← Back
Office with commercial, 7-19 stories
330 WEST 34 STREET
MANHATTAN · BIN 1013553
💬 Discuss this project
1926Year Built
18Stories
O6Building Class
C6-4Zoning
646,464 sfGross Floor Area
28Units
LL97 CoveredRent Stabilized23 Open Violations ▸FISP: SAFE
Office with commercial, 7-19 stories · Owner of record: 330 WEST 34TH OWNER LLC · 46,412 sf lot · 13.93 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionLandscapeCivilGeneral
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 12 docs
Floor 1540p · 7 filings · 20 docs
Floor 14
Floor 13
Floor 122p · 2 filings · 13 docs
Floor 11
Floor 10
Floor 9Under Construction112p · 11 filings · 20 docs
Floor 8Under Construction118p · 14 filings · 20 docs
Floor 7Under Construction88p · 12 filings · 20 docs
Floor 639p · 4 filings · 20 docs
Floor 532p · 1 filing · 10 docs
Floor 4
Floor 3
Floor 21p · 1 filing · 5 docs
Floor 174p · 24 filings · 20 docs
Mezzanine1p · 1 filing · 11 docs
Cellar50p · 11 filings · 20 docs
Sub-CellarUnder Construction5p · 1 filing · 5 docs
Basement3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VORNADO REALTY TRUST24409/13/2026
330 WEST 34TH OWNER LLC103/22/2026
MELVA CONSTRUCTION103/22/2026
VORNANDO OFFICE MANAGEMENT18803/22/2026
330 WEST 34TH SPE LLC203/22/2026
LHOTSE203/22/2026
330 WEST 34 SPE LLC CONTR203/22/2026
330 W 34 SPE CONTROLLER203/22/2026
330W 34 ST SPE CONTROLLER103/22/2026
VERNADO REALTY TRUST203/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GILMAN CONSULTANT4403/21/2026
ARCHETYPE CONSULTANTS12603/21/2026
CITY BUILDING NY ARCHITECT P C603/21/2026
NEW YORK SIGN CONSULTANTS403/21/2026
BUILDING BROTHERS403/21/2026
BAC Developers Group303/21/2026
GREEN STUDIO203/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
CHERICO KING ARCHITECT P C603/21/2026
PATUXENT ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VANGUARD CONSTRUCTION ANDGeneral Contractor2307/08/2026
STRUCTURE TONE, LLCGeneral Contractor2207/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor1907/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor1407/08/2026
W5 GROUP LLCGeneral Contractor1107/08/2026
JOHN GALLIN & SON, INCGeneral Contractor807/08/2026
LHOTSE CORPGeneral Contractor707/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor607/08/2026
SKYLINE FIRE SPRINKLER COFire Protection507/08/2026
FIVE HORSEMEN LLCGeneral Contractor504/09/2026
BEDROCK PLBG. & HTG., INCPlumbing407/08/2026
MARLIN MECHANICAL INCGeneral Contractor407/08/2026
MILL BROOK FIRE PROTECTIONFire Protection407/08/2026
PAR PLUMBING CO., INCPlumbing407/08/2026
A&A PLUMBING CORPPlumbing307/08/2026
ICON INTERIORS INCGeneral Contractor307/17/2026
SIRINA FIRE PROT CORPFire Protection307/08/2026
PSI PARTNERS, LLCFire Protection307/08/2026
TRISTATE PLBG SVCS CORPPlumbing207/08/2026
ANTHONY FIGUCCIOElectrical203/21/2026
CORP. ELEC'L TECHNOLOGIESElectrical203/22/2026
PATRIOT ELECTRIC CORPElectrical203/22/2026
SOTIRIOS STATHOPOULOSElectrical203/21/2026
AMBASSADOR CONSTRUCTION CGeneral Contractor203/21/2026
NEW YORK LADDER & SCAFFOLDGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851108/03/2026
HANSEN ENGINEERING PC81741507/06/2026
CITY BUILDING NY ARCHITEC1394204/10/2025
PRUDIGM ENGINEERING LLCU4304204/10/2025
MILROSE CONSULTANTS LLC2003210/29/2024
SKYLINE ENGINEERING, PLLC2672104/10/2024
ALAN D MARCUS, PE17611105/04/2023
BECKER ENGINEERING, PC6332101/23/2023
TSF ENGINEERING, PC1274312/02/2021
G&G SPRINKLER SERVICES LL2782303/24/2021
Building Lifecycle
All (300)Filed (77)Permit Issued (80)Signed Off (33)Facade (FISP) (3)Violation (7)Inspection (42)Objection (28)Special Inspection (30)
08/04/2026
Permit issued — Boiler Equipment
M01433667-I1-BE
08/03/2026
Filed — Alteration
CONVERSION TO TRUBURN FUEL OIL.
