← Back
BuildNYC
Elevator cooperative
33 5TH AVENUE
MANHATTAN · Greenwich Village · BIN 1009226
💬 Discuss this project
1923Year Built
16Stories
D4Building Class
R10Zoning
65,028 sfGross Floor Area
63Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMP
Elevator cooperative · Owner of record: 33 Fifth Ave Owners · 5,267 sf lot · 12.35 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1 filing
Floor 16Unit PHB
Floor 15Unit 15AB, Unit 15CD1p · 2 filings · 20 docs
Floor 14Unit 14A, Unit 14B, Unit 14C +34p · 2 filings · 17 docs
Floor 13
Floor 12
Floor 11
Floor 10Unit 10A, Unit 10B, Unit 10AB +13p · 4 filings · 20 docs
Floor 9Unit 9C, Unit 9D3p · 3 filings · 13 docs
Floor 8
Floor 7
Floor 6
Floor 5Unit 5CD1p · 3 filings · 13 docs
Floor 4Unit 4A, Unit 4B4p · 3 filings · 13 docs
Floor 3Unit 3B3p · 1 filing · 14 docs
Floor 21 filing · 14 docs
Floor 1Vision NYC Jonathan Kruh MD, Unit 1A3 filings · 14 docs
CellarBoiler and burner replacement2 filings · 11 docs
Site & exteriorInstall new gas service, meter and piping1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
33 Fifth Ave Owners6103/22/2026
Century Operating903/21/2026
33 Fifth A303/21/2026
The Lovett Company203/21/2026
Fifth Avenue203/21/2026
CKC Associates LLP C/O FS Restoration103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert Bischoff, Architect902/17/2026
SGM Engineering102/07/2025
Archetype Architecture602/06/2025
Opera Studio Architecture810/15/2024
MQ Consulting204/04/2024
Jenny Gonzalez Architect510/20/2023
Emtg Consultants408/23/2023
Frank S Caminiti, RA508/21/2022
Adal Engineering308/20/2022
New York & Company308/11/2022
Stroop103/25/2022
Jack Green Associates103/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering Architecture1603/21/2026
SMB Consultant703/21/2026
Nexus Consulting NYC2203/21/2026
Big Orange Expediting803/21/2026
New York & Company603/21/2026
Tailwind Consultants1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Concept General ContractingGeneral Contractor1307/08/2026
AJ Renovation GroupGeneral Contractor903/21/2026
S.M. GodwinGeneral Contractor707/08/2026
Martin-PetersGeneral Contractor603/21/2026
Urban ElephantGeneral Contractor407/08/2026
Demar Plumbingspecialty_contractor307/08/2026
Matros Automated ElectricalElectrical303/22/2026
Limitless RenovationsGeneral Contractor303/21/2026
Sana InteriorGeneral Contractor303/21/2026
Champion CombustionGeneral Contractor207/08/2026
Champ Plumbing & HeatingPlumbing207/08/2026
Demar MechanicalPlumbing207/08/2026
Demar PlumbingPlumbing207/08/2026
Drumsilla PlumbingPlumbing207/08/2026
Euro Tech P&H ContractingGeneral Contractor207/08/2026
Creggan ElectrialElectrical203/22/2026
Moreair Mechanical Servicesspecialty_contractor207/08/2026
P.S.I. MechanicalPlumbing107/08/2026
Falco Electrical ServicesElectrical103/22/2026
Madison ElectricElectrical103/21/2026
Redline ElectricElectrical103/22/2026
Stan ElectricElectrical103/22/2026
Evan Long Island PaintingGeneral Contractor104/09/2026
Mega Art Home ImprovementGeneral Contractor107/08/2026
NamronGeneral Contractor104/09/2026
RenovytGeneral Contractor104/09/2026
Aspect Plumbing & Heating CoPlumbing107/08/2026
Nice PlumbingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266802/17/2026
SGM Engineering2366202/07/2025
Integrity Consulting Service666410/15/2024
Opera Studio Architecture59701110/15/2024
HRF Services5616404/04/2024
March Chadwick, Architect2253408/23/2023
M. International Engineering3129208/21/2022
Adal Engineering4205308/20/2022
New York Engineering Associates851308/11/2022
Hamann Engineering4949103/25/2022
Edra Engineering & Inspec2820103/25/2022
Anthony J Farina5788209/01/2021
Met Inspections7385107/07/2021
Building Lifecycle
All (264)Filed (48)Permit Issued (48)Signed Off (24)Facade (FISP) (13)Violation (34)Inspection (31)Objection (36)Special Inspection (30)
03/02/2026
Signed off — Alteration
General Construction & Mechanical-related work to facilitate alterations at Apt. 3B. No change to use, egress or occupancy.
