← Back
BuildNYC
Miscellaneous commercial condo
512 WEST 22ND STREET
MANHATTAN · BIN 1090200
💬 Discuss this project
1920Year Built
11Stories
R5Building Class
M1-5Zoning
129,231 sfGross Floor Area
2Units
LL97 Covered0 Active ViolationsFISP: No Report Filed
Miscellaneous commercial condo · Owner of record: 510 West 22nd Street Owner · 19,750 sf lot · 6.54 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 2 docs
Floor 11Next Jump NYC40p · 5 filings · 20 docs
Floor 10Next Jump NYC40p · 5 filings · 20 docs
Floor 9Next Jump NYC33p · 3 filings · 19 docs
Floor 8Genius, Nightingale +2150p · 17 filings · 20 docs
Floor 7Nucleus Advisors78p · 9 filings · 20 docs
Floor 6Vornado Realty Trust108p · 6 filings · 20 docs
Floor 5Vornado Realty Trust21p · 3 filings · 18 docs
Floor 4Genius91p · 8 filings · 20 docs
Floor 3Humble Capital, Warner Media110p · 9 filings · 20 docs
Floor 2Warner Media22p · 6 filings · 20 docs
Floor 1Nara Roesler Gallery, Warner Media80p · 15 filings · 20 docs
Site & exteriorKenneth Cole7p · 5 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust19507/08/2026
510 West 22nd St Partners4603/21/2026
510 W 22 Street Owners1103/21/2026
Time Warner Cable Co503/21/2026
Albanese Development203/21/2026
511 W 21 St Realty203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Archetype Consultants13003/21/2026
J.A.M. Associates2603/21/2026
Milrose Consultants1903/21/2026
Lombardo Building Consultants103/21/2026
Building Brothers403/21/2026
All in Permit Consultants103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Clune Construction CoGeneral Contractor2907/08/2026
JRM Construction ManagementGeneral Contractor2307/08/2026
Structure ToneGeneral Contractor1207/08/2026
Capitol Fire Sprinkler CoFire Protection407/08/2026
Enobrac PlumbingPlumbing407/08/2026
Bedrock Plumbing & HeatingPlumbing407/08/2026
Tristate Plumbing ServicesPlumbing307/08/2026
Universal PlumbingPlumbing207/08/2026
Balaton ConsultingSign hanger207/08/2026
HI-Tech C.P.MGeneral Contractor207/08/2026
Avon Plumbing & HeatingFire Protection207/08/2026
Nova ElectricElectrical203/22/2026
Arsenal ScaffoldScaffold203/21/2026
Enobrac PlumbingFire Protection207/08/2026
HI-Tech C.P.MScaffold203/21/2026
Miller Plumbing & HeatingFire Protection207/08/2026
Sirina Fire ProtectionFire Protection207/08/2026
Tristate Plumbing ServicesFire Protection207/08/2026
A Plus PlumbingPlumbing107/08/2026
JSP Electl CNTNGElectrical103/21/2026
MRD Electrical ServicesElectrical103/22/2026
Omta TechElectrical103/22/2026
Talisen ConstructionGeneral Contractor107/08/2026
Active SignsSign hanger107/08/2026
A&A PlumbingPlumbing107/08/2026
Hig Electric Assc NYCElectrical103/22/2026
A + SprinklerFire Protection107/08/2026
Avon Plumbing & HeatingPlumbing107/08/2026
Donato PlumbingPlumbing107/08/2026
KG SprinklerFire Protection107/08/2026
Metro Fire ProtectionFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering81742903/17/2025
CES Engineering1277802/14/2023
G&G Sprinkler Services2782502/03/2022
Alan D Marcus, PE1761802/01/2022
AK Engineering6781211/02/2021
Becker Engineering633609/29/2021
DNA Controlled Inspection554405/28/2020
Valerio Associates1379103/10/2020
Asda Architecture + Desig2015103/03/2020
Building Lifecycle
All (300)Filed (70)Permit Issued (49)Signed Off (53)Violation (12)Inspection (55)Objection (31)Special Inspection (30)
09/09/2025
Signed off — Alteration
M01181765-I1
08/25/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/22/2025
Signed off — Alteration
Plumbing changes on the 4th floor as indicated on drawings.