M01433667-I1
07/20/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
07/16/2026
Permit issued — Structural
M01409216-I1-ST
07/06/2026
Filed — Alteration
Structural changes on the 8th and 9th floors as indicated on drawings.
M01409216-I1
06/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/04/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/29/2026
Special inspection requirement — Final
Ryan Hansen
05/29/2026
Special inspection requirement — Concrete - Cast-In-Place
Ryan Hansen
05/29/2026
Special inspection requirement — Structural Steel - Details
Ryan Hansen
05/29/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Ryan Hansen
05/29/2026
Special inspection requirement — Structural Steel - Welding
Ryan Hansen
05/13/2026
Signed off — Alteration
To file MS mechanical work type in conjunction with DOB Now Build application job#M01196902. No change in use, egress or occupancy under this application.
M01196933-I1
04/30/2026
Signed off — Alteration
ERECT NON-ILLUMINATED PROJECTION BANNER NON-FLASHING, NON ADVERTISING SIGN "BARNEY BROWN" AS PER DRAWING FILE HEREWITH.
M01368175-I1
04/07/2026
Permit issued — General Construction
M01368386-I1-GC
04/03/2026
Permit issued — Plumbing
M01368399-I1-PL
04/02/2026
Permit issued — Sprinklers
M01368404-I1-EW-SP
04/02/2026
Permit issued — Mechanical Systems
M01368392-I1-MS
03/25/2026
Filed — Alteration
Mechanical changes on the 7th, 8th and 9th floors as indicated on drawings.
M01368392-I1
03/25/2026
Filed — Alteration
Architectural changes on the 7th, 8th and 9th floors as indicated on drawings.
M01368386-I1
03/24/2026
Filed — Alteration
Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.
M01368399-I1
03/24/2026
Filed — Alteration
Sprinkler changes on the 7th, 8th & 9th floors as indicated on drawings.
M01368404-I1
03/23/2026
Filed — Alteration
ERECT NON-ILLUMINATED PROJECTION BANNER NON-FLASHING, NON ADVERTISING SIGN "BARNEY BROWN" AS PER DRAWING FILE HEREWITH.
M01368175-I1
03/23/2026
Permit issued — Sign
M01368175-I1-SG
03/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/18/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
03/17/2026
Special inspection requirement — Final
Ryan Hung
03/13/2026
Signed off — Alteration
Minor plumbing work on 7th, 8th and 9th floors.
M00554966-I1
03/06/2026
Special inspection requirement — Final
Ryan Hansen
03/06/2026
Special inspection requirement — Post-installed Anchors
Ryan Hansen
03/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/06/2026
Special inspection requirement — Sprayed fire-resistant materials
Ryan Hansen
03/06/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
01/28/2026
Permit issued — Sprinklers
M01266150-I1-EW-SP
01/28/2026
Permit issued — Sprinklers
M01279197-I1-EW-SP
01/21/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/21/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/16/2026
Permit issued — Plumbing
M01279190-I1-PL
01/16/2026
Permit issued — Plumbing
M01266147-I1-PL
01/09/2026
Permit issued — General Construction
M01279184-I1-GC
01/09/2026
Permit issued — Mechanical Systems
M01279186-I1-MS
01/09/2026
Permit issued — Mechanical Systems
M01266143-I1-MS
01/09/2026
Permit issued — General Construction
M01266135-I1-GC
12/18/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
12/17/2025
Permit issued — Mechanical Systems
M01196933-I1-MS
12/12/2025
Filed — Alteration
Restrooms - Construction work on the 7th floor as indicated on drawings.