M01011047-I1
02/28/2026
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT BISCHOFF
02/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
02/28/2026
Special inspection requirement — Final
ROBERT BISCHOFF
02/28/2026
Special inspection requirement — Mechanical Systems
Peter Varsalona
02/17/2026
Filed — Alteration
General Construction & Mechanical-related work to facilitate alterations at Apt. 3B. No change to use, egress or occupancy.
M01011047-P1
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
ROBERT BISCHOFF
01/12/2026
Special inspection requirement — Mechanical Systems
Peter Varsalona
01/12/2026
Special inspection requirement — Final
ROBERT BISCHOFF
01/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Peter Varsalona
09/25/2025
Permit issued — Mechanical Systems
M01161197-S1-MS
05/28/2025
Objection resolved — Addressed
05/14/2025
Objection resolved — Addressed
04/08/2025
Objection raised — Energy
04/08/2025
Objection raised — Scope
03/19/2025
Permit issued — General Construction
M01161197-I1-GC
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
03/06/2025
Objection resolved — Addressed
02/24/2025
Objection resolved — Addressed
02/24/2025
Objection resolved — Addressed
02/24/2025
Objection resolved — Addressed
02/14/2025
Objection raised — Inspections
02/14/2025
Objection raised — Scope
02/14/2025
Objection raised — Admin
02/14/2025
Objection raised — Energy
02/14/2025
Objection raised — Structural
02/14/2025
Objection raised — Zoning
02/07/2025
Filed — Alteration
Mechanical work will be performed in existing unit #10CD on the 10th floor. The initial general construction application is to be filed. All are as per the submitted plans. Under this application, there will be no changes to use, egress, or occupancy.
M01161197-S1
02/06/2025
Filed — Alteration
Mechanical work will be performed in existing unit #10CD on the 10th floor. The initial general construction application is to be filed. All are as per the submitted plans. Under this application, there will be no changes to use, egress, or occupancy.
M01161197-I1
01/24/2025
Signed off — Alteration
Subsequent application filed for Mechanical work , new condensers, Airhandlers and equipment in unit 15AB.
M00833988-I1
01/24/2025
Signed off — Alteration
Subsequent application filed for Mechanical work , new condensers, Airhandlers and equipment in unit 15AB.
M00833988-S2
01/24/2025
Signed off — Alteration
Subsequent application filed for Mechanical work , new condensers, Airhandlers and equipment in unit 15AB.
M00833988-S1
12/04/2024
Objection resolved — Addressed
11/07/2024
Objection raised — Accessibility
11/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
Thomas Barry
11/01/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
11/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
11/01/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
11/01/2024
Special inspection requirement — Maintenance information
Thomas Barry
11/01/2024
Special inspection requirement — Interior lighting power
Thomas Barry
11/01/2024
Special inspection requirement — Final
Thomas Barry
11/01/2024
Special inspection requirement — Lighting in dwelling units
Thomas Barry
11/01/2024
Special inspection requirement — Post-installed Anchors
ALEKSANDR LEVIN
11/01/2024
Special inspection requirement — Insulation placement and R values
Thomas Barry
10/15/2024
Filed — Alteration
Subsequent application filed for Mechanical work , new condensers, Airhandlers and equipment in unit 15AB.
M00833988-P1
10/15/2024
Filed — Alteration
Subsequent application filed for Mechanical work , new condensers, Airhandlers and equipment in unit 15AB.
