Elevator cooperative
51 5TH AVENUE
MANHATTAN · Greenwich Village · BIN 1009275
💬 Discuss this project
1929Year Built
16Stories
D4Building Class
R10Zoning
121,128 sfGross Floor Area
89Units
LL97 CoveredRent Stabilized0 Active Violations 1 old, status unconfirmed ▸FISP: SWARMP
Elevator cooperative · Owner of record: 51 Fifth Avenue Owners · 8,500 sf lot · 14.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofExterior Restoration2p · 2 filings · 11 docs
Floor 17Unit 17A6p · 2 filings · 16 docs
Floor 16
Floor 15
Floor 14Unit 14E2p · 2 filings · 12 docs
Floor 13
Floor 12Unit 12B3p · 1 filing · 4 docs
Floor 11Unit 11E1p · 2 filings · 13 docs
Floor 10Unit 10BF32p · 2 filings · 17 docs
Floor 9Unit 9C, Unit 9D6p · 1 filing · 13 docs
Floor 8Unit 8C17p · 2 filings · 20 docs
Floor 7Unit 7A, Unit 7B, Unit 7FUnder Construction2 filings · 14 docs
Floor 6
Floor 5Unit 5BF1p · 1 filing · 6 docs
Floor 4Unit 4A5p · 2 filings · 17 docs
Floor 3
Floor 2Unit 2AUnder Construction2p · 2 filings · 12 docs
Floor 1
CellarStructural framing and cellar work1p · 1 filing · 8 docs
Site & exteriorJohn B. Lovett & Associates, LTD.23p · 4 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
51 Fifth Ave Owners13703/22/2026
John B. Lovett & Associates8607/08/2026
The Lovett Company1603/21/2026
Elizabeth C Church607/08/2026
51-5th Units403/21/2026
51 5th Ave403/21/2026
Edward J. Minskoff Equities210/21/2026
426 West Broadway House Condo203/21/2026
51 PHB203/21/2026
Asst Secretary203/21/2026
RJ Design103/22/2026
Campbell Design and Construction103/22/2026
Blank Property Group103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design403/21/2026
DJL Architect303/21/2026
KM Associates of New York403/21/2026
Socotec403/21/2026
Resolution Expediting203/21/2026
Building Violation Solutions803/21/2026
J A Expediting603/21/2026
Agouti Construction Consulting1203/21/2026
Municipal Building Consultants103/21/2026
RPO203/21/2026
Dana Trezza103/21/2026
AE Design Solution203/21/2026
K & M Associates403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ceprine ConstructionScaffold1107/08/2026
Zoom ContractingGeneral Contractor407/08/2026
Euro T.IGeneral Contractor303/21/2026
Zatos Plumbing and HeatingPlumbing307/08/2026
LRL ConstructionGeneral Contractor303/21/2026
Killowen ConstructionGeneral Contractor307/08/2026
Maxco ContractingGeneral Contractor208/05/2026
Hamilton Air CompanyGeneral Contractor203/21/2026
Ark-Pol PlumbingPlumbing207/08/2026
Plumbing & Heating DoctorPlumbing207/08/2026
Procore MechanicalPlumbing107/08/2026
Power Surge ElectricElectrical103/22/2026
L.J.F. & Sons Electrical ContsElectrical103/22/2026
Aster ElectricElectrical103/22/2026
Pna ContractingGeneral Contractor104/09/2026
RDM RenovationGeneral Contractor107/08/2026
VerusGeneral Contractor110/21/2026
Lebo ElectricElectrical103/22/2026
Joseph Weinstein ElectricElectrical103/22/2026
P.S.I. MechanicalPlumbing107/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
High Quality Electric ofElectrical103/22/2026
Top Notch ElectricElectrical103/22/2026
Creo ProjectsGeneral Contractor104/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alan Margolin & Associates423207/07/2026
Sterling Engineering Service1012210/15/2025
O'Rourke Engineering5873109/19/2025
Cthree Architecture + Des1124411/21/2024
Crosscheck Inspection Services544211/04/2024
Azark8507406/17/2024
Leo Y Lee Associates2481106/06/2024
Paradigm Architecture5931202/27/2024
Nikolai Katz Architect3482308/30/2023
Dario Architecture & Desig6878305/08/2023
Jack Green Associates422407/01/2021
Arcitecture8088112/11/2020
Philip Toscano, Architect2474110/27/2020
2 by 4 Architecture4737106/04/2020
Building Lifecycle
All (231)Filed (36)Permit Issued (34)Signed Off (21)Facade (FISP) (14)Violation (57)Inspection (19)Objection (20)Special Inspection (30)
10/20/2026
Permit issued — General Construction
M01451150-I1-GC
10/14/2026
Objection resolved — Addressed
10/14/2026
Objection resolved — Addressed
10/14/2026
Objection resolved — Addressed
10/09/2026
Objection raised — Inspections
10/09/2026
Objection raised — Scope
10/09/2026
Objection raised — Scope
10/08/2026
Filed — Alteration
Interior demolition and construction for renovation on Apt 7F on 7th floor
M01451150-I1
08/25/2026
Special inspection requirement — Final
Michael Kahn
08/14/2026
Signed off — Alteration
Filing for plumbing renovations to unit 17A as per plans. No change of use, egress or occupancy.
