| Owner | Filings | Most Recent |
|---|---|---|
| BROWN HARRIS STEVENS RESIDENTIAL MA | 27 | 09/29/2026 |
| KINGS GROUP NY | 5 | 09/03/2026 |
| CENTRAL CONSTRUCTION MANAGEMENT | 15 | 07/08/2026 |
| BROWN HARRIS STEVENS | 37 | 07/08/2026 |
| MATRIX MECHANICAL CORP. | 5 | 03/22/2026 |
| OXFORD CONDO C/O BHS | 3 | 03/22/2026 |
| INIG-NIA RESIDENTIAL GROU | 1 | 03/22/2026 |
| OWNER OF 422 EAST 72 STRE | 1 | 03/22/2026 |
| ARCHITECTURAL PANELS INC | 1 | 03/22/2026 |
| GIAMBOI BROS. INC | 2 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ANDRES DIAZ ARCHITECT | 4 | 08/20/2026 |
| FRANK J QUATELA ARCHITECT P.C | 3 | 08/04/2026 |
| EVAN CHAN ARCHITECT, PC | 2 | 07/20/2026 |
| CHEUNG SHOWMAN ARCHITECTS | 5 | 05/28/2026 |
| SPENCER ENGINEERING, PC | 4 | 04/14/2026 |
| EN-POWER GROUP | 2 | 02/06/2026 |
| RICHARD ALLON, ARCHITECT | 2 | 10/21/2025 |
| HARPREET SINGH | 1 | 09/03/2025 |
| PS ENGINEERS, INC. | 1 | 08/27/2025 |
| MICHAEL PETERMANN ARCHITECT LLC | 1 | 06/25/2025 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 12/05/2024 |
| MSM ENGINEERING SERVICES, PLLC | 1 | 04/11/2024 |
| RONALD VARGO ARCHITECT | 6 | 03/16/2024 |
| MIHAI RADU ARCHITECTS PLLC | 6 | 06/08/2023 |
| STEPHEN WANG | 3 | 10/28/2022 |
| RSVP ARCHITECTURE STUDIO PLLC | 5 | 07/21/2022 |
| GREYBAR ARCHITECTURE PLLC | 1 | 06/22/2022 |
| SALVATOR A. CARADONNA JR. | 1 | 09/01/2020 |
| BOGUE TRONDOWSKI ARCHITECT PLLC | 2 | 06/10/2020 |
| NICHOLAS J. DEFELICE, P.E. | 3 | 05/20/2020 |
| FRADKIN & MCALPIN ARCHITECTS, LLP | 2 | 06/25/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| ARINNITY NYC | 2 | 03/21/2026 |
| J A EXPEDITING | 4 | 03/21/2026 |
| PS ENGINEERS | 6 | 03/21/2026 |
| Manetta architecture design pllc | 4 | 03/21/2026 |
| SRA ARCHITECTURE + ENGINEERING | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 3 | 03/21/2026 |
| DIRECT ACCESS EXPEDITING, INC. | 2 | 03/21/2026 |
| CENTRAL CONSTRUCTION MGMT | 3 | 03/21/2026 |
| FRANKLYN ESTRELLA ARCHITECT PLLC | 2 | 03/21/2026 |
| W J PROFESSIONAL EXPEDITING COMPANY | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CENTRAL CONSTRUCTION MANAGEMENT | General Contractor | 7 | 07/08/2026 |
| ART DECO ENTERPRISES INC | General Contractor | 6 | 03/21/2026 |
| ZEN RESTORATION INC | General Contractor | 4 | 07/08/2026 |
| TRIBUTE RESTORATION INC | General Contractor | 4 | 09/29/2026 |
| TPR GLOBAL CONSTRUCTION I | General Contractor | 4 | 07/08/2026 |
| HIGHMARK TEC & CHILLER | General Contractor | 3 | 03/21/2026 |
| A.M.N. CORPORATION | Plumbing | 3 | 07/08/2026 |
| ANDALORO CONSTRUCTION LLC | General Contractor | 3 | 07/08/2026 |
| ANDAMIO SCAFFOLDING LLC | General Contractor | 3 | 03/21/2026 |
| LIT GROUP, INC | General Contractor | 2 | 07/08/2026 |
| LIAN CONSTRUCTION GROUP L | General Contractor | 2 | 07/08/2026 |
| JOHN PETROCELLI CONSTRUCTION | General Contractor | 2 | 03/21/2026 |
| ARROYO CONTRACTING CORP | General Contractor | 2 | 07/08/2026 |
| BEST INTERIORS MGMT CO INC | General Contractor | 2 | 03/21/2026 |
| KINGS GROUP NY CORP | General Contractor | 2 | 09/03/2026 |
| NORTHEAST ELECTL CONTING | Electrical | 1 | 03/22/2026 |
| LUPO, CIRO | Electrical | 1 | 03/21/2026 |
| ESSEX ELECTRIC INC | Electrical | 1 | 03/22/2026 |
| LENS ELECTRIC, INC | Electrical | 1 | 03/22/2026 |
| JOSEPH WEINSTEIN ELECTRIC | Electrical | 1 | 03/22/2026 |
| CARLO COPPOLA | Electrical | 1 | 03/21/2026 |
| BARRY SAXE | Electrical | 1 | 03/21/2026 |
| A & E GENERAL PAINTING IN | General Contractor | 1 | 04/09/2026 |
| ARK-POL PLUMBING | General Contractor | 1 | 04/09/2026 |
| J.G.C. ELECTRIC, LLC | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| JSPECS,INC | 9429 | 3 | 08/04/2026 |
| EVAN CHAN ARCHITECT, P.C. | 5605 | 2 | 07/20/2026 |
| AMINOV DESIGN ENGINEER, P | 9365 | 2 | 03/31/2026 |
| RYAN SPECIAL ENGINEERING | 2018 | 1 | 06/25/2025 |
| BUILDTECH ENGINEERING | 6369 | 1 | 12/05/2024 |
| GROUP-S LLC | 5216 | 1 | 11/11/2024 |
| RONALD VARGO ARCHITECT | 848 | 4 | 05/02/2023 |
| BUREAU VERITAS NA | 6902 | 1 | 02/27/2023 |
| BERGMAN CONSULTING ENGINE | 253 | 3 | 10/28/2022 |