M00833988-P2
10/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/03/2024
Special inspection requirement — Insulation placement and R values
Thomas Barry
10/03/2024
Special inspection requirement — Maintenance information
Thomas Barry
10/03/2024
Special inspection requirement — Lighting in dwelling units
Thomas Barry
10/03/2024
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
10/03/2024
Special inspection requirement — Final
Thomas Barry
10/03/2024
Special inspection requirement — Shutoff dampers
Thomas Barry
10/03/2024
Special inspection requirement — Maintenance information
Thomas Barry
10/03/2024
Special inspection requirement — Final
Thomas Barry
10/03/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Thomas Barry
10/03/2024
Special inspection requirement — Mechanical Systems
Thomas Barry
10/03/2024
Special inspection requirement — HVAC-R and service water heating system controls
Thomas Barry
07/10/2024
Objection resolved — Addressed
Latest 60 of 264 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedNamron09/25/2025
DOB NOWGeneral ConstructionPermit IssuedRenovyt03/19/2025
DOB NOWMechanical SystemsSigned-offEvan Long Island Paint Co03/14/2024
DOB NOWGeneral ConstructionSigned-offAJ Renovation Group01/19/2024
DOB NOWGeneral ConstructionPermit IssuedLimitless Renovations12/22/2023
DOB NOWBoiler EquipmentSigned-offChampion Combustion12/04/2023
DOB NOWGeneral ConstructionSigned-offChampion Combustion12/01/2023
DOB NOWPlumbingSigned-offChamp Plumbing & Heating12/01/2023
DOB NOWMechanical SystemsSigned-offEuro Tech P&H Contracting10/12/2023
DOB NOWMechanical SystemsSigned-offEuro Tech P&H Contracting06/13/2023
DOB NOWPlumbingSigned-offP.S.I. Mechanical06/08/2023
DOB NOWGeneral ConstructionSigned-offSana Interior06/08/2023
DOB NOWGeneral ConstructionSigned-offConcept General Contracting06/01/2023
DOB NOWMechanical SystemsPermit IssuedUrban Elephant05/11/2023
DOB NOWGeneral ConstructionPermit IssuedUrban Elephant05/07/2023
DOB NOWGeneral ConstructionSigned-offConcept General Contracting03/24/2023
DOB NOWMechanical SystemsSigned-offDemar Plumbing03/17/2023
DOB NOWGeneral ConstructionSigned-offConcept General Contracting03/06/2023
DOB NOWPlumbingSigned-offNice Plumbing02/28/2023
DOB NOWMechanical SystemsSigned-offAJ Renovation Group02/09/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating02/08/2023
DOB NOWGeneral ConstructionSigned-offAJ Renovation Group02/06/2023
DOB NOWPlumbingSigned-offDemar Mechanical10/31/2022
DOB NOWGeneral ConstructionSigned-offConcept General Contracting10/18/2022
DOB NOWMechanical SystemsSigned-offS.M. Godwin09/29/2022
DOB NOWPlumbingSigned-offDrumsilla Plumbing08/22/2022
DOB NOWPlumbingSigned-offChamp Plumbing & Heating08/21/2022
DOB NOWGeneral ConstructionSigned-offChampion Combustion08/18/2022
DOB NOWBoiler EquipmentSigned-offChampion Combustion08/18/2022
DOB NOWGeneral ConstructionSigned-offS.M. Godwin06/10/2022
DOB NOWGeneral ConstructionSigned-offConcept General Contracting06/02/2022
DOB NOWGeneral ConstructionSigned-offConcept General Contracting05/31/2022
DOB NOWPlumbingSigned-offDrumsilla Plumbing05/27/2022
DOB NOWGeneral ConstructionSigned-offS.M. Godwin05/17/2022
DOB NOWMechanical SystemsPermit IssuedDemar Plumbing05/17/2022
DOB NOWPlumbingSigned-offDemar Mechanical05/16/2022
DOB NOWGeneral ConstructionSigned-offMega Art Home Improvement05/05/2022
DOB NOWGeneral ConstructionSigned-offConcept General Contracting04/26/2022
DOB NOWPlumbingSigned-offAspect Plumbing & Heating Co08/30/2021
DOB NOWGeneral ConstructionSigned-offMartin-Peters08/22/2021
+ 58 more permits on file
4 projects · most recent 02/07/2025
Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
02/07/2025Permit IssuedNamronAir Conditioning Systems
Cooling
National Comfort Products NCP/NCP4244000B 23 tons · Split System ×2
04/11/2024Permit IssuedUrban ElephantAir Conditioning Systems, Associated Ducts and Piping
Cooling
Task TGC021TWEC-3324 25,500 BTU · Condensing Unit ×2
02/09/2023Signed-offConcept General ContractingAir Conditioning Systems
Cooling
Panasonic MXZ-4C36NA2 35,400 BTU · Vrf Outdoor ×1
05/06/2022Permit IssuedDemar PlumbingAir Conditioning Systems
Cooling
Daikin RXTQQ48TAVJU 45,500 BTU · Vrf Outdoor ×1
2 projects · most recent 04/11/2024
Gas Water/Sanitary
FiledStatusContractorScope
