| Owner | Filings | Most Recent |
|---|---|---|
| SIUH | 13 | 09/29/2026 |
| SBA NETWORK SERVICES | 5 | 07/08/2026 |
| NORTHWELL HEALTH (SIUH) | 102 | 04/09/2026 |
| SBA | 4 | 03/22/2026 |
| STATEN ISLAND UNVRST HOSPITAL | 4 | 03/22/2026 |
| S I UNIVERSITY HOSPITAL | 39 | 03/21/2026 |
| STATEN ISLAND HOSPITAL | 2 | 03/21/2026 |
| T-MOBILE | 1 | 03/21/2026 |
| SI UNIV HOSPITAL | 3 | 03/21/2026 |
| PILKU CONSTRUCTION SERVICE | 3 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| MAGARAM ENGINEERING SERVICES | 1 | 08/13/2026 |
| CANY ARCHITECTURE & ENGINEERING DPC | 14 | 07/10/2026 |
| AG ENGINEERING PLLC | 1 | 01/20/2026 |
| LORING CONSULTING ENGINEERS, INC. | 3 | 10/30/2025 |
| FRENCH & PARRELLO ASSOCIATES | 1 | 10/03/2025 |
| GEORGE SIGALOS P.E. | 2 | 10/01/2025 |
| AKF ENGINEERS, LLP | 14 | 08/25/2025 |
| LEVIN ENGINEERING PLLC | 1 | 08/19/2025 |
| GILSANZ MURRAY STEFICEK LLP | 9 | 08/13/2025 |
| IMEG | 2 | 07/23/2025 |
| ROGERS CALVANICO GROUP PLLC | 2 | 06/20/2025 |
| DAVID J DARCY, ARCHITECT | 8 | 06/17/2025 |
| BRAND ACCESS SOLUTIONS | 8 | 03/12/2025 |
| MASCIONI & BEHRMANN, ARCHITECTURE & | 1 | 02/18/2025 |
| LANGAN ENGINEERING | 1 | 01/27/2025 |
| P.W. GROSSER CONSULTING | 4 | 11/26/2024 |
| WSP | 2 | 09/04/2024 |
| FRANCIS CAUFFMAN ARCHITECTS (FCA) | 1 | 08/30/2024 |
| TOHFAZ UDDIN PE PC | 6 | 05/16/2024 |
| KMB DESIGN GROUP, LLC | 1 | 06/14/2023 |
| EWINGCOLE | 2 | 01/19/2023 |
| PAMELA A. SMITH | 1 | 01/05/2023 |
| A SAXON DESIGN GROUP | 1 | 06/30/2022 |
| MACAN DEVE ENGINEERS | 2 | 06/20/2022 |
| PERMANENT ENGINEERING P.C. | 1 | 04/01/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 40 | 03/21/2026 |
| UPRIGHT EXPEDITERS | 34 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 16 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 12 | 03/21/2026 |
| METROPOLIS GROUP INC | 10 | 03/21/2026 |
| SUPPORT BUILDINGS OF NEW YORK | 6 | 03/21/2026 |
| OUTSOURCE CONSULTANTS, INC. | 4 | 03/21/2026 |
| CONSTRUCTION PERMIT SERVICES | 7 | 03/21/2026 |
| SUMMIT CONSULTING & EXPEDITING | 2 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| SPRING SCAFFOLDING LLC | General Contractor | 29 | 07/08/2026 |
| JRB CONSTRUCTION CORP | General Contractor | 28 | 07/08/2026 |
| HUNTER ROBERTS CONSTRUCTION | General Contractor | 21 | 09/24/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 16 | 09/19/2026 |
| CAPITAL CONTR P&H CORP | Plumbing | 12 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 6 | 09/03/2026 |
| OVERLAND CONTRACTING INC | General Contractor | 6 | 03/21/2026 |
| METRO ENVIRONMENTAL SRVCS | General Contractor | 6 | 03/21/2026 |
| MARIC MECHANICAL INC | General Contractor | 6 | 03/21/2026 |
| THE WHITING-TURNER CONTRA | General Contractor | 5 | 04/09/2026 |
| CAPITAL CONTR P & H CORP | Fire Protection | 5 | 07/08/2026 |
| L.F. DRISCOLL COMPANY LLC | General Contractor | 4 | 07/08/2026 |
| SCARAN OIL SERVICE INC | General Contractor | 4 | 07/08/2026 |
| TARA BUILDERS INC | General Contractor | 3 | 03/21/2026 |
| TILOSCO INC | General Contractor | 3 | 07/08/2026 |
| UNITY CONSTR. SVCS INC | General Contractor | 3 | 07/08/2026 |
| PANCZAK, JANUSZ | Electrical | 2 | 03/21/2026 |
| BLISSENBACH, K | Electrical | 2 | 03/21/2026 |
| JACKSON, CORNELIUS | Electrical | 2 | 03/21/2026 |
| CAPITOL AWNING CO INC | General Contractor | 2 | 03/21/2026 |
| MORELAND CONSTRUCTION GR* | General Contractor | 2 | 04/09/2026 |
| COMMUNICATION COMPONENT S | General Contractor | 1 | 09/29/2026 |
| REID, E | Electrical | 1 | 03/21/2026 |
| RALPH OCCHIPINTI | Electrical | 1 | 03/21/2026 |
| PASCARELLA, JOSEPH | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BIG APPLE GROUP NY A RMA | 9168 | 24 | 07/10/2026 |
| AG ENGINEERING PLLC | 8899 | 1 | 01/20/2026 |
| MT GROUP | 798 | 5 | 10/30/2025 |
| A TECH ENGINEERING NYC, P | 6738 | 12 | 10/01/2025 |
| BIG APPLE GROUP NY, LLC | 1258 | 5 | 08/13/2025 |
| AMARACON TESTING & INSPEC | 5842 | 7 | 09/04/2024 |
| WSP USA CORP | 1848 | 2 | 01/30/2024 |
| CNS INSPECTION SERVICES | 7566 | 2 | 01/30/2024 |
| KMB DESIGN GROUP, LLC | 513 | 1 | 06/14/2023 |
| WSP USA | 3159 | 4 | 01/19/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Antenna | Permit Issued | COMMUNICATION COMPONENT S | 09/28/2026 |
