Roof1p · 5 filings · 20 docs
ArchitectureElectricalEquipmentMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sidewalk Shed · Supported Scaffold
Filing herewith roof repairs. No change in use, egress, or occupancy.
On file for this project
6 documents
PROPOSED INSTALLATION OF LEO BETA MAX HOIST FOR EQUIPMENT/MATERIALS MOVEMENT PURPOSES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY TO THE BUILDING.
On file for this project
2 documents
INSTALLATION OF 24 LF OF HEAVY DUTY SIDEWALK SHED ON 14TH FLOOR SET-BACK ROOF TERRACE AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents
Latest 3 of 5 filings on this floor.
Floor 335p · 3 filings · 19 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 1 drawing sheet
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents · 2 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 2 drawing sheets
Floor 32
Floor 3110p · 9 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Filing herewith sprinkler work, Hume Expansion, at existing 31st floor space. No change in use, egress or occupancy.
On file for this project
4 documents
Filing herewith interior renovation, Hume Expansion, on existing 31th floor. No change in use, egress or occupancy.
On file for this project
7 documents
Filing herewith mechanical work, Hume Expansion, on existing 31st floor space. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Floor 303p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Filing herewith plumbing and sprinkler work, pre build suites, in existing 30th floor space. No change in use, egress or occupancy.
On file for this project
17 documents
(Demo Phase) Installation of Temporary Core Sprinkler Loop System [TCSP] as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents
(Demo Phase) Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 29
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 23Under Construction2p · 3 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Removal of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing Sprinkler and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 2 drawing sheets
Floor 22Under Construction2p · 3 filings · 17 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Removal of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing Sprinkler and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 2 drawing sheets
Floor 21Under Construction4p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents
Removal of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Modification to existing Sprinkler and plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 2013p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith pluming and sprinkler work for interior fit out in existing 17th through 20th floor space. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Filing herewith mechanical work for interior fit out in existing 17th through 20th floors. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Filing herewith interior renovation in existing 17 through 20 floor space. No change in use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 12 filings on this floor.
Floor 1911p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith pluming and sprinkler work for interior fit out in existing 17th through 20th floor space. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Filing herewith mechanical work for interior fit out in existing 17th through 20th floors. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Filing herewith interior renovation in existing 17 through 20 floor space. No change in use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 12 filings on this floor.
Floor 1812p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith pluming and sprinkler work for interior fit out in existing 17th through 20th floor space. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Filing herewith mechanical work for interior fit out in existing 17th through 20th floors. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Filing herewith interior renovation in existing 17 through 20 floor space. No change in use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 12 filings on this floor.
Floor 1711p · 12 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Filing herewith pluming and sprinkler work for interior fit out in existing 17th through 20th floor space. No change in use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Filing herewith mechanical work for interior fit out in existing 17th through 20th floors. No change in use, egress or occupancy.
On file for this project
14 documents · 3 drawing sheets
Filing herewith interior renovation in existing 17 through 20 floor space. No change in use, egress or occupancy.
On file for this project
13 documents
Latest 3 of 12 filings on this floor.
Floor 16
Floor 153p · 3 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
Reconfigure egress stair by eliminating fire tower with 2 hour fire rated partitions and 90-minute fireproof self-closing doors and change building construction classification from Class I fireproof (1938 code) to Class I-B (1968 code) per CCD1 #73205.
On file for this project
16 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
17 documents · 2 drawing sheets
Structural modifications as per plans filed herewith. (Related to ALT 1 123213851) Strengthening of the existing 14th floor slab and beams at amenity space. Introduction of new terrace access stairs, ramp, and stage area. (Continued on Sheet S-001.00)
On file for this project
10 documents · 1 drawing sheet
Floor 1414p · 20 filings · 20 docs
ArchitectureCivilFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Reconfigure egress stair by eliminating fire tower with 2 hour fire rated partitions and 90-minute fireproof self-closing doors and change building construction classification from Class I fireproof (1938 code) to Class I-B (1968 code) per CCD1 #73205.
On file for this project
16 documents
INSTALLATION OF TIE-BACK ANCHORS FOR SUSPENDED SCAFFOLD FILED IN CONJUNCTION WITH FACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
12 documents · 1 drawing sheet
INSTALLATION OF 24 LF OF HEAVY DUTY SIDEWALK SHED ON 14TH FLOOR SET-BACK ROOF TERRACE AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 20 filings on this floor.
Floor 131p · 1 filing · 10 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
Plumbing · Sprinklers
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
10 documents · 1 drawing sheet
Floor 12
Floor 11
Floor 10
Floor 92p · 1 filing · 14 docs
Fire ProtectionStructural
Issued Permit Scope
Sprinklers · Structural
Add new steel framing for moveable partition supports; local structural repairs & slab infills in reinforced concrete and supplemental steel beams where required. Concrete volume, < 50 cu yd.
