← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Waterline Square
400 WEST 61ST STREET · BIN 1089723
💬 Discuss this project
2016Year Built
38Stories
RMBuilding Class
C4-7Zoning
846,331 sfGross Floor Area
890Units
LL97 CoveredRent Stabilized3 Open Violations ▸FISP: UNSAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: RCB1 NOMINEE LLC · 92,878 sf lot · 9.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Floor 371p · 1 filing · 12 docs
Floor 36
Floor 355p · 2 filings · 20 docs
Floor 34
Floor 33
Floor 32
Floor 31
Floor 30
Floor 294p · 1 filing · 3 docs
Floor 28
Floor 27
Floor 26
Floor 25
Floor 24
Floor 231p · 1 filing · 2 docs
Floor 22
Floor 21
Floor 20
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 5 docs
Floor 1
Sub-Cellar2p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GID2907/08/2026
GID PROPERTY MGMT603/22/2026
MYRIAD CONSTRUCTION SERVI403/22/2026
TISHMAN CONSTRUCTION1703/22/2026
PINNACLE INDUSTRIES LLC403/22/2026
INF ASSOCIATES103/22/2026
RCB 4 NOMINEE LLC A DELAWARE1303/21/2026
RCB1 NOMINEE LLC A DELAWARE LIM4903/21/2026
RCB1 NOMINEE2703/21/2026
RCB1 NOMINEE LLC C O GID DEV GRP503/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR1003/21/2026
NYCCODE1603/21/2026
METROPOLIS GROUP INC1403/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
JM ZONING, LLC.1403/21/2026
CLARKE CONSTRUCTION CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE1003/21/2026
WM ARCH603/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAFWAY ATLANTIC, LLCGeneral Contractor1707/08/2026
MYRIAD CONSTRUCTION SERVIGeneral Contractor1207/08/2026
CLINTON CONST INCGeneral Contractor603/21/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor603/21/2026
DVE CONSTRUCTION INCGeneral Contractor603/21/2026
ROUNDSQUARE BUILDERS,LLCGeneral Contractor507/08/2026
CITY SIGNSScaffold307/08/2026
HIGHLINE CONSTRUCTION GRGeneral Contractor307/08/2026
RRP PLUMBING CORPFire Protection207/08/2026
METROTECH MECHANICAL CORPPlumbing207/08/2026
RRP PLUMBING CORPPlumbing207/08/2026
KAPNAG HEATING & PLBG CORFire Protection207/08/2026
FRED GELLER ELEC'L INC.Electrical203/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor207/10/2026
FORTE EXPRESS P & H INCPlumbing207/08/2026
JP GENERAL CONTRACTOR &General Contractor107/08/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
KNIGHT ELEC'L SERV. CORP.Electrical103/22/2026
OMD ELECTRICAL CORPElectrical103/22/2026
SPIRELLI ELECTRIC INCElectrical103/22/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
ALL CITY REMODELING, INCGeneral Contractor107/08/2026
CRESCO ELECTRICAL CORPElectrical103/22/2026
SUCCESS CONTACT INCGeneral Contractor107/08/2026
ACCESS PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FREYER COLLABORATIVE ARCH2198203/29/2024
METRIC CONSULTING AND INS1803503/08/2024
ARNOLD MONTAG ARCHITECT,4599108/29/2023
LINEA LLP3155704/19/2022
RYAN SPECIAL ENGINEERING2018203/10/2022
DY SPECIAL INSPECTION LLC7210302/04/2022
TECTONIC ENGINEERING CONS106507/27/2021
Building Lifecycle
All (292)Filed (44)Permit Issued (54)Signed Off (30)Facade (FISP) (3)Violation (60)Inspection (21)Objection (50)Special Inspection (30)
07/27/2026
Cycle 10 facade report submitted
07/27/2026
Cycle 10 facade report signed — UNSAFE
07/09/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01383162-I1
07/08/2026
Permit issued — Sidewalk Shed
M01379240-I1-SH
06/22/2026
Cycle 10 facade inspection completed
05/08/2026
Violation issued (HPD, closed)
A
05/04/2026
Permit issued — Suspended Scaffold
M01383162-I1-SC
04/21/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01383162-I1
04/06/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01379240-I1
04/06/2026
Permit issued — Sidewalk Shed
