← Back
BuildNYC
Condo, commercial tower (mixed-use) [derived]
Fsa Plaza Condominium
36-36 MAIN STREET · BIN 4540141
💬 Discuss this project
1940Year Built
8Stories
RCBuilding Class
C4-3Zoning
37,140 sfGross Floor Area
21Units
LL97 Covered0 Active ViolationsFISP: SWARMPFDNY Report ↗
Condo, commercial tower (mixed-use) [derived] · 14,788 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire AlarmEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofQueens Surgical Center5p · 1 filing · 6 docs
Floor 6223 Borden Ave Lic, LLC2p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 3Fsa Capital LLC9p · 2 filings · 15 docs
Floor 2Queens Surgical Center14p · 3 filings · 20 docs
Floor 1Preliminary construction documents6p · 1 filing · 5 docs
CellarPreliminary construction documents6p · 1 filing · 5 docs
BasementPreliminary construction documents1p · 1 filing · 5 docs
Site & exteriorFsa Capital LLC7p · 4 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Fsa Main Street6103/21/2026
223 Borden Ave Lic2907/08/2026
Queens Surgical Center2203/21/2026
Main Street North1703/21/2026
BTW Main Realty1203/21/2026
Fsa Plaza703/22/2026
Panorama CMS603/21/2026
Fsa Capital503/22/2026
Happy Healthy Life103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
United Building Consulting102/28/2025
Associates203/26/2024
Allen Shinfeld, P.E311/02/2023
Gga Studios307/28/2023
FL&M Engineering Design & Inspection207/24/2023
E K Associates110/20/2022
Studio C Architects102/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Domani Consulting303/21/2026
United Building Consulting203/21/2026
Youn Design603/21/2026
Millennium Designs of New York203/21/2026
Studio C Architects203/21/2026
S M Expediting203/21/2026
Millennium Designs203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Continental NetworkGeneral Contractor603/21/2026
Neptune Signs & AwningsSign hanger307/08/2026
New York H&Y ConstructionGeneral Contractor303/21/2026
Tri Borough ScaffoldingScaffold303/21/2026
Air Stream Air Conditioningspecialty_contractor203/21/2026
MC SuperstructureScaffold107/08/2026
Enobrac PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
United Building Consulting9268102/28/2025
Metrospec Sia6420203/26/2024
EK Engineering6883110/20/2022
Building Lifecycle
All (90)Filed (13)Permit Issued (10)Signed Off (8)Facade (FISP) (6)Violation (33)Inspection (3)Objection (10)Special Inspection (7)
05/05/2025
Signed off — Alteration
PROPOSE TO INSTALL A SPLIT SYSTEM AC UNIT AS PER PLANS SUBMITTED HERWITH.
Q00994439-I1
03/27/2025
Signed off — Alteration
THIS APPLICATION IS FILING TO OBTAIN EQUIPMENT USE PERMIT/CERTIFICATE OF COMPLIANCE FOR (1) 3/4 TON AIR COOLED SPLIT HEAT PUMP SYSTEM SERVING IT CLOSET, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q01188069-I1
03/18/2025
Permit issued — Mechanical Systems
Q01188069-I1-MS
03/14/2025
Objection raised — Admin
03/14/2025
Objection resolved — Addressed
03/11/2025
Objection resolved — Addressed
03/11/2025
Objection resolved — Addressed
03/10/2025
Objection raised — Other
03/10/2025
Objection raised — Fire_Protection
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection raised — Scope
03/10/2025
Objection resolved — Addressed
03/10/2025
Objection raised — Plumbing
02/28/2025
Filed — Alteration
THIS APPLICATION IS FILING TO OBTAIN EQUIPMENT USE PERMIT/CERTIFICATE OF COMPLIANCE FOR (1) 3/4 TON AIR COOLED SPLIT HEAT PUMP SYSTEM SERVING IT CLOSET, NO CHANGE IN EGRESS, USE OR OCCUPANCY.
Q01188069-I1
07/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2024
Permit issued — Plumbing
Q00994439-S1-PL
04/04/2024
Permit issued — Mechanical Systems
Q00994439-I1-MS
03/26/2024
Filed — Alteration
PROPOSE TO INSTALL A SPLIT SYSTEM AC UNIT AS PER PLANS SUBMITTED HERWITH.