| O'ROURKE ENGINEERING, LLC | 5873 | 1 | 06/22/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | TRIBUTE RESTORATION INC | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | GLOBAL DESIGN CONCEPT COR | 09/23/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | KINGS GROUP NY CORP | 09/02/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 08/27/2026 |
| DOB NOW | General Construction | Permit Issued | ARROYO CONTRACTING CORP | 05/18/2026 |
| DOB NOW | Plumbing | Permit Issued | ORBIT PLBG & HTG INC | 04/08/2026 |
| DOB NOW | General Construction | Permit Issued | A & E GENERAL PAINTING IN | 03/09/2026 |
| DOB NOW | Plumbing | Permit Issued | G.BASSOLINO PLUMBING LTD | 02/24/2026 |
| DOB NOW | Plumbing | Permit Issued | WILLIAM C. GERAKARIS P&H | 01/27/2026 |
| DOB NOW | General Construction | Permit Issued | ARROYO CONTRACTING CORP | 01/26/2026 |
| DOB NOW | Plumbing | Signed-off | MEGA PLBG CORP | 01/07/2026 |
| DOB NOW | General Construction | Permit Issued | NORTHEAST SPECIALIST GROUP | 12/16/2025 |
| DOB NOW | General Construction | Permit Issued | LIAN CONSTRUCTION GROUP L | 10/10/2025 |
| DOB NOW | General Construction | Permit Issued | TRIBUTE RESTORATION INC | 10/10/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 10/03/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 09/04/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | KINGS GROUP NY CORP | 09/04/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | TRIBUTE RESTORATION INC | 08/28/2025 |
| DOB NOW | Plumbing | Permit Issued | 2022 A N J CONSTRUCTION | 08/25/2025 |
| DOB NOW | General Construction | Permit Issued | LIAN CONSTRUCTION GROUP L | 08/12/2025 |
| DOB NOW | General Construction | Signed-off | ART DECO ENTERPRISES INC | 02/13/2025 |
| DOB NOW | Plumbing | Signed-off | NICE PLUMBING CORP | 01/14/2025 |
| DOB NOW | General Construction | Signed-off | ART DECO ENTERPRISES INC | 01/13/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HIGHMARK TEC & CHILLER | 11/20/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | ANDAMIO SCAFFOLDING LLC | 04/11/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | VERTICAL ACCESS LLC | 01/04/2024 |
| DOB NOW | General Construction | Signed-off | ARCHWEY ARCHITECT | 06/05/2023 |
| DOB NOW | Mechanical Systems | Permit Issued | ARCHWEY ARCHITECT | 06/05/2023 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 04/13/2023 |
| DOB NOW | General Construction | Signed-off | ANDALORO CONSTRUCTION | 11/28/2022 |
| DOB NOW | General Construction | Signed-off | TPR GLOBAL CONSTRUCTION I | 09/02/2022 |
| DOB NOW | Plumbing | Signed-off | CROSSFIELD PLBG.&HTG | 08/19/2022 |
| DOB NOW | Plumbing | Signed-off | APEC CORP | 08/15/2022 |
| DOB NOW | General Construction | Signed-off | ANDALORO CONSTRUCTION | 08/11/2022 |
| DOB NOW | General Construction | Signed-off | JOHN PETROCELLI CONSTRUCT | 07/11/2022 |
| DOB NOW | Plumbing | Signed-off | A.M.N. CORPORATION | 07/05/2022 |
| DOB NOW | Plumbing | Signed-off | JETWORK SERVICES LLC | 05/10/2022 |
| DOB NOW | General Construction | Signed-off | ARCHWEY ARCHITECT | 04/28/2022 |
| DOB NOW | Mechanical Systems | Permit Issued | ARCHWEY ARCHITECT | 04/28/2022 |
| DOB NOW | General Construction | Signed-off | TPR GLOBAL CONSTRUCTION I | 04/19/2022 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/25/2022 | Permit Issued | ZEN RESTORATION INC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/04/2026 | Permit Issued | ZATOS PLBG AND HTG INC | Gas, Water/Sanitary |
| 07/20/2026 | — | — | Gas, Water/Sanitary |
| 05/28/2026 | Permit Issued | WILLIAM C. GERAKARIS P&H | Gas, Water/Sanitary |
| 02/06/2026 | Permit Issued | G.BASSOLINO PLUMBING LTD | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/28/2026 | Permit Issued | JP & SON ELECTRIC CORP | General Wiring |
| 08/19/2026 | Complete | NORTHEAST ELECTRICAL CONTRACTING | General Wiring |
| 06/08/2026 | Complete | A&L ELECTRIC & AUTOMATION | — |
| 01/29/2026 | Complete | A&L ELECTRIC & AUTOMATION | — |
| 09/11/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 09/09/2025 | Complete | ALL WAYS ELECTRIC CORP.W | General Wiring |
