Office with commercial, 7-19 stories
347 WEST 39TH STREET
MANHATTAN · BIN 1013679
💬 Discuss this project
1928Year Built
14Stories
O6Building Class
C6-4Zoning
28,080 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized1 Active Violation ▸FISP: SWARMP
Office with commercial, 7-19 stories · Owner of record: West Side Loft · 8,488 sf lot · 3.31 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentLandscapeCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExterior repairs and facade restoration7p · 2 filings · 20 docs
BulkheadExterior repairs and facade restoration2p · 1 filing · 15 docs
Floor 141 filing
Floor 13Unit 13N22p · 1 filing · 20 docs
Floor 12Unit 12W1p · 1 filing · 9 docs
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Unit 7W7p · 3 filings · 20 docs
Floor 6
Floor 5Unit 5E10p · 2 filings · 20 docs
Floor 4
Floor 3
Floor 2
Floor 1Installation of Heavy Duty Sidewalk Shed4p · 1 filing · 6 docs
Site & exteriorExterior repairs and facade restoration20p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
West Side Lofts5903/22/2026
Western Loft Equities2203/21/2026
DK103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Stephen Blatz104/29/2026
Ashraf201/31/2025
MSM Engineering Services105/23/2024
KZ Engineering104/12/2024
Thomas A Fenniman Architect204/03/2024
Versai712/08/2023
Saro Gumusyan Architecture307/11/2023
Hamann Engineering405/15/2023
M.A. Rubiano, P.E104/28/2023
Asr Engineering310/23/2022
Joel Phagoo P.E212/16/2021
Steve E Blatz Architect207/09/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
Expediting303/21/2026
Saro Gumusyan Architecture103/21/2026
Big Orange Expediting803/21/2026
Zoe Anne Sinclair703/21/2026
Synergy Building Consultants103/21/2026
Rigid Structural Design403/21/2026
Agouti Construction Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold707/08/2026
Sagewood Construction & DGeneral Contractor603/21/2026
Yarks NYCScaffold407/08/2026
Vanguard RenovationGeneral Contractor407/08/2026
Pepaj ConstructionGeneral Contractor403/21/2026
DA MartinoGeneral Contractor303/21/2026
Arnica Heating & Air Condspecialty_contractor203/21/2026
Awr GroupGeneral Contractor204/09/2026
Gregg NY PlumbingPlumbing107/08/2026
Apollo Electric USAElectrical103/22/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
Denmar ElectricElectrical103/22/2026
Roney ElectricElectrical103/22/2026
TM Select ElectricElectrical103/22/2026
Four Streets Cool AirGeneral Contractor107/08/2026
New York Ladder & ScaffoldScaffold107/08/2026
RE-Brick ConstructionScaffold107/08/2026
Drilon Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steve E. Blatz Architect3634304/29/2026
KZ Engineering4665104/12/2024
Thomas A. Fenniman Architects260204/03/2024
Philibert Engineering223204/03/2024
Versai8133712/08/2023
Saro Gumusyan Architect6437407/11/2023
Hamann Engineering4949405/15/2023
Building Lifecycle
All (192)Filed (29)Permit Issued (23)Signed Off (12)Facade (FISP) (12)Violation (60)Inspection (10)Objection (16)Special Inspection (30)
04/29/2026
Filed — Alteration
M01390709-I1
02/02/2026
Signed off — Alteration
Facade Restoration including masonry repair/replacement, cast stone repairs and roof recover and metal cladding installation at roof bulkheads. No change in Use, Egress or Occupancy.
M00867215-I1
08/01/2025
Cycle 9 facade report signed — SWARMP
07/21/2025
Cycle 9 facade inspection completed
06/12/2025
Permit issued — General Construction
M00867215-I1-GC
05/21/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01019785-I1
04/25/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01055350-I1
03/11/2025
Permit issued — Sidewalk Shed
M01019785-I1-SH
03/06/2025
Permit issued — Suspended Scaffold
M01020617-I1-SC
01/31/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01019785-P1
12/24/2024
Cycle 9 facade report submitted
06/11/2024
Permit issued — General Construction
M00867215-I1-GC
05/24/2024
Permit issued — Supported Scaffold
M01055350-I1-SF
05/23/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01055350-I1
05/23/2024
Signed off — Alteration
AT 7TH FLOOR APT 7W- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00832021-I1
05/16/2024
Signed off — Alteration
INSTALLATION OF NEW AIR CONDITIONING SPLIT SYSTEM AT APT 7W ON 7TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00832024-I1
05/14/2024
Signed off — Alteration
AT 7TH FLOOR APT 7W- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00828189-I1
05/11/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/11/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/25/2024
Permit issued — Suspended Scaffold
M01020617-I1-SC
04/12/2024
Filed — Alteration
M01020617-I1
04/03/2024
Filed — Alteration
Facade Restoration including masonry repair/replacement, cast stone repairs and roof recover and metal cladding installation at roof bulkheads. No change in Use, Egress or Occupancy.