Q00994439-I1
03/26/2024
Filed — Alteration
PROPOSE TO INSTALL A SPLIT SYSTEM AC UNIT AS PER PLANS SUBMITTED HERWITH.
Q00994439-S1
01/16/2024
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00953867-I1
01/16/2024
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00953886-I1
01/16/2024
Signed off — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00952828-I1
12/19/2023
Inspection — Pass-Final Sign Permit Inspection
Pass
View inspection ↗
12/06/2023
Permit issued — Sign
Q00953867-I1-SG
12/06/2023
Permit issued — Sign
Q00952828-I1-SG
12/06/2023
Permit issued — Sign
Q00953886-I1-SG
11/02/2023
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00953867-I1
11/02/2023
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00953886-I1
11/02/2023
Filed — Alteration
INSTALLATION OF AN ILLUMINATED BUSINESS ACCESSORY SIGN ON EXISTING CANOPY PERMITTED UNDER CANOPY PERMIT JOB#Q08042718. PROPOSED SIGN TO BE COMPLIED WITH BUILDING CODE CHAPTER 19-26. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00952828-I1
11/01/2023
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00832685-I1
07/28/2023
Filed — Alteration
ALTERATION APPLICATION FILED HEREWITH FOR INSTILLATION OF A NEW MARQUEEABOVE THE MAIN BUILDING ENTRY. NO CHANGE OF USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION. PAA FILED TO INDICATE REVISED PLANS. PAA 2 TO REVISE PLANS
Q08042718-P2
07/28/2023
Special inspection requirement — Final
Chih Hsu
07/28/2023
Special inspection requirement — Final
Chih Hsu
07/24/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00832685-P1
07/13/2023
Permit issued — Sidewalk Shed
Q00832685-I1-SH
07/12/2023
Filed — Alteration
ALTERATION APPLICATION FILED HEREWITH FOR INSTILLATION OF A NEW MARQUEEABOVE THE MAIN BUILDING ENTRY. NO CHANGE OF USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION. PAA FILED TO INDICATE REVISED PLANS. PAA 2 TO REVISE PLANS
Q08042718-P1
07/07/2023
Permit issued — General Construction
Q08042718-I1-GC
07/07/2023
Special inspection requirement — Final
Chih Hsu
02/24/2023
Permit issued — Sidewalk Shed
Q00832685-I1-SH
02/23/2023
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Q00832685-I1
01/12/2023
Signed off — Alteration
Q00776769-I1
12/07/2022
Filed — Alteration
ALTERATION APPLICATION FILED HEREWITH FOR INSTILLATION OF A NEW MARQUEEABOVE THE MAIN BUILDING ENTRY. NO CHANGE OF USE, OCCUPANCY OR EGRESSUNDER THIS APPLICATION. PAA FILED TO INDICATE REVISED PLANS. PAA 2 TO REVISE PLANS
Q08042718-I1
12/02/2022
Permit issued — Mechanical Systems
Q00776769-I1-MS
10/20/2022
Filed — Alteration
Q00776769-I1
07/25/2022
Signed off — Alteration
Q00678563-I1
07/18/2022
Special inspection requirement — Final
EDWARD KAJA
07/18/2022
Special inspection requirement — Mechanical Systems
EDWARD KAJA
02/16/2022
Filed — Alteration
Q00678563-I1
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
Wilson Chao
02/10/2022
Special inspection requirement — Final
Wilson Chao
09/01/2020
Cycle 9 facade report submitted
08/24/2020
Cycle 9 facade report signed — SWARMP
08/18/2020
Cycle 9 facade inspection completed
05/12/2020
Cycle 8 facade inspection completed
04/11/2020
Cycle 8 facade report signed — No Report Filed
01/30/2020
Cycle 8 facade report submitted
04/30/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 90 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offContinental Network03/18/2025
DOB NOWPlumbingPermit IssuedEnobrac Plumbing04/25/2024
DOB NOWMechanical SystemsSigned-offAir Stream Air Conditioni04/04/2024
DOB NOWSignSigned-offNeptune Signs & Awnings12/06/2023
DOB NOWSignSigned-offNeptune Signs & Awnings12/06/2023
DOB NOWSignSigned-offNeptune Signs & Awnings12/06/2023
DOB NOWSidewalk ShedSigned-offMC Superstructure07/13/2023
DOB NOWGeneral ConstructionPermit IssuedNew York H&Y Construction07/07/2023
DOB NOWSidewalk ShedSigned-offTri Borough Scaffolding02/24/2023
