| Owner | Filings | Most Recent |
|---|---|---|
| Milbank | 129 | 09/13/2026 |
| Related | 52 | 10/16/2026 |
| Cooley | 42 | 07/08/2026 |
| Third Point | 29 | 07/08/2026 |
| Cognizant | 28 | 07/08/2026 |
| Stonepeak Partners | 27 | 07/08/2026 |
| Marketaxess Holdings | 20 | 03/21/2026 |
| 55 Hudson Yards Bakery LLC D B | 16 | 03/21/2026 |
| Vivvi | 14 | 07/08/2026 |
| Mount Sinai Healthy System | 11 | 03/21/2026 |
| Vista | 8 | 07/08/2026 |
| Dubin & Co | 8 | 03/21/2026 |
| Vista Equity Partners | 4 | 03/21/2026 |
| Hudson Yards | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Robert Derector Associates | 55 | 10/01/2026 |
| Gensler | 9 | 10/01/2026 |
| AMA Consulting Engineers | 16 | 06/04/2026 |
| WB Engineers & Consultants | 60 | 06/03/2026 |
| Lehman Smith McLeish | 8 | 06/03/2026 |
| Exdem Engineering Services | 1 | 04/30/2026 |
| Architecture Plus Information | 9 | 04/14/2026 |
| WSP | 10 | 03/03/2026 |
| Alliance Architecture | 4 | 11/04/2025 |
| HLW International | 5 | 08/11/2025 |
| The Switzer Group | 2 | 08/11/2025 |
| Slade Architecture | 1 | 06/26/2024 |
| McAlpine Associates Architects | 5 | 04/19/2024 |
| HLW International | 6 | 12/19/2023 |
| TPG Architecture | 3 | 12/19/2023 |
| Ted Moudis Associates | 3 | 07/13/2023 |
| Noah Steffes | 1 | 12/06/2021 |
| Stamp Architecture | 1 | 09/24/2021 |
| NBBJ Architecture | 1 | 06/14/2021 |
| WSP USA | 1 | 06/11/2021 |
| Alliance Architecture of Maryland | 2 | 03/11/2021 |
| Avcon Engineering | 6 | 03/02/2021 |
| Spacesmith | 1 | 09/04/2019 |
| Michael Greene | 2 | 06/07/2019 |
| SYNC Architecture | 1 | 02/04/2019 |
| Tohfaz Uddin PE | 1 | 01/08/2019 |
| Safway Atlantic | 3 | 01/02/2019 |
| Richard Puswald PE | 1 | 05/16/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| KM Associates of New York | 59 | 03/21/2026 |
| EDG | 37 | 03/21/2026 |
| Related Companies | 5 | 03/21/2026 |
| Socotec | 24 | 03/21/2026 |
| Metropolis Group | 12 | 03/21/2026 |
| Municipal Building Consultants | 1 | 03/21/2026 |
| Codegreen | 5 | 03/21/2026 |
| William Vittaco Associates | 5 | 03/21/2026 |
| A1 Expediting Service | 8 | 03/21/2026 |
| AE Design Solution | 2 | 03/21/2026 |
| Metropolis | 1 | 03/21/2026 |
| K & M Associates | 59 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Cross Management | General Contractor | 37 | 10/06/2026 |
| Reidy Contracting Group | General Contractor | 19 | 07/08/2026 |
| Structure Tone | General Contractor | 18 | 07/08/2026 |
| Tri-Star Construction | General Contractor | 10 | 10/09/2026 |
| Abco-Peerless Sprinkler | Fire Protection | 10 | 10/16/2026 |
| James E Fitzgerald | General Contractor | 7 | 07/08/2026 |
| Safway Atlantic | Scaffold | 7 | 07/08/2026 |
| L&K Partners | General Contractor | 6 | 07/08/2026 |
| Sean Coakley P & H | Fire Protection | 6 | 07/08/2026 |
| Benchmark Builders | General Contractor | 6 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 5 | 10/15/2026 |
| Par Plumbing Co | Plumbing | 5 | 07/08/2026 |
| Abco-Peerless Sprinkler | Plumbing | 5 | 03/22/2026 |
| Transition Management | General Contractor | 4 | 03/21/2026 |
| Americon Construction | General Contractor | 4 | 07/08/2026 |
| Accurate Mechanical | Fire Protection | 4 | 07/08/2026 |
| CM Plumbing | Plumbing | 4 | 07/08/2026 |
| Icon Interiors | General Contractor | 4 | 03/21/2026 |
| Par Fire Protection | Fire Protection | 3 | 07/08/2026 |
| Patriot Fire Suppression | Fire Protection | 3 | 07/08/2026 |
| Lab Plumbing & Heating Co | Plumbing | 3 | 07/08/2026 |
| Accurate Mechanical | Plumbing | 3 | 07/08/2026 |
| Sean Coakley P & H | Plumbing | 3 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 3 | 07/08/2026 |
| SKH Mechanical | Fire Protection | 3 | 07/08/2026 |
| Cma Plumbing & Heating | Fire Protection | 3 | 07/08/2026 |
| Nuline McHncl Services | Plumbing | 3 | 03/22/2026 |
| Buildingrite | General Contractor | 2 | 03/21/2026 |
| Atlas-Acon Electric Service | Electrical | 2 | 03/22/2026 |
| Ashland Plumbing | Plumbing | 2 | 07/08/2026 |
| JT Magen & Company | General Contractor | 2 | 03/21/2026 |
| Kaback Enterprises | General Contractor | 2 | 03/21/2026 |