M01379240-I1-SH
03/25/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2026
Violation issued (ECB, closed)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/25/2025
Violation issued (HPD, closed)
A
08/08/2025
Violation issued (HPD, closed)
C
08/01/2025
Violation issued (HPD, closed)
C
03/13/2025
Violation issued (HPD, closed)
B
03/13/2025
Violation issued (HPD, closed)
A
03/13/2025
Violation issued (HPD, closed)
B
03/13/2025
Violation issued (HPD, closed)
B
02/12/2025
Violation issued (HPD, closed)
A
02/12/2025
Violation issued (HPD, closed)
B
11/29/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
B
11/12/2024
Violation issued (HPD, closed)
A
11/12/2024
Violation issued (HPD, closed)
C
11/12/2024
Violation issued (HPD, closed)
C
09/11/2024
Violation issued (HPD, closed)
B
09/11/2024
Violation issued (HPD, closed)
B
09/11/2024
Violation issued (HPD, closed)
B
09/11/2024
Violation issued (HPD, closed)
B
04/18/2024
Signed off — Alteration
INTERIOR ALTERATION TO COMBINED APARTMENTS #23G & 23H.RENOVATION OF EXISTING KITCHEN KITCHEN ADDITION OF STUDY ROOM IN EXISTING BEDROOM CLOSING ENTRANCE TO APARTMENT 23H. APPLICATION TO COMBINE APARTMENTS FILED UNDER JOB # 140915570.
M00912684-I1
04/17/2024
Violation issued (HPD, closed)
A
04/08/2024
Signed off — Alteration
plumbing work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress or occupancy
M00718540-S2
04/08/2024
Signed off — Alteration
sprinkler work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy
M00718416-S1
04/04/2024
Signed off — Alteration
sprinkler work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress, or occupancy
M00718416-S2
04/04/2024
Signed off — Alteration
INSTALLATION OF MOVEABLE SLIDING DOOR AND A GYPSUM BOARD PARTITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00939579-I1
04/04/2024
Signed off — Alteration
plumbing work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress or occupancy
M00718540-S3
04/02/2024
Signed off — Alteration
plumbing work associated with the apartment renovation as shown on plans filed herewith. no change to use, egress or occupancy
M00718540-S1
03/29/2024
Filed — Alteration
INSTALLATION OF MOVEABLE SLIDING DOOR AND A GYPSUM BOARD PARTITION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY
M00939579-P1
Latest 60 of 292 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC07/08/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S05/04/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC04/06/2026
DOB NOWGeneral ConstructionSigned-offCLINTON CONST INC11/16/2023
DOB NOWGeneral ConstructionSigned-offCLINTON CONST INC09/19/2023
DOB NOWSignSigned-offELMER DAWSON04/06/2023
DOB NOWPlumbingSigned-offFORTE EXPRESS P & H INC11/01/2022
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI10/19/2022
DOB NOWGeneral ConstructionSigned-offMYRIAD CONSTRUCTION SERVI10/19/2022
DOB NOWGeneral ConstructionSigned-offALL CITY REMODELING, INC09/06/2022
DOB NOWMechanical SystemsSigned-offHIGHLINE CONSTRUCTION GR08/19/2022
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR08/19/2022
DOB NOWGeneral ConstructionSigned-offHIGHLINE CONSTRUCTION GR08/19/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP08/18/2022
DOB NOWPlumbingSigned-offMETROTECH MECHANICAL CORP08/18/2022
DOB NOWSprinklersSigned-offKAPNAG HEATING & PLBG COR08/15/2022
DOB NOWSprinklersSigned-offKAPNAG HEATING & PLBG COR08/15/2022
DOB NOWGeneral ConstructionSigned-offJP GENERAL CONTRACTOR &05/24/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.05/24/2022
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI01/06/2022
DOB NOWGeneral ConstructionSigned-offMYRIAD CONSTRUCTION SERVI01/05/2022
