Hospital, sanitarium, mental institution
SI Hospital South Campus
375 SEGUINE AVENUE · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5082757
💬 Discuss this project
1967Year Built
3Stories
I1Building Class
R3XZoning
220,240 sfGross Floor Area
200Units
13 Open Violations ▸FDNY Report ↗
Hospital, sanitarium, mental institution · Owner of record: STATEN ISLAND UNVRST HOSPITAL · 251,199 sf lot · 0.88 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
Roof55p · 28 filings · 20 docs
Floor 4Under Construction40p · 2 filings · 8 docs
Floor 3Under Construction41p · 3 filings · 14 docs
Floor 2Under Construction43p · 4 filings · 20 docs
Floor 160p · 13 filings · 20 docs
CellarUnder Construction4p · 3 filings · 20 docs
BasementUnder Construction10p · 6 filings · 20 docs
Sub-BasementUnder Construction45p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SIUH1309/29/2026
SBA NETWORK SERVICES507/08/2026
NORTHWELL HEALTH (SIUH)10204/09/2026
SBA403/22/2026
STATEN ISLAND UNVRST HOSPITAL403/22/2026
S I UNIVERSITY HOSPITAL3903/21/2026
STATEN ISLAND HOSPITAL203/21/2026
T-MOBILE103/21/2026
SI UNIV HOSPITAL303/21/2026
PILKU CONSTRUCTION SERVICE303/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRING SCAFFOLDING LLCGeneral Contractor2907/08/2026
JRB CONSTRUCTION CORPGeneral Contractor2807/08/2026
HUNTER ROBERTS CONSTRUCTIONGeneral Contractor2109/24/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1609/19/2026
CAPITAL CONTR P&H CORPPlumbing1207/08/2026
SIRINA FIRE PROT CORPFire Protection609/03/2026
OVERLAND CONTRACTING INCGeneral Contractor603/21/2026
METRO ENVIRONMENTAL SRVCSGeneral Contractor603/21/2026
MARIC MECHANICAL INCGeneral Contractor603/21/2026
THE WHITING-TURNER CONTRAGeneral Contractor504/09/2026
CAPITAL CONTR P & H CORPFire Protection507/08/2026
L.F. DRISCOLL COMPANY LLCGeneral Contractor407/08/2026
SCARAN OIL SERVICE INCGeneral Contractor407/08/2026
TARA BUILDERS INCGeneral Contractor303/21/2026
TILOSCO INCGeneral Contractor307/08/2026
UNITY CONSTR. SVCS INCGeneral Contractor307/08/2026
PANCZAK, JANUSZElectrical203/21/2026
BLISSENBACH, KElectrical203/21/2026
JACKSON, CORNELIUSElectrical203/21/2026
CAPITOL AWNING CO INCGeneral Contractor203/21/2026
MORELAND CONSTRUCTION GR*General Contractor204/09/2026
COMMUNICATION COMPONENT SGeneral Contractor109/29/2026
REID, EElectrical103/21/2026
RALPH OCCHIPINTIElectrical103/21/2026
PASCARELLA, JOSEPHElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682407/10/2026
AG ENGINEERING PLLC8899101/20/2026
MT GROUP798510/30/2025
A TECH ENGINEERING NYC, P67381210/01/2025
BIG APPLE GROUP NY, LLC1258508/13/2025
AMARACON TESTING & INSPEC5842709/04/2024
WSP USA CORP1848201/30/2024
CNS INSPECTION SERVICES7566201/30/2024
KMB DESIGN GROUP, LLC513106/14/2023
WSP USA3159401/19/2023
Building Lifecycle
All (300)Filed (56)Permit Issued (74)Signed Off (45)Violation (18)Inspection (37)Objection (40)Special Inspection (30)
09/28/2026
Permit issued — Antenna
S01442538-I1-AN
09/23/2026
Permit issued — Structural
S01190460-I1-GC
09/18/2026
Permit issued — Supported Scaffold
S01191414-I1-SF
09/02/2026
Permit issued — Sprinklers
S01233521-I1-EW-SP
09/01/2026
Permit issued — General Construction
S01190460-I1-ST
08/24/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2026
Filed — Alteration
DEP Antenna Site. Removal of (2) antennas on bulkhead facade. Install (1) DCU cabinet on roof at bulkhead facade and (1) related solar panel on bulkhead facade. No change in use, egress or occupancy
S01442538-I1
08/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/14/2026
Signed off — Alteration
Filing for roof & guardrail replacment & concrete patching as per plans filed herewith. No change in use, egress or occupancy.
