| Owner | Filings | Most Recent |
|---|---|---|
| New York Life Insurance Co | 499 | 03/22/2026 |
| NY Life Ins. Co | 17 | 03/21/2026 |
| Quantum Design | 4 | 07/08/2026 |
| Highview Equities | 1 | 03/21/2026 |
| Houstons | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Robert Derector Associates | 31 | 09/22/2026 |
| Meyers+ Engineers | 7 | 09/22/2026 |
| HLW International | 21 | 09/18/2026 |
| WJE Engineers & Architects | 19 | 09/16/2026 |
| Kahn Architecture & Design | 5 | 06/05/2026 |
| Christies | 2 | 03/09/2026 |
| O'Neil Langan Architects | 3 | 02/18/2026 |
| HC Pec | 1 | 08/06/2025 |
| Howard Shapiro & Associates | 1 | 08/05/2025 |
| Wellworth Consulting | 2 | 07/24/2025 |
| TPG Architecture | 11 | 05/19/2025 |
| WJE Engineers & Architects | 4 | 05/19/2025 |
| Armour Unsderfer Engineering Inc, P | 5 | 05/08/2025 |
| WG & Associates | 15 | 06/28/2024 |
| Clarke Engineering Services | 1 | 06/13/2024 |
| Urban Integrations | 2 | 06/07/2024 |
| MG Engineering | 8 | 04/30/2024 |
| Sterling Engineering Services | 1 | 04/29/2024 |
| Syska Hennessy Group | 7 | 02/20/2024 |
| Jaros Baum & Bolles | 35 | 10/05/2023 |
| Building | 1 | 07/09/2023 |
| Newtec Engineering | 2 | 04/27/2023 |
| Tohfaz Uddin PE | 2 | 04/24/2023 |
| Levin Engineering | 1 | 02/27/2023 |
| 360 Engineering | 1 | 02/10/2023 |
| Vocon | 1 | 11/16/2022 |
| G3 Architecture Interiors Planning | 1 | 08/09/2022 |
| Lilker Associates Consulting Engineering | 1 | 09/18/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| Milrose Consultants | 156 | 03/21/2026 |
| Empire City Consultants | 148 | 03/21/2026 |
| United Safety Consultants | 4 | 03/21/2026 |
| Eurocelt Expediting | 2 | 03/21/2026 |
| Metropolis Group | 2 | 03/21/2026 |
| Nycer | 1 | 03/21/2026 |
| Direct Access Expediting | 2 | 03/21/2026 |
| Howard I Shapiro Associates | 2 | 03/21/2026 |
| Codegreen | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JT Magen & Company | General Contractor | 75 | 10/04/2026 |
| John Gallin & Son | General Contractor | 27 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 16 | 07/08/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 12 | 07/08/2026 |
| Par Plumbing Co | Plumbing | 12 | 07/08/2026 |
| Ask Contracting | General Contractor | 11 | 07/08/2026 |
| Nicholson & Galloway | General Contractor | 10 | 07/08/2026 |
| JRM Construction Management | General Contractor | 10 | 07/08/2026 |
| DK Construction One | General Contractor | 8 | 07/08/2026 |
| Steadfast Development and | General Contractor | 6 | 04/09/2026 |
| Lab Plumbing & Heating Co | Plumbing | 5 | 07/08/2026 |
| Dycon Enterprises | General Contractor | 4 | 03/21/2026 |
| NYC Fire Sprinkler | Fire Protection | 4 | 07/08/2026 |
| Par Fire Protection | Fire Protection | 4 | 07/08/2026 |
| L&K Partners | General Contractor | 4 | 03/21/2026 |
| PJP Installers | Scaffold | 4 | 07/08/2026 |
| Metro-Tech Erectors | Scaffold | 4 | 07/08/2026 |
| Spring Scaffolding | Scaffold | 4 | 04/09/2026 |
| Robert B. Samuels | Electrical | 3 | 03/22/2026 |
| N.Y. Life Insurance Co | Electrical | 3 | 03/21/2026 |
| D&E Refrigeration & Air | specialty_contractor | 3 | 03/21/2026 |
| M & S Mechanical Services | specialty_contractor | 3 | 07/08/2026 |
| King Hoist & Scaffolding | Scaffold | 3 | 07/08/2026 |
| The Sweet Construction GR | General Contractor | 2 | 07/08/2026 |
| George Breslaw Plumbing | Plumbing | 2 | 07/08/2026 |
| Lawrence J. Levine | Fire Protection | 2 | 03/21/2026 |
| Ashland Plumbing | Plumbing | 1 | 07/08/2026 |
| Cardoza Plumbing | Plumbing | 1 | 07/08/2026 |
| DJC | Plumbing | 1 | 07/08/2026 |
| DJC | Fire Protection | 1 | 07/08/2026 |
| Duo Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Evergreen Mechanical | Fire Protection | 1 | 07/08/2026 |
| TF Electrical | Electrical | 1 | 03/22/2026 |
| M & S Buildings Services | Fire Protection | 1 | 07/08/2026 |
| M & S Mechanical Services | Plumbing | 1 | 07/08/2026 |
| RNH Electric Company | Electrical | 1 | 03/21/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Fischer & Makooi Archite* | Electrical | 1 | 03/21/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/22/2026 |
| S.B.A. Plumbing | Plumbing | 1 | 07/08/2026 |
| Atlas-Acon Electric Service | Electrical | 1 | 03/21/2026 |
| Nicholson & Galloway | Scaffold | 1 | 07/08/2026 |
| Soh Par Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Donnelly Mechanical | specialty_contractor | 1 | 07/08/2026 |
| Aggressive Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Outsource Special Inspection | 2827 | 8 | 09/22/2026 |
| Engineering Building Service | 7303 | 66 | 09/22/2026 |
