| Owner | Filings | Most Recent |
|---|---|---|
| SL Green Realty | 309 | 07/08/2026 |
| 460 West 34th St Associates | 289 | 03/21/2026 |
| 601W Tenth Owner | 168 | 07/08/2026 |
| Kaufman Organization | 41 | 03/21/2026 |
| 460_Associates | 30 | 03/21/2026 |
| YWJHC | 2 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/18/2020 | $809.9M | — | 460W34 OWNER LLC → 601W Tenth Owner | $1,504/sf building |
| 05/01/2019 | $291.7M | — | — → — | $542/sf building |
| Representative | Filings | Most Recent |
|---|---|---|
| Codegreen | 169 | 03/21/2026 |
| Spring Scaffolding | 26 | 03/21/2026 |
| D R Brown | 4 | 03/21/2026 |
| Kazam Consultants | 4 | 03/21/2026 |
| Beam Living | 2 | 03/21/2026 |
| Anzalone Architecture | 8 | 03/21/2026 |
| New York Sign Consultants | 34 | 03/21/2026 |
| All in Permit Consultants | 1 | 03/21/2026 |
| Metropolis Group | 6 | 03/21/2026 |
| Jab Consulting NYC | 6 | 03/21/2026 |
| Green Studio | 2 | 03/21/2026 |
| Clarke Construction Consultants | 1 | 03/21/2026 |
| Synergy Building Consultants | 2 | 03/21/2026 |
| Related Companies | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Spring Scaffolding | Scaffold | 46 | 07/08/2026 |
| P & D Mechanical | Fire Protection | 35 | 10/04/2026 |
| Archstone Builders | General Contractor | 28 | 07/08/2026 |
| CM Plumbing | Plumbing | 21 | 07/08/2026 |
| Mauceri Sign Co | Sign hanger | 17 | 07/08/2026 |
| JT Magen & Company | General Contractor | 17 | 07/08/2026 |
| Ceprine Construction | Scaffold | 7 | 07/08/2026 |
| Build NYC Group | General Contractor | 6 | 04/09/2026 |
| L&K Partners | General Contractor | 6 | 07/08/2026 |
| Cooper Works | General Contractor | 6 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 5 | 07/08/2026 |
| Connelly & Sons Plumbing | Plumbing | 4 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 4 | 07/08/2026 |
| New York City Prime | Scaffold | 3 | 09/19/2026 |
| Accurate Mechanical | Fire Protection | 3 | 07/08/2026 |
| Armon Mechanical | Fire Protection | 3 | 07/08/2026 |
| James E Fitzgerald | General Contractor | 3 | 07/08/2026 |
| L.S. Sign Co | Sign hanger | 3 | 07/17/2026 |
| A&A Plumbing | Plumbing | 3 | 07/08/2026 |
| Champ Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| A&H Express Plumbing & Heating | Plumbing | 2 | 09/09/2026 |
| Par Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Accurate Mechanical | Plumbing | 2 | 07/08/2026 |
| A.G.S. Improvements | General Contractor | 2 | 08/13/2026 |
| Michelle Kuo | General Contractor | 2 | 03/21/2026 |
| Global Facility Management | General Contractor | 2 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 2 | 07/08/2026 |
| National Maintenance | Sign hanger | 2 | 07/08/2026 |
| Central Elevator | Electrical | 2 | 03/21/2026 |
| Tristate Plumbing Services | Plumbing | 1 | 07/08/2026 |
| High Quality Electric of | Electrical | 1 | 03/21/2026 |
| XH&RC Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| RM Electric Co | Electrical | 1 | 03/21/2026 |
| Green Apple Electrical Services | Electrical | 1 | 03/22/2026 |
| Mike Lewkovicz Electric Company | Electrical | 1 | 03/21/2026 |
| McDonald Timothy | Electrical | 1 | 03/21/2026 |
| McQueen Eusebio | Electrical | 1 | 03/21/2026 |
| Polo Electric Corp D/B/A | Electrical | 1 | 03/22/2026 |
| Proff Electrical | Electrical | 1 | 03/22/2026 |
| BLH Elect'l Contractors | Electrical | 1 | 03/21/2026 |
| Ronald Testa, JR | Electrical | 1 | 03/21/2026 |
| Silverman Robert | Electrical | 1 | 03/21/2026 |
| Mac Elect'l Contracting | Electrical | 1 | 03/21/2026 |
| B & Q Company Inc. Electric | Electrical | 1 | 03/21/2026 |
| Cubenine | General Contractor | 1 | 10/14/2026 |
| Demarco Philip | General Contractor | 1 | 03/21/2026 |
| Green City Box Trans | General Contractor | 1 | 04/09/2026 |
| Lti Construction | General Contractor | 1 | 07/08/2026 |
| P D Mechanical | General Contractor | 1 | 03/21/2026 |
| Torres & Builders Group | General Contractor | 1 | 07/08/2026 |