| DNA Plumbing Contractors | Plumbing | 2 | 07/08/2026 |
| Team Electric | Electrical | 2 | 03/22/2026 |
| Newgrange Construction Co | General Contractor | 2 | 07/08/2026 |
| Nucor Construction | General Contractor | 2 | 03/21/2026 |
| Preferred Sprinkler and Mechanical | Fire Protection | 2 | 07/08/2026 |
| Freedom Electl & Data | Electrical | 2 | 03/22/2026 |
| York Scaffold Equipment | Scaffold | 2 | 03/21/2026 |
| A&A Plumbing | Plumbing | 2 | 07/08/2026 |
| William C. Gerakaris P&H | Plumbing | 1 | 07/08/2026 |
| E-J Electric Installation Co | Electrical | 1 | 03/22/2026 |
| Matros Automated Electrical | Electrical | 1 | 03/22/2026 |
| P.E. Stone | Electrical | 1 | 03/22/2026 |
| Polo Electric Corp D/B/A | Electrical | 1 | 03/22/2026 |
| Power Source Electric of NY | Electrical | 1 | 03/22/2026 |
| RX Electric | Electrical | 1 | 03/22/2026 |
| BP Mechanical | specialty_contractor | 1 | 07/08/2026 |
| Gilbane Building Company | General Contractor | 1 | 07/08/2026 |
| Negliaccio Improvements | General Contractor | 1 | 07/08/2026 |
| Turner Construction Company | General Contractor | 1 | 07/08/2026 |
| Palace Hoisting & Scaffolding | Scaffold | 1 | 07/08/2026 |
| Titan Industrial Service | Scaffold | 1 | 07/08/2026 |
| Accurate Mechanical Indstrs | Plumbing | 1 | 07/08/2026 |
| Addison Plumbing and Heating | Plumbing | 1 | 07/08/2026 |
| Advanced Plumbing, Mechanical & Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Advanced Plumbing Mechanical | Plumbing | 1 | 07/08/2026 |
| Ami and Associates | Fire Protection | 1 | 07/08/2026 |
| City/Suburban Plumbing | Plumbing | 1 | 07/04/2026 |
| Connelly & Sons Plumbing | Plumbing | 1 | 07/08/2026 |
| Evergreen Mechanical | Plumbing | 1 | 07/08/2026 |
| Evergreen Mechanical | Fire Protection | 1 | 07/08/2026 |
| LCS Plumbing & Consulting | Plumbing | 1 | 07/08/2026 |
| Mac Felder | Plumbing | 1 | 07/08/2026 |
| Pace Plumbing | Plumbing | 1 | 07/08/2026 |
| Tristate Plumbing Services | Plumbing | 1 | 07/08/2026 |
| Tristate Plumbing Services | Fire Protection | 1 | 07/08/2026 |
| Freedom Electl & Data | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Shahrish Shuvo Engineering | 8524 | 2 | 10/01/2026 |
| Crosscheck Inspection Services | 544 | 19 | 06/04/2026 |
| Socotec Engineering | 4983 | 37 | 06/03/2026 |
| Amaracon Testing & Inspec | 5842 | 9 | 04/13/2026 |
| AK Engineering | 678 | 13 | 11/04/2025 |
| Eti Consultants | 7694 | 12 | 08/11/2025 |
| Codegreen | 510 | 5 | 07/08/2024 |
| DNA Controlled Inspection | 554 | 51 | 05/03/2024 |
| McAlpine Architecture | 5694 | 5 | 04/19/2024 |
| Skyline Engineering | 267 | 8 | 03/21/2024 |
| Sag Engineering & Consulting | 608 | 3 | 10/28/2022 |
| Macia Inspection & Testin | 402 | 7 | 12/10/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 10/15/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 10/14/2026 |
| DOB NOW | General Construction | Permit Issued | Tri-Star Construction | 10/07/2026 |
| DOB NOW | General Construction | Permit Issued | Cross Management | 10/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Cross Management | 10/02/2026 |
| DOB NOW | Sprinklers | Permit Issued | Cma Plumbing & Heating | 06/11/2026 |
| DOB NOW | Plumbing | Permit Issued | Sean Coakley P & H | 05/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | Titan Industrial Service | 04/30/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Americon Construction | 03/06/2026 |
| DOB NOW | General Construction | Permit Issued | Americon Construction | 03/05/2026 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 02/13/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 02/09/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Americon Construction | 02/06/2026 |
| DOB NOW | Sprinklers | Signed-off | Cma Plumbing & Heating | 02/06/2026 |
| DOB NOW | General Construction | Permit Issued | Americon Construction | 02/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 01/23/2026 |
| DOB NOW | Plumbing | Signed-off | Connelly & Sons Plumbing | 09/23/2025 |
