| Owner | Filings | Most Recent |
|---|---|---|
| MILBANK | 65 | 09/13/2026 |
| RELATED | 45 | 07/08/2026 |
| STONEPEAK PARTNERS | 23 | 07/08/2026 |
| COOLEY | 42 | 07/08/2026 |
| COGNIZANT | 20 | 07/08/2026 |
| VIVVI | 14 | 07/08/2026 |
| VISTA | 8 | 07/08/2026 |
| HUDSON BAY CAPITAL MANAGEMENT | 12 | 07/08/2026 |
| YORK SCAFFOLD EQUIPMENT CORP. | 5 | 03/22/2026 |
| CROSS MANAGEMENT | 12 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AMA CONSULTING ENGINEERS, PC | 16 | 06/04/2026 |
| WB ENGINEERS & CONSULTANTS PLLC | 60 | 06/03/2026 |
| LEHMAN SMITH MCLEISH | 8 | 06/03/2026 |
| EXDEM ENGINEERING SERVICES | 1 | 04/30/2026 |
| ARCHITECTURE PLUS INFORMATION | 9 | 04/14/2026 |
| WSP | 10 | 03/03/2026 |
| ALLIANCE ARCHITECTURE | 4 | 11/04/2025 |
| ROBERT DERECTOR ASSOCIATES | 53 | 10/31/2025 |
| HLW INTL LLP | 5 | 08/11/2025 |
| THE SWITZER GROUP | 2 | 08/11/2025 |
| SLADE ARCHITECTURE | 1 | 06/26/2024 |
| GENSLER | 8 | 05/02/2024 |
| MCALPINE ASSOCIATES ARCHITECTS PC | 5 | 04/19/2024 |
| HLW INTERNATIONAL | 6 | 12/19/2023 |
| TPG ARCHITECTURE, LLP | 3 | 12/19/2023 |
| TED MOUDIS ASSOCIATES | 3 | 07/13/2023 |
| NOAH STEFFES | 1 | 12/06/2021 |
| STAMP ARCHITECTURE DPC | 1 | 09/24/2021 |
| NBBJ ARCHITECTURE, PLLC | 1 | 06/14/2021 |
| WSP USA | 1 | 06/11/2021 |
| ALLIANCE ARCHITECTURE OF MARYLAND | 2 | 03/11/2021 |
| AVCON ENGINEERING PC | 6 | 03/02/2021 |
| SPACESMITH | 1 | 09/04/2019 |
| MICHAEL GREENE | 2 | 06/07/2019 |
| SYNC ARCHITECTURE P.C | 1 | 02/04/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 59 | 03/21/2026 |
| LMS-ACE SERVICES | 37 | 03/21/2026 |
| RELATED COMPANIES | 5 | 03/21/2026 |
| CONVERSANO ASSOCIATES, INC. | 24 | 03/21/2026 |
| METROPOLIS GROUP INC | 12 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| RIZZO GROUP | 5 | 03/21/2026 |
| WILLIAM VITTACO ASSOCIATES | 5 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 8 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CROSS MANAGEMENT CORP | General Contractor | 35 | 07/08/2026 |
| REIDY CONTRACTING GROUP | General Contractor | 19 | 07/08/2026 |
| STRUCTURE TONE, LLC | General Contractor | 18 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 9 | 07/08/2026 |
| TRI-STAR CONSTRUCTION CORP | General Contractor | 9 | 07/08/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 7 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 7 | 07/08/2026 |
| L&K PARTNERS, INC | General Contractor | 6 | 07/08/2026 |
| SEAN COAKLEY P & H INC | Fire Protection | 6 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 6 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR | Plumbing | 5 | 03/22/2026 |
| PAR PLUMBING CO., INC | Plumbing | 5 | 07/08/2026 |
| CM PLUMBING INC | Plumbing | 4 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Fire Protection | 4 | 07/08/2026 |
| TRANSITION MANAGEMENT COR | General Contractor | 4 | 03/21/2026 |
| AMERICON CONSTRUCTION INC. | General Contractor | 4 | 07/08/2026 |
| ICON INTERIORS INC | General Contractor | 4 | 03/21/2026 |
| FULL CAPACITY FIRE CORP | Fire Protection | 4 | 07/08/2026 |
| CMA PLUMBING & HEATING IN | Fire Protection | 3 | 07/08/2026 |
| ACCURATE MECHANICAL INC | Plumbing | 3 | 07/08/2026 |
| LAB PLBG & HTG CO INC | Plumbing | 3 | 07/08/2026 |
| SKH MECHANICAL CORP | Fire Protection | 3 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| PATRIOT FIRE SUPPRESSION, | Fire Protection | 3 | 07/08/2026 |
| PAR FIRE PROTECTION LLC | Fire Protection | 3 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CROSSCHECK INSPECTION SER | 544 | 19 | 06/04/2026 |
| SOCOTEC ENGINEERING | 4983 | 37 | 06/03/2026 |