M01181758-I1
08/22/2025
Signed off — Alteration
Mechanical changes on the 4th and 8th floors as indicated on drawings.
M01181753-I1
08/22/2025
Signed off — Alteration
Architectural and demolition changes on the 4th and 8th floors as indicated on drawings.
M01181750-I1
08/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Signed off — Alteration
Plumbing changes on the 3rd and 4th floors as indicated on drawings.
M00954729-I1
07/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/06/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/15/2025
Signed off — Alteration
Sprinkler changes on the 3rd and 4th floors as indicated on drawings.
M00954731-I1
04/01/2025
Permit issued — Sprinklers
M01181765-I1-EW-SP
04/01/2025
Permit issued — Plumbing
M01181758-I1-PL
04/01/2025
Permit issued — General Construction
M01181750-I1-GC
03/27/2025
Permit issued — Mechanical Systems
M01181753-I1-MS
03/18/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Ryan Hansen
03/18/2025
Special inspection requirement — HVAC-R and service water heating system controls
Ryan Hansen
03/18/2025
Special inspection requirement — HVAC-R and service water heating equipment
Ryan Hansen
03/18/2025
Special inspection requirement — Maintenance information
Ryan Hansen
03/18/2025
Special inspection requirement — Electrical motors and elevators
Ryan Hansen
03/17/2025
Filed — Alteration
M01181765-I1
03/17/2025
Filed — Alteration
Plumbing changes on the 4th floor as indicated on drawings.
M01181758-I1
03/17/2025
Filed — Alteration
Mechanical changes on the 4th and 8th floors as indicated on drawings.
M01181753-I1
03/14/2025
Filed — Alteration
Architectural and demolition changes on the 4th and 8th floors as indicated on drawings.
M01181750-I1
03/14/2025
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
03/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
02/24/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/18/2025
Special inspection requirement — Interior lighting power
Ryan Hansen
02/18/2025
Special inspection requirement — Lighting controls
Ryan Hansen
02/14/2025
Special inspection requirement — Mechanical Systems
Ryan Hansen
02/14/2025
Special inspection requirement — Final
Ryan Hansen
02/14/2025
Special inspection requirement — Final
Ryan Hansen
01/02/2025
Signed off — Alteration
Architectural changes on the 3rd and 4th floors as indicated on drawings.
M00954713-I1
01/02/2025
Signed off — Alteration
Mechanical changes on the 3rd and 4th floors as indicated on drawings.
M00954724-I1
12/03/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/18/2024
Filed — No Work
M01142047-I1
11/18/2024
Objection raised — Other
11/18/2024
Objection resolved — Resolved
08/02/2024
Signed off — Alteration
M08008416-I1
08/02/2024
Signed off — Alteration
Architectural work on part of 8thh floor (Kyra Suite) as indicated on drawings.
M08008347-I1
07/30/2024
Filed — Alteration
Architectural work on part of 8thh floor (Kyra Suite) as indicated on drawings.
M08008347-P1
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/30/2024
Special inspection requirement — Interior lighting power
Ryan Hansen
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
07/30/2024
Special inspection requirement — Sprinkler Systems
Ryan Hansen
07/30/2024
Special inspection requirement — Final
Ryan Hansen
07/30/2024
Special inspection requirement — Lighting controls
Ryan Hansen
07/29/2024
Filed — Alteration
Sprinkler changes on the 3rd and 4th floors as indicated on drawings.
M00954731-P1
07/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
07/25/2024
Special inspection requirement — Sprinkler Systems
Ryan Hansen
06/24/2024
Signed off — Alteration
Installation of partitions for tenant use in the existing first floor commercial space and replace existing louvers with glass on the existing storefront. No change in use, egress or occupancy.
