIN STREET PROPERTIES US | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | HLP CONTRACTING CORP | 08/20/2026 |
| DOB NOW | General Construction | Permit Issued | DUTCHMAN CONTRACTING INC | 08/07/2026 |
| DOB NOW | Plumbing | Permit Issued | GANIC PLUMBING & HTG INC | 07/21/2026 |
| DOB NOW | General Construction | Permit Issued | RG DECORATING & PAINTING | 07/14/2026 |
| DOB NOW | General Construction | Permit Issued | XHEMA OF N.Y. INC | 06/25/2026 |
| DOB NOW | Plumbing | Signed-off | DONATO PLUMBING, INC | 06/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | XHEMA OF N.Y. INC | 06/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | XHEMA OF N.Y. INC | 06/23/2026 |
| DOB NOW | General Construction | Permit Issued | XHEMA OF N.Y. INC | 06/23/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 06/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WILLOWFIELD DEVELOPMENT | 06/17/2026 |
| DOB NOW | Plumbing | Permit Issued | METROTECH MECHANICAL CORP | 06/16/2026 |
| DOB NOW | General Construction | Permit Issued | XHEMA OF N.Y. INC | 06/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | XHEMA OF N.Y. INC | 06/12/2026 |
| DOB NOW | General Construction | Permit Issued | WILLOWFIELD DEVELOPMENT | 05/20/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | DYNAMIX SCAFFOLD GROUP LL | 05/18/2026 |
| DOB NOW | Supported Scaffold | Signed-off | DYNAMIX SCAFFOLD GROUP LL | 05/18/2026 |
| DOB NOW | General Construction | Permit Issued | ORION CONSTRUCTION & PAIN | 03/12/2026 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 03/12/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | GEM AIR CONDITIONING | 03/05/2026 |
| DOB NOW | Plumbing | Permit Issued | HI-TECH PLUMBING & HEATIN | 03/05/2026 |
| DOB NOW | General Construction | Permit Issued | HLP CONTRACTING CORP | 03/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | TC BROWNE & CO., LLC | 01/09/2026 |
| DOB NOW | General Construction | Permit Issued | TC BROWNE & CO., LLC | 12/12/2025 |
| DOB NOW | Plumbing | Permit Issued | P.S.I. MECHANICAL | 12/09/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | XHEMA OF N.Y. INC | 12/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | LIT GROUP | 12/08/2025 |
| DOB NOW | General Construction | Permit Issued | LIT GROUP | 12/08/2025 |
| DOB NOW | General Construction | Permit Issued | XHEMA OF N.Y. INC | 12/05/2025 |
| DOB NOW | Plumbing | Permit Issued | DONATO PLUMBING, INC | 12/03/2025 |
| DOB NOW | Plumbing | Permit Issued | METROTECH MECHANICAL CORP | 11/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | ALL MAKES HTG & A/C CORP | 11/13/2025 |
| DOB NOW | General Construction | Signed-off | WILLOWFIELD DEVELOPMENT | 11/13/2025 |
| DOB NOW | General Construction | Signed-off | ALL MAKES HTG & A/C CORP | 10/16/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | DYNAMIX SCAFFOLD GROUP LL | 09/02/2025 |
| DOB NOW | Structural | Signed-off | STRUCTURAL PRESERV SYSTEM | 07/14/2025 |
| DOB NOW | Plumbing | Signed-off | FIVE STAR P AND H CO, INC | 06/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | ALL MAKES HTG & A/C CORP | 06/11/2025 |
| DOB NOW | Plumbing | Signed-off | PRACTICAL PLBG & HTG INC | 05/16/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/27/2026 | Permit Issued | TC BROWNE & CO., LLC | Air Conditioning Systems | Cooling Task Applied Products TYC021TW-25K 2 tons · Condensing Unit ×6 TYE021-25K-HXX 24,000 BTU · Fan Coil Indoor ×6 |
| 12/22/2025 | Permit Issued | WILLOWFIELD DEVELOPMENT | Heating and Air Conditioning Systems | Heat / Cool Above Air Technologies VC-VCU-C-030-X 30,000 BTU · Condensing Unit ×2 |
| 12/08/2025 | Permit Issued | XHEMA OF N.Y. INC | Air Conditioning Systems | Cooling Task ×4 |
| 11/14/2025 | Permit Issued | GEM AIR CONDITIONING INC | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric MXZ-4C36NA4 145,600 BTU · Condensing Unit ×8 MXZ-SM60NAM2 120,000 BTU · Condensing Unit ×4 |
| 09/24/2025 | Permit Issued | ALL MAKES HTG & A/C CORP | Air Conditioning Systems | Cooling First Company 24HXX 24,000 BTU · Ahu ×1 Friedrich WCT12B10A 12,000 BTU · Ptac ×1 Task TVC021TWC-24K 24,000 BTU · Condensing Unit ×1 |
| 07/22/2025 | Permit Issued | LIT GROUP, INC | Air Conditioning Systems | Cooling |
| 08/14/2024 | Permit Issued | XHEMA OF N.Y. INC | Air Conditioning Systems | Cooling |
| 05/01/2024 | Permit Issued | DINO KOLJENOVIC BDC CORP | Air Conditioning Systems | Cooling |
| 11/16/2023 | Permit Issued | MAIN STREET PROPERTIES US | Air Conditioning Systems | Cooling Above Air VCU-C-018-1-X 18,500 BTU · Condensing Unit ×2 VCU-C-030-1-X 28,200 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 07/27/2026 | — | — | Water/Sanitary |
| 03/17/2026 | Permit Issued | GANIC PLUMBING & HTG INC | Gas, Water/Sanitary |
| 11/14/2025 | Permit Issued | HI-TECH PLUMBING & HEATIN | Gas, Water/Sanitary |