M01279184-I1
12/12/2025
Filed — Alteration
Restrooms - Construction wok on the 8th floor as indicated on drawings.
M01266135-I1
12/01/2025
Filed — Alteration
Restrooms - Plumbing work on the 7th floor as indicated on drawings.
M01279190-I1
12/01/2025
Filed — Alteration
M01266147-I1
12/01/2025
Filed — Alteration
M01266150-I1
12/01/2025
Filed — Alteration
Restrooms - Mechanical work on the 7th floor as indicated on drawings.
M01279186-I1
12/01/2025
Filed — Alteration
M01279197-I1
12/01/2025
Filed — Alteration
Restrooms - Mechanical work on the 8th floor as indicated on drawings.
M01266143-I1
11/26/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/24/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/19/2025
Signed off — Alteration
Minor sprinkler work on 9th floor.
M00554971-I1
11/18/2025
Filed — Alteration
Minor plumbing work on 7th, 8th and 9th floors.
M00554966-P1
11/13/2025
Special inspection requirement — Lighting controls
Ryan Hansen
11/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedEAST COAST PETROLEUM INC08/04/2026
DOB NOWStructuralPermit IssuedICON INTERIORS INC07/16/2026
DOB NOWGeneral ConstructionPermit IssuedICON INTERIORS INC04/07/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP04/03/2026
DOB NOWMechanical SystemsPermit IssuedICON INTERIORS INC04/02/2026
DOB NOWSprinklersPermit IssuedMORA FIRE PROTECTION LLC04/02/2026
DOB NOWSignSigned-offSIGNS CAD CORP03/23/2026
DOB NOWSprinklersPermit IssuedMORA FIRE PROTECTION LLC01/28/2026
DOB NOWSprinklersPermit IssuedMORA FIRE PROTECTION LLC01/28/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP01/16/2026
DOB NOWPlumbingPermit IssuedA&A PLUMBING CORP01/16/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC01/09/2026
DOB NOWGeneral ConstructionPermit IssuedJRM CONSTRUCTION MGMT LLC01/09/2026
DOB NOWMechanical SystemsPermit IssuedJRM CONSTRUCTION MGMT LLC01/09/2026
DOB NOWMechanical SystemsSigned-offFIVE HORSEMEN LLC12/17/2025
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING08/08/2025
DOB NOWGeneral ConstructionPermit IssuedFIVE HORSEMEN LLC07/25/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG07/23/2025
DOB NOWGeneral ConstructionPermit IssuedFIVE HORSEMEN LLC06/17/2025
DOB NOWSignPermit IssuedPOLSINELLI, HENRY12/18/2024
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC11/07/2024
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC11/06/2024
DOB NOWSignSigned-offPAUL SIGNS, INC01/31/2024
DOB NOWSignSigned-offPAUL SIGNS, INC01/31/2024
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND01/29/2024
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND01/29/2024
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND01/29/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND01/29/2024
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND01/29/2024
DOB NOWProtection and Mechanical MethodsSigned-offANDAMIO SCAFFOLDING LLC11/14/2023
DOB NOWGeneral ConstructionSigned-offLHOTSE CORP11/03/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC10/25/2023
DOB NOWGeneral ConstructionPermit IssuedVANGUARD CONSTRUCTION AND10/19/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC08/11/2023
DOB NOWConstruction FencePermit IssuedMC SUPERSTRUCTURE INC07/26/2023
DOB NOWStructuralSigned-offVANGUARD CONSTRUCTION AND06/27/2023
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND06/13/2023
DOB NOWMechanical SystemsSigned-offVANGUARD CONSTRUCTION AND06/13/2023
DOB NOWGeneral ConstructionSigned-offVANGUARD CONSTRUCTION AND06/13/2023
+ 60 more permits on file
3 projects · most recent 03/25/2026
Air Conditioning Systems Refrigeration Systems Ventilation Systems Associated Ducts and Piping Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2026Permit IssuedICON INTERIORS INCAir Conditioning Systems
Cooling
Above Air MCW-007D-7-HGH0 1,200 CFM · Wshp ×3
Water Furnace V7AH120 4,120 CFM · Wshp ×2
V2AH072 2,265 CFM · Wshp ×1