M00867215-P1
04/03/2024
Special inspection requirement — Final
Thomas Fenniman
04/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
04/03/2024
Special inspection requirement — Masonry
Thomas Fenniman
04/02/2024
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
04/02/2024
Special inspection requirement — Final
Thomas Fenniman
04/02/2024
Special inspection requirement — Masonry
Thomas Fenniman
03/21/2024
Violation issued (HPD, closed)
C
03/21/2024
Violation issued (HPD, closed)
C
03/15/2024
Permit issued — Sidewalk Shed
M01019785-I1-SH
03/14/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01019785-I1
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/08/2024
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/31/2023
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, closed)
C
12/14/2023
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00794233-S1
12/14/2023
Signed off — Alteration
PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00794233-I1
12/13/2023
Permit issued — General Construction
M00794233-I1-GC
12/11/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Klodian Pepaj
12/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Klodian Pepaj
12/08/2023
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00794233-P5
12/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Klodian Pepaj
12/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/13/2023
Objection resolved — Addressed
10/27/2023
Objection raised — Other
10/18/2023
Filed — Alteration
PLUMBING WORK ASSOCIATED WITH THE INTERIOR RENOVATION OF APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00794233-P4
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Klodian Pepaj
07/14/2023
Special inspection requirement — Tenant Protection Plan Compliance
Saro Gumusyan
07/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Saro Gumusyan
07/11/2023
Filed — Alteration
AT 7TH FLOOR APT 7W- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
M00832021-P1
07/10/2023
Special inspection requirement — Tenant Protection Plan Compliance
Saro Gumusyan
07/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Saro Gumusyan
07/07/2023
Objection resolved — Addressed
06/01/2023
Objection raised — Other
05/18/2023
Filed — Alteration
Facade Restoration including masonry repair/replacement, cast stone repairs and roof recover and metal cladding installation at roof bulkheads. No change in Use, Egress or Occupancy.
M00867215-I1
Latest 60 of 192 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAwr Group06/12/2025
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/11/2025
DOB NOWSuspended ScaffoldPermit IssuedAwr Group03/06/2025
DOB NOWGeneral ConstructionSigned-offAwr Group06/11/2024
DOB NOWSupported ScaffoldSigned-offAndamio Scaffolding05/24/2024
DOB NOWSuspended ScaffoldPermit IssuedAwr Group04/25/2024
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/15/2024
DOB NOWGeneral ConstructionSigned-offPepaj Construction12/13/2023
DOB NOWMechanical SystemsSigned-offFour Streets Cool Air05/04/2023
DOB NOWPlumbingSigned-offGregg NY Plumbing05/01/2023
DOB NOWGeneral ConstructionSigned-offDA Martino04/19/2023
DOB NOWSidewalk ShedPermit IssuedYarks NYC02/27/2023
DOB NOWGeneral ConstructionSigned-offVanguard Renovation02/08/2023
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D12/16/2022
DOB NOWPlumbingSigned-offDrilon Plumbing & Heating11/09/2022
DOB NOWGeneral ConstructionSigned-offPepaj Construction11/01/2022
DOB NOWSidewalk ShedPermit IssuedYarks NYC10/03/2022
DOB NOWGeneral ConstructionSigned-offSagewood Construction & D08/31/2022
DOB NOWSidewalk ShedPermit IssuedRE-Brick Construction08/29/2022