DOB NOWMechanical SystemsSigned-offContinental Network12/02/2022
BISOTISSUEDAG Contracting Services12/05/2019
BISFSISSUEDChampion Combustion02/27/2019
BISOTISSUEDPhoenix Medical Construction09/27/2018
BISMHISSUEDPhoenix Medical Construction09/27/2018
BIS—ISSUEDPhoenix Medical Construction09/14/2018
BISOTISSUEDAll State 12 General Cont03/28/2018
BISMHISSUEDPhoenix Medical Construction02/22/2018
BISPLISSUEDUniversal Plumbing12/07/2017
BISSDISSUEDFull Capacity Fire12/05/2017
BISSPISSUEDFull Capacity Fire12/04/2017
BISOTISSUEDAll State 12 General Cont10/19/2017
BISOTISSUEDPhoenix Medical Construction09/28/2017
BISOTISSUEDTriborough Construction S05/31/2017
BISPLISSUEDGreat City Plumbing04/19/2017
BISSPISSUEDGo Pro Fire Protection03/21/2017
BISOTISSUEDMC Superstructure03/16/2017
BISOTISSUEDMC Superstructure03/16/2017
BISMHISSUEDMC Superstructure03/15/2017
BISSPISSUEDOrion Plumbing & Heating12/29/2014
BISPLISSUEDFleet Plumbing and Heating12/29/2014
BISOTISSUEDMC Superstructure06/04/2014
BISMHISSUEDMC Superstructure06/04/2014
BISOTISSUEDMC Superstructure06/04/2014
BISPLISSUEDFleet Plumbing and Heating01/06/2014
BISSPISSUEDOrion Plumbing & Heating01/06/2014
BISMHISSUEDSuper Power Construction12/24/2013
BISOTISSUEDJian Li12/17/2013
BISPLISSUEDTri State Plumbing & Heating12/17/2013
BISOTISSUEDJian Li12/17/2013
BISMHISSUEDJian Li12/17/2013
+ 20 more permits on file
1 project · most recent 03/26/2024
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/26/2024Signed-offAir Stream Air ConditioniAir Conditioning Systems
Cooling
Mitsubishi Electric PKA-A30KA7 630 CFM · Vrf Indoor ×1
PUZ-HA30NKA 30,000 BTU · Condensing Unit ×1
4 projects · most recent 11/22/2023
FiledStatusContractorScope
11/22/2023CompleteJong Hyun Kim—
11/22/2023CompleteJong Hyun Kim—
11/22/2023CompleteJong Hyun Kim—
08/14/2023CompleteGoodall Electric—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/19/2023Pass-Final Sign Permit InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
07/28/2023FinalChih Hsuprogress
07/28/2023FinalChih Hsuprogress
07/07/2023FinalChih Hsuprogress
07/18/2022FinalEDWARD KAJAprogress
07/18/2022Mechanical SystemsEDWARD KAJAspecial
02/10/2022Energy Code Compliance InspectionsWilson Chaoprogress
02/10/2022FinalWilson Chaoprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Queens Surgical CenterMedical / HealthcareFloor 2, Roof
Project Q00994439 Alteration · Permit Entire · 03/26/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 636 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/26/2026Q00678563-I1Request digital key ↗
08/25/2026Q00776769-I1Request digital key ↗
08/24/2026Q00832685-P1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits145
▸BISPLAN / WORK APPROVAL APPLICATION70
06/15/2020420869910Open ↗
05/26/2020410198263Open ↗
05/14/2020420869910Open ↗
Showing 3 of 70 on file for this type
▸BISWORK PERMIT APPLICATION57
12/12/2019421905807Open ↗
03/01/2019421613178Open ↗
03/01/2019421613178Open ↗
Showing 3 of 57 on file for this type
▸BISApplication Withdrawal/Address Change Form OP-1138
06/15/2020420869910Open ↗
05/26/2020410198263Open ↗
05/14/2020420869910Open ↗
Showing 3 of 8 on file for this type
▸BISREQUEST FOR CERTIFICATE OF OCCUPANCY WITH OPEN APPLICATION(S)5
12/21/2021421534067Open ↗
12/21/2021421534067Open ↗
12/14/2021421534067Open ↗
Showing 3 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
10/26/2018421534067Open ↗
▸Zoning, Tax Lot & Property Records2
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
11/23/2021421534067Open ↗
▸BISVERIFY TAX LOT1
10/14/2021421534067Open ↗
▸Seals & Professional Certifications129
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
03/11/2020421905807Open ↗
03/11/2020421613178Open ↗
12/11/2019421905807Open ↗
Showing 3 of 77 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
