Roof5p · 10 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalStructuralOther
Issued Permit Scope
Antenna · General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Decommission of existing Future Technologies site. Remove 3 GPS antennas and 1 whip antenna on roof and remove 1 equipment cabinet from 63rd floor radio room.
On file for this project
4 documents
FBI- Remove one existing whip antenna on roof, related mounting pipe to remain. No change in use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
BulkheadUnder Construction1p · 1 filing · 17 docs
Equipment
Installation of suspended scaffold for facade work and/or inspection. Amend #2 added outrigger detail
On file for this project
17 documents · 1 drawing sheet
Floor 632 filings · 8 docs
Electrical
Issued Permit Scope
Antenna
Decommission of existing Future Technologies site. Remove 3 GPS antennas and 1 whip antenna on roof and remove 1 equipment cabinet from 63rd floor radio room.
On file for this project
4 documents
Filing to decom existing antenna site. Remove 4 antenna and 1 GPS unit from roof and equipment from room on 63rd floor. Initial install approved under app 220062991. No change in use, egress, or occupancy. Carrier Clearwire / Sprint
On file for this project
4 documents
Floor 621p · 1 filing · 6 docs
Structural
Issued Permit Scope
Structural
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Floor 61
Floor 602p · 1 filing · 17 docs
EquipmentGeneralMechanicalStructural
Issued Permit Scope
Supported Scaffold
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Floor 59Under Construction20p · 7 filings · 17 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Plumbing and Sprinkler modifications as per plans filed herewith. No change in egress, use or occupancy.
On file for this project
9 documents · 2 drawing sheets
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 5815p · 5 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 1 drawing sheet
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 8 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 572p · 4 filings · 17 docs
EquipmentGeneralMechanicalStructural
Issued Permit Scope
Mechanical Systems · Structural · Supported Scaffold
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents
ST work as per plans.
On file for this project
4 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents
Latest 3 of 4 filings on this floor.
Floor 567p · 4 filings · 17 docs
EquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Structural · Supported Scaffold
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this project
12 documents · 4 drawing sheets
Modification to existing Plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 5510p · 11 filings · 17 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents
Latest 3 of 11 filings on this floor.
Floor 547p · 12 filings · 17 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents · 1 drawing sheet
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents
FILING HEREWITH FOR FIT OUT WORK RELATED TO APAX STUDIOS PROJECT ON 58-59 (CONSTRUCTION FLOORS 54-55). NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents
Latest 3 of 12 filings on this floor.
Floor 53Under Construction44p · 14 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
BTG Pactual - New installation and modifications to existing Sprinkler Systems as per plans filed herewith for floor 53rd (Construction); 57th (Marketing). No change in use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Project M01426596Permit Issued · 07/31/2026
BTG Pactual - Interior modifications as per plans filed herewith for floor 53rd (Construction); 57th (Marketing). No change in use, egress or occupancy
On file for this project
2 documents
BTG Pactual - Modifications to the Mechanical Systems as per plans filed herewith for floor 53rd (Construction); 57th (Marketing). No change in use, egress or occupancy
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 14 filings on this floor.
Floor 52Under Construction20p · 14 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
14 documents · 1 drawing sheet
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents · 3 drawing sheets
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents · 2 drawing sheets
Latest 3 of 14 filings on this floor.
Floor 51Under Construction11p · 4 filings · 17 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Sprinklers · Supported Scaffold
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents · 4 drawing sheets
DEMOLITION AND INTERIOR FIT-0T OF PARTIAL 49TH, 50TH, PARTIAL 51ST AND PARTIAL 52ND FLOORS INCLUDING NON-LOAD BEARING PARTIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES, CORE TOILET ROOMS, REMOVAL OF AN EXISTING CONVIENCE STAIR AND NEW CONVIENCE STAIR
On file for this project
7 documents · 5 drawing sheets
Sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
11 documents
Latest 3 of 4 filings on this floor.
Floor 50Under Construction15p · 4 filings · 17 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Structural · Supported Scaffold
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 49Under Construction29p · 24 filings · 17 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
14 documents
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
INTERIOR DEMO OF TENANT 53RD FLOOR INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY
On file for this project
5 documents
Latest 3 of 24 filings on this floor.
Floor 48Under Construction14p · 14 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents · 1 drawing sheet
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents
Latest 3 of 14 filings on this floor.