M00569520-S2
04/17/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2024
Special inspection requirement — Lighting controls
Ryan Hansen
04/12/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
04/12/2024
Special inspection requirement — Fire-Resistance Rated Construction
Ryan Hansen
04/12/2024
Special inspection requirement — Final
Ryan Hansen
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offH M Sprinkler04/01/2025
DOB NOWPlumbingSigned-offDonato Plumbing04/01/2025
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/01/2025
DOB NOWMechanical SystemsSigned-offClune Construction Co03/27/2025
DOB NOWGeneral ConstructionSigned-offStructure Tone02/07/2024
DOB NOWPlumbingSigned-offA&A Plumbing02/06/2024
DOB NOWMechanical SystemsSigned-offStructure Tone02/06/2024
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co02/05/2024
DOB NOWSignSigned-offActive Signs07/25/2023
DOB NOWSprinklersSigned-offA + Sprinkler05/01/2023
DOB NOWPlumbingSigned-offA Plus Plumbing05/01/2023
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co04/18/2023
DOB NOWMechanical SystemsSigned-offClune Construction Co04/18/2023
DOB NOWGeneral ConstructionSigned-offClune Construction Co04/18/2023
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating04/17/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone04/17/2023
DOB NOWMechanical SystemsSigned-offStructure Tone04/17/2023
DOB NOWSprinklersPermit IssuedAvon Plumbing & Heating12/23/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating10/28/2022
DOB NOWMechanical SystemsSigned-offStructure Tone10/27/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone10/27/2022
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co10/26/2022
DOB NOWPlumbingSigned-offBedrock Plumbing & Heating08/23/2022
DOB NOWSprinklersSigned-offCapitol Fire Sprinkler Co08/23/2022
DOB NOWGeneral ConstructionSigned-offStructure Tone08/04/2022
DOB NOWMechanical SystemsSigned-offStructure Tone07/25/2022
DOB NOWConstruction FenceSigned-offArsenal Scaffold06/09/2022
DOB NOWConstruction FenceSigned-offHI-Tech C.P.M03/02/2022
DOB NOWMechanical SystemsPermit IssuedHI-Tech C.P.M02/28/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co02/08/2022
DOB NOWMechanical SystemsSigned-offClune Construction Co02/03/2022
DOB NOWMechanical SystemsSigned-offClune Construction Co01/19/2022
DOB NOWSprinklersSigned-offEnobrac Plumbing01/19/2022
DOB NOWPlumbingSigned-offEnobrac Plumbing01/19/2022
DOB NOWGeneral ConstructionSigned-offClune Construction Co01/17/2022
DOB NOWPlumbingSigned-offAvon Plumbing & Heating12/15/2021
DOB NOWSprinklersPermit IssuedAvon Plumbing & Heating12/15/2021
DOB NOWGeneral ConstructionSigned-offHI-Tech C.P.M11/15/2021
DOB NOWSprinklersSigned-offEnobrac Plumbing10/28/2021
DOB NOWPlumbingSigned-offEnobrac Plumbing10/26/2021
+ 60 more permits on file
1 project · most recent 02/14/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/14/2023Permit IssuedHI-Tech C.P.MAir Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P24NMAU-E3 24,000 CFM · Vrf Indoor ×4
PEFY-P30NMAU-E3 24,000 BTU · Vrf Indoor ×2
PKFY-P12NLMU-E 12,000 BTU · Vrf Indoor ×2
PQRY-9120TLMU-A1 120,000 BTU · Vrf Outdoor ×2
PVFY-P48NAMU-E1 48,000 BTU · Vrf Indoor ×2
2 projects · most recent 02/10/2023
FiledStatusContractorScope
02/10/2023Permit IssuedAvon Plumbing & Heating33 heads
03/12/2020——4 heads
1 project · most recent 02/14/2023
Water/Sanitary
FiledStatusContractorScope
02/14/2023Signed-offAvon Plumbing & HeatingWater/Sanitary
25 projects · most recent 02/10/2026
General Wiring Lighting
FiledStatusContractorScope
02/10/2026Permit IssuedJSP Electl CNTNGGeneral Wiring
11/13/2025Permit IssuedMRD Electrical ServicesGeneral Wiring
03/20/2025CompleteOmta Tech—
01/02/2025CompleteRX ElectricGeneral Wiring
01/30/2024CompleteRX Electric—
07/26/2023CompleteRainbow Electric Co—
05/12/2023CompleteLive Wire Electric 1General Wiring
05/02/2023CompleteEmpire State Electric MaintenanceGeneral Wiring, Lighting
03/15/2023CompleteLive Wire Electric 1General Wiring