| AK Engineering | 678 | 43 | 06/10/2026 |
| Christie Engineering | 5795 | 2 | 03/09/2026 |
| Milrose Consultants | 2003 | 5 | 01/13/2025 |
| Clarke Engineering Services | 3795 | 1 | 06/13/2024 |
| Sterling Engineering Service | 1012 | 1 | 04/29/2024 |
| Obaid Mian | 849 | 2 | 04/27/2023 |
| Beasley Chin & Hunderman | 1238 | 4 | 03/08/2023 |
| Eti Consultants | 7694 | 21 | 02/09/2023 |
| Emtec Consultants | 152 | 1 | 03/06/2020 |
| Lilker Associates Consulting | 816 | 1 | 09/18/2019 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/28/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/25/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/24/2026 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 09/24/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/24/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/23/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/22/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 06/22/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 06/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | Aggressive Fire Protection | 06/11/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 06/09/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 06/08/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 06/08/2026 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 05/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 05/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 02/03/2026 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Metro-Tech Erectors | 10/21/2025 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 10/21/2025 |
| DOB NOW | Plumbing | Signed-off | Lab Plumbing & Heating Co | 10/20/2025 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 10/20/2025 |
| DOB NOW | Structural | Signed-off | JT Magen & Company | 10/17/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 10/16/2025 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/29/2025 |
| DOB NOW | General Construction | Permit Issued | JT Magen & Company | 09/29/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | JT Magen & Company | 09/29/2025 |
| DOB NOW | General Construction | Signed-off | JT Magen & Company | 09/26/2025 |
| DOB NOW | Mechanical Systems | Signed-off | JT Magen & Company | 09/26/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Metro-Tech Erectors | 09/04/2025 |
| DOB NOW | Plumbing | Signed-off | Duo Plumbing & Heating | 08/06/2025 |
| DOB NOW | Construction Fence | Signed-off | PJP Installers | 08/06/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | Metro-Tech Erectors | 08/05/2025 |
| DOB NOW | Supported Scaffold | Signed-off | Spring Scaffolding | 07/01/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 06/26/2025 |
| DOB NOW | Plumbing | Signed-off | Par Plumbing Co | 06/26/2025 |
| DOB NOW | General Construction | Signed-off | Nicholson & Galloway | 06/24/2025 |
| DOB NOW | Structural | Signed-off | Steadfast Development and | 06/18/2025 |
| DOB NOW | Sprinklers | Permit Issued | Sirina Fire Protection | 06/13/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/11/2026 | Signed-off | Steadfast Development and | Air Conditioning Systems | Cooling Trane TPEFYP096MH140A 680 CFM · Vrf Indoor ×12 TUHYE0963AN41AN 204,000 BTU · Condensing Unit ×12 TPKFYP012LM140B 325 CFM · Fan Coil Indoor ×9 TPEFYP072MH140A 375 CFM · Fan Coil Indoor ×6 TPVFY048AM141 A 75 CFM · Fan Coil Indoor ×6 TUHYE1443AN41AN 234,000 BTU · Condensing Unit ×6 TPVFY048AM141A 160 CFM · Vrf Indoor ×3 TRUZA0361 KA70NA 234,000 BTU · Condensing Unit ×3 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | Permit Issued | Sirina Fire Protection | 310 heads |
| 09/22/2026 | — | — | — |
| 09/22/2026 | Permit Issued | Abco-Peerless Sprinkler | 81 heads |
| 06/04/2026 | Permit Issued | Abco-Peerless Sprinkler | 495 heads |
| 06/04/2026 | Permit Issued | Aggressive Fire Protection | — |
| 06/03/2025 | Permit Issued | Abco-Peerless Sprinkler | 27 heads |
| 05/19/2025 | Permit Issued | Abco-Peerless Sprinkler | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/22/2026 | — | — | Water/Sanitary |
| 09/22/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| 06/04/2026 | Signed-off | Lab Plumbing & Heating Co | Water/Sanitary |
| 06/04/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/20/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/13/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/13/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/13/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/13/2026 | Permit Issued | TF Electrical | General Wiring |