| DOB NOW | Structural | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 09/23/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 09/18/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 09/02/2026 |
| DOB NOW | General Construction | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 09/01/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | PPM TELECOM LLC | 05/11/2026 |
| DOB NOW | Mechanical Systems | Signed-off | B.C. MECHANICAL INC | 03/24/2026 |
| DOB NOW | General Construction | Permit Issued | THE WHITING-TURNER CONTRA | 03/13/2026 |
| DOB NOW | Standpipe | Permit Issued | CAPITAL CONTR P&H CORP | 03/04/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 01/22/2026 |
| DOB NOW | Suspended Scaffold | Signed-off | PPM TELECOM LLC | 01/13/2026 |
| DOB NOW | Structural | Permit Issued | L.F. DRISCOLL COMPANY LLC | 01/09/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L.F. DRISCOLL COMPANY LLC | 01/09/2026 |
| DOB NOW | Standpipe | Permit Issued | SIRINA FIRE PROT CORP | 12/16/2025 |
| DOB NOW | Plumbing | Permit Issued | SIRINA FIRE PROT CORP | 12/16/2025 |
| DOB NOW | Antenna | Signed-off | SBA NETWORK SERVICES LLC | 10/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JRB CONSTRUCTION CORP | 10/07/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SAFWAY ATLANTIC, LLC | 09/29/2025 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 09/04/2025 |
| DOB NOW | Plumbing | Signed-off | CAPITAL CONTR P&H CORP | 08/28/2025 |
| DOB NOW | Mechanical Systems | Signed-off | MORELAND CONSTRUCTION GR* | 08/21/2025 |
| DOB NOW | Structural | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 07/15/2025 |
| DOB NOW | Structural | Permit Issued | HUNTER ROBERTS CONSTRUCTION | 07/15/2025 |
| DOB NOW | General Construction | Signed-off | HUNTER ROBERTS CONSTRUCTION | 06/10/2025 |
| DOB NOW | General Construction | Signed-off | HUNTER ROBERTS CONSTRUCTION | 06/10/2025 |
| DOB NOW | General Construction | Signed-off | MORELAND CONSTRUCTION GR* | 05/23/2025 |
| DOB NOW | Sprinklers | Permit Issued | CAPITAL CONTR P&H CORP | 03/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | THE WHITING-TURNER CONTRA | 03/14/2025 |
| DOB NOW | Plumbing | Permit Issued | CAPITAL CONTR P&H CORP | 03/12/2025 |
| DOB NOW | General Construction | Permit Issued | THE WHITING-TURNER CONTRA | 03/12/2025 |
| DOB NOW | Sprinklers | Signed-off | CAPITAL CONTR P&H CORP | 03/12/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | SAFWAY ATLANTIC, LLC | 03/12/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | SAFWAY ATLANTIC, LLC | 03/12/2025 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 03/11/2025 |
| DOB NOW | Mechanical Systems | Signed-off | UNITY CONSTR. SVCS INC | 03/10/2025 |
| DOB NOW | General Construction | Signed-off | UNITY CONSTR. SVCS INC | 02/27/2025 |
| DOB NOW | Structural | Signed-off | UNITY CONSTR. SVCS INC | 02/27/2025 |
| DOB NOW | Structural | Permit Issued | L.F. DRISCOLL COMPANY LLC | 12/30/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | L.F. DRISCOLL COMPANY LLC | 12/30/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/04/2024 | Permit Issued | L.F. DRISCOLL COMPANY LLC | Air Conditioning Systems, Heating Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2025 | — | — | 1 heads, 1 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2025 | — | — | — |
| 06/20/2025 | Signed-off | CAPITAL CONTR P&H CORP | Water/Sanitary |
| 06/20/2023 | — | — | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/02/2026 | Permit Issued | HATZEL AND BUEHLER, INC | General Wiring |
| 09/24/2025 | Permit Issued | NEAD ELECTRIC INC. | — |
| 07/18/2025 | Complete | L&B ELEC'L INTERNATIONAL | General Wiring |
| 03/31/2025 | Permit Issued | NEAD ELECTRIC INC. | General Wiring |
| 02/21/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 05/09/2024 | Permit Issued | CORPORATE ELEC. GROUP INC | — |
| 06/08/2023 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 06/08/2023 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 05/18/2023 | Complete | DIANE ELECTRIC INC. | General Wiring |
| 01/06/2023 | Complete | MHO'S ELECTRIC CORP | — |
| 10/06/2022 | Complete | DIANE ELECTRIC INC. | General Wiring |