02/07/2023CompleteNova ElectricGeneral Wiring
11/04/2022CompleteNova ElectricGeneral Wiring
08/24/2022CompleteLive Wire Electric 1General Wiring
11/17/2021CompleteY.S. ElectricGeneral Wiring, Lighting
10/12/2021CompleteLive Wire Electric 1General Wiring
05/24/2021Permit IssuedHig Electric Assc NYCGeneral Wiring
▾Field Inspections (DOB CAP) — 55
DateTypeResultReport
08/25/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/04/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/03/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/24/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/27/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/25/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
Latest 25 of 55.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/18/2025HVAC-R and service water heating equipmentRyan Hansenenergy_progress
03/18/2025HVAC-R and service water piping design and insulationRyan Hansenenergy_progress
03/18/2025HVAC-R and service water heating system controlsRyan Hansenenergy_progress
03/18/2025Electrical motors and elevatorsRyan Hansenenergy_progress
03/18/2025Maintenance informationRyan Hansenenergy_progress
03/14/2025Fire-Resistance Rated ConstructionRyan Hansenprogress
03/14/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/11/2025Fire-Resistant Penetrations and JointsRyan Hansenspecial
02/18/2025Interior lighting powerRyan Hansenenergy_progress
02/18/2025Lighting controlsRyan Hansenenergy_progress
02/14/2025FinalRyan Hansenprogress
02/14/2025Mechanical SystemsRyan Hansenspecial
02/14/2025FinalRyan Hansenprogress
07/30/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/30/2024Sprinkler SystemsRyan Hansenspecial
07/30/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/30/2024Lighting controlsRyan Hansenenergy_progress
07/30/2024Interior lighting powerRyan Hansenenergy_progress
07/30/2024Fire-Resistance Rated ConstructionRyan Hansenprogress
07/30/2024FinalRyan Hansenprogress
07/25/2024Fire-Resistant Penetrations and JointsRyan Hansenspecial
07/25/2024Sprinkler SystemsRyan Hansenspecial
04/12/2024Fire-Resistance Rated ConstructionRyan Hansenprogress
04/12/2024Interior lighting powerRyan Hansenenergy_progress
04/12/2024Lighting controlsRyan Hansenenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
GeniusOfficeFloors 4, 8
Project M01181753 Alteration · LOC Issued · 03/17/2025
Project M01181758 Alteration · LOC Issued · 03/17/2025
Project M01181765 Alteration · LOC Issued · 03/17/2025
Project M01181750 Alteration · LOC Issued · 03/14/2025
Kenneth ColeRetail—
Project M00875914 Alteration · LOC Issued · 06/16/2023
Humble CapitalOfficeFloor 3
Project M00842375 Alteration · LOC Issued · 04/17/2023
Project M00842401 Alteration · LOC Issued · 04/17/2023
Project M00842408 Alteration · LOC Issued · 04/17/2023
Project M00842371 Alteration · LOC Issued · 04/14/2023
NightingaleOfficeFloor 8
Project M00820800 Alteration · LOC Issued · 04/12/2023
Project M00820830 Alteration · LOC Issued · 04/12/2023
Project M00820852 Alteration · LOC Issued · 04/12/2023
Project M00820862 Alteration · LOC Issued · 04/12/2023
KyraOfficeFloor 8
Project M08008347 Alteration · LOC Issued · 10/19/2022
Project M08008416 Alteration · LOC Issued · 10/19/2022
Project M08008450 Alteration · LOC Issued · 10/19/2022
Project M08008460 Alteration · LOC Issued · 10/19/2022
SumeruOfficeFloor 8
Project M00750343 Alteration · LOC Issued · 08/01/2022
Project M00750358 Alteration · LOC Issued · 07/21/2022
Project M00750385 Alteration · LOC Issued · 07/21/2022
Project M00752603 Alteration · LOC Issued · 07/21/2022
Nucleus AdvisorsOfficeFloor 7
Project M00633771 Alteration · LOC Issued · 01/12/2022
Project M00633773 Alteration · LOC Issued · 01/12/2022
Project M00633781 Alteration · LOC Issued · 01/12/2022
Project M00633785 Alteration · LOC Issued · 01/12/2022
Vornado Realty TrustOfficeFloor 6
Project M00484256 Alteration · LOC Issued · 06/07/2021
Project M00487244 Alteration · LOC Issued · 06/04/2021