Floor 47Under Construction5p · 9 filings · 17 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents
DEMOLITION AND INTERIOR FIT-0T OF PARTIAL 49TH, 50TH, PARTIAL 51ST AND PARTIAL 52ND FLOORS INCLUDING NON-LOAD BEARING PARTIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES, CORE TOILET ROOMS, REMOVAL OF AN EXISTING CONVIENCE STAIR AND NEW CONVIENCE STAIR
On file for this project
7 documents
Latest 3 of 9 filings on this floor.
Floor 46Under Construction16p · 7 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
PL/SP WORK RELATED TO DEMOLITION AND INTERIOR FIT-0T OF 49TH -51ST FLOORS AS PER PLANS.
On file for this project
24 documents
PL/SP work as per plans.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 45Under Construction56p · 10 filings · 17 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Supported Scaffold
CHANGE OF USE FROM ALL BUSINESS TO BUISNESS (E), DINING (F-4) AND ASSEMBLY (F-1b). 2 HOURFIRE RATED PARTITION TO TERMINATE PUBLIC ASSEMBLY TRAVEL DISTANCE PER CCD-1,
On file for this project
7 documents · 5 drawing sheets
Project M01335303Permit Issued · 01/20/2026
SD work as per plans.
On file for this project
1 document · 1 drawing sheet
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
On file for this project
12 documents
Latest 3 of 10 filings on this floor.
Floor 44Under Construction21p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
PL/SP work as per plans.
On file for this project
14 documents · 5 drawing sheets
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents · 3 drawing sheets
GC work as per plans. No change to use egress or occupancy on this application.
On file for this project
14 documents · 13 drawing sheets
Floor 431p · 1 filing · 5 docs
Mechanical
Filing for interior mechanical removals prior to fit out on construction floor 39, marketing floor 43. No change to use egress or occupancy on this application.
On file for this project
5 documents · 1 drawing sheet
Floor 42Under Construction1p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Structural
PL/SP work as per plans.
On file for this project
14 documents
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents
GC work as per plans. No change to use egress or occupancy on this application.
On file for this project
14 documents
Latest 3 of 5 filings on this floor.
Floor 41Under Construction5 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Standpipe · Structural
Project M01335303Permit Issued · 01/20/2026
SD work as per plans.
On file for this project
1 document
PL/SP work as per plans.
On file for this project
14 documents
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents
Latest 3 of 5 filings on this floor.
Floor 40Under Construction3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
PL/SP work as per plans.
On file for this project
14 documents
Demolition of existing ductwork, VAVs, AC units, air outlets, and piping on the 45th floor except where noted. Full fit out of the floor with new VAVs, AC units, ductwork, air outlets, piping. New Kitchen exhaust and makeup air systems placed on roof
On file for this project
7 documents
GC work as per plans. No change to use egress or occupancy on this application.
On file for this project
14 documents
Floor 392p · 3 filings · 13 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Filing for interior sprinkler removals prior to fit out on construction floor 39, marketing floor 43. No change to use egress or occupancy on this application.
On file for this project
3 documents · 1 drawing sheet
Removal of non load bearing partitions and internal finishes on construction floor 39, marketing floor 43. No change to use egress or occupancy on this filing.
On file for this project
5 documents · 1 drawing sheet
Filing for interior mechanical removals prior to fit out on construction floor 39, marketing floor 43. No change to use egress or occupancy on this application.
On file for this project
5 documents
Floor 38Under Construction1 filing · 7 docs
Structural
Issued Permit Scope
Structural
STRUCTURAL WORK FOR SUPPORT OF REPLACEMENT UPS EQUIPMENT
On file for this project
7 documents
Floor 37
Floor 36
Floor 357p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Installation of sprinkler temp loop and installation of NEW sprinkler heads. No change in egress, use or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural alterations for new communicating stairs and moving partition as per plans filled herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Mechanical modifications as per plans filed here with. No change in egress, use or occupancy. No change one mechanical drawings
On file for this project
29 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 347p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
ST WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICATION.
On file for this project
6 documents · 1 drawing sheet
Installation of sprinkler temp loop and installation of NEW sprinkler heads. No change in egress, use or occupancy.
On file for this project
8 documents · 1 drawing sheet
Structural alterations for new communicating stairs and moving partition as per plans filled herewith. No change in use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 3319p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
PL/SP WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICAITION.