| AMARACON TESTING & INSPEC | 5842 | 9 | 04/13/2026 |
| AK ENGINEERING PC | 678 | 13 | 11/04/2025 |
| ETI CONSULTANTS LLC | 7694 | 12 | 08/11/2025 |
| CODEGREEN | 510 | 5 | 07/08/2024 |
| DNA CONTROLLED INSPECTION | 554 | 51 | 05/03/2024 |
| MCALPINE ARCHITECTURE PC | 5694 | 5 | 04/19/2024 |
| SKYLINE ENGINEERING, PLLC | 267 | 8 | 03/21/2024 |
| SAG ENGINEERING & CONSULT | 608 | 3 | 10/28/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | CMA PLUMBING & HEATING IN | 06/11/2026 |
| DOB NOW | Plumbing | Permit Issued | SEAN COAKLEY P & H INC | 05/13/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | TITAN INDUSTRIAL SVC CORP | 04/30/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 04/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | AMERICON CONSTRUCTION INC. | 03/06/2026 |
| DOB NOW | General Construction | Permit Issued | AMERICON CONSTRUCTION INC. | 03/05/2026 |
| DOB NOW | General Construction | Signed-off | TRI-STAR CONSTRUCTION COR | 02/13/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A PLUMBING CORP | 02/09/2026 |
| DOB NOW | General Construction | Permit Issued | AMERICON CONSTRUCTION INC. | 02/06/2026 |
| DOB NOW | Sprinklers | Signed-off | CMA PLUMBING & HEATING IN | 02/06/2026 |
| DOB NOW | Mechanical Systems | Signed-off | AMERICON CONSTRUCTION INC. | 02/06/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STRUCTURE TONE, LLC | 01/23/2026 |
| DOB NOW | Plumbing | Signed-off | CONNELLY & SONS PLUMBING | 09/23/2025 |
| DOB NOW | General Construction | Permit Issued | REIDY CONTRACTING GROUP | 09/22/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | REIDY CONTRACTING GROUP | 09/22/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 09/15/2025 |
| DOB NOW | Standpipe | Signed-off | PATRIOT FIRE SUPPRESSION, | 09/08/2025 |
| DOB NOW | General Construction | Permit Issued | NEWGRANGE CONSTRUCTION CO | 08/21/2025 |
| DOB NOW | Plumbing | Signed-off | LAB PLBG & HTG CO INC | 08/20/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NEWGRANGE CONSTRUCTION CO | 08/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURE TONE, LLC | 08/15/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 08/14/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 05/29/2025 |
| DOB NOW | Sprinklers | Signed-off | AMI AND ASSOCIATES INC | 04/03/2025 |
| DOB NOW | Plumbing | Signed-off | ACCURATE MECH INDSTRS INC | 04/03/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURE TONE, LLC | 04/02/2025 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 03/28/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | CROSS MANAGEMENT CORP | 03/27/2025 |
| DOB NOW | Sprinklers | Permit Issued | FULL CAPACITY FIRE CORP | 01/14/2025 |
| DOB NOW | Plumbing | Signed-off | CITY/SUBURBAN PLBG CORP | 01/08/2025 |
| DOB NOW | Structural | Permit Issued | TRI-STAR CONSTRUCTION COR | 12/09/2024 |
| DOB NOW | General Construction | Permit Issued | TRI-STAR CONSTRUCTION COR | 12/09/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | TRI-STAR CONSTRUCTION COR | 12/09/2024 |
| DOB NOW | Plumbing | Permit Issued | LAB PLBG & HTG CO INC | 10/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 09/03/2024 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 08/30/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CROSS MANAGEMENT CORP | 08/13/2024 |
| DOB NOW | General Construction | Signed-off | CROSS MANAGEMENT CORP | 08/13/2024 |