04/10/2025Signed-offFIVE HORSEMEN LLCAir Conditioning Systems, Refrigeration Systems, Ventilation Systems
Cooling
Daikin GDH070 68,500 BTU · Wshp ×1
Ventilation
Panasonic FV-0511VF1 110 CFM · Exhaust Fan ×1
Rational Ultravent Plus 250 CFM · Kitchen Exhaust ×1
Refrigeration
Norlake CPB075PC-S-0 6,700 BTU · Refrigeration Unit ×1
03/19/2024Signed-offVANGUARD CONSTRUCTION ANDAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems
Cooling
Hitachi HITACHI/TVAHP120B32S 10 tons · Vrf Outdoor ×4
HITACH/TVAHR144B32S 12 tons · Vrf Outdoor ×2
HITACHI/TVAHR168B32S 14 tons · Vrf Outdoor ×2
TIDH036B23S 3 tons · Split System ×2
Technical Systems TECHNICAL SYSTEMS/20A0LD10-1 10 tons · Condensing Unit ×2
Heat / Cool
Hitachi HITACHI / TIC4012B21S 2 tons · Split System ×10
HITACHI / TIDH036B23S 3 tons · Split System ×5
HITACHI / TIDH048B23S 4 tons · Split System ×4
HITACHI /TIDH048B23S 4 tons · Vrf Outdoor ×4
HITACHI / TIC4024B21S 2 tons · Split System ×2
HITACHI / TIDH015B23S 1 tons · Split System ×2
HITACHI / TIWM024B22S 2 tons · Split System ×2
HITACHI /TIDH024B23S 2 tons · Split System ×2
TIDH024B23S 2 tons · Vrf Indoor ×2
TIDH036B23S 3 tons · Split System ×2
Ducts & Piping
N/A N/A 1 BTU · Ductwork ×1
2 projects · most recent 03/24/2026
FiledStatusContractorScope
03/24/2026Permit IssuedPSI PARTNERS, LLC1,163 heads
04/10/2025Signed-offSAFEPIPE PLUMBING INC9 heads
5 projects · most recent 03/24/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
03/24/2026———
03/24/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
12/01/2025Permit IssuedA&A PLUMBING CORPWater/Sanitary
04/10/2025Signed-offSAFEPIPE PLUMBING INCWater/Sanitary
04/10/2024Signed-offBEDROCK PLBG. & HTG., INCGas, Storm, Water/Sanitary
25 projects · most recent 07/29/2026
General Wiring
FiledStatusContractorScope
07/29/2026CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
04/07/2026Permit IssuedMETROPOLIS ELECTRIC CORPGeneral Wiring
01/30/2026Permit IssuedCINTRON ELECL SVCS & LIGTGeneral Wiring
05/26/2024CompleteACM ELECTRIC CORPORATIONGeneral Wiring
02/09/2024Permit IssuedLIMITLESS ELECT RESOURCESGeneral Wiring
02/09/2024Permit IssuedLIMITLESS ELECT RESOURCESGeneral Wiring
08/29/2023CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
05/14/2023CompleteZEREM ELECTRIC CORP.General Wiring
09/07/2022Permit IssuedPOLO ELECTRIC CORP. D/B/A2 meters, 2 new_meters
07/14/2022CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
04/07/2022CompleteZEREM ELECTRIC CORP.—
10/08/2021CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
08/06/2021Permit IssuedINTER CONNECTION ELETRIC—
06/11/2021CompleteCORP. ELEC'L TECHNOLOGIESGeneral Wiring
04/07/2021CompleteOM ELECTRICAL CONTRACTINGGeneral Wiring
1 project · most recent 07/06/2026
Steel Concrete
FiledStatusContractorScope
07/06/2026Permit IssuedICON INTERIORS INCSteel, Concrete
1 project · most recent 07/26/2023
Fence
FiledStatusContractorScope
07/26/2023Permit IssuedMC SUPERSTRUCTURE INCFence
▾Field Inspections (DOB CAP) — 43
DateTypeResultReport
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/04/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/21/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/18/2025Fail-Final General Construction Non-Directive 14FailView ↗
11/26/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/24/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/04/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/03/2024Pass-Final PL - UndergroundPassView ↗
03/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/19/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
03/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/08/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/01/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/20/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/20/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/12/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 43.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/20/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