DOB NOWMechanical SystemsSigned-offMYRIAD CONSTRUCTION SERVI11/30/2021
DOB NOWPlumbingSigned-offFORTE EXPRESS P & H INC10/27/2021
DOB NOWGeneral ConstructionSigned-offMYRIAD CONSTRUCTION SERVI10/26/2021
DOB NOWGeneral ConstructionSigned-offMYRIAD CONSTRUCTION SERVI10/06/2021
DOB NOWPlumbingSigned-offRRP PLUMBING CORP08/18/2021
DOB NOWPlumbingSigned-offRALPH W. LANDOLFI JR.08/18/2021
DOB NOWPlumbingSigned-offKAPNAG HTG & PLBG CORP.07/27/2021
DOB NOWGeneral ConstructionSigned-offSUCCESS CONTACT INC07/20/2021
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.06/24/2021
DOB NOWGeneral ConstructionSigned-offDVE CONSTRUCTION INC06/02/2021
DOB NOWSignSigned-offELMER DAWSON05/18/2021
DOB NOWSignSigned-offELMER DAWSON05/18/2021
DOB NOWSprinklersSigned-offRRP PLUMBING CORP05/18/2021
DOB NOWGeneral ConstructionSigned-offDVE CONSTRUCTION INC05/06/2021
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC03/07/2021
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC02/13/2021
DOB NOWMechanical SystemsSigned-offROUNDSQUARE BUILDERS,LLC02/01/2021
DOB NOWPlumbingSigned-offANTHONY CAIAZZO01/21/2021
DOB NOWPlumbingSigned-offACCESS PLUMBING CORP12/18/2020
+ 60 more permits on file
1 project · most recent 09/16/2021
Water/Sanitary
FiledStatusContractorScope
09/16/2021——Water/Sanitary
25 projects · most recent 03/30/2026
General Wiring
FiledStatusContractorScope
03/30/2026Permit IssuedTOP SHELF ELECTRIC CORP—
04/16/2025CompleteGLENDALE ELECTL CONTNG IN—
04/19/2024CompleteSCHLESINGER ELECT'L CONTRGeneral Wiring
06/14/2023CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
06/09/2023CompleteCRESCO ELECTRICAL CORPGeneral Wiring
02/20/2023CompleteOMD ELECTRICAL CORP1 meters, 1 new_meters
02/15/2023CompleteE-J ELEC. INSTALLATION COGeneral Wiring
10/06/2022CompleteV.I.P. ELECTL CONTR CORPGeneral Wiring
04/19/2022CompleteFRED GELLER ELEC'L INC.General Wiring
03/03/2022CompleteATTRACTIVE LIGHTING ELECL—
12/02/2021CompleteKNIGHT ELEC'L SERV. CORP.General Wiring
09/15/2021CompleteLIPPOLIS ELECTRIC, INC.General Wiring
08/06/2021CompleteSTELLMANN ELECTRICAL CORPGeneral Wiring
06/23/2021CancelledGSA ELECTRIC CORP.General Wiring
06/21/2021CompleteSPIRELLI ELECTRIC INCGeneral Wiring
1 project · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026Permit IssuedSTRUCTURAL PRESERVATION S—
▾Field Inspections (DOB CAP) — 21
DateTypeResultReport
04/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/31/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/17/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/17/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/09/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/30/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/22/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/22/2022Certified Sprinkler - SP - RoughingCertifiedView ↗
06/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/22/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/03/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/28/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/25/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/20/2021Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
03/26/2024FinalWarren Freyerprogress
03/26/2024Fire-Resistant Penetrations and JointsWarren Freyerspecial
03/22/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
03/07/2024Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
08/23/2023FinalArnold Montagprogress
08/01/2023Fire-Resistance Rated ConstructionArnold Montagprogress
08/01/2023Energy Code Compliance InspectionsArnold Montagprogress
08/01/2023Fire-Resistant Penetrations and JointsArnold Montagspecial
06/08/2022HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