| North Shore Neon Sign Co | Sign hanger | 1 | 07/08/2026 |
| Ashlar Mechanical | Fire Protection | 1 | 07/08/2026 |
| Dependable Mechanical | Fire Protection | 1 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 1 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 1 | 07/08/2026 |
| Orbit Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| QMB Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Codegreen | 510 | 12 | 10/13/2026 |
| AK Consulting Services, I | 6198 | 2 | 07/24/2026 |
| Engineering Building Service | 7303 | 4 | 07/22/2026 |
| O'Rourke Engineering | 5873 | 2 | 02/19/2026 |
| Winton Group Architecture | 4343 | 1 | 10/31/2025 |
| Qwa Studio | 9293 | 2 | 10/21/2025 |
| Consulting and Testing SE | 6152 | 32 | 02/18/2025 |
| Zelta Inspection | 7764 | 2 | 09/27/2024 |
| W Chan Engineering | 2881 | 1 | 09/27/2024 |
| Metrospec Sia | 6420 | 4 | 02/16/2024 |
| CFS Engineering | 615 | 7 | 04/13/2023 |
| WB Engineering | 533 | 29 | 09/28/2022 |
| Atlantic Engineeringlabor | 1381 | 1 | 04/26/2022 |
| Alan Margolin & Associates | 423 | 72 | 06/07/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | Cubenine | 10/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | New York City Prime | 09/18/2026 |
| DOB NOW | Plumbing | Permit Issued | A&H Express Plumbing & Heating | 09/08/2026 |
| DOB NOW | General Construction | Permit Issued | A.G.S. Improvements | 08/12/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Avenue Contracting | 08/04/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | Avenue Contracting | 07/24/2026 |
| DOB NOW | Sign | Permit Issued | L.S. Sign Co | 07/16/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | New York City Prime | 06/18/2026 |
| DOB NOW | General Construction | Permit Issued | Torres & Builders Group | 06/12/2026 |
| DOB NOW | Plumbing | Signed-off | Orbit Plumbing & Heating | 06/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | Ashlar Mechanical | 05/27/2026 |
| DOB NOW | General Construction | Permit Issued | Global Facility Management | 05/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Global Facility Management | 05/19/2026 |
| DOB NOW | Sprinklers | Permit Issued | Dependable Mechanical | 05/15/2026 |
| DOB NOW | Plumbing | Permit Issued | Lab Plumbing & Heating Co | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | A.G.S. Improvements | 04/27/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | KMM Construction of NY | 03/20/2026 |
| DOB NOW | Plumbing | Signed-off | A&H Express Plumbing & Heating | 03/09/2026 |
| DOB NOW | General Construction | Permit Issued | Build NYC Group | 02/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Build NYC Group | 02/25/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | New York City Prime | 02/20/2026 |
| DOB NOW | Plumbing | Signed-off | XH&RC Plumbing and Heating | 10/29/2025 |
| DOB NOW | General Construction | Signed-off | Green City Box Trans | 10/24/2025 |
| DOB NOW | Sign | Signed-off | National Maintenance | 09/24/2025 |
| DOB NOW | Sign | Signed-off | National Maintenance | 09/24/2025 |
| DOB NOW | Sign | Signed-off | Weinfeld, Elliot | 02/27/2025 |
| DOB NOW | Sign | Signed-off | Weinfeld, Elliot | 02/25/2025 |
| DOB NOW | Structural | Permit Issued | Build NYC Group | 02/18/2025 |
| DOB NOW | General Construction | Permit Issued | Build NYC Group | 02/18/2025 |
| DOB NOW | Plumbing | Signed-off | Champ Plumbing & Heating | 12/26/2024 |
| DOB NOW | Plumbing | Signed-off | QMB Plumbing & Heating | 12/20/2024 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 10/18/2024 |
| DOB NOW | General Construction | Signed-off | 18-15 Realty | 10/16/2024 |
| DOB NOW | Sign | Signed-off | North Shore Neon Sign Co | 09/17/2024 |
| DOB NOW | Plumbing | Signed-off | Anthony Disabato | 04/02/2024 |
| DOB NOW | Sprinklers | Signed-off | Accurate Mechanical | 03/19/2024 |
| DOB NOW | Mechanical Systems | Signed-off | Cooper Works | 02/27/2024 |
| DOB NOW | General Construction | Signed-off | Cooper Works | 02/27/2024 |