05/29/2026Structural Steel - High Strength BoltingRyan Hansenspecial
05/29/2026Structural Steel - WeldingRyan Hansenspecial
05/29/2026Concrete - Cast-In-PlaceRyan Hansenspecial
05/29/2026Structural Steel - DetailsRyan Hansenspecial
05/29/2026FinalRyan Hansenprogress
03/18/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/18/2026Post-installed AnchorsRyan Hansenspecial
03/17/2026FinalRyan Hungprogress
03/06/2026Sprinkler SystemsRyan Hansenspecial
03/06/2026Fire-Resistance Rated ConstructionRyan Hansenprogress
03/06/2026Post-installed AnchorsRyan Hansenspecial
03/06/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/06/2026FinalRyan Hansenprogress
03/06/2026Sprayed fire-resistant materialsRyan Hansenspecial
11/13/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
11/13/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
11/13/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
11/13/2025Energy Code Compliance InspectionsRyan Hansenprogress
11/13/2025Interior lighting powerRyan Hansenenergy_progress
11/13/2025Lighting controlsRyan Hansenenergy_progress
08/28/2025Mechanical SystemsRyan Hansenspecial
08/28/2025Sprinkler SystemsRyan Hansenspecial
08/28/2025FinalRyan Hansenprogress
08/28/2025FinalRyan Hansenprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Barney BrownRestaurant / Food ServiceFloor 1
Project M01196910 Alteration · Permit Entire · 04/10/2025
Project M01196914 Alteration · Permit Entire · 04/10/2025
Project M01196933 Alteration · LOC Issued · 04/10/2025
Stobg Innovation LabOfficeFloor 12
Project M01114295 Alteration · LOC Issued · 10/29/2024
Project M01096517 Alteration · LOC Issued · 10/28/2024
Bar PrimiRestaurant / Food ServiceCellar, Floor 1
Project M08028415 Alteration · LOC Issued · 11/05/2022
Project M00764745 Alteration · LOC Issued · 08/22/2022
Vornado Bar PrimiRestaurant / Food ServiceFloor 1
Project M08028305 Alteration · Permit Entire · 11/04/2022
Project M00764848 Alteration · LOC Issued · 08/30/2022
DokaworksRestaurant / Food ServiceFloor 1
Project M00267496 Alteration · LOC Issued · 12/16/2019
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 4,072 on file (BIS + DOB NOW)
▸Plans & Drawings148
▸DOB NOWPlans/Sketch86
09/06/2026M01368175-I1Request digital key ↗
09/03/2026M00501653-I1Request digital key ↗
09/03/2026M00501653-P1Request digital key ↗
Showing 3 of 86 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold19
09/05/2026M00315254-I1Request digital key ↗
09/03/2026M00389836-A2Request digital key ↗
09/03/2026M00389836-A3Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Plumbing9
09/05/2026M00249990-I1Request digital key ↗
09/05/2026M00265915-I1Request digital key ↗
09/05/2026M00290831-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems8
09/05/2026M00249962-I1Request digital key ↗
09/05/2026M00267496-I1Request digital key ↗
09/05/2026M00258238-P1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed7
09/05/2026M00253263-I1Request digital key ↗
09/05/2026M00315254-I1Request digital key ↗
09/04/2026M00419278-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/05/2026M00250019-I1Request digital key ↗
09/05/2026M00265983-I1Request digital key ↗
09/05/2026M00258393-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - General Construction4
09/04/2026M00448207-I1Request digital key ↗
09/04/2026M00458903-I1Request digital key ↗
09/03/2026M00472907-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00109163-I1Request digital key ↗
09/05/2026M00203905-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Protection of Mechanical Methods1
09/04/2026M00473413-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe1
09/05/2026M00258361-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00258181-I1Request digital key ↗