06/08/2022Ventilation and air distribution systemSAMI HAJJAR P.Eenergy_progress
06/08/2022HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
06/08/2022HVAC-R and service water piping design and insulationSAMI HAJJAR P.Eenergy_progress
06/06/2022Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
05/17/2022Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
05/17/2022Mechanical SystemsSAMI HAJJAR P.Especial
05/17/2022FinalSAMI HAJJAR P.Eprogress
04/25/2022Fire-Resistant Penetrations and JointsLisa Vangelasspecial
04/25/2022Energy Code Compliance InspectionsLisa Vangelasprogress
04/25/2022Post-installed AnchorsLisa Vangelasspecial
04/21/2022FinalWEN-HAU HSUprogress
04/13/2022FinalSAMI HAJJAR P.Eprogress
04/13/2022FinalSAMI HAJJAR P.Eprogress
04/08/2022FinalGarrett Gourlayprogress
03/14/2022Energy Code Compliance InspectionsLisa Vangelasprogress
03/14/2022FinalAxay Patelprogress
Latest 25 of 72.
▾Documents — 1,617 on file (BIS + DOB NOW)
▸Plans & Drawings47
▸DOB NOWPlans/Sketch38
09/06/2026M00041078-I1Request digital key ↗
09/06/2026M00047554-I1Request digital key ↗
09/06/2026M00047562-I1Request digital key ↗
Showing 3 of 38 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/03/2026M00362041-P2Request digital key ↗
09/03/2026M00362041-P1Request digital key ↗
09/03/2026M00362041-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler3
09/03/2026M00362041-P2Request digital key ↗
09/03/2026M00362041-P1Request digital key ↗
09/03/2026M00362041-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00362039-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/05/2026M00231371-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Place of Assembly1
08/14/2026M00155333-I1Request digital key ↗
▸Applications & Permits312
▸BISPLAN / WORK APPROVAL APPLICATION221
01/15/2025121193181Open ↗
01/03/2024140963125Open ↗
12/15/2023140411793Open ↗
Showing 3 of 221 on file for this type
▸BISWORK PERMIT APPLICATION88
01/06/2023123600601Open ↗
Showing 1 of 88 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Zoning, Tax Lot & Property Records10
▸BISFLOOD ZONE DESIGN CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFLOOD ZONE COMPLIANCE3
02/27/2024122780437Open ↗
02/27/2024122780437Open ↗
01/30/2023123600601Open ↗
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications324
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION126
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 126 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature43
09/06/2026M00041078-I1Open ↗
09/06/2026M00047554-I1Open ↗
09/03/2026M00486992-I1Open ↗
Showing 3 of 43 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature40
09/02/2026M00723456-I1Open ↗
09/01/2026M00362039-I1Open ↗
09/01/2026M00362039-I1Open ↗
Showing 3 of 40 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026M00362039-I1Open ↗
09/01/2026M00718540-S2Open ↗
08/31/2026M00589351-I1Open ↗
Showing 3 of 20 on file for this type
▸BISAPPLICANT OWNER SIGNATURE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Trade Schedules & Equipment89
▸BISSCHEDULE B - PLUMBING39
01/25/2023123600601Open ↗
01/17/2023123600601Open ↗
10/27/2022123600601Open ↗
Showing 3 of 39 on file for this type
▸BISEQUIPMENT USE PERMITS18
06/14/2023123600601Open ↗
06/14/2023123600601Open ↗
06/14/2023123600601Open ↗
Showing 3 of 18 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT14
06/14/2023123600601Open ↗
06/14/2023123600601Open ↗
06/14/2023123600601Open ↗
Showing 3 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA5
10/08/2024123216171Open ↗
02/13/2024123423214Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection11
▸DOB NOWTenant Protection Plan4