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating05/09/2022
DOB NOWGeneral ConstructionSigned-offVanguard Renovation05/05/2022
DOB NOWSidewalk ShedSigned-offNew York Ladder & Scaffol12/03/2021
DOB NOWMechanical SystemsSigned-offArnica Heating Air Cond01/10/2020
BISOTISSUEDTeka Enterprises04/11/2019
BISPLISSUEDDelta-Sigma Mechanical02/08/2019
BISOTISSUEDTeka Enterprises01/14/2019
BISSPISSUEDGeneral Plumbing05/23/2018
BISPLISSUEDSafety Plumbing & Heating12/28/2017
BISOTISSUEDLower East Side Construction09/27/2017
BISPLISSUEDAll American Plumbing & Heating08/16/2016
BISPLISSUEDFred Smith P&H Co08/12/2016
BISOTISSUEDMidtown Interior Resource07/27/2016
BISEQISSUEDRock Group NY04/08/2016
BISSPISSUEDGeneral Plumbing03/10/2016
BISSPISSUEDRCI Fire Protection09/25/2015
BISEQISSUEDRock Group NY04/10/2015
BISPLISSUEDFred Smith P&H Co04/01/2015
BISPLISSUEDPro Star Plumbing, Heating & Mechanical10/17/2014
BISPLISSUEDA.M.N06/16/2014
BISOTISSUEDMarek Szmacinski06/13/2014
+ 33 more permits on file
1 project · most recent 05/15/2023
Gas Water/Sanitary
FiledStatusContractorScope
05/15/2023Signed-offOrbit Plumbing & HeatingGas, Water/Sanitary
14 projects · most recent 09/21/2026
General Wiring
FiledStatusContractorScope
09/21/2026Permit IssuedRigid ElectricGeneral Wiring
05/15/2024CompleteApollo Electric USA—
04/15/2024CompleteDaven Electric—
03/19/2024CompleteBorowide Elect'l Contractors—
10/06/2023CompleteValley Electric of NY—
05/15/2023CompleteAmergy Electric of NYGeneral Wiring
04/19/2023CompleteBerger Quality Electrical ConGeneral Wiring
11/09/2022CompleteGramercy ElectricGeneral Wiring
08/31/2022CompleteRichard Neu—
01/26/2022CompleteTM Select Electric—
11/29/2021Permit IssuedRoney Electric—
10/21/2020CompleteApollo Electric USA—
07/09/2020CompleteDenmar ElectricGeneral Wiring
02/02/2019Permit IssuedV. Vass ElectricGeneral Wiring
1 project · most recent 10/23/2022
Sidewalk Shed
FiledStatusContractorScope
10/23/2022Permit IssuedYarks NYCSidewalk Shed
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/11/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/11/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
04/03/2024FinalThomas Fennimanprogress
04/03/2024Tenant Protection Plan ComplianceJacky Philibertspecial
04/03/2024MasonryThomas Fennimanspecial
04/02/2024Tenant Protection Plan ComplianceJacky Philibertspecial
04/02/2024FinalThomas Fennimanprogress
04/02/2024MasonryThomas Fennimanspecial
12/11/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
12/11/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
12/08/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
09/19/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
07/14/2023Tenant Protection Plan ComplianceSaro Gumusyanspecial
07/14/2023Fire-Resistant Penetrations and JointsSaro Gumusyanspecial
07/10/2023Tenant Protection Plan ComplianceSaro Gumusyanspecial
07/10/2023Fire-Resistant Penetrations and JointsSaro Gumusyanspecial
05/12/2023Fire-Resistant Penetrations and JointsCARL HAMANNspecial
02/28/2023Tenant Protection Plan ComplianceSaro Gumusyanspecial
02/27/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
02/27/2023FinalKlodian Pepajprogress
02/27/2023Lighting controlsKlodian Pepajenergy_progress
02/27/2023Lighting in dwelling unitsKlodian Pepajenergy_progress
02/13/2023Lighting in dwelling unitsSaro Gumusyanenergy_progress
02/13/2023Energy Code Compliance InspectionsSaro Gumusyanprogress
02/13/2023FinalSaro Gumusyanprogress
02/02/2023Lighting controlsKlodian Pepajenergy_progress
02/02/2023Fire-Resistant Penetrations and JointsKlodian Pepajspecial
Latest 25 of 44.