S01189539-I1
07/13/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Final
Yifeng Zhang
07/13/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
07/13/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
07/10/2026
Filed — Alteration
Filing for roof & guardrail replacment & concrete patching as per plans filed herewith. No change in use, egress or occupancy.
S01189539-P2
07/01/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Final
Yifeng Zhang
07/01/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
07/01/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
06/15/2026
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH MOBILE KITCHEN TRAILER FILED UNDER S01227343 TO PROVIDE EXTERIOR GREASE TRAP & GRAY WATER HOLDING TANKS FOR TEMP MOBILE HOSPITAL KITCHEN. TEMP DOMESTIC WATER SUPLLY CONNECTION BETWEEN HOSPITAL & MOBILE KITCHEN
S01227343-I1
05/12/2026
Filed — Alteration
Filing for roof & guardrail replacment & concrete patching as per plans filed herewith. No change in use, egress or occupancy.
S01189539-P1
05/12/2026
Special inspection requirement — Final
Yifeng Zhang
05/12/2026
Special inspection requirement — Structural Steel - Welding
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Insulation placement and R values
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Post-installed Anchors
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Fenestration air leakage
SOORJBALLY HARILALL
05/12/2026
Special inspection requirement — Structural Steel - Details
SOORJBALLY HARILALL
05/11/2026
Permit issued — Suspended Scaffold
S01389145-I1-SC
04/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY JERSEY BARRICADE WITH PLYWOOD FENCE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
S00819022-S1
04/17/2026
Filed — Alteration
IRA FOR THE VERTICLA CABLE TRAY LOCATION INSPECTION
S01389145-I1
04/13/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/01/2026
Signed off — Alteration
Filing for the direct replacement of the existing HVAC, condenser, and air handler inkind. No change in use, egress,s or occupancy.
S01348500-I1
04/01/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/01/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/25/2026
Signed off — Alteration
Modification to existing T-Mobile site on roof. Replace 2 equipment cabinets, 2 antennas, and 3 RRH units. Remove 3 RRH units and 2 TMAs. No change in use, egress, or occupancy.
S01226340-I1
03/24/2026
Permit issued — Mechanical Systems
S01348500-I1-MS
03/17/2026
Filed — Alteration
Filing for facade repair and window replacement as per plans filed herewith. No change in use, egress or occupancy.
S01231597-I1
03/13/2026
Permit issued — General Construction
S01096424-I1-GC
03/04/2026
Permit issued — Standpipe
S01081324-I1-PL
02/27/2026
Signed off — Alteration
S01234434-I1
02/18/2026
Objection resolved — Addressed
02/16/2026
Signed off — Alteration
IRA FOR THE VERTICLA CABLE TRAY LOCATION INSPECTION
S01343397-I1
02/16/2026
Objection resolved — Addressed
02/16/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Fire_Protection
02/04/2026
Objection resolved — Addressed
02/02/2026
Objection raised — Scope
02/02/2026
Objection raised — Zoning
02/02/2026
Objection raised — Structural
01/26/2026
Signed off — Alteration
DIRECT REPLACEMENT OF EXISTING GREASE EXHAUST FAN ON ROOF; REPLACEMENT OF EXISTING TYPE I GREASE DUCT FROM BASEMENT HOOD TO ROOF,
S01199603-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaPermit IssuedCOMMUNICATION COMPONENT S09/28/2026
DOB NOWStructuralPermit IssuedHUNTER ROBERTS CONSTRUCTION09/23/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/18/2026
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP09/02/2026
DOB NOWGeneral ConstructionPermit IssuedHUNTER ROBERTS CONSTRUCTION09/01/2026
DOB NOWSuspended ScaffoldPermit IssuedPPM TELECOM LLC05/11/2026
DOB NOWMechanical SystemsSigned-offB.C. MECHANICAL INC03/24/2026
DOB NOWGeneral ConstructionPermit IssuedTHE WHITING-TURNER CONTRA03/13/2026
DOB NOWStandpipePermit IssuedCAPITAL CONTR P&H CORP03/04/2026
DOB NOWProtection and Mechanical MethodsSigned-offSPRING SCAFFOLDING LLC01/22/2026
DOB NOWSuspended ScaffoldSigned-offPPM TELECOM LLC01/13/2026
DOB NOWStructuralPermit IssuedL.F. DRISCOLL COMPANY LLC01/09/2026
DOB NOWMechanical SystemsPermit IssuedL.F. DRISCOLL COMPANY LLC01/09/2026
DOB NOWStandpipePermit IssuedSIRINA FIRE PROT CORP12/16/2025