M00991240-I1
08/04/2026
Permit issued — Mechanical Systems
M01404368-I1-MS
07/08/2026
Special inspection requirement — Mechanical Systems
Young Suh
07/08/2026
Special inspection requirement — Final
anthony alduino
07/08/2026
Special inspection requirement — HVAC-R and service water heating system controls
Young Suh
07/07/2026
Filed — Alteration
Filing for installation of two a/c units on the 2nd floor. No change in egress, use or occupancy.
M01404368-P1
06/16/2026
Permit issued — Mechanical Systems
M01404368-I1-MS
06/05/2026
Filed — Alteration
Filing for installation of two a/c units on the 2nd floor. No change in egress, use or occupancy.
M01404368-I1
03/04/2026
Signed off — Alteration
Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.
M01266740-I1
02/19/2026
Objection resolved — Addressed
01/30/2026
Cycle 10 facade report signed — SAFE
01/22/2026
Cycle 10 facade report submitted
12/29/2025
Permit issued — General Construction
M01266740-I1-GC
12/17/2025
Cycle 10 facade inspection completed
12/11/2025
Signed off — Alteration
M01063918-I1
12/11/2025
Objection resolved — Addressed
11/28/2025
Signed off — Alteration
M01001172-I1
11/24/2025
Permit issued — General Construction
M01266740-I1-GC
11/07/2025
Objection raised — Scope
11/07/2025
Objection raised — Cost
11/04/2025
Signed off — Alteration
M01067428-I1
10/15/2025
Filed — Alteration
Mechanical work for new AC units installed in masonry openings filed as the initial filing.
M01293315-S1
10/14/2025
Filed — Alteration
Mechanical work for new AC units installed in masonry openings filed as the initial filing.
M01293315-I1
10/07/2025
Permit issued — General Construction
M01266740-I1-GC
10/03/2025
Signed off — Alteration
FILING FOR INTERIOR RENOVATIONS TO APARTMENT 10BF. REMOVAL AND INSTALLATION OF NON-LOADING BEARING PARTITIONS, DOORS, PLUMBING FIXTURES,AND RELATED GENERAL CONSTRUCTION AS SHOWN ON DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01026138-I1
09/30/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
THomas DeLorenzo
09/30/2025
Special inspection requirement — Maintenance information
THomas DeLorenzo
09/30/2025
Special inspection requirement — Energy Code Compliance Inspections
THomas DeLorenzo
09/30/2025
Special inspection requirement — HVAC-R and service water heating system controls
THomas DeLorenzo
09/30/2025
Special inspection requirement — HVAC-R and service water heating equipment
THomas DeLorenzo
09/25/2025
Objection resolved — Addressed
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
THomas DeLorenzo
09/25/2025
Special inspection requirement — Final
THomas DeLorenzo
09/25/2025
Special inspection requirement — Mechanical Systems
THomas DeLorenzo
09/25/2025
Special inspection requirement — Final
THomas DeLorenzo
09/24/2025
Objection raised — Scope
09/19/2025
Filed — Alteration
Renovation of an existing dwelling unit. Architectural work as per plans. No change of use, occupancy or egress.
M01266740-I1
08/06/2025
Signed off — Alteration
M01240671-I1
08/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Danielle Albert
08/05/2025
Special inspection requirement — Lighting in dwelling units
Danielle Albert
08/05/2025
Special inspection requirement — Post-installed Anchors
BRIAN O'ROURKE
08/05/2025
Special inspection requirement — Final
Danielle Albert
07/15/2025
Permit issued — Supported Scaffold
M01067428-I1-SF
06/27/2025
Filed — Alteration
M01240671-I1
06/27/2025
Permit issued — Supported Scaffold
M01240671-I1-SF
06/25/2025
Permit issued — Suspended Scaffold
M01058276-I1-SC
06/03/2025
Permit issued — Sidewalk Shed
M01063918-I1-SH
03/12/2025
Signed off — Alteration
Filing for interior renovations of apartment 17A. No change in use, egress or occupancy.