On file for this project
14 documents · 2 drawing sheets
Floor 8Under Construction6p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
12 documents
Add new steel framing for moveable partition supports; local structural repairs & slab infills in reinforced concrete and supplemental steel beams where required. Concrete volume, < 50 cu yd.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 7
Floor 6
Floor 55p · 5 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD FROM THE TOP OF THE 2ND FLOOR TO PAST THE 5TH FLOOR.
On file for this project
4 documents
Filing herewith mechanical work at 45 Madison Avenue - Mikasa Space - on existing Mezzanine and 1st floor space. No change in use, egress or occupancy.
On file for this project
17 documents
REPLACE TWO- 50 TON CHILLERs CONNECTING TO THE EXISTING CHILL WATER PIPING, ELECTRICAL POWER AND CONTROLS.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 41p · 4 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD FROM THE TOP OF THE 2ND FLOOR TO PAST THE 5TH FLOOR.
On file for this project
4 documents
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
7 documents · 1 drawing sheet
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application
On file for this project
5 documents
Latest 3 of 4 filings on this floor.
Floor 3Under Construction4p · 6 filings · 20 docs
ArchitectureCivilElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural · Supported Scaffold
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD FROM THE TOP OF THE 2ND FLOOR TO PAST THE 5TH FLOOR.
On file for this project
4 documents
Latest 3 of 6 filings on this floor.
Floor 2Under Construction30p · 15 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modification to existing Sprinkler system (connecting new sprinkler heads to existing branch piping) as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
3 documents · 2 drawing sheets
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
6 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD FROM THE TOP OF THE 2ND FLOOR TO PAST THE 5TH FLOOR.
On file for this project
4 documents
Latest 3 of 15 filings on this floor.
Floor 1Under Construction48p · 25 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural · Supported Scaffold
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 3 drawing sheets
Removal and installation of interior non bearing partitions to 1st Floor and Sub Cellar Level with New Interim Dining space and Kitchen Office. Scope of Work includes Demolition, New Partitions, Ceilings, MEP and New Finishes. No change in use, egress
On file for this project
6 documents
Removal and installation of interior non bearing partitions. Scope of Work includes Partial Demolition, New MEP and Structure. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Latest 3 of 25 filings on this floor.
MezzanineUnder Construction35p · 13 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Removal and installation of interior non bearing partitions. Scope of Work includes Partial Demolition, New MEP and Structure. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Filing herewith plumbing work at existing first floor, MEZ and Sub-Cellar #3, 3B Level, space, Issey Miyake, 45 Madison Avenue. No change in use, egress or occupancy.
On file for this project
5 documents
Filing herewith structural work at existing first floor, MEZ and Sub-Cellar #3, 3B Level, space, Issey Miyake, 45 Madison Avenue. No change in use, egress or occupancy.
On file for this project
8 documents
Latest 3 of 13 filings on this floor.
Cellar3p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Structural
FILING HEREWITH SOFT REMOVAL IN EXISTING 1ST FL & MEZ & 3B LEVEL SPACE AT 45 MADISON AVE MIKASA SPACE OF NONLOAD BEARING PARTITIONS FINISHES ELEVA ELECTR LIGHTING ABANDONED MH&PL STREFRNT DOORS ARE EXISTING TO REMAIN NO CHANGE IN USE EGRESS OR OCCUPANCY
On file for this project
25 documents
Filing herewith structural work at 45 Madison Avenue, Mikasa Space, on existing Mezzanine and 1st Floor. No change in use, egress or occupancy.
On file for this project
32 documents
Filing herewith plumbing work at 45 Madison Avenue - Mikasa Space - to existing 3B Level, Mezzanine and 1st Floor space. No change in use, egress or occupancy.
On file for this project
15 documents
Latest 3 of 6 filings on this floor.
Sub-CellarUnder Construction61p · 24 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
14 documents · 1 drawing sheet
Removal and installation of interior non bearing partitions to 1st Floor and Sub Cellar Level with New Interim Dining space and Kitchen Office. Scope of Work includes Demolition, New Partitions, Ceilings, MEP and New Finishes. No change in use, egress
On file for this project
6 documents · 9 drawing sheets
Removal and installation of interior non bearing partitions. Scope of Work includes Partial Demolition, New MEP and Structure. No change in use, egress or occupancy under this application.
On file for this project
8 documents
Latest 3 of 24 filings on this floor.
Basement1p · 1 filing · 20 docs
Other
FILING HEREWITH STRUCTURAL PLANS TO INDICATE STRUCTURAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
28 documents · 1 drawing sheet
Sub-Basement1 filing · 20 docs
Structural
Issued Permit Scope
Structural
FILING HEREWITH STRUCTURAL PLANS TO INDICATE STRUCTURAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
28 documents
Site & exterior4 filings · 14 docs
ArchitectureEquipment
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE/ENCLOSURE SYSTEM AS PER DRAWINGS. FENCE ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
On file for this project
2 documents · 3 drawing sheets
Filing herewith facade repairs to existing store front entrance. No change in use, egress or occupancy.
On file for this project
5 documents · 9 drawing sheets
Installation of sidewalk shed for public protection during construction work, no change on egress
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.