DOB NOWPlumbingPermit IssuedSIRINA FIRE PROT CORP12/16/2025
DOB NOWAntennaSigned-offSBA NETWORK SERVICES LLC10/28/2025
DOB NOWMechanical SystemsSigned-offJRB CONSTRUCTION CORP10/07/2025
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC09/29/2025
DOB NOWSprinklersPermit IssuedSIRINA FIRE PROT CORP09/04/2025
DOB NOWPlumbingSigned-offCAPITAL CONTR P&H CORP08/28/2025
DOB NOWMechanical SystemsSigned-offMORELAND CONSTRUCTION GR*08/21/2025
DOB NOWStructuralPermit IssuedHUNTER ROBERTS CONSTRUCTION07/15/2025
DOB NOWStructuralPermit IssuedHUNTER ROBERTS CONSTRUCTION07/15/2025
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION06/10/2025
DOB NOWGeneral ConstructionSigned-offHUNTER ROBERTS CONSTRUCTION06/10/2025
DOB NOWGeneral ConstructionSigned-offMORELAND CONSTRUCTION GR*05/23/2025
DOB NOWSprinklersPermit IssuedCAPITAL CONTR P&H CORP03/14/2025
DOB NOWMechanical SystemsPermit IssuedTHE WHITING-TURNER CONTRA03/14/2025
DOB NOWPlumbingPermit IssuedCAPITAL CONTR P&H CORP03/12/2025
DOB NOWGeneral ConstructionPermit IssuedTHE WHITING-TURNER CONTRA03/12/2025
DOB NOWSprinklersSigned-offCAPITAL CONTR P&H CORP03/12/2025
DOB NOWSidewalk ShedPermit IssuedSAFWAY ATLANTIC, LLC03/12/2025
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC03/12/2025
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP03/11/2025
DOB NOWMechanical SystemsSigned-offUNITY CONSTR. SVCS INC03/10/2025
DOB NOWGeneral ConstructionSigned-offUNITY CONSTR. SVCS INC02/27/2025
DOB NOWStructuralSigned-offUNITY CONSTR. SVCS INC02/27/2025
DOB NOWStructuralPermit IssuedL.F. DRISCOLL COMPANY LLC12/30/2024
DOB NOWMechanical SystemsPermit IssuedL.F. DRISCOLL COMPANY LLC12/30/2024
+ 60 more permits on file
1 project · most recent 09/04/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/04/2024Permit IssuedL.F. DRISCOLL COMPANY LLCAir Conditioning Systems, Heating Systems
Cooling
N/A AXM030 20,000 CFM ×1
Heating
Trane AXM030 831,000 BTU · Heat Pump Outdoor ×1
TPACVMV0600D3-MM-HR 1,582,000 BTU · Vrf Outdoor ×1
1 project · most recent 08/25/2025
FiledStatusContractorScope
08/25/2025——1 heads, 1 outlets
3 projects · most recent 08/25/2025
Water/Sanitary Gas
FiledStatusContractorScope
08/25/2025———
06/20/2025Signed-offCAPITAL CONTR P&H CORPWater/Sanitary
06/20/2023——Gas
21 projects · most recent 03/02/2026
General Wiring
FiledStatusContractorScope
03/02/2026Permit IssuedHATZEL AND BUEHLER, INCGeneral Wiring
09/24/2025Permit IssuedNEAD ELECTRIC INC.—
07/18/2025CompleteL&B ELEC'L INTERNATIONALGeneral Wiring
03/31/2025Permit IssuedNEAD ELECTRIC INC.General Wiring
02/21/2025CompleteNEAD ELECTRIC INC.General Wiring
05/09/2024Permit IssuedCORPORATE ELEC. GROUP INC—
06/08/2023CompleteNEAD ELECTRIC INC.General Wiring
06/08/2023CompleteNEAD ELECTRIC INC.General Wiring
05/18/2023CompleteDIANE ELECTRIC INC.General Wiring
01/06/2023CompleteMHO'S ELECTRIC CORP—
10/06/2022CompleteDIANE ELECTRIC INC.General Wiring
10/06/2022CompleteDIANE ELECTRIC INC.General Wiring
09/08/2022CompleteDIANE ELECTRIC INC.General Wiring
07/19/2022Permit IssuedTOP SHELF ELECTRIC CORP—
09/07/2021CompleteNEAD ELECTRIC INC.General Wiring
8 projects · most recent 07/10/2026
Steel Concrete
FiledStatusContractorScope
07/10/2026Signed-offHUNTER ROBERTS CONSTRUCTISteel
03/17/2026——Steel
01/13/2026——2 scope_items
01/13/2026——2 scope_items
08/13/2025Permit IssuedL.F. DRISCOLL COMPANY LLCSteel, Concrete
07/23/2025——Steel, Concrete
06/20/2025Signed-offCAPITAL CONTR P&H CORP3 scope_items
03/11/2025Permit IssuedHUNTER ROBERTS CONSTRUCTISteel
2 projects · most recent 04/17/2026
FiledStatusContractorScope
04/17/2026Permit IssuedPPM TELECOM LLC—
12/07/2023Permit Issued——
▾Field Inspections (DOB CAP) — 49
DateTypeResultReport
08/24/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/13/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/01/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/01/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/12/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/13/2025Pass-Final General Construction Directive 14PassView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/07/2025Certified Medical Gas - MG - PL - RoughingCertifiedView ↗
10/07/2025Certified Medical Gas - MG - PL - TestCertifiedView ↗
10/07/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/12/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/06/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