▸Applications & Permits559
▸BISPLAN / WORK APPROVAL APPLICATION352
02/24/2026122535890Open ↗
01/12/2026122535890Open ↗
01/06/2026122535890Open ↗
Showing 3 of 352 on file for this type
▸BISWORK PERMIT APPLICATION187
09/21/2021123735262Open ↗
06/03/2021123830453Open ↗
Showing 2 of 187 on file for this type
▸BISPLACE OF ASSEMBLY16
02/19/2026122535890Open ↗
02/12/2026122535890Open ↗
02/12/2026122535890Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWHPD Certification Letter or CPC Special Permit4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING RESOLUTION DETERMINATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Seals & Professional Certifications948
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION372
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 372 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature148
09/06/2026M01368175-I1Open ↗
09/05/2026M00249990-I1Open ↗
09/05/2026M00249962-I1Open ↗
Showing 3 of 148 on file for this type
▸DOB NOWProgress Inspector Seal & Signature126
09/22/2026M01196933-I1Open ↗
09/21/2026M00554905-I1Open ↗
09/21/2026M00554905-I1Open ↗
Showing 3 of 126 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT108
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 108 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST93
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 93 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature88
09/23/2026M01279197-I1Open ↗
09/23/2026M01368404-I1Open ↗
09/22/2026M01196933-I1Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISProfessional and Owner Certification (POC3)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment255
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE95
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 95 on file for this type
▸BISEQUIPMENT USE PERMITS39
10/19/2021123749177Open ↗
10/19/2021123749177Open ↗
Showing 2 of 39 on file for this type
▸BISSELF-CERT PLUMBING NOTICE39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT29
10/19/2021123749177Open ↗
10/18/2021123749177Open ↗
Showing 2 of 29 on file for this type
▸BISSCHEDULE B - PLUMBING26
02/24/2022123735262Open ↗
02/22/2022123735262Open ↗
02/18/2022123735262Open ↗
Showing 3 of 26 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA17
08/25/2021123408614Open ↗
Showing 1 of 17 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection428
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist139
09/05/2026M00258181-I1Open ↗
09/05/2026M00290831-P1Open ↗
09/05/2026M00290831-I1Open ↗
Showing 3 of 139 on file for this type
▸DOB NOWHPD-1: Anti-Harassment Area Checklist112
09/05/2026M00258181-I1Open ↗
09/05/2026M00290831-P1Open ↗
09/05/2026M00290831-I1Open ↗
Showing 3 of 112 on file for this type
▸BISANTI-HARASSMENT CHECKLIST75
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 75 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 71 on file for this type
▸DOB NOWCertificate of No Harassment13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSTREET TREE CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWStreet Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos429
▸DOB NOWDEP ACP-5: Asbestos Assessment Report109
09/06/2026M01368175-I1Open ↗
09/05/2026M00249990-I1Open ↗
09/05/2026M00249962-I1Open ↗
Showing 3 of 109 on file for this type
▸DOB NOWOER: Notice to Proceed98
09/05/2026M00290831-P1Open ↗
09/05/2026M00290831-I1Open ↗
09/04/2026M00338343-I1Open ↗
Showing 3 of 98 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 61 on file for this type
▸DOB NOWOER: Notice of Satisfaction54
09/05/2026M00290831-P1Open ↗
09/05/2026M00290831-I1Open ↗
09/04/2026M00338343-I1Open ↗
Showing 3 of 54 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION12
02/29/2024123699569Open ↗
01/09/2024123845964Open ↗
04/06/2023123735262Open ↗
Showing 3 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