09/03/2026M00362041-I1Open ↗
09/03/2026M00362041-P2Open ↗
09/03/2026M00362041-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTENANT PROTECTION PLAN AND NOTES3
11/01/2024123216171Open ↗
Showing 1 of 3 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos56
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION18
10/07/2024123216171Open ↗
08/08/2023140551695Open ↗
08/08/2023140656476Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWOER: Notice to Proceed14
09/06/2026M00041078-I1Open ↗
09/06/2026M00047554-I1Open ↗
09/03/2026M00589355-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWOER: Notice of Satisfaction13
09/06/2026M00041078-I1Open ↗
09/06/2026M00047554-I1Open ↗
09/03/2026M00589355-I1Open ↗
Showing 3 of 13 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Energy Compliance65
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY19
09/28/2023140656476Open ↗
09/28/2023140656476Open ↗
09/28/2023121193181Open ↗
Showing 3 of 19 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)8
03/01/2024140963125Open ↗
12/06/2023140411793Open ↗
11/16/2023121193181Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.5
09/03/2026M00536127-I1Open ↗
09/02/2026M00589351-I1Open ↗
08/13/2026M00498148-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
09/28/2023140656476Open ↗
07/25/2023140340290Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
03/01/2024140963125Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
11/28/2023121193181Open ↗
▸Inspections & Test Reports138
▸BISTECHNICAL REPORT: RESPONSIBILITY88
03/05/2024140963125Open ↗
02/13/2024122780437Open ↗
01/03/2024140963125Open ↗
Showing 3 of 88 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL STEEL - WELDING2
01/30/2023123600601Open ↗
11/30/2022123225562Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING2
01/30/2023123600601Open ↗
11/30/2022123225562Open ↗
▸BISMASONRY1
12/26/2023121193181Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
01/30/2023123600601Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
12/12/2023121193181Open ↗
▸Approvals, Objections & Sign-offs136
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST52
11/04/2024123216171Open ↗
10/07/2024123216171Open ↗
03/06/2024140963125Open ↗
Showing 3 of 52 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION31
01/06/2023123600601Open ↗
Showing 1 of 31 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE30
12/15/2022121193181Open ↗
11/23/2022121193181Open ↗
Showing 2 of 30 on file for this type
▸BISFINAL12
02/22/2024140551695Open ↗
01/05/2024140963125Open ↗
11/29/2023140411793Open ↗
Showing 3 of 12 on file for this type
▸BISSUPERSEDING LETTER8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership72
▸BISCOST AFFIDAVIT49
01/12/2022140733703Open ↗
Showing 1 of 49 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW314
11/04/2024123216171Open ↗
03/04/2024140963125Open ↗
02/27/2024123423214Open ↗
Showing 3 of 14 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms261
▸BISADDITIONAL INFORMATION167
11/27/2023123132154Open ↗
11/14/2022123600601Open ↗
02/11/2022123600601Open ↗
Showing 3 of 167 on file for this type
▸BISBOROUGH INTAKE FORM40
01/06/2023123600601Open ↗
Showing 1 of 40 on file for this type
▸BISEFILING COVER SHEET39
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 39 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸Other Documents30
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)5
10/31/2023122780437Open ↗
05/24/2023140525545Open ↗
05/24/2023140411793Open ↗
Showing 3 of 5 on file for this type
▸BISLOWEST FLOOR ELEVATION2
02/27/2024122780437Open ↗
02/27/2024122780437Open ↗
▸DOB NOWIRA Certification1
08/17/2026M01383162-I1Open ↗