M00991222-I1
02/28/2025
Permit issued — General Construction
M01001172-I1-GC
01/21/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/08/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 231 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedVerus10/20/2026
DOB NOWMechanical SystemsPermit IssuedMaxco Contracting08/04/2026
DOB NOWMechanical SystemsPermit IssuedMaxco Contracting06/16/2026
DOB NOWGeneral ConstructionSigned-offKillowen Construction12/29/2025
DOB NOWGeneral ConstructionSigned-offKillowen Construction11/24/2025
DOB NOWGeneral ConstructionSigned-offKillowen Construction10/07/2025
DOB NOWSupported ScaffoldSigned-offCeprine Construction07/15/2025
DOB NOWSupported ScaffoldSigned-offCeprine Construction06/27/2025
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting06/25/2025
DOB NOWSidewalk ShedSigned-offCeprine Construction06/03/2025
DOB NOWGeneral ConstructionSigned-offPna Contracting02/28/2025
DOB NOWPlumbingPermit IssuedProcore Mechanical07/17/2024
DOB NOWGeneral ConstructionSigned-offCreo Projects07/16/2024
DOB NOWSupported ScaffoldSigned-offCeprine Construction07/11/2024
DOB NOWSuspended ScaffoldPermit IssuedPna Contracting06/29/2024
DOB NOWSidewalk ShedSigned-offCeprine Construction06/20/2024
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical03/04/2024
DOB NOWGeneral ConstructionSigned-offLRL Construction02/27/2024
DOB NOWPlumbingSigned-offP.S.I. Mechanical11/16/2022
DOB NOWMechanical SystemsSigned-offEuro T.I09/14/2022
DOB NOWMechanical SystemsSigned-offHamilton Air Company08/01/2022
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co07/14/2022
DOB NOWGeneral ConstructionSigned-offRDM Renovation07/12/2022
DOB NOWPlumbingSigned-offMathew Weiss04/15/2022
DOB NOWGeneral ConstructionSigned-offZoom Contracting11/05/2021
DOB NOWMechanical SystemsSigned-offZoom Contracting09/21/2021
DOB NOWPlumbingSigned-offZatos Plumbing and Heating06/30/2021
DOB NOWGeneral ConstructionSigned-offZoom Contracting06/24/2021
DOB NOWPlumbingSigned-offMathew Weiss03/16/2021
DOB NOWPlumbingSigned-offZatos Plumbing and Heating09/30/2020
DOB NOWPlumbingSigned-offArk-Pol Plumbing09/15/2020
DOB NOWPlumbingSigned-offArk-Pol Plumbing07/27/2020
DOB NOWMechanical SystemsSigned-offZoom Contracting06/19/2020
DOB NOWPlumbingSigned-offZatos Plumbing and Heating06/18/2020
BISPLISSUEDAdriatic Plumbing & Heating03/09/2023
BISOTISSUEDJ. Christopher Interiors12/09/2022
BISOTISSUEDZoom Contracting03/22/2021
BISOTISSUEDCiti Contracting of New Y03/04/2021
BISOTISSUEDCampbell Design02/10/2021
BISOTISSUEDCiti Contracting of New Y01/02/2021
+ 44 more permits on file
1 project · most recent 07/07/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Permit IssuedMaxco ContractingAir Conditioning Systems
Cooling
Fujitsu AOU24CL1 24,000 BTU · Heat Pump Outdoor ×2
AOU36RLXFZ 34,000 BTU · Heat Pump Outdoor ×2
ASU09RLF 9,000 BTU · Split System ×4
ASU24CL1 24,000 BTU · Split System ×1
2 projects · most recent 11/21/2024
Gas Water/Sanitary
FiledStatusContractorScope
11/21/2024Permit IssuedProcore MechanicalGas, Water/Sanitary
06/17/2024Signed-offDelta-Sigma MechanicalGas, Water/Sanitary
25 projects · most recent 10/16/2025
General Wiring
FiledStatusContractorScope
10/16/2025CompleteTop Notch ElectricGeneral Wiring
07/16/2024Permit IssuedPower Surge ElectricGeneral Wiring
06/14/2024CompleteHigh Quality Electric of—
03/09/2024CompleteDenali ElectricGeneral Wiring
01/22/2024Permit IssuedL.J.F. & Sons Electrical ContsGeneral Wiring
10/25/2023CompleteGlendale Electl ContngGeneral Wiring
10/17/2023CompleteL.J.F. & Sons Electrical ContsGeneral Wiring
12/06/2022Permit IssuedRobert Chimenti7 meters, 1 new_meters
10/04/2022CompleteAllstate ElectricGeneral Wiring
04/26/2022CompleteResponse ElectricGeneral Wiring
04/26/2022CompleteResponse ElectricGeneral Wiring
04/26/2022CompleteResponse ElectricGeneral Wiring
04/26/2022CompleteResponse ElectricGeneral Wiring
03/21/2022CompleteResponse ElectricGeneral Wiring
03/21/2022CompleteResponse ElectricGeneral Wiring
1 project · most recent 06/06/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/06/2024Permit IssuedPna ContractingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 19
DateTypeResultReport