▾Documents — 721 on file (BIS + DOB NOW)
▸Plans & Drawings28
▸DOB NOWPlans/Sketch27
09/03/2026M00532453-I1Request digital key ↗
09/03/2026M00637477-P1Request digital key ↗
09/03/2026M00637477-I1Request digital key ↗
Showing 3 of 27 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00248753-I1Request digital key ↗
▸Applications & Permits109
▸BISPLAN / WORK APPROVAL APPLICATION55
10/24/2019123880185Open ↗
07/25/2019123124804Open ↗
02/19/2019103427926Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION54
11/07/2019123880185Open ↗
02/11/2019123124804Open ↗
01/14/2019123124804Open ↗
Showing 3 of 54 on file for this type
▸Seals & Professional Certifications142
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION61
02/28/2020123880185Open ↗
10/24/2019123880185Open ↗
10/11/2019123124804Open ↗
Showing 3 of 61 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature28
09/03/2026M00637477-I1Open ↗
09/03/2026M00637477-P1Open ↗
09/02/2026M00691271-I1Open ↗
Showing 3 of 28 on file for this type
▸DOB NOWProgress Inspector Seal & Signature18
09/26/2026M00691273-I1Open ↗
09/26/2026M00691273-I1Open ↗
09/01/2026M00637477-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/26/2026M00691273-I1Open ↗
09/02/2026M00794233-P4Open ↗
09/02/2026M00794233-P3Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
08/10/2017123350177Open ↗
07/11/2016122791675Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment84
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISSCHEDULE B - PLUMBING17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISEQUIPMENT USE PERMITS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
07/25/2019123124804Open ↗
05/11/2018123350177Open ↗
05/10/2018123350177Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSPRINKLER INSP REPORT : FP-852
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
09/27/2018123350186Open ↗
05/16/2018122967352Open ↗
▸Safety & Tenant Protection48
▸DOB NOWHPD-1: Anti-Harassment Area Checklist27
09/02/2026M00691271-I1Open ↗
09/02/2026M00691271-P2Open ↗
09/02/2026M00691271-P1Open ↗
Showing 3 of 27 on file for this type
▸BISANTI-HARASSMENT CHECKLIST9
10/24/2019123880185Open ↗
10/23/2018123124804Open ↗
09/27/2017123107672Open ↗
Showing 3 of 9 on file for this type
▸BISHPD-1 - Anti-Harassment Area Checklist6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTenant Protection Plan and Notes4
10/24/2019123880185Open ↗
10/23/2018123124804Open ↗
11/14/2017123350177Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00248753-I1Open ↗
▸DOB NOWCertificate of No Harassment1
08/13/2026M00532453-I1Open ↗
▸Environmental & Asbestos61
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/02/2026M00691271-P1Open ↗
09/02/2026M00691271-P2Open ↗
09/02/2026M00691271-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
10/24/2019123880185Open ↗
10/23/2018123124804Open ↗
08/22/2017123107672Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice to Proceed9
09/02/2026M00691271-I1Open ↗
08/13/2026M00691273-I1Open ↗
08/13/2026M00532453-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction7
08/13/2026M00691273-I1Open ↗
08/13/2026M00794233-S1Open ↗
08/13/2026M00532453-I1Open ↗
Showing 3 of 7 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED5
10/30/2019123880185Open ↗
12/03/2018123124804Open ↗
09/22/2017123107672Open ↗
Showing 3 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/15/2026M00867215-I1Open ↗
▸Energy Compliance41
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS22
10/24/2019123880185Open ↗
10/11/2019123124804Open ↗
10/23/2018123124804Open ↗
Showing 3 of 22 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
02/28/2020123880185Open ↗
10/11/2019123124804Open ↗
03/15/2018123107672Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00532453-I1Open ↗
08/13/2026M00691273-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs72
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST43
02/28/2020123880185Open ↗
10/11/2019123124804Open ↗
02/07/2019104839980Open ↗
Showing 3 of 43 on file for this type
▸BISADMINISTRATIVE OBJECTIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
10/11/2019123124804Open ↗
10/11/2019123124804Open ↗
06/14/2018122967352Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
12/26/2018104839980Open ↗
12/26/2018104839980Open ↗
12/24/2018104839980Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/15/2026M00867215-I1Open ↗
▸Cost, Insurance & Ownership48
▸BISCOST AFFIDAVIT47
02/28/2020123880185Open ↗
10/24/2019123880185Open ↗
10/11/2019123124804Open ↗
Showing 3 of 47 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
01/14/2019123124804Open ↗
▸Filing & Intake Forms77
▸BISBOROUGH INTAKE FORM32
02/28/2020123880185Open ↗
10/11/2019123124804Open ↗
07/25/2019123124804Open ↗
Showing 3 of 32 on file for this type
▸BISADDITIONAL INFORMATION21
10/24/2019123880185Open ↗
10/24/2019123880185Open ↗
05/03/2018123350177Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING COVER SHEET21
10/24/2019123880185Open ↗
10/23/2018123124804Open ↗
08/22/2017123107672Open ↗
Showing 3 of 21 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
05/09/2017122791675Open ↗
09/15/2016140313319Open ↗
Showing 2 of 4 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLOT DIAGRAM1
11/08/2018104839980Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M01020617-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01020617-I1Open ↗