| DOB NOW | Structural | Signed-off | TRI-STAR CONSTRUCTION COR | 07/16/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 04/13/2026 | Permit Issued | TRI-STAR CONSTRUCTION COR | Air Conditioning Systems, Ventilation Systems | Cooling Bosch CL024-4HZC-ALS 23,800 BTU · Wshp ×8 Water Furnace V3AH012 10,600 BTU · Wshp ×2 Ventilation Titus DTFS-F 520 CFM · Fan Powered Box ×2 |
| 08/11/2025 | Signed-off | CROSS MANAGEMENT CORP | Air Conditioning Systems | Cooling Liebert MT036E(EVAP)
MTC38W (CU) 38,400 BTU · Crac Unit ×10 |
| 09/26/2024 | Permit Issued | STRUCTURE TONE, LLC | Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | CMA PLUMBING & HEATING IN | — |
| 04/14/2026 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | Sprinkler System |
| 04/13/2026 | Permit Issued | FULL CAPACITY FIRE CORP | Sprinkler System |
| 01/29/2026 | Signed-off | CMA PLUMBING & HEATING IN | — |
| 10/31/2025 | Signed-off | PREFERRED SPKLR AND MECH | 98 heads |
| 08/12/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 177 heads |
| 08/11/2025 | Signed-off | AMI AND ASSOCIATES INC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/04/2026 | Permit Issued | A&A PLUMBING CORP | Water/Sanitary |
| 06/03/2026 | Permit Issued | SEAN COAKLEY P & H INC | Water/Sanitary |
| 04/14/2026 | Signed-off | CONNELLY & SONS PLUMBING | Water/Sanitary |
| 04/13/2026 | Signed-off | CITY/SUBURBAN PLBG CORP | Water/Sanitary |
| 10/31/2025 | — | — | — |
| 08/12/2025 | Signed-off | LAB PLBG & HTG CO INC | Water/Sanitary |
| 08/11/2025 | Signed-off | ACCURATE MECH INDSTRS INC | Water/Sanitary |
| 09/25/2024 | Permit Issued | LAB PLBG & HTG CO INC | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/24/2026 | Permit Issued | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 07/21/2026 | Complete | ENNELL GRP ELECTRIC CORP | General Wiring |
| 03/17/2026 | Permit Issued | P.E. STONE INC | General Wiring |
| 01/26/2026 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 11/21/2025 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 11/06/2025 | Permit Issued | CAPITOL ELECTRIC CORP | — |
| 10/02/2025 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 07/25/2025 | Complete | FREEDOM ELECTRIC & DATA | General Wiring |
| 12/18/2024 | Complete | MATROS AUTOMATED ELEC'L C | General Wiring |
| 12/04/2024 | Complete | P.E. STONE INC | General Wiring |
| 12/02/2024 | Complete | A.S.K. ELECTRICAL CORP | General Wiring |
| 11/13/2024 | Complete | RX ELECTRIC INC | General Wiring |
| 10/21/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| 09/27/2024 | Complete | TEAM ELECTRIC, INC | General Wiring |
| 08/27/2024 | Complete | ATLAS-ACON ELEC. SERVICE | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/30/2026 | Permit Issued | TITAN INDUSTRIAL SVC CORP | Steel, Concrete |
| 01/29/2026 | Permit Issued | A&A PLUMBING CORP | 2 scope_items |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/25/2026 | Pass-Final PL - Underground | Pass | View ↗ |
| 08/21/2026 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 08/21/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 08/18/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/13/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/24/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/28/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 05/26/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/05/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/18/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/20/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/20/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/16/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/18/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 12/18/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/05/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 06/05/2026 | Final | JAMES MCLEISH | progress |