01/21/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/08/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/25/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/15/2023Pass-Final PL - UndergroundPassView ↗
03/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
12/05/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
08/25/2026FinalMichael Kahnprogress
07/08/2026Mechanical SystemsYoung Suhspecial
07/08/2026Finalanthony alduinoprogress
07/08/2026HVAC-R and service water heating system controlsYoung Suhenergy_progress
09/30/2025Energy Code Compliance InspectionsTHomas DeLorenzoprogress
09/30/2025HVAC-R and service water heating equipmentTHomas DeLorenzoenergy_progress
09/30/2025HVAC-R and service water heating system controlsTHomas DeLorenzoenergy_progress
09/30/2025HVAC-R and service water piping design and insulationTHomas DeLorenzoenergy_progress
09/30/2025Maintenance informationTHomas DeLorenzoenergy_progress
09/25/2025Structural Stability – Alterations of existing buildingsTHomas DeLorenzospecial
09/25/2025FinalTHomas DeLorenzoprogress
09/25/2025Mechanical SystemsTHomas DeLorenzospecial
09/25/2025FinalTHomas DeLorenzoprogress
08/05/2025Post-installed AnchorsBRIAN O'ROURKEspecial
08/05/2025Lighting in dwelling unitsDanielle Albertenergy_progress
08/05/2025Energy Code Compliance InspectionsDanielle Albertprogress
08/05/2025FinalDanielle Albertprogress
12/02/2024Fire-Resistant Penetrations and JointsSalvatore Crocespecial
11/15/2024Fire-Resistant Penetrations and JointsSalvatore Crocespecial
11/15/2024Post-installed AnchorsEUGENE BIFULCOspecial
11/15/2024FinalSalvatore Croceprogress
11/15/2024Interior lighting powerSalvatore Croceenergy_progress
09/20/2024Fire-Resistant Penetrations and JointsSalvatore Crocespecial
09/20/2024Post-installed AnchorsEUGENE BIFULCOspecial
09/20/2024FinalSalvatore Croceprogress
Latest 25 of 71.
▾Documents — 1,493 on file (BIS + DOB NOW)
▸Plans & Drawings35
▸DOB NOWPlans/Sketch29
09/03/2026M00499959-I1Request digital key ↗
09/02/2026M00745006-I1Request digital key ↗
09/02/2026M00745006-P1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/05/2026M00256752-I1Request digital key ↗
09/04/2026M00352397-I1Request digital key ↗
09/04/2026M00402834-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00256752-S1Request digital key ↗
09/04/2026M00415790-I1Request digital key ↗
▸Applications & Permits310
▸BISPLAN / WORK APPROVAL APPLICATION183
08/30/2023121675080Open ↗
12/06/2022141021631Open ↗
10/07/2022121675080Open ↗
Showing 3 of 183 on file for this type
▸BISWORK PERMIT APPLICATION127
03/09/2023121675080Open ↗
12/09/2022141021631Open ↗
02/10/2021140991292Open ↗
Showing 3 of 127 on file for this type
▸Seals & Professional Certifications289
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION144
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 144 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature36
10/13/2026M01451150-I1Open ↗
09/05/2026M00256752-I1Open ↗
09/05/2026M00256752-S1Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026M00415790-I1Open ↗
09/02/2026M00415790-I1Open ↗
08/31/2026M00499710-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/02/2026M00415790-I1Open ↗
09/01/2026M01026488-I1Open ↗
08/31/2026M01058276-I1Open ↗
Showing 3 of 23 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT13
12/06/2022141021631Open ↗
Showing 1 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
12/06/2022141021631Open ↗
Showing 1 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
12/06/2022141021631Open ↗
Showing 1 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
01/05/2021140991292Open ↗
Showing 1 of 4 on file for this type
▸Trade Schedules & Equipment97
▸BISSELF-CERT PLUMBING NOTICE41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE30
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 30 on file for this type
▸BISSCHEDULE B - PLUMBING21
08/30/2023121675080Open ↗
Showing 1 of 21 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/13/2022121797626Open ↗
▸Safety & Tenant Protection38
▸BISTenant Protection Plan and Notes25
07/29/2021140111064Open ↗
07/29/2021101580077Open ↗
06/29/2021100087987Open ↗
