| Owner | Filings | Most Recent |
|---|---|---|
| DCAS | 175 | 09/17/2026 |
| 210 MUNI | 86 | 03/21/2026 |
| NEW YORK CITY DCAS | 35 | 03/21/2026 |
| PRIME CONTRACTORS | 29 | 07/08/2026 |
| DEPT OF CITYWIDE ADMIN SERVICE | 25 | 03/21/2026 |
| CITY OF NEW YORK DCAS | 8 | 03/21/2026 |
| ASSET MANAGEMENT DCAS | 4 | 03/21/2026 |
| SDBOV CONSTRUCTION | 1 | 03/22/2026 |
| DOB | 1 | 03/21/2026 |
| DCAS, CITY OF NEW YORK | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| HARRISON-HAMNETT, P.C. | 1 | 08/13/2026 |
| STANTEC | 24 | 06/18/2026 |
| IKRA CONSULTING LLC | 8 | 06/11/2026 |
| LORING CONSULTING ENGINEERS, INC. | 9 | 06/05/2026 |
| JACOB FEINBERG KATZ & MICHAELI CONS | 19 | 05/19/2026 |
| CHI F. LAU ARCHITECT, P.C. | 5 | 02/16/2026 |
| BRAND ACCESS SOLUTIONS | 5 | 11/06/2025 |
| SUPERSTRUCTURES ENG. + ARCH. | 4 | 09/15/2025 |
| ELEVATE CONSULTING ENGINEERS PLLC | 4 | 09/10/2025 |
| LINGLE DESIGN GROUP, INC. | 2 | 08/19/2025 |
| M-ENGINEERING NEW YORK, LLC | 3 | 07/30/2025 |
| BERGMEYER ARCHITECTURAL PC | 2 | 07/30/2025 |
| TSF ENGINEERING, PC | 1 | 03/24/2025 |
| SRW ENGINEERS | 3 | 01/08/2025 |
| QUEENS ENGINEERING | 2 | 07/30/2024 |
| ROSA CONSULTING ENGINEERS, D.P.C. | 1 | 01/22/2024 |
| DATTNER ARCHITECTS D.P.C. | 1 | 12/15/2023 |
| TOHFAZ UDDIN PE PC | 1 | 08/15/2023 |
| 2LS CONSULTING ENGINEERING, DPC | 7 | 04/14/2023 |
| MOHAMMAD AHEAD, PE | 2 | 03/28/2023 |
| O'NEIL LANGAN ARCHITECTS, P.C. | 2 | 03/15/2023 |
| SDG ENGINEERING PC | 1 | 12/20/2022 |
| PKSB ARCHITECTS, PC | 1 | 11/30/2022 |
| NYMS CONSULTING, LLC | 4 | 11/04/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 6 | 06/03/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| OUTSOURCE CONSULTANTS, INC. | 62 | 03/21/2026 |
| A1 EXPEDITING SERVICE | 24 | 03/21/2026 |
| SUPERSTRUCTURES ENG + ARCH | 4 | 03/21/2026 |
| LOUIS STRIAR | 6 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 5 | 03/21/2026 |
| JM ZONING, LLC. | 18 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 1 | 03/21/2026 |
| BURNHAM NATIONWIDE INC | 1 | 03/21/2026 |
| 4444 PPPP CORP | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| TECHNICO CONSTRUCTION | General Contractor | 33 | 07/08/2026 |
| PRIME CONTRACTORS, INC | General Contractor | 26 | 07/08/2026 |
| SIRINA FIRE PROT | Plumbing | 21 | 03/22/2026 |
| SAFWAY ATLANTIC, LLC | General Contractor | 20 | 09/22/2026 |
| WELKIN MECHANICAL, LLC | General Contractor | 17 | 07/08/2026 |
| P & K CONTRACTING INC | General Contractor | 9 | 07/08/2026 |
| PEREIRA, WESLLEY | Electrical | 8 | 03/21/2026 |
| ALPHONSE, MICHAEL | Electrical | 8 | 03/21/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 7 | 07/08/2026 |
| WMP PLUMBING LLC | Plumbing | 7 | 07/08/2026 |
| STEADFAST DEVELOPMENT AND | General Contractor | 6 | 03/21/2026 |
| F.L. PINTO COMPANIES LLC | General Contractor | 6 | 03/21/2026 |
| YARKS NYC INC | General Contractor | 4 | 09/17/2026 |
| P.I. MECHANICAL CORP | General Contractor | 3 | 07/08/2026 |
| E & S AND SONS CORP | General Contractor | 3 | 07/08/2026 |
| YORK SCAFFOLD EQUIPMENT CORP. | General Contractor | 2 | 07/08/2026 |
| MACKLER MASTER FIRE INC | Fire Protection | 2 | 07/08/2026 |
| VALLESIGNS & AWNINGS INC | General Contractor | 2 | 03/21/2026 |
| FIVE TOWN NEON SIGN CO IN | Scaffold | 1 | 07/08/2026 |
| FRANK MERESHENSKY | Electrical | 1 | 03/21/2026 |
| KENNETH FISK | Electrical | 1 | 03/21/2026 |
| NELLO ELECTRIC LLC | Electrical | 1 | 03/22/2026 |
| PLUMBING WORKS CORP | Fire Protection | 1 | 06/28/2026 |
| RRP PLUMBING CORP | Fire Protection | 1 | 07/08/2026 |
| CARLITOS CONTRACTING CORP | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| IKRA CONSULTING LLC | 7032 | 3 | 06/11/2026 |
| CNS INSPECTION SERVICES | 7566 | 43 | 06/05/2026 |
| AK CONSULTING SERVICES, I | 6198 | 1 | 04/20/2026 |
| JD ENGINEERING PC | 9859 | 4 | 02/16/2026 |
| OUTSOURCE SPECIAL INSPECT | 2827 | 3 | 08/19/2025 |
| QUALITY TESTING, LLC | 7344 | 6 | 07/30/2025 |
| DISTINCT ENGINEERING SOLU | 2641 | 1 | 01/22/2024 |
| H & O ENGINEERING, DPC | 5595 | 1 | 12/20/2022 |
| JOSEPH BOTTA, PE, PC | 1139 | 1 | 11/30/2022 |