04/11/2024Signed-offNice PlumbingGas, Water/Sanitary
08/20/2022Signed-offDemar MechanicalGas, Water/Sanitary
25 projects · most recent 05/07/2025
General Wiring Boiler Controls Lighting
FiledStatusContractorScope
05/07/2025CompleteJoseph Weinstein Electric—
09/05/2024CompleteRedline ElectricGeneral Wiring
04/12/2024CompleteVertex ElectricGeneral Wiring
10/25/2023CompleteCreggan ElectrialGeneral Wiring
08/25/2023CompleteDenmar ElectricGeneral Wiring
07/05/2023CompleteMatros Automated ElectricalGeneral Wiring
06/20/2023CompleteAccurate ElectricalGeneral Wiring
06/12/2023CompleteE & M Electrical NYGeneral Wiring
03/13/2023CompleteUrban Tech ElectricGeneral Wiring
02/05/2023CompleteArree ElectricGeneral Wiring
09/30/2022CompleteMatros Automated Electrical—
09/20/2022CompleteMatros Automated Electrical—
08/31/2022Permit IssuedItkin ElectricBoiler Controls
06/02/2022CompleteMac Elect'l ContractingGeneral Wiring
04/28/2022Permit IssuedMatros Automated Electrical—
1 project · most recent 08/14/2023
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
08/14/2023Permit IssuedLimitless RenovationsTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 31
DateTypeResultReport
04/05/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/08/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/19/2024Pass-Final Boiler Equipment InspectionPassView ↗
12/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/27/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/15/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/30/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/07/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/15/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 31.
▾Special Inspection Requirements (DOB NOW) — 130
DateRequirementInspectorRole
02/28/2026Mechanical SystemsPeter Varsalonaspecial
02/28/2026FinalROBERT BISCHOFFprogress
02/28/2026Fire-Resistance Rated ConstructionROBERT BISCHOFFprogress
02/28/2026Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
01/12/2026FinalROBERT BISCHOFFprogress
01/12/2026Fire-Resistant Penetrations and JointsPeter Varsalonaspecial
01/12/2026Mechanical SystemsPeter Varsalonaspecial
01/12/2026Fire-Resistance Rated ConstructionROBERT BISCHOFFprogress
11/01/2024FinalThomas Barryprogress
11/01/2024Interior lighting powerThomas Barryenergy_progress
11/01/2024Fenestration and door U-factor and product ratingsThomas Barryenergy_progress
11/01/2024Energy Code Compliance InspectionsThomas Barryprogress
11/01/2024Lighting in dwelling unitsThomas Barryenergy_progress
11/01/2024Insulation placement and R valuesThomas Barryenergy_progress
11/01/2024Maintenance informationThomas Barryenergy_progress
11/01/2024Fire-Resistant Penetrations and JointsThomas Barryspecial
11/01/2024Tenant Protection Plan ComplianceThomas Barryspecial
11/01/2024Post-installed AnchorsALEKSANDR LEVINspecial
10/03/2024Post-installed AnchorsALEKSANDR LEVINspecial
10/03/2024Mechanical SystemsThomas Barryspecial
10/03/2024Tenant Protection Plan Compliance—special
10/03/2024Energy Code Compliance InspectionsThomas Barryprogress
10/03/2024FinalThomas Barryprogress
10/03/2024HVAC-R and service water heating equipmentThomas Barryenergy_progress
10/03/2024HVAC-R and service water heating system controlsThomas Barryenergy_progress
Latest 25 of 130.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Vision NYC Jonathan Kruh MDMedical / HealthcareFloor 1
Project M00709497 Alteration · LOC Issued · 04/11/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 957 on file (BIS + DOB NOW)
▸Plans & Drawings53
▸DOB NOWPlans/Sketch45
09/04/2026M00472302-P1Request digital key ↗
09/04/2026M00472302-I1Request digital key ↗
09/04/2026M00472306-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸DOB NOWPlans/Sketch - General Construction5
09/04/2026M00467694-P1Request digital key ↗
09/04/2026M00472302-P1Request digital key ↗
09/04/2026M00472302-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/03/2026M00473473-I1Request digital key ↗
08/15/2026M00473473-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/04/2026M00472306-I1Request digital key ↗
▸Applications & Permits195
▸BISWORK PERMIT APPLICATION80
04/14/2025104036124Open ↗
04/07/2025104036124Open ↗
08/26/2021123013443Open ↗
Showing 3 of 80 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION68
03/18/2025104036124Open ↗