| DOB NOW | Sprinklers | Permit Issued | Accurate Mechanical | 01/23/2024 |
| DOB NOW | Plumbing | Permit Issued | Anthony Disabato | 01/19/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/07/2026 | Permit Issued | Global Facility Management | Air Conditioning Systems | Cooling Toshiba MCY-MUB0608HS2P-UL 5 tons · Vrf Outdoor ×1 RAV-BP361ST2P-UL 1,130 CFM · Split System ×1 TOSHIBA/MCY-MUB0608HS2P-UL 5 tons · Vrf Outdoor ×1 |
| 03/28/2026 | — | — | Air Conditioning Systems | Cooling Florida Heat Pump MITSUBISHI
MXZ-SM48NAM 12 tons · Vrf Outdoor ×3 MITSUBISHI MXZ-SM60NAM 5 tons · Vrf Outdoor ×1 |
| 02/13/2026 | Permit Issued | Build NYC Group | Air Conditioning Systems | Cooling Mitsubishi Electric MITSUBISHI-PUZ-A42NKA7 1,483 CFM · Heat Pump Outdoor ×2 |
| 08/09/2023 | Permit Issued | Cooper Works | Air Conditioning Systems | Cooling Mitsubishi Electric TPEFYP072MH140A 2,542 CFM · Split System ×2 |
| 05/12/2023 | — | — | Air Conditioning Systems | Cooling Unknown MMD36 1,250 CFM ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/13/2026 | Permit Issued | Ashlar Mechanical | 103 heads |
| 04/29/2026 | — | — | 49 heads |
| 11/20/2023 | Permit Issued | Accurate Mechanical | 4 heads, 1 outlets |
| 05/15/2023 | — | — | 7 heads, 1 outlets |
| 09/27/2022 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Permit Issued | Lab Plumbing & Heating Co | Water/Sanitary |
| 07/22/2026 | Permit Issued | A&H Express Plumbing & Heating | Gas, Water/Sanitary |
| 02/19/2026 | Signed-off | Orbit Plumbing & Heating | Water/Sanitary |
| 08/08/2023 | Permit Issued | QPR Mechanical | Water/Sanitary |
| 08/08/2023 | — | — | Water/Sanitary |
| 05/15/2023 | — | — | Water/Sanitary |
| 05/07/2020 | Permit Issued | CM Plumbing | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/17/2026 | Permit Issued | L&B Electrical International | General Wiring |
| 05/15/2026 | Permit Issued | Troon Electric of New Yor | General Wiring |
| 04/21/2026 | Permit Issued | Accurate Electrical Contractors | General Wiring |
| 03/31/2026 | Complete | Home Run Electric | — |
| 03/31/2026 | Complete | Home Run Electric | — |
| 02/19/2026 | Permit Issued | High Quality Electric of NYC | — |
| 05/13/2025 | Complete | AL-Lectric Elect'l Contracting | General Wiring |
| 03/13/2025 | Complete | Aurora Electrical Contg | — |
| 09/16/2024 | Complete | Proff Electrical | — |
| 06/11/2024 | Complete | Green Apple Electrical Services | General Wiring |
| 05/17/2023 | Complete | E-J Electric Installation Co | General Wiring |
| 11/10/2022 | Complete | Team Electric | General Wiring |
| 05/16/2022 | Complete | Campbell & Dawes Ltd Electric | General Wiring |
| 01/21/2022 | Permit Issued | Jam Electrical | — |
| 01/04/2022 | Complete | R. Gunzer | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | — | — | Steel |
| 01/23/2025 | Permit Issued | Build NYC Group | 1 scope_items |
| 05/12/2023 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | New York City Prime | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/24/2026 | Permit Issued | Avenue Contracting | Suspended Scaffold (SC) |
| 03/17/2026 | Permit Issued | Avenue Contracting | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/17/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/04/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/22/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 12/08/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/02/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/28/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/17/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/14/2025 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 02/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/13/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/03/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/12/2024 | Fail-Final Boiler Equipment Inspection | Fail | View ↗ |