On file for this project
12 documents · 2 drawing sheets
PROJECT SCOPE IS FOR THE INTERIOR FIT-OUT OF TENANT 33RD FLOOR (29TH FLOOR CONSTRUCTION)INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES AND CORE TOILETROOMS.
On file for this project
5 documents · 8 drawing sheets
New fitout of full 33rd floor. New ductwork connections to base building shafts, new condenser water piping connections to tenant risers, VAV distribution downstream, limited AC units added for supplemental cooling and critical cooling for (1) IDF load.
On file for this project
14 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 323p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
FILING PLUMBING/SPRINKLER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUUPANCY.
On file for this project
36 documents · 1 drawing sheet
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents
STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 4 filings on this floor.
Floor 3112p · 8 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
FILING PLUMBING/SPRINKLER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUUPANCY.
On file for this project
36 documents · 2 drawing sheets
MECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
21 documents · 2 drawing sheets
STRUCTURAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 308p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification/additions to existing sprinkler system and related piping. No change in use, egress or occupancy under this application.
On file for this project
24 documents · 3 drawing sheets
Modification/additions to existing sprinkler system and related piping. No change in use, egress or occupancy under this application.
On file for this project
15 documents · 8 drawing sheets
Removal and installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents
Floor 2910p · 12 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
PL/SP WORK AS PER PLANS. NO CHANGE TO USE EGRESS OR OCCUPANCY ON THIS APPLICAITION.
On file for this project
12 documents
PROJECT SCOPE IS FOR THE INTERIOR FIT-OUT OF TENANT 33RD FLOOR (29TH FLOOR CONSTRUCTION)INCLUDING NON-LOAD BEARING PARTITIONS, INTERIOR FINISHES, EXISTING STAIR FINISHES AND CORE TOILETROOMS.
On file for this project
5 documents
New fitout of full 33rd floor. New ductwork connections to base building shafts, new condenser water piping connections to tenant risers, VAV distribution downstream, limited AC units added for supplemental cooling and critical cooling for (1) IDF load.
On file for this project
14 documents
Latest 3 of 12 filings on this floor.
Floor 2812p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications on the 28th FL as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
7 documents
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
10 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2713p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications on the 27th FL as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
8 documents
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
10 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2611p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Sprinkler modifications on the 26th FL as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
7 documents
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
10 documents · 8 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2515p · 10 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modifications to sprinkler systems. Addition of 2 and relocation of 1 sprinkler head. No change in use, egress, or occupancy
On file for this project
4 documents · 1 drawing sheet
Scheduled proposed FFE layout and new partitions, new fire alarm strobes. No change in use, occupancy or egress.
On file for this project
14 documents · 7 drawing sheets
MECHANICAL MODIFICATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 247p · 2 filings · 17 docs
ArchitectureDMFire ProtectionGeneral
Issued Permit Scope
General Construction · Sprinklers
Modifications to sprinkler systems. No change in use, egress, or occupancy
On file for this project
3 documents · 1 drawing sheet
Scheduled proposed FFE layout and new partitions, new fire alarm strobes. No change in use, occupancy or egress.
On file for this project
14 documents · 6 drawing sheets
Floor 23Under Construction1p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
6 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Filing herewith for sprinkler work on floors 26-27 (Construction floors 22-23) as per plans. No change to use egress or occupancy on this application.
On file for this project
22 documents · 1 drawing sheet
Floor 22Under Construction2p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modification to existing HVAC system as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
6 documents
Modification to existing Sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Filing herewith for sprinkler work on floors 26-27 (Construction floors 22-23) as per plans. No change to use egress or occupancy on this application.
On file for this project
22 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 215p · 8 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural
Structural work for demolition of existing beams, new slab opening and new structural steel beams and posts as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
mechanical demo as per plans filed herewith. no change to use, egress, or occupancy.
On file for this project
6 documents
Mechanical modifications as per plans filed here with. No change in egress, use or occupancy.
On file for this project
18 documents
Latest 3 of 8 filings on this floor.
Floor 201p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing and sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
9 documents
Sprinkler temporary loop additions/modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
4 documents
Structural work for demolition of existing beams, new slab opening and new structural steel beams and posts as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents
Latest 3 of 6 filings on this floor.