| 09/24/2025 | Permit Issued | METROTECH MECHANICAL CORP | Gas, Water/Sanitary |
| 07/22/2025 | Permit Issued | P.S.I. MECHANICAL | Gas, Water/Sanitary |
| 05/16/2025 | Permit Issued | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| 08/14/2024 | Signed-off | DONATO PLUMBING, INC | Gas, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | Permit Issued | DANUBE ELECTRIC CO., INC. | General Wiring |
| 06/23/2026 | Permit Issued | POWER SURGE ELECTRIC, INC | General Wiring |
| 06/17/2026 | Permit Issued | EMELEC ELECTRIC CORP | General Wiring |
| 06/17/2026 | Permit Issued | MODERN VOLTAGE NYC INC | General Wiring |
| 05/08/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 03/24/2026 | Complete | DANUBE ELECTRIC CO., INC. | — |
| 03/17/2026 | Permit Issued | ALL WAYS ELECTRIC CORP.W | — |
| 03/11/2026 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/23/2026 | Complete | AE ELECTRIC INC | — |
| 02/02/2026 | Permit Issued | VERTEX ELECTRIC CORP. | General Wiring |
| 01/09/2026 | Permit Issued | WTG ELECTRIC INC. | General Wiring |
| 12/17/2025 | Permit Issued | ETECH ELECTRICAL LLC | General Wiring |
| 11/17/2025 | Permit Issued | EURO ELEC'L CONTRG, INC | General Wiring |
| 07/22/2025 | Complete | AMSTERDAM ELECTRIC CORP | General Wiring |
| 07/16/2025 | Permit Issued | R.A. PHILLIPS ELEC'L CONT | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/14/2025 | Permit Issued | GEM AIR CONDITIONING INC | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | Signed-off | DYNAMIX SCAFFOLD GROUP LL | Scaffold |
| 07/23/2026 | Signed-off | DYNAMIX SCAFFOLD GROUP LL | Sidewalk Shed |
| 06/28/2022 | Signed-off | DYNAMIC INSTALLATION CORP | Scaffold |
| 03/25/2019 | Signed-off | DYNAMIC INSTALLATION CORP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2025 | Permit Issued | METROTECH MECHANICAL CORP | Tenant Protection Plan 72 Hour |
| 07/22/2025 | Permit Issued | LIT GROUP, INC | Tenant Protection Plan 72 Hour |
| 07/22/2025 | Permit Issued | LIT GROUP, INC | Tenant Protection Plan 72 Hour |
| 07/22/2025 | Permit Issued | P.S.I. MECHANICAL | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/26/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/17/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/05/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 06/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/18/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/24/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/14/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 04/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/31/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/27/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 03/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/06/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/05/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/26/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/29/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/24/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/10/2026 | Lighting in dwelling units | MARINA MAJIC | energy_progress |
| 07/27/2026 | Fire-Resistance Rated Construction | Brian Bercarich | progress |
| 07/27/2026 | Final | Brian Bercarich | progress |
| 07/27/2026 | Post-installed Anchors | Brian Bercarich | special |
| 07/27/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 07/27/2026 | Heating Systems | Brian Bercarich | special |
| 07/27/2026 | Mechanical Systems | Brian Bercarich | special |
| 07/24/2026 | Post-installed Anchors | Karol Zdancewicz | special |
| 07/22/2026 | Fire-Resistance Rated Construction | Jeffery Povero | progress |
| 07/08/2026 | Heating Systems | Brian Bercarich | special |
| 07/08/2026 | Post-installed Anchors | Brian Bercarich | special |
| 07/08/2026 | Fire-Resistant Penetrations and Joints | Brian Bercarich | special |
| 07/08/2026 | Fire-Resistance Rated Construction | Brian Bercarich | progress |
| 07/08/2026 | Final | Brian Bercarich | progress |
| 07/08/2026 | Mechanical Systems | Brian Bercarich | special |
| 07/06/2026 | Final | Jeffery Povero | progress |
| 06/16/2026 | Post-installed Anchors | LAWRENCE GREEN | special |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | LAWRENCE GREEN | special |
| 06/16/2026 | Lighting in dwelling units | Claus Rademacher | energy_progress |
| 06/16/2026 | Final | Claus Rademacher | progress |
| 06/16/2026 | Fire-Resistance Rated Construction | Claus Rademacher | progress |
| 06/16/2026 | Energy Code Compliance Inspections | Claus Rademacher | progress |
| 06/16/2026 | Fire-Resistant Penetrations and Joints | Younes Abouyaala | special |
| 06/16/2026 | Final | MARINA MAJIC | progress |
| 03/11/2026 | Fire-Resistant Penetrations and Joints | Younes Abouyaala | special |