09/05/2026M00290831-I1Open ↗
09/03/2026M00501653-I1Open ↗
▸Energy Compliance184
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS113
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 113 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS26
12/06/2022123876234Open ↗
10/18/2021123749177Open ↗
07/26/2021140876274Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY16
12/06/2022123876234Open ↗
12/06/2022123876234Open ↗
12/02/2022123876234Open ↗
Showing 3 of 16 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS6
02/29/2024123699569Open ↗
04/06/2023123735262Open ↗
04/06/2023123735262Open ↗
Showing 3 of 6 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
02/29/2024123699569Open ↗
04/06/2023123735262Open ↗
12/02/2022123876234Open ↗
Showing 3 of 5 on file for this type
▸BISLIGHTING CONTROLS4
02/29/2024123699569Open ↗
12/02/2022123876234Open ↗
08/12/2022140958248Open ↗
Showing 3 of 4 on file for this type
▸BIS* HVAC INSULATION AND SEALING4
04/11/2023123735262Open ↗
04/06/2023123735262Open ↗
04/06/2023123735262Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Inspections & Test Reports43
▸BISTECHNICAL REPORT: RESPONSIBILITY27
01/09/2024123845964Open ↗
12/06/2022123876234Open ↗
12/06/2022123876234Open ↗
Showing 3 of 27 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)5
04/11/2023123735262Open ↗
04/06/2023123735262Open ↗
04/06/2023123735262Open ↗
Showing 3 of 5 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISMECHANICAL SYSTEMS4
04/11/2023123735262Open ↗
04/06/2023123735262Open ↗
04/06/2023123735262Open ↗
Showing 3 of 4 on file for this type
▸BISFUEL-GAS PIPING (WELDING)3
04/11/2023123735262Open ↗
04/06/2023123735262Open ↗
04/06/2023123735262Open ↗
▸Approvals, Objections & Sign-offs304
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST145
03/18/2024123699569Open ↗
02/26/2024123799167Open ↗
01/12/2024123845964Open ↗
Showing 3 of 145 on file for this type
▸DOB NOWTransit Authority Approval55
09/05/2026M00258181-I1Open ↗
09/05/2026M00290831-I1Open ↗
09/05/2026M00290831-P1Open ↗
Showing 3 of 55 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION45
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 45 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE26
11/15/2024123004104Open ↗
11/14/2024123004104Open ↗
11/14/2024123004104Open ↗
Showing 3 of 26 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISFINAL10
02/29/2024123699569Open ↗
02/22/2024123799167Open ↗
01/11/2024123845964Open ↗
Showing 3 of 10 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Cost, Insurance & Ownership266
▸BISCOST AFFIDAVIT259
12/06/2022123876234Open ↗
10/18/2021123749177Open ↗
08/27/2021123408614Open ↗
Showing 3 of 259 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW37
02/29/2024123699569Open ↗
02/23/2024123799167Open ↗
01/09/2024123845964Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms375
▸BISEFILING COVER SHEET146
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 146 on file for this type
▸BISADDITIONAL INFORMATION135
02/24/2026122535890Open ↗
01/12/2026122535890Open ↗
11/19/2024123004104Open ↗
Showing 3 of 135 on file for this type
▸BISBOROUGH INTAKE FORM82
09/21/2021123735262Open ↗
Showing 1 of 82 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents69
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISSupporting Document: Fee Exempt8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISPLOT DIAGRAM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWMultiple Dwelling Special District Feasibility of Government Funded Rehabilitation1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProperty Ownership Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWMultiple Dwelling Special District Notice to Community Board1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProof of Historic Building1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type