| 03/25/2025 | Permit Issued | EMPIRE LIC ELECL CONTRS | General Wiring |
| 02/26/2025 | Permit Issued | J.G.C. ELECTRIC, LLC | General Wiring |
| 12/30/2024 | Permit Issued | FRIED ELECTRIC CO. | General Wiring |
| 12/10/2024 | Complete | TITANIUM ELECTRICAL CORP | General Wiring |
| 09/11/2024 | Permit Issued | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 04/24/2024 | Complete | BOROWIDE ELECT'L CONTR'S | — |
| 03/12/2024 | Complete | RM ELECTRIC CO., INC. | General Wiring |
| 12/14/2022 | Complete | ESSEX ELECTRIC INC | General Wiring |
| 11/03/2022 | Complete | TM SELECT ELECTRIC CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2025 | Permit Issued | TRIBUTE RESTORATION INC | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/27/2025 | Permit Issued | TRIBUTE RESTORATION INC | Scaffold |
| 05/20/2020 | Permit Issued | CENTRAL CONSTRUCTION MANA | Sidewalk Shed |
| 06/17/2019 | — | — | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | TRIBUTE RESTORATION INC | Suspended Scaffold |
| 05/28/2026 | Permit Issued | ARROYO CONTRACTING CORP | Tenant Protection Plan 72 Hour |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | TRIBUTE RESTORATION INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/29/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/26/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/08/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 04/10/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/08/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/06/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/20/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/16/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/02/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/12/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 09/04/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/12/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/13/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/18/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/25/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 05/18/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 05/18/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/27/2026 | Energy Code Compliance Inspections | Jeffrey Stones | progress |
| 08/27/2026 | Fire-Resistance Rated Construction | Jeffrey Stones | progress |
| 08/27/2026 | Interior lighting power | Jeffrey Stones | energy_progress |
| 08/27/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 08/27/2026 | Tenant Protection Plan Compliance | — | special |
| 08/21/2026 | Alternative Materials - OTCR Buildings Bulletin Number | FRANCISCO PEREZ | special |
| 08/18/2026 | Alternative Materials - OTCR Buildings Bulletin Number | FRANCISCO PEREZ | special |
| 07/24/2026 | Fire-Resistance Rated Construction | Jeffrey Stones | progress |
| 07/24/2026 | Fire-Resistant Penetrations and Joints | Jeffrey Stones | special |
| 07/24/2026 | Tenant Protection Plan Compliance | — | special |
| 07/24/2026 | Energy Code Compliance Inspections | Jeffrey Stones | progress |
| 07/24/2026 | Interior lighting power | Jeffrey Stones | energy_progress |
| 07/17/2026 | Lighting controls | Evan Chan | energy_progress |
| 07/17/2026 | Tenant Protection Plan Compliance | Evan Chan | special |
| 07/17/2026 | Lighting in dwelling units | Evan Chan | energy_progress |
| 07/17/2026 | Interior lighting power | Evan Chan | energy_progress |
| 07/17/2026 | Fire-Resistant Penetrations and Joints | Evan Chan | special |
| 07/17/2026 | Tenant Protection Plan Compliance | Evan Chan | special |
| 07/17/2026 | Final | Evan Chan | progress |
| 07/17/2026 | Energy Code Compliance Inspections | Evan Chan | progress |
| 07/17/2026 | Fire-Resistance Rated Construction | Evan Chan | progress |
| 05/09/2026 | Energy Code Compliance Inspections | Esther Cheung | progress |
| 05/09/2026 | Lighting in dwelling units | Esther Cheung | energy_progress |
| 05/09/2026 | Fire-Resistant Penetrations and Joints | MARK AMINOV | special |
| 05/09/2026 | Final | Esther Cheung | progress |