| HRF SERVICES CORP | 5616 | 2 | 04/14/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/21/2026 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/18/2026 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/17/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | YARKS NYC INC | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | WM PLUMBING | 08/28/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | YARKS NYC INC | 07/08/2026 |
| DOB NOW | Boiler Equipment | Permit Issued | CHAMPION COMBUSTION CORP | 06/30/2026 |
| DOB NOW | General Construction | Permit Issued | P & K CONTRACTING INC | 05/20/2026 |
| DOB NOW | Boiler Equipment | Signed-off | CHAMPION COMBUSTION CORP | 05/06/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | P&K CONTRACTING INC | 04/30/2026 |
| DOB NOW | General Construction | Permit Issued | P & K CONTRACTING INC | 04/21/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | YARKS NYC INC | 04/08/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | YARKS NYC INC | 04/03/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 03/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 03/10/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 03/10/2026 |
| DOB NOW | General Construction | Signed-off | P.I. MECHANICAL CORP | 02/20/2026 |
| DOB NOW | Sprinklers | Signed-off | RALPH W. LANDOLFI JR. | 02/19/2026 |
| DOB NOW | Plumbing | Signed-off | VAND MECHANICAL INC | 02/19/2026 |
| DOB NOW | Mechanical Systems | Signed-off | P.I. MECHANICAL CORP | 02/17/2026 |
| DOB NOW | Structural | Permit Issued | TECHNICO CONSTRUCTION | 01/26/2026 |
| DOB NOW | General Construction | Permit Issued | TECHNICO CONSTRUCTION | 01/26/2026 |
| DOB NOW | General Construction | Permit Issued | TECHNICO CONSTRUCTION | 01/26/2026 |
| DOB NOW | General Construction | Permit Issued | TECHNICO CONSTRUCTION | 01/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 01/25/2026 |
| DOB NOW | General Construction | Permit Issued | P & K CONTRACTING INC | 12/17/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 12/16/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | WELKIN MECHANICAL, LLC | 12/16/2025 |
| DOB NOW | General Construction | Signed-off | P.I. MECHANICAL CORP | 12/08/2025 |
| DOB NOW | Plumbing | Permit Issued | WMP PLUMBING LLC | 11/26/2025 |
| DOB NOW | Plumbing | Permit Issued | WMP PLUMBING LLC | 10/10/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/26/2025 |
| DOB NOW | Construction Fence | Permit Issued | SAFWAY ATLANTIC, LLC | 09/25/2025 |
| DOB NOW | Protection and Mechanical Methods | Permit Issued | SAFWAY ATLANTIC, LLC | 09/25/2025 |
| DOB NOW | Standpipe | Permit Issued | SIRINA FIRE PROT CORP | 09/08/2025 |
| DOB NOW | Boiler Equipment | Signed-off | CHAMPION COMBUSTION CORP | 08/11/2025 |
| DOB NOW | Supported Scaffold | Permit Issued | PRIME CONTRACTORS, INC | 06/13/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | PRIME CONTRACTORS, INC | 06/13/2025 |
| DOB NOW | Boiler Equipment | Permit Issued | CHAMPION COMBUSTION CORP | 05/09/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/09/2026 | Permit Issued | WELKIN MECHANICAL, LLC | Air Conditioning Systems, Refrigeration Systems | — |
| 09/10/2025 | Permit Issued | GEM AIR CONDITIONING INC | Air Conditioning Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/07/2026 | Permit Issued | SIRINA FIRE PROT CORP | 3 outlets |
| 09/10/2025 | Permit Issued | BLUEWATER P&H, INC | Sprinkler System |
| 08/25/2025 | Permit Issued | SIRINA FIRE PROT CORP | 10,448 heads |
| 12/30/2024 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/19/2026 | Permit Issued | WM PLUMBING | Gas, Storm, Water/Sanitary |
| 01/07/2026 | — | — | — |
| 09/10/2025 | Signed-off | J. CAIAZZO PLBG & HTG COR | Gas, Water/Sanitary |
| 11/04/2022 | Signed-off | WMP PLUMBING LLC | Gas |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/13/2026 | Complete | RIGHTWAY ELECTRICAL INC | General Wiring |
| 09/02/2025 | Permit Issued | LIT MODE ELECL CONTG INC | — |
| 03/26/2025 | Permit Issued | ARCADIA ELECT'L CO. INC. | General Wiring |
| 03/10/2025 | Complete | NELLO ELECTRIC LLC | General Wiring |
| 03/04/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 02/28/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| 02/26/2025 | Complete | NELLO ELECTRIC LLC | — |