Project M00484244 Alteration · LOC Issued · 06/03/2021
Project M00493958 Alteration · LOC Issued · 06/03/2021
Next Jump NYCOfficeFloors 9–11
Project M00500436 Alteration · LOC Issued · 04/26/2021
Project M00500458 Alteration · LOC Issued · 04/26/2021
Project M00499873 Alteration · LOC Issued · 04/21/2021
Project M00481061 Alteration · LOC Issued · 03/17/2021
Project M00481102 Alteration · LOC Issued · 03/16/2021
Project M00481194 Alteration · LOC Issued · 03/12/2021
Project M00481213 Alteration · LOC Issued · 03/12/2021
Nara Roesler GalleryArts / Culture / EntertainmentFloor 1
Project M00348277 Alteration · LOC Issued · 08/21/2020
Project M00348280 Alteration · LOC Issued · 08/21/2020
Project M00348259 Alteration · LOC Issued · 05/11/2020
Warner MediaOfficeFloors 1, 2
Project M00323121 Alteration · Approved · 03/12/2020
Project M00322861 Alteration · LOC Issued · 03/10/2020
Project M00322890 Alteration · LOC Issued · 03/03/2020
Project M00322906 Alteration · LOC Issued · 03/03/2020
Project M00272728 Alteration · LOC Issued · 01/13/2020
Project M00271634 Alteration · LOC Issued · 01/10/2020
Project M00272510 Alteration · LOC Issued · 01/10/2020
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,249 on file (BIS + DOB NOW)
▸Plans & Drawings101
▸DOB NOWPlans/Sketch70
09/04/2026M00481194-I1Request digital key ↗
09/04/2026M00481102-I1Request digital key ↗
09/04/2026M00481061-P1Request digital key ↗
Showing 3 of 70 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly8
09/05/2026M00213340-I1Request digital key ↗
09/03/2026M00583983-I1Request digital key ↗
09/02/2026M00674455-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler7
09/05/2026M00322906-I1Request digital key ↗
09/05/2026M00323121-I1Request digital key ↗
09/04/2026M00272510-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems6
09/05/2026M00271634-I1Request digital key ↗
09/05/2026M00322890-I1Request digital key ↗
09/04/2026M00386309-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/04/2026M00272510-I1Request digital key ↗
09/04/2026M00272510-P1Request digital key ↗
09/04/2026M00348277-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Sign2
09/05/2026M00245847-I1Request digital key ↗
09/05/2026M00245853-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/05/2026M00272728-I1Request digital key ↗
09/05/2026M00322861-I1Request digital key ↗
▸Applications & Permits145
▸BISPLAN / WORK APPROVAL APPLICATION85
07/18/2025121186466Open ↗
07/07/2025121186466Open ↗
05/30/2025140902227Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION56
09/11/2020140945084Open ↗
09/01/2020140902227Open ↗
08/26/2020140902281Open ↗
Showing 3 of 56 on file for this type
▸BISPLACE OF ASSEMBLY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISZONING EXHIBIT IV- CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications411
▸DOB NOWProgress Inspector Seal & Signature115
10/09/2026M00649564-I1Open ↗
10/09/2026M00649564-I1Open ↗
09/29/2026M00493958-P1Open ↗
Showing 3 of 115 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature99
09/05/2026M00245853-I1Open ↗
09/05/2026M00271634-I1Open ↗
09/05/2026M00272728-I1Open ↗
Showing 3 of 99 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature78
10/09/2026M00649564-I1Open ↗
09/29/2026M00493958-P1Open ↗
09/27/2026M00348259-I1Open ↗
Showing 3 of 78 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION70
03/23/2020123874771Open ↗
03/05/2020123842618Open ↗
03/05/2020123842618Open ↗
Showing 3 of 70 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
09/04/2020140945084Open ↗
05/18/2020140902227Open ↗
05/11/2020140902281Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST12
03/23/2020123874771Open ↗
03/05/2020123842618Open ↗
03/04/2020123842609Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
09/04/2020140945084Open ↗
05/18/2020140902227Open ↗
05/11/2020140902281Open ↗
Showing 3 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION7
09/04/2020140945084Open ↗
05/18/2020140902227Open ↗