11/12/2019421905807Open ↗
Showing 1 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/24/2026Q00832685-I1Open ↗
08/23/2026Q00952828-I1Open ↗
08/23/2026Q00953867-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026Q08042718-P1Open ↗
08/29/2026Q08042718-I1Open ↗
08/27/2026Q00776769-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISApplicant / Owner Signature1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/12/2019421905807Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q00776769-I1Open ↗
▸Trade Schedules & Equipment58
▸BISSELF-CERT PLUMBING NOTICE16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE PERMITS8
02/12/2019421524210Open ↗
Showing 1 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
11/27/2018421524201Open ↗
11/26/2018421524210Open ↗
10/05/2017421524210Open ↗
Showing 3 of 6 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
02/12/2019421524210Open ↗
02/12/2019421524210Open ↗
Showing 2 of 4 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA3
08/10/2021421607933Open ↗
02/04/2020421524997Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
12/14/2018421613178Open ↗
03/22/2018421613178Open ↗
▸BISSPRINKLER/STANDPIPE ELECTRICAL LETTER1
02/08/2019421524201Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST4
05/24/2018421534067Open ↗
Showing 1 of 4 on file for this type
▸BISST-1 Street Tree Checklist2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos28
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/23/2026Q00994439-S1Open ↗
08/23/2026Q00994439-I1Open ↗
08/20/2026Q01188069-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
12/11/2019421905807Open ↗
03/01/2019421613178Open ↗
12/04/2017421524201Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
08/20/2021421607933Open ↗
10/26/2020421524997Open ↗
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS30
03/11/2020421613178Open ↗
11/12/2019421905807Open ↗
02/11/2019421524210Open ↗
Showing 3 of 30 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
03/11/2020421905807Open ↗
03/11/2020421613178Open ↗
02/11/2019421524210Open ↗
Showing 3 of 11 on file for this type
▸BISTR8: Energy Code Progress Inspections6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Inspections & Test Reports2
▸BISHYDRO FLOW TEST LETTER1
11/22/2017421524201Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
11/22/2017421524201Open ↗
▸Approvals, Objections & Sign-offs92
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST33
08/20/2021421607933Open ↗
12/17/2020421534067Open ↗
12/03/2020421534067Open ↗
Showing 3 of 33 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION25
04/20/2020421534067Open ↗
01/27/2020421524997Open ↗
01/27/2020421524997Open ↗
Showing 3 of 25 on file for this type
▸BISADMINISTRATIVE OBJECTIONS20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
08/01/2019421534067Open ↗
07/29/2019421534067Open ↗
06/25/2019421534067Open ↗
Showing 3 of 6 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISOIL TANK REMOVAL CERT : LETTER-FO2
01/07/2020421613178Open ↗
01/07/2020421613178Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT47
06/02/2020421524997Open ↗
03/11/2020421905807Open ↗
03/11/2020421613178Open ↗
Showing 3 of 47 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
10/15/2021421534067Open ↗
08/19/2021421607933Open ↗
▸Filing & Intake Forms62
▸BISEFILING COVER SHEET26
11/12/2019421905807Open ↗
03/22/2018421613178Open ↗
03/02/2018421607933Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION21
09/22/2021421534067Open ↗
02/20/2020421613178Open ↗
01/07/2020421613178Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM14
06/15/2020420869910Open ↗
05/26/2020410198263Open ↗
05/14/2020420869910Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents3
▸BISPLOT DIAGRAM3
10/10/2018421534067Open ↗
05/24/2018421534067Open ↗
Showing 2 of 3 on file for this type