| 05/21/2024 | Complete | A & A ELEC'L CONTR'G CORP | General Wiring |
| 03/15/2023 | Permit Issued | ARCADIA ELECT'L CO. INC. | General Wiring |
| 01/12/2023 | Complete | MER ELECTRIC, INC | General Wiring |
| 06/29/2022 | Permit Issued | SIGNS CAD CORP | General Wiring |
| 03/16/2022 | Permit Issued | AMIN ELECTRICAL CORP | — |
| 02/16/2022 | Permit Issued | ARCADIA ELECT'L CO. INC. | — |
| 10/26/2021 | Complete | SIGNS CAD CORP | — |
| 10/26/2021 | Complete | SIGNS CAD CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/13/2026 | Permit Issued | WELKIN MECHANICAL, LLC | Steel |
| 06/18/2026 | Permit Issued | TECHNICO CONSTRUCTION | 1 scope_items |
| 03/05/2026 | Permit Issued | TECHNICO CONSTRUCTION | Steel, Concrete |
| 01/22/2024 | — | — | Steel, Wood |
| 12/20/2022 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/11/2026 | Permit Issued | YARKS NYC INC | Scaffold |
| 04/14/2026 | Permit Issued | YARKS NYC INC | Sidewalk Shed |
| 06/03/2022 | Permit Issued | PRIME CONTRACTORS, INC | Sidewalk Shed |
| 04/14/2022 | Permit Issued | PRIME CONTRACTORS, INC | Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/20/2026 | Permit Issued | P&K CONTRACTING INC | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 07/22/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/13/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 05/07/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 04/07/2026 | Pass-Final PL - Up to 9 Requested Floors | Pass | View ↗ |
| 03/06/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/03/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 03/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/27/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 02/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/12/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 02/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/02/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/29/2026 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 01/28/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 12/22/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 12/19/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/03/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 11/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/01/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 09/12/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 07/07/2026 | Post-installed Anchors | — | special |
| 07/07/2026 | Masonry | — | special |
| 07/07/2026 | Structural Steel - Details | — | special |
| 07/06/2026 | Final | — | progress |
| 06/29/2026 | Heating Systems | John Nucatola | special |
| 06/29/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | John Nucatola | special |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | John Nucatola | special |
| 06/22/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | John Nucatola | special |
| 06/22/2026 | Heating Systems | — | special |
| 06/15/2026 | Post-installed Anchors | MD MOSTAFA | special |
| 06/04/2026 | Heating Systems | — | special |
| 06/04/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | John Nucatola | special |
| 06/04/2026 | Heating Systems | John Nucatola | special |
| 06/04/2026 | Fuel-Oil Storage and Fuel-Oil Piping Systems | John Nucatola | special |
| 05/07/2026 | Fire-Resistant Penetrations and Joints | John Nucatola | special |
| 04/29/2026 | Post-installed Anchors | MD MOSTAFA | special |
| 04/16/2026 | Post-installed Anchors | WALIUR RAHMAN | special |
| 04/16/2026 | Alternative Materials - OTCR Buildings Bulletin Number | WALIUR RAHMAN | special |
| 04/09/2026 | Post-installed Anchors | MD MOSTAFA | special |
| 03/06/2026 | Structural Stability – Alterations of existing buildings | John Nucatola | special |
| 03/06/2026 | Structural Steel - Welding | John Nucatola | special |
| 03/06/2026 | Concrete - Cast-In-Place | John Nucatola | special |
| 03/06/2026 | Structural Steel - High Strength Bolting | John Nucatola | special |
| 03/06/2026 | Final | John Nucatola | progress |
| 03/06/2026 | Structural Steel - Details | John Nucatola | special |