Whole building & multi-floor projects180' high pipe scaffold1 filing
INSTALLATION OF TEMPORARY 180' HIGH PIPE SCAFFOLD ORIGINATING (OFF SHED)FOR EXISTING BUILDING REMEDIAL WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY,PIPE SCAFFOLD SHALL COMPLY WITH CHAPTER#33 OF 2014 THE NY BUILDING CODE.HEAVY DUTY SIDEWALK SHED FILED UNDER SEPARATE APPLICATION#M00039074.
On file for this project
2 documents
RoofRoof replacementUnder Construction2p · 2 filings · 20 docs
Architecture
Issued Permit Scope
General Construction
Roof replacement as shown on the drawings filed herewith. No change in use, egress, or occupancy.
On file for this project
14 documents · 2 drawing sheets
PROPOSED FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 1 drawing sheet
BulkheadTieback and anchor for masonry3p · 2 filings · 12 docs
EquipmentGeneralSC
Installation of material hoist. Amend #1, change in tieback and anchor for masonry, added Ctwt and tie back to beam detail, and added concrete wall anchor detail
On file for this project
10 documents · 1 drawing sheet
IRA to assist with Condition Assessment.
On file for this project
2 documents · 2 drawing sheets
PenthouseUnit PH81p · 1 filing · 4 docs
MechanicalStructural
Issued Permit Scope
Mechanical Systems
NEW MECHANICAL SYSTEM INSTALLATION INCLUDING NEW INDOOR & OUTDOOR UNITS TO REPLACE EXISTING WINDOW UNITS AS PER PLANS FILED HEREWITH. NO CHANGES IN EGRESS, USE OR OCCUPANCY.
On file for this project
4 documents · 1 drawing sheet
Floor 15Unit 15B, Unit 15C, Unit 15D2p · 5 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Interior Renovation of Existing Apartment 15B as per plans filed herewith, no change is use, egress or occupancy.
On file for this project
16 documents
Installation & Replacement of Plumbing Fixtures to an existing apartment (15B) . As per plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents · 1 drawing sheet
Installation of Mechanical Equipment with HVAC Design Heat Pump Air Handles and Water Cooled Condensing Units. No change to use, occupancy or egress.
On file for this project
11 documents
Latest 3 of 5 filings on this floor.
Floor 14Unit 14A1 filing · 7 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
Supported Scaffold
Firestopping required for electrical upgrade to Apartment 14A. As per plans filed herewith, no change to use, occupancy or egress.
On file for this project
7 documents · 2 drawing sheets
Floor 13Unit 13B, Unit 13E2 filings · 11 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Interior Renovation of an existing apartment (Apt 13E) for the removal of Non-load-bearing interior partitions and cabinet work. As per plans filed herewith, no change to use, occupancy or egress.
On file for this project
6 documents
WORK FILED TO SHOW THE LEGALIZATION OF THE MECHANICAL WORK IN APT 13B AS PER PLANS, NO CHANGE IN USE, EGRESS AND OCCUPANCY.
On file for this project
5 documents
Floor 12
Floor 11
Floor 10Unit 10BUnder Construction1 filing · 9 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 10B ON THE 10TH FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
Floor 9Unit 9A, Unit 9B1p · 3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Renovations to exist'g coop apt #9A. Work to include demo, gen. const. & related finishes, replace windows in exist'g openings, new masonry openings for mech. equip. & related st work, as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
18 documents
Install PTAC Units and radiators. No Change in Use, Egress, Occupancy.
On file for this project
22 documents
REPLACE EXISTING PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
18 documents · 1 drawing sheet
Floor 8Unit 8B, Unit 8D3p · 2 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Renovation of an existing apartment# 8B on the 8th Floor. work includes non-Structural Demolition, general Construction and replace of window in existing openings.
On file for this project
25 documents · 3 drawing sheets
Herewith filing new alt2 application for general construction work to be performed in existing unit 8D on the 8th floor. All in accordance with submitted plans. No changes to use, egress, or occupancy under this application.
On file for this project
10 documents
Floor 7Unit 7A, Unit 7B1p · 3 filings · 18 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
Interior renovation project in an exsiting class A apartment; as per plans filed herewith. No change of use, egress, or occupancy.
On file for this project
6 documents
PLUMBING WORK IN UNIT #7B ON 7THFLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Project M23417578Signed-off · 09/11/2020
PLUMBING WORK IN UNIT #7B ON 7THFLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Floor 6Unit 6B1 filing · 5 docs
ArchitectureGeneralMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
PROPOSED PARTIAL INTERIOR RENOVATION OF THE EXIST.APARTMENT AT THE 6TH FLOOR(APT.6B)MINOR NON- BEARING WALL PARTITION REMOVAL TO CREATE WIDER MAID'S BEDROOM AND RENOVATION OF EXISTING BATHROOM WITHIN EXISTING LAYOUT ,ADJOINING TO THAT ROOM.
On file for this project
5 documents
Floor 5Unit 5A, Unit 5D3 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Supported Scaffold
PLUMBING FIXTURES IN APT 5A FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
17 documents
FILING FOR FACADE REPAIR ALL AS PER PLANS FILED HERE WITH. NO CHANGE OT USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
FILING FOR THE INTERIOR RENOVATION OF APARTMENT 5D, ALL AS PER PLAN FILED HEREWITH. NO CHANGE TO USE, EGRESS O OCCUPANCY.
On file for this project
4 documents
Floor 4Unit 4E, Unit 4F1p · 1 filing · 16 docs
ArchitectureDMGeneralMechanicalStructural
Issued Permit Scope
General Construction · Supported Scaffold
INTERIOR REMOVALS IN APARTMENTS 4E AND 4F. NO PLUMBING OR PIPING WORK. NO WORK ON EXTERIOR OR WINDOWS. NO CHANGE IN USE, EGRESS, OCCUPANCY, OR FIRE PROTECTION.
On file for this project
16 documents · 1 drawing sheet
Floor 3
Floor 2
Floor 1
CellarCellar level vacuum tank replacement1 filing · 5 docs
Mechanical
Issued Permit Scope
Mechanical Systems
INSTALLATION OF NEW WATER FEED LINE IN CONJUNCTION WITH THE REPLACEMENT OF A VACUUM TANK IN THE BOILER ROOM. NO CHANGE IN EGRESS OR OCCUPANCY.
On file for this project
5 documents
Site & exteriorProposed sidewalk shed installation4 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods · Sidewalk Shed
INSTALLATION OF 300psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents · 12 drawing sheets
PROPOSED FACADE REPAIRS AS INDICATED ON PLANS SUBMITTED HEREWITH. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 12 drawing sheets
INSTALLATION OF STORAGE MARERIALS AS PER PLANS. STORAGE MATERIALS SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE INUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.