Showing 3 of 25 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWTenant Protection Plan4
09/05/2026M00256752-S1Open ↗
08/13/2026M00256752-I1Open ↗
08/13/2026M00352397-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN3
12/09/2022141021631Open ↗
02/10/2021140991292Open ↗
Showing 2 of 3 on file for this type
▸Environmental & Asbestos89
▸BISASBESTOS: CERTIFICATION (DEP ACP5)39
12/06/2022141021631Open ↗
01/05/2021140991292Open ↗
Showing 2 of 39 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report26
10/13/2026M01451150-I1Open ↗
09/05/2026M00256752-S1Open ↗
09/05/2026M00256752-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/13/2026M01026488-I1Open ↗
08/13/2026M01026138-I1Open ↗
▸Energy Compliance150
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS70
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 70 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS31
10/10/2023141021631Open ↗
08/08/2022140982792Open ↗
10/05/2021140905974Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
10/13/2022121675080Open ↗
09/14/2022121675080Open ↗
09/13/2022121675080Open ↗
Showing 3 of 25 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
03/15/2022123441597Open ↗
11/23/2021121675080Open ↗
08/09/2021121623788Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
08/13/2026M00499710-I1Open ↗
08/13/2026M00499710-S4Open ↗
08/13/2026M00792804-I1Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS3
09/24/2021121675080Open ↗
08/09/2021121623788Open ↗
07/29/2021140111064Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
12/06/2022141021631Open ↗
01/05/2021140991292Open ↗
Showing 2 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
09/24/2021121675080Open ↗
08/09/2021121623788Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports51
▸BISTECHNICAL REPORT: RESPONSIBILITY45
10/13/2022121675080Open ↗
10/03/2022140844898Open ↗
09/22/2022140845922Open ↗
Showing 3 of 45 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)3
08/09/2021121623788Open ↗
07/29/2021140111064Open ↗
07/29/2021101580077Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
07/29/2021101580077Open ↗
06/29/2021100087987Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs116
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST64
10/17/2023141021631Open ↗
10/02/2023121675080Open ↗
10/04/2022140844898Open ↗
Showing 3 of 64 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION19
06/29/2021101580077Open ↗
06/15/2021140603639Open ↗
04/27/2021100087987Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISFINAL7
09/29/2022140845922Open ↗
09/29/2022140844898Open ↗
09/24/2021121675080Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
07/07/2022121797626Open ↗
06/28/2022121797626Open ↗
06/24/2022121797626Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER4
03/09/2023121675080Open ↗
Showing 1 of 4 on file for this type
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership117
▸BISCOST AFFIDAVIT104
12/06/2022141021631Open ↗
08/08/2022140982792Open ↗
09/30/2021140905974Open ↗
Showing 3 of 104 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW36
10/10/2023141021631Open ↗
03/15/2022123441597Open ↗
11/23/2021121675080Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms162
▸BISEFILING COVER SHEET53
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 53 on file for this type
▸BISBOROUGH INTAKE FORM51
03/09/2023121675080Open ↗
Showing 1 of 51 on file for this type
▸BISADDITIONAL INFORMATION47
09/08/2023121675080Open ↗
08/30/2023121675080Open ↗
12/06/2022141021631Open ↗
Showing 3 of 47 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET11
12/06/2022141021631Open ↗
Showing 1 of 11 on file for this type
▸Other Documents20
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
01/20/2021140991292Open ↗
Showing 1 of 5 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISDHCR DOCUMENT2
12/06/2022141021631Open ↗
06/07/2021122059431Open ↗
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BIS* FIRE STOPS 27-3452
07/29/2021101580077Open ↗
06/29/2021100087987Open ↗
▸DOB NOWDHCR Document2
08/13/2026M00415681-I1Open ↗
08/13/2026M00415790-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01058276-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01058276-I1Open ↗