| 10/04/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 06/25/2024 | Pass-Final Construction Permit Withdrawal | Pass | View ↗ |
| 06/06/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/03/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/31/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/08/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/22/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/22/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/22/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 10/06/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 10/06/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 09/10/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 09/10/2026 | Sprinkler Systems | James Sullivan Jr | special |
| 09/10/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 07/24/2026 | Post-installed Anchors | Tony Cartagine | special |
| 07/24/2026 | Fire-Resistant Penetrations and Joints | Tony Cartagine | special |
| 07/14/2026 | Final | ADITYA DESAI | progress |
| 07/13/2026 | Fire-Resistant Penetrations and Joints | Tony Cartagine | special |
| 07/13/2026 | Post-installed Anchors | Tony Cartagine | special |
| 06/08/2026 | Interior lighting power | Shuji Suzumori | energy_progress |
| 06/08/2026 | Energy Code Compliance Inspections | Shuji Suzumori | progress |
| 06/08/2026 | Lighting controls | Shuji Suzumori | energy_progress |
| 05/13/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 05/13/2026 | Structural Cold-Formed Steel | — | special |
| 05/13/2026 | Structural Steel - Details | — | special |
| 05/13/2026 | Structural Steel - High Strength Bolting | — | special |
| 05/13/2026 | Structural Steel - Welding | — | special |
| 05/13/2026 | Final | — | progress |
| 05/07/2026 | Interior lighting power | James Sullivan Jr | energy_progress |
| 05/07/2026 | Fire-Resistant Penetrations and Joints | James Sullivan Jr | special |
| 05/07/2026 | HVAC-R and service water heating system controls | James Sullivan Jr | energy_progress |
| 05/07/2026 | HVAC-R and service water heating equipment | James Sullivan Jr | energy_progress |
| 05/07/2026 | Lighting controls | James Sullivan Jr | energy_progress |
| 05/07/2026 | HVAC-R and service water piping design and insulation | James Sullivan Jr | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Le Cafe Coffee | Restaurant / Food Service | Sub-basement | Project M01423749 Project M01333806 Project M01333810 Project M01328875 |
| Odo Hudson | Restaurant / Food Service | Floor 1 | Project M01397518 Project M01364446 Project M01364450 Project M01364444 |
| Odo Restaurant | Restaurant / Food Service | Floor 1 | Project M01401522 Project M01401521 |
| Luckin Coffee | Restaurant / Food Service | Floor 1 | Project M01297323 |
| Bank of America | Bank / Financial branch | Floor 1 | Project M01269848 Project M01269853 |
| Dunkin' / Baskin-Robbins | Restaurant / Food Service | — | Project M01169345 Project M01169348 |
| Dunkin' NextGen - Cool Palette | Restaurant / Food Service | Floor 1 | Project M01099998 Project M01100001 Project M00891084 Project M00890997 |
| Chopt | Restaurant / Food Service | Sub-basement, Floor 1 | Project M01064931 Project M00984316 Project M00891153 |
| Lechitec C | Restaurant / Food Service | Sub-basement, Floor 1 | Project M00891658 Project M00891692 Project M00891681 |
| First Republic Bank | Bank / Financial branch | Cellar, Sub-basement, Floors 1–6, Mezzanine | Project M00794758 Project M00794864 Project M00792506 Project M00795157 Project M00596792 Project M00596827 Project M00597036 Project M00596763 Project M00601775 Project M00601869 Project M00601905 Project M00601942 |
| Compass | Office | Cellar | Project M00756552 |
| Maman | Restaurant / Food Service | Sub-basement, Floor 1 | Project M00525646 Project M00525660 |
| Brookbridge Consulting | Office | Floors 18, 19 | Project M00429398 Project M00429407 Project M00429432 |
| Jones Lang Lasalle | Office | Floor 15 | Project M00429440 Project M00429445 Project M00429462 |