11/08/2024Fail-Final Boiler Equipment InspectionFailView ↗
10/03/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 49.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/13/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
07/13/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
07/13/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
07/13/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/13/2026FinalYifeng Zhangprogress
07/13/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
07/13/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
07/13/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
07/01/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
07/01/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
07/01/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
07/01/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
07/01/2026FinalYifeng Zhangprogress
07/01/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
07/01/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
07/01/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
05/12/2026Fenestration and door U-factor and product ratingsSOORJBALLY HARILALLenergy_progress
05/12/2026Fenestration air leakageSOORJBALLY HARILALLenergy_progress
05/12/2026Insulation placement and R valuesSOORJBALLY HARILALLenergy_progress
05/12/2026FinalYifeng Zhangprogress
05/12/2026Energy Code Compliance InspectionsSOORJBALLY HARILALLprogress
05/12/2026Structural Steel - WeldingSOORJBALLY HARILALLspecial
05/12/2026Structural Steel - DetailsSOORJBALLY HARILALLspecial
05/12/2026Post-installed AnchorsSOORJBALLY HARILALLspecial
01/19/2026HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
University Hospital Northwell HealthMedical / Healthcare—
Project S01085291 Alteration · Permit Entire · 09/04/2024
NWH - SIUH South ORMedical / Healthcare—
Project S01085294 Alteration · Permit Entire · 08/18/2024
Northwell SIUHMedical / Healthcare—
Project S08002327 Alteration · LOC Issued · 10/24/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 1,003 on file (BIS + DOB NOW)
▸Plans & Drawings94
▸DOB NOWPlans/Sketch87
08/26/2026S00013308-I1Request digital key ↗
08/25/2026S00526902-I1Request digital key ↗
08/25/2026S00598597-I1Request digital key ↗
Showing 3 of 87 on file for this type
▸DOB NOWPlans/Sketch - Antenna3
08/26/2026S00341778-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - General Construction2
08/25/2026S00463446-I1Request digital key ↗
08/25/2026S00463446-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026S00401248-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00463446-S1Request digital key ↗
▸Applications & Permits112
▸BISPLAN / WORK APPROVAL APPLICATION59
12/13/2024520367709Open ↗
12/12/2024520367709Open ↗
12/06/2024520367709Open ↗
Showing 3 of 59 on file for this type
▸BISWORK PERMIT APPLICATION53
11/07/2024520367709Open ↗
08/25/2022520367709Open ↗
08/24/2022520367709Open ↗
Showing 3 of 53 on file for this type
▸Seals & Professional Certifications341
▸DOB NOWProgress Inspector Seal & Signature104
09/23/2026S01199603-I1Open ↗
09/23/2026S01348500-I1Open ↗
09/23/2026S01348500-I1Open ↗
Showing 3 of 104 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature91
08/26/2026S00013308-I1Open ↗
08/26/2026S00290740-I1Open ↗
08/26/2026S00341778-I1Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature72
09/23/2026S08002327-I1Open ↗
09/23/2026S00798820-I1Open ↗
09/23/2026S01199603-I1Open ↗
Showing 3 of 72 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION45
01/29/2020520222704Open ↗
01/06/2020520394225Open ↗
03/28/2019520367674Open ↗
Showing 3 of 45 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment34
▸BISEQUIPMENT USE APPLICATION/PERMIT9
05/22/2025520367709Open ↗
01/22/2025520367709Open ↗
12/11/2024520367709Open ↗
Showing 3 of 9 on file for this type
▸BISEQUIPMENT USE PERMITS9
05/22/2025520367709Open ↗
01/13/2025520367709Open ↗
10/30/2019520329421Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING7
12/02/2024520367709Open ↗
01/24/2024520367709Open ↗
05/03/2021500098039Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
03/04/2019520367709Open ↗
Showing 1 of 3 on file for this type
▸BISSELF-CERT PLUMBING NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER SYSTEMS1
01/10/2023520367674Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/11/2020520144460Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
11/18/2021520367709Open ↗