| 06/05/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 06/05/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 06/05/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 06/01/2026 | Post-installed Anchors | ALEXIS SCHLESSINGERMAN | special |
| 06/01/2026 | Fire-Resistant Penetrations and Joints | ALEXIS SCHLESSINGERMAN | special |
| 06/01/2026 | Maintenance information | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 06/01/2026 | HVAC-R and service water heating system controls | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | HVAC-R and service water heating equipment | ALEXIS SCHLESSINGERMAN | energy_progress |
| 06/01/2026 | HVAC-R and service water piping design and insulation | ALEXIS SCHLESSINGERMAN | energy_progress |
| 05/26/2026 | Final | JAMES MCLEISH | progress |
| 05/26/2026 | Sprinkler Systems | EUGENE BIFULCO | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 05/26/2026 | Post-installed Anchors | EUGENE BIFULCO | special |
| 04/21/2026 | Demolition | EUGENE BIFULCO | special |
| 04/17/2026 | Final | CONNIE PISANI | progress |
| 04/17/2026 | Fire-Resistant Penetrations and Joints | CONNIE PISANI | special |
| 04/17/2026 | Fire-Resistance Rated Construction | CONNIE PISANI | progress |
| 04/14/2026 | Final | ALEXIS SCHLESSINGERMAN | progress |
| 04/14/2026 | Energy Code Compliance Inspections | ALEXIS SCHLESSINGERMAN | progress |
| 04/13/2026 | Final | CONNIE PISANI | progress |
| 04/13/2026 | Mechanical Systems | CONNIE PISANI | special |
| 04/13/2026 | HVAC-R and service water heating system controls | CONNIE PISANI | energy_progress |
| 04/13/2026 | Fire-Resistant Penetrations and Joints | CONNIE PISANI | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Point 72 | Office | Floors 3, 7, 8, 10, 12–14, 24, 25 | Project M01394718 Project M01266748 Project M01027045 Project M01004479 Project M01004472 Project M01004463 Project M00990855 Project M00990863 Project M00990870 Project M00992565 Project M00996754 Project M00986090 |
| Milbank | Office | Floors 29–39 | Project M01357468 Project M01348293 Project M01346811 Project M01138434 Project M01007180 Project M01007185 Project M01007186 Project M01002826 Project M00844436 |
| Cognizant Recording Studio | Office | Floor 25 | Project M01252459 |
| Cooley | Office | Floors 41–46 | Project M01099991 Project M00931553 Project M00931556 Project M00931559 |
| Cognizant AI Studio | Office | Floor 26 | Project M01090087 Project M01090090 |
| Ashurst | Office | Floor 18 | Project M01034681 |
| JF Lehman & Company | Office | Floor 23 | Project M01012617 Project M01012628 Project M01012613 |
| Point 72 - HFT Lab | Office | Floor 5 | Project M00884619 |
| Diameter Capital | Office | Floor 29 | Project M00897717 Project M00495872 |
| Stonepeak Infrastructure Partners | Office | Floors 46–48 | Project M00888174 Project M00538687 |
| Silverlake | Office | Floors 39, 40 | Project M08045102 |
| Vista Credit Partners | Office | Floor 23 | Project M00615824 |
| Boies Schiller Flexner | Office | Floor 17 | Project M00583335 |
| Cognizant | Office | Floor 25 | Project M00560141 |
| Mount Sinai | Medical / Healthcare | Floor 2 | Project M00522581 |
| Vivvi, Inc. c/o WeWork | Office | Floor 1 | Project M00346872 Project M00346876 |
| EMW | Office | Floor 3 | Project M00221555 |
| BSF - Ashurst | Office | Floor 17 | Project M00217232 |
| Laser Bounce | Retail | — | Project M00116796 |