| 09/09/2026 | Permit Issued | Atlas-Acon Electric Service | 1 meters |
| 05/26/2026 | Permit Issued | Robert B Samuels | General Wiring |
| 10/23/2025 | Complete | Atlas-Acon Electric Service | General Wiring |
| 10/03/2025 | Permit Issued | Atlas-Acon Electric Service | 1 meters |
| 08/27/2025 | Complete | Robert B Samuels | General Wiring |
| 07/07/2025 | Complete | Atlas-Acon Electric Service | General Wiring |
| 03/06/2025 | Complete | Robert B Samuels | General Wiring |
| 12/06/2024 | Complete | Robert B Samuels | General Wiring |
| 10/10/2024 | Permit Issued | Atlas-Acon Electric Service | 1 meters |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/16/2026 | — | — | Steel, Concrete |
| 06/04/2026 | Signed-off | JT Magen & Company | Steel, Concrete |
| 03/09/2026 | Signed-off | Steadfast Development and | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | — | — | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/24/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/24/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/17/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/17/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/05/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 11/07/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/25/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/30/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/07/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/07/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/14/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/09/2026 | Fire-Resistant Penetrations and Joints | Tony Cartagine | special |
| 09/08/2026 | Wall Panels, Curtain Walls, and Veneers | — | special |
| 09/08/2026 | Mastic and Intumescent Fire-resistant Coatings | Tony Cartagine | special |
| 09/03/2026 | Structural Steel - Welding | Tony Cartagine | special |
| 09/03/2026 | Structural Stability – Alterations of existing buildings | Tony Cartagine | special |
| 09/03/2026 | Post-installed Anchors | Tony Cartagine | special |
| 09/03/2026 | Sprayed fire-resistant materials | Tony Cartagine | special |
| 09/03/2026 | Concrete - Cast-In-Place | Tony Cartagine | special |
| 09/03/2026 | Structural Steel - Details | Tony Cartagine | special |
| 09/03/2026 | Structural Steel - High Strength Bolting | Tony Cartagine | special |
| 08/12/2026 | Sprinkler Systems | JONAR MADRIAGA | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 08/12/2026 | Post-installed Anchors | JONAR MADRIAGA | special |
| 07/30/2026 | HVAC-R and service water heating equipment | Tony Cartagine | energy_progress |
| 07/30/2026 | Final | Tony Cartagine | progress |
| 07/30/2026 | Post-installed Anchors | Tony Cartagine | special |
| 07/30/2026 | HVAC-R and service water piping design and insulation | Tony Cartagine | energy_progress |
| 07/30/2026 | Lighting controls | Tony Cartagine | energy_progress |
| 07/30/2026 | HVAC-R and service water heating system controls | Tony Cartagine | energy_progress |
| 07/30/2026 | Mechanical Systems | Tony Cartagine | special |
| 07/30/2026 | Interior lighting power | Tony Cartagine | energy_progress |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Tony Cartagine | special |
| 07/22/2026 | Fire-Resistant Penetrations and Joints | Tony Cartagine | special |
| 07/22/2026 | Sprinkler Systems | Tony Cartagine | special |
| 07/22/2026 | Final | Bennet Dunkley | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| New York Life Insurance Company | Office | Sub-cellar, Floors 1, 2, 5, Mezzanine | Project M01412721 Project M01382752 Project M01382766 Project M01382790 Project M01015232 Project M01015242 Project M01015244 Project M01015249 Project M01014943 Project M01035432 |
| Issey Miyake | Retail | Sub-cellar, Floor 1, Mezzanine | Project M01159381 Project M01175974 Project M01175982 Project M01175991 Project M01159378 Project M01159376 |
| New York Life | Office | Sub-cellar, Floors 1, 14, 15, 17–21, 30, 31, Mezzanine | Project M01134406 Project M00997579 Project M00997589 Project M00997597 Project M00838274 Project M00933927 Project M00924041 Project M00933939 Project M00814052 Project M00822415 Project M00826345 Project M08013531 |
| Hume | Office | Floor 31 | Project M01036890 Project M01036901 Project M01037693 |
| Mikasa | Office | Sub-cellar, Cellar, Floors 1, 2, 5, Mezzanine | Project M00837917 Project M00837948 Project M00837964 Project M00837979 Project M00837993 |
| Otis | Office | Sub-cellar | Project M00306909 |
| Sup Ac | Office | Sub-cellar | Project M00242518 |