▸Environmental & Asbestos75
▸DOB NOWDEP ACP-5: Asbestos Assessment Report56
09/27/2026S01442538-I1Open ↗
08/26/2026S00013308-I1Open ↗
08/26/2026S00341778-I1Open ↗
Showing 3 of 56 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
11/06/2019520394225Open ↗
03/28/2019520367674Open ↗
Showing 2 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance46
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
01/29/2020520222704Open ↗
01/09/2020520394225Open ↗
01/06/2020520394225Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
07/18/2020520238635Open ↗
01/29/2020520222704Open ↗
Showing 2 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
08/24/2026S00504655-I1Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/25/2020520367709Open ↗
07/18/2020520238635Open ↗
06/18/2020520367709Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
12/24/2024520367709Open ↗
12/14/2022520367674Open ↗
08/11/2020520144460Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
12/24/2024520367709Open ↗
01/10/2023520367674Open ↗
08/11/2020520144460Open ↗
▸BISLIGHTING CONTROLS2
12/24/2024520367709Open ↗
12/14/2022520367674Open ↗
▸BISINTERIOR LIGHTING POWER2
12/24/2024520367709Open ↗
12/14/2022520367674Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* HVAC INSULATION AND SEALING1
12/14/2022520367674Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports37
▸BISTECHNICAL REPORT: RESPONSIBILITY18
10/29/2024520367709Open ↗
10/11/2024520367709Open ↗
10/10/2024520367709Open ↗
Showing 3 of 18 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
12/24/2024520367709Open ↗
01/09/2023520367674Open ↗
08/11/2020520144460Open ↗
▸BISMECHANICAL SYSTEMS3
04/15/2025520367709Open ↗
01/10/2023520367674Open ↗
08/11/2020520144460Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
04/21/2023500098039Open ↗
10/27/2021500246940Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)2
04/21/2023500098039Open ↗
10/27/2021500246940Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS2
12/13/2024520367709Open ↗
01/09/2023520367674Open ↗
▸BISPOST-INSTALLED ANCHORS1
10/29/2024520367709Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
10/29/2024520367709Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/19/2020520367709Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
10/29/2024520367709Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/29/2024520367709Open ↗
▸DOB NOWSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs117
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter74
08/25/2026S00463446-I1Open ↗
08/25/2026S00463446-P1Open ↗
08/25/2026S00463446-S1Open ↗
Showing 3 of 74 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
04/16/2025520367709Open ↗
04/27/2023500098039Open ↗
01/17/2023520367674Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWDEP Variance (V5) letter3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/25/2020520367709Open ↗
Showing 1 of 2 on file for this type
▸BISFINAL2
04/15/2025520367709Open ↗
01/09/2023520367674Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWNYS DEC Freshwater Wetlands Approval1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT27
07/18/2020520238635Open ↗
01/13/2020520394225Open ↗
03/04/2019520367709Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
09/04/2024520367709Open ↗
12/13/2022520367674Open ↗
08/11/2020520144460Open ↗
▸Filing & Intake Forms55
▸BISEFILING COVER SHEET26
11/06/2019520394225Open ↗
10/30/2019520367709Open ↗
03/04/2019520367709Open ↗
Showing 3 of 26 on file for this type
▸BISBOROUGH INTAKE FORM16
11/07/2024520367709Open ↗
07/23/2021500246940Open ↗
09/25/2020520367709Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
12/17/2024520367709Open ↗
10/10/2024520367709Open ↗
09/27/2024520367709Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents38
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION18
08/19/2020520367709Open ↗
08/19/2020520367709Open ↗
08/19/2020520367709Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWIRA Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BIS* FIRE STOPS 27-3452
04/21/2023500098039Open ↗
10/27/2021500246940Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7792
04/21/2023500098039Open ↗
10/27/2021500246940Open ↗
▸BISSTRUCTURAL COLD-FORMED STEEL1
10/29/2024520367709Open ↗
▸BISMAINTENANCE INFORMATION1
08/11/2020520144460Open ↗
▸DOB NOWNYS DEC Freshwater Wetlands Map1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type