05/11/2020140902281Open ↗
Showing 3 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment48
▸BISEQUIPMENT USE PERMITS28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISSCHEDULE B - PLUMBING11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT4
02/14/2020121186466Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection64
▸DOB NOWHPD-1: Anti-Harassment Area Checklist38
09/04/2026M00481061-I1Open ↗
09/04/2026M00481061-P1Open ↗
09/03/2026M00493958-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWCertificate of No Harassment14
09/03/2026M00493958-I1Open ↗
09/03/2026M00556944-I1Open ↗
Showing 2 of 14 on file for this type
▸BISANTI-HARASSMENT CHECKLIST7
03/05/2020123842618Open ↗
03/04/2020123842609Open ↗
08/07/2019123713776Open ↗
Showing 3 of 7 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos52
▸DOB NOWDEP ACP-5: Asbestos Assessment Report39
09/05/2026M00271634-I1Open ↗
09/05/2026M00272728-I1Open ↗
09/05/2026M00322890-I1Open ↗
Showing 3 of 39 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
09/04/2020140945084Open ↗
08/26/2020140902281Open ↗
03/23/2020123874771Open ↗
Showing 3 of 9 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
05/11/2020140902281Open ↗
Showing 1 of 2 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY19
10/13/2022123874771Open ↗
10/13/2022123874771Open ↗
11/16/2021140945084Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
03/23/2020123874771Open ↗
03/05/2020123842618Open ↗
03/05/2020123842618Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.14
09/04/2026M00481194-I1Open ↗
09/04/2026M00481061-I1Open ↗
09/03/2026M00556944-I1Open ↗
Showing 3 of 14 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS12
10/13/2022123874771Open ↗
11/16/2021140945084Open ↗
11/10/2021140945084Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/04/2020140945084Open ↗
05/11/2020140902281Open ↗
▸Inspections & Test Reports65
▸BISTECHNICAL REPORT: RESPONSIBILITY40
10/17/2022123874771Open ↗
10/17/2022123874771Open ↗
10/14/2022123874771Open ↗
Showing 3 of 40 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHYDRO FLOW TEST LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
09/01/2020140902227Open ↗
▸Approvals, Objections & Sign-offs82
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST34
05/29/2025140902227Open ↗
10/17/2022123874771Open ↗
11/16/2021140945084Open ↗
Showing 3 of 34 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE10
07/18/2025121186466Open ↗
07/07/2025121186466Open ↗
03/19/2021121186466Open ↗
Showing 3 of 10 on file for this type
▸BISSUPERSEDING LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISHIGH LINE - PARKS APPROVAL REQUIRED5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION4
11/04/2021140945084Open ↗
Showing 1 of 4 on file for this type
▸BISSHED LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership50
▸BISCOST AFFIDAVIT40
10/13/2022123874771Open ↗
11/16/2021140945084Open ↗
11/10/2021140945084Open ↗
Showing 3 of 40 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/17/2023140902227Open ↗
07/28/2022123874771Open ↗
▸Filing & Intake Forms120
▸BISADDITIONAL INFORMATION58
07/25/2025121186466Open ↗
07/15/2021121186466Open ↗
02/25/2021140902281Open ↗
Showing 3 of 58 on file for this type
▸BISBOROUGH INTAKE FORM32
03/23/2020123874771Open ↗
02/14/2020121186466Open ↗
11/20/2019121186466Open ↗
Showing 3 of 32 on file for this type
▸BISEFILING COVER SHEET18
03/05/2020123842618Open ↗
03/04/2020123842609Open ↗
12/24/2019123726254Open ↗
Showing 3 of 18 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET12
09/04/2020140945084Open ↗
05/18/2020140902227Open ↗
05/11/2020140902281Open ↗
Showing 3 of 12 on file for this type
▸Other Documents25
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
07/15/2021121186466Open ↗
Showing 1 of 11 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPLOT DIAGRAM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBPP-DEP: INSTALL/RELOCATE FIRE HYDRANT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type