| DOB NOW | General Construction | Permit Issued | Reidy Contracting Group | 09/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Reidy Contracting Group | 09/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | Abco-Peerless Sprinkler | 09/15/2025 |
| DOB NOW | Standpipe | Signed-off | Patriot Fire Suppression | 09/08/2025 |
| DOB NOW | General Construction | Permit Issued | Newgrange Construction Co | 08/21/2025 |
| DOB NOW | Plumbing | Signed-off | Lab Plumbing & Heating Co | 08/20/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Newgrange Construction Co | 08/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 08/15/2025 |
| DOB NOW | Sprinklers | Signed-off | Abco-Peerless Sprinkler | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 05/29/2025 |
| DOB NOW | Sprinklers | Signed-off | Ami and Associates | 04/03/2025 |
| DOB NOW | Plumbing | Signed-off | Accurate Mechanical Indstrs | 04/03/2025 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 04/02/2025 |
| DOB NOW | General Construction | Signed-off | Cross Management | 03/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Cross Management | 03/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 01/14/2025 |
| DOB NOW | Plumbing | Signed-off | City/Suburban Plumbing | 01/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | Tri-Star Construction | 12/09/2024 |
| DOB NOW | Structural | Permit Issued | Tri-Star Construction | 12/09/2024 |
| DOB NOW | General Construction | Permit Issued | Tri-Star Construction | 12/09/2024 |
| DOB NOW | Plumbing | Permit Issued | Lab Plumbing & Heating Co | 10/30/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/01/2026 | Permit Issued | Cross Management | Heating Systems | — |
| 04/13/2026 | Permit Issued | Tri-Star Construction | Air Conditioning Systems, Ventilation Systems | Cooling Bosch CL024-4HZC-ALS 23,800 BTU · Wshp ×8 Water Furnace V3AH012 10,600 BTU · Wshp ×2 Ventilation Titus DTFS-F 520 CFM · Fan Powered Box ×2 |
| 08/11/2025 | Signed-off | Cross Management | Air Conditioning Systems | Cooling Liebert MT036E(EVAP)
MTC38W (CU) 38,400 BTU · Crac Unit ×10 |
| 09/26/2024 | Permit Issued | Structure Tone | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/01/2026 | Permit Issued | Abco-Peerless Sprinkler | Sprinkler System |
| 06/04/2026 | Permit Issued | Cma Plumbing & Heating | — |
| 04/14/2026 | Permit Issued | Abco-Peerless Sprinkler | Sprinkler System |
| 04/13/2026 | Permit Issued | Full Capacity Fire | Sprinkler System |
| 01/29/2026 | Signed-off | Cma Plumbing & Heating | — |
| 10/31/2025 | Signed-off | Preferred Sprinkler and Mechanical | 98 heads |
| 08/12/2025 | Signed-off | Abco-Peerless Sprinkler | 177 heads |
| 08/11/2025 | Signed-off | Ami and Associates | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 06/03/2026 | Permit Issued | Sean Coakley P & H | Water/Sanitary |
| 04/14/2026 | Signed-off | Connelly & Sons Plumbing | Water/Sanitary |
| 04/13/2026 | Signed-off | City/Suburban Plumbing | Water/Sanitary |
| 10/31/2025 | — | — | — |
| 08/12/2025 | Signed-off | Lab Plumbing & Heating Co | Water/Sanitary |
| 08/11/2025 | Signed-off | Accurate Mechanical Indstrs | Water/Sanitary |
| 09/25/2024 | Permit Issued | Lab Plumbing & Heating Co | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | Permit Issued | Atlas-Acon Electric Service | General Wiring |
| 07/21/2026 | Complete | Ennell Group Electric | General Wiring |
| 03/17/2026 | Permit Issued | P.E. Stone | General Wiring |
| 01/26/2026 | Complete | Freedom Electric & Data | General Wiring |
| 11/21/2025 | Complete | Atlas-Acon Electric Service | General Wiring |
| 11/06/2025 | Permit Issued | Capitol Electric | — |
| 10/02/2025 | Complete | Freedom Electric & Data | General Wiring |
| 07/25/2025 | Complete | Freedom Electric & Data | General Wiring |
| 12/18/2024 | Complete | Matros Automated Electrical | General Wiring |
| 12/04/2024 | Complete | P.E. Stone | General Wiring |
| 12/02/2024 | Complete | A.S.K. Electrical | General Wiring |
| 11/13/2024 | Complete | RX Electric | General Wiring |
| 10/21/2024 | Complete | Atlas-Acon Electric Service | General Wiring |