06/28/2021123013443Open ↗
06/04/2021123580080Open ↗
Showing 3 of 68 on file for this type
▸DOB NOWLPC Approval/Permit46
09/04/2026M00467694-P1Open ↗
09/04/2026M00472302-I1Open ↗
09/04/2026M00472302-P1Open ↗
Showing 3 of 46 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
08/23/2021123013443Open ↗
▸Seals & Professional Certifications241
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION83
11/14/2019122856276Open ↗
11/14/2019122856276Open ↗
07/29/2019123157172Open ↗
Showing 3 of 83 on file for this type
▸DOB NOWProgress Inspector Seal & Signature54
10/01/2026M00458190-S3Open ↗
10/01/2026M00458190-S3Open ↗
10/01/2026M00458190-S3Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature48
09/04/2026M00467694-I1Open ↗
09/04/2026M00467694-P1Open ↗
09/04/2026M00472302-I1Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/01/2026M00458190-S3Open ↗
09/23/2026M00779420-I1Open ↗
09/02/2026M00458190-S2Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment61
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE22
02/13/2020123157172Open ↗
05/01/2019123157172Open ↗
01/24/2019123580080Open ↗
Showing 3 of 22 on file for this type
▸BISSELF-CERT PLUMBING NOTICE13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
11/23/2020122821811Open ↗
05/22/2019123239860Open ↗
09/11/2017122513761Open ↗
Showing 3 of 11 on file for this type
▸BISEQUIPMENT USE PERMITS4
11/23/2020122821811Open ↗
05/22/2019123239860Open ↗
09/11/2017122513761Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes9
05/01/2019123157172Open ↗
08/10/2018123580080Open ↗
12/28/2017123239860Open ↗
Showing 3 of 9 on file for this type
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos77
▸DOB NOWDEP ACP-5: Asbestos Assessment Report48
09/04/2026M00467694-P1Open ↗
09/04/2026M00472302-I1Open ↗
09/04/2026M00472302-P1Open ↗
Showing 3 of 48 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)17
05/23/2019123157172Open ↗
08/10/2018123580080Open ↗
12/28/2017123239860Open ↗
Showing 3 of 17 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance55
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
11/14/2019122856276Open ↗
05/23/2019123239860Open ↗
05/01/2019123157172Open ↗
Showing 3 of 35 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
09/02/2021123013443Open ↗
08/30/2021123580080Open ↗
11/14/2019122856276Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
09/02/2021123013443Open ↗
09/02/2021123013443Open ↗
08/30/2021123580080Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/23/2020122821811Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY7
05/13/2025104036124Open ↗
09/02/2021123013443Open ↗
09/02/2021123013443Open ↗
Showing 3 of 7 on file for this type
▸Approvals, Objections & Sign-offs98
▸BISLANDMARKS APPROVAL32
05/23/2019123157172Open ↗
08/10/2018123580080Open ↗
01/10/2018123239860Open ↗
Showing 3 of 32 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST31
05/14/2025104036124Open ↗
09/02/2021123013443Open ↗
08/31/2021123580080Open ↗
Showing 3 of 31 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION14
10/31/2017122921357Open ↗
10/11/2017122821820Open ↗
10/11/2017122821820Open ↗
Showing 3 of 14 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLANDMARKS SIGNOFF5
05/14/2025104036124Open ↗
08/30/2021123580080Open ↗
11/25/2020122821811Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
04/14/2025104036124Open ↗
Showing 1 of 3 on file for this type
▸Cost, Insurance & Ownership67
▸BISCOST AFFIDAVIT61
05/13/2025104036124Open ↗
09/02/2021123013443Open ↗
08/31/2021123580080Open ↗
Showing 3 of 61 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
04/02/2025104036124Open ↗
11/25/2020122821811Open ↗
▸Filing & Intake Forms76
▸BISEFILING COVER SHEET30
05/01/2019123157172Open ↗
08/10/2018123580080Open ↗
12/28/2017123239860Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION26
11/23/2020122821811Open ↗
02/24/2020123157172Open ↗
07/29/2019122856276Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM20
04/14/2025104036124Open ↗
04/07/2025104036124Open ↗
08/26/2021123013443Open ↗
Showing 3 of 20 on file for this type
▸Other Documents17
▸DOB NOWProof of Historic Building10
09/02/2026M00709497-I1Open ↗
Showing 1 of 10 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form3
08/10/2018123580080Open ↗
08/10/2018123580080Open ↗
01/11/2018123239860Open ↗