| 10/06/2022 | Complete | DIANE ELECTRIC INC. | General Wiring |
| 09/08/2022 | Complete | DIANE ELECTRIC INC. | General Wiring |
| 07/19/2022 | Permit Issued | TOP SHELF ELECTRIC CORP | — |
| 09/07/2021 | Complete | NEAD ELECTRIC INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/10/2026 | Signed-off | HUNTER ROBERTS CONSTRUCTI | Steel |
| 03/17/2026 | — | — | Steel |
| 01/13/2026 | — | — | 2 scope_items |
| 01/13/2026 | — | — | 2 scope_items |
| 08/13/2025 | Permit Issued | L.F. DRISCOLL COMPANY LLC | Steel, Concrete |
| 07/23/2025 | — | — | Steel, Concrete |
| 06/20/2025 | Signed-off | CAPITAL CONTR P&H CORP | 3 scope_items |
| 03/11/2025 | Permit Issued | HUNTER ROBERTS CONSTRUCTI | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2026 | Permit Issued | PPM TELECOM LLC | — |
| 12/07/2023 | Permit Issued | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/03/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/01/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/13/2025 | Pass-Final General Construction Directive 14 | Pass | View ↗ |
| 10/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/07/2025 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 10/07/2025 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 10/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/26/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/18/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/04/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/12/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 05/06/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/02/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/11/2024 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 11/08/2024 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 10/03/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/30/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/13/2026 | Post-installed Anchors | SOORJBALLY HARILALL | special |
| 07/13/2026 | Structural Steel - Welding | SOORJBALLY HARILALL | special |
| 07/13/2026 | Structural Steel - Details | SOORJBALLY HARILALL | special |
| 07/13/2026 | Energy Code Compliance Inspections | SOORJBALLY HARILALL | progress |
| 07/13/2026 | Final | Yifeng Zhang | progress |
| 07/13/2026 | Fenestration and door U-factor and product ratings | SOORJBALLY HARILALL | energy_progress |
| 07/13/2026 | Insulation placement and R values | SOORJBALLY HARILALL | energy_progress |
| 07/13/2026 | Fenestration air leakage | SOORJBALLY HARILALL | energy_progress |
| 07/01/2026 | Post-installed Anchors | SOORJBALLY HARILALL | special |
| 07/01/2026 | Structural Steel - Details | SOORJBALLY HARILALL | special |
| 07/01/2026 | Structural Steel - Welding | SOORJBALLY HARILALL | special |
| 07/01/2026 | Energy Code Compliance Inspections | SOORJBALLY HARILALL | progress |
| 07/01/2026 | Final | Yifeng Zhang | progress |
| 07/01/2026 | Fenestration and door U-factor and product ratings | SOORJBALLY HARILALL | energy_progress |
| 07/01/2026 | Fenestration air leakage | SOORJBALLY HARILALL | energy_progress |
| 07/01/2026 | Insulation placement and R values | SOORJBALLY HARILALL | energy_progress |
| 05/12/2026 | Fenestration and door U-factor and product ratings | SOORJBALLY HARILALL | energy_progress |
| 05/12/2026 | Fenestration air leakage | SOORJBALLY HARILALL | energy_progress |
| 05/12/2026 | Insulation placement and R values | SOORJBALLY HARILALL | energy_progress |
| 05/12/2026 | Final | Yifeng Zhang | progress |
| 05/12/2026 | Energy Code Compliance Inspections | SOORJBALLY HARILALL | progress |
| 05/12/2026 | Structural Steel - Welding | SOORJBALLY HARILALL | special |
| 05/12/2026 | Structural Steel - Details | SOORJBALLY HARILALL | special |
| 05/12/2026 | Post-installed Anchors | SOORJBALLY HARILALL | special |
| 01/19/2026 | HVAC-R and service water heating equipment | ARIEL GOLSHAN | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| University Hospital Northwell Health | Medical / Healthcare | — | Project S01085291 |
| NWH - SIUH South OR | Medical / Healthcare | — | Project S01085294 |
| Northwell SIUH | Medical / Healthcare | — | Project S08002327 |