| 09/27/2024 | Complete | Team Electric | General Wiring |
| 08/27/2024 | Complete | Atlas-Acon Electric Service | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | Titan Industrial Service | Steel, Concrete |
| 01/29/2026 | Permit Issued | A&A Plumbing | 2 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 10/15/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/25/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/21/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/21/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/18/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/18/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/27/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/23/2025 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 09/18/2025 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/28/2026 | Energy Code Compliance Inspections | Shahrish Shuvo | progress |
| 09/28/2026 | HVAC-R and service water heating system controls | Shahrish Shuvo | energy_progress |
| 09/28/2026 | Maintenance information | Shahrish Shuvo | energy_progress |
| 09/28/2026 | HVAC-R and service water piping design and insulation | Shahrish Shuvo | energy_progress |
| 09/28/2026 | Heating Systems | Shahrish Shuvo | special |
| 09/28/2026 | HVAC-R and service water heating equipment | Shahrish Shuvo | energy_progress |
| 09/28/2026 | Interior lighting power | Shahrish Shuvo | energy_progress |
| 09/28/2026 | Post-installed Anchors | Shahrish Shuvo | special |
| 09/28/2026 | Lighting controls | Shahrish Shuvo | energy_progress |
| 09/22/2026 | Sprinkler Systems | Shahrish Shuvo | special |
| 09/22/2026 | Final | Jhonatan Diaz-Santana | progress |
| 09/22/2026 | Final | Sandra Joslyn | progress |
| 09/22/2026 | Mechanical Systems | Shahrish Shuvo | special |
| 06/05/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 06/05/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 06/05/2026 | Final | JAMES MCLEISH | progress |
| 06/05/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 06/01/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/01/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 06/01/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/01/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/26/2026 | Final | JAMES MCLEISH | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Silverlake | Office | Floors 39–41 | Project M01463484 Project M08045102 |
| Point 72 | Office | Floors 3, 5, 7, 8, 10, 12–14, 22, 24, 25 | Project M01394718 Project M01266748 Project M01184871 Project M01027045 Project M01004479 Project M01004472 Project M01004463 Project M00990855 Project M00990863 Project M00990870 Project M00992565 Project M00996754 |
| Milbank | Office | Floors 29–39 | Project M01357468 Project M01348293 Project M01346811 Project M01138434 Project M01138437 Project M01007180 Project M01007185 Project M01007186 Project M01002826 Project M00844436 Project M00512482 Project M00512503 |
| Cooley | Office | Floors 41–47 | Project M01252911 Project M01099991 Project M00931553 Project M00931556 Project M00931559 |
| Ashurst | Office | Floor 18 | Project M01034681 |
| JF Lehman & Company | Office | Floor 23 | Project M01012617 Project M01012628 Project M01012613 |
| Diameter Capital | Office | Floor 29 | Project M00897717 Project M00495872 |
| Vista Credit | Office | Floor 22 | Project M00615824 Project M00615839 Project M00615864 |
| Boies Schiller Flexner | Office | Floor 17 | Project M00583335 |
| Cognizant | Office | Floors 25, 26 | Project M00560141 Project M00560184 Project M00560208 Project M01090087 Project M01090090 Project M01252459 |
| Mount Sinai Health System | Medical / Healthcare | Floor 2 | Project M00513185 Project M00522581 |
| Robert Director Assoc | Office | Floor 46 | Project M00469017 Project M00469022 Project M00469024 |
| Vivvi | Education | Floor 1 | Project M00346872 Project M00346876 |
| Market Axess | Office | Floors 15, 16 | Project M00242943 Project M00242953 Project M00242960 |
| Office | Floors 23, 24 | Project M00247123 | |
| EMW | Office | Floor 3 | Project M00221474 Project M00221555 |