Floor 198p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Structural modifications for stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Plumbing and sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
4 documents
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 1810p · 7 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Interior renovations on 18th FL as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
9 documents · 8 drawing sheets
Mechanical additions/modifications on the 18th FL as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
14 documents
Structural modifications for stair buildout as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 179p · 9 filings · 20 docs
ArchitectureCivilDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Plumbing and sprinkler modifications with the removal of standpipe fire hose cabinet as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
15 documents · 1 drawing sheet
Sprinkler modifications on the 17th floor as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
8 documents · 1 drawing sheet
Mechanical additions/modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents
Latest 3 of 9 filings on this floor.
Floor 1611p · 4 filings · 20 docs
ArchitectureCivilFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Plumbing and sprinkler modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
11 documents · 1 drawing sheet
Interior renovations on as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
5 documents · 8 drawing sheets
Mechanical modifications, amending the mechanical schedule to reflect as built conditions.
On file for this project
12 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 1516p · 11 filings · 20 docs
ArchitectureCivilDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Plumbing and sprinkler modifications with the removal of standpipe fire hose cabinet as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
15 documents · 2 drawing sheets
Mechanical additions/modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents
Interior renovations on floors 15 and 17 as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 14
Floor 13
Floor 12
Floor 11
Floor 105p · 2 filings · 19 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers
mechanical modifications as per plans filed herewith 10th floor construction (14th floor tenant). no change to use, egress, or occupancy.
On file for this project
7 documents · 3 drawing sheets
plumbing and sprinkler modifications as per plans filed herewith 10th floor construction (14th floor tenant). no change to use, egress, or occupancy.
On file for this project
12 documents · 2 drawing sheets
Floor 93p · 2 filings · 16 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
Mechanical Modifications as per plans filed herewith. No change in use, occupancy, or egress.
On file for this project
12 documents · 3 drawing sheets
Modification to existing Plumbing system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents
Floor 81p · 1 filing · 16 docs
Mechanical
Mechanical modifications as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
16 documents · 1 drawing sheet
Floor 77p · 8 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Renovation of storage rooms and the installation of a new exhaust riser from the 2nd floor to 7th floor roof as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 8 filings on this floor.
Floor 623p · 14 filings · 20 docs
ArchitectureDMFire ProtectionLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents · 2 drawing sheets
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Renovation of storage rooms and the installation of a new exhaust riser from the 2nd floor to 7th floor roof as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 14 filings on this floor.
Floor 528p · 12 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Renovation of storage rooms and the installation of a new exhaust riser from the 2nd floor to 7th floor roof as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 12 filings on this floor.
Floor 48p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Renovation of storage rooms and the installation of a new exhaust riser from the 2nd floor to 7th floor roof as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 38p · 7 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents
The installation of a new exhaust riser and HVAC duct work serving the 2nd floor as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Renovation of storage rooms and the installation of a new exhaust riser from the 2nd floor to 7th floor roof as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents
Latest 3 of 7 filings on this floor.
Floor 2Under Construction41p · 18 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
159 EAST 53RD STREET - NYU - INTERIOR DEMO TO MECHANICAL DUCTWORK ON 2ND FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
18 documents · 5 drawing sheets
Structural modifications as per plans filed herewith. NO change in use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 18 filings on this floor.
Floor 126p · 21 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
Installation of sprinkler heads related to restaurant renovation/fit out, includes new kitchen, bar, lounge and dining rooms. No change to use egress or occupancy on this application.
On file for this project
22 documents · 4 drawing sheets
Installation of mechanical equipment related to restaurant renovation/fit out, includes new kitchen, bar, lounge and dining rooms. No change to use egress or occupancy on this application.
On file for this project
14 documents · 4 drawing sheets
GC work related to fit out of ilili restaurant on first floor and cellar. No change to use, egress or occupancy on this application.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 21 filings on this floor.
Mezzanine1 filing · 8 docs
Architecture
Issued Permit Scope
General Construction
HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE SUBCELLAR, CELLAR, MEZZANINE AND 1ST LEVEL OF ST PETERS CHURCH PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Cellar30p · 25 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Installation of sprinkler heads related to restaurant renovation/fit out, includes new kitchen, bar, lounge and dining rooms. No change to use egress or occupancy on this application.
On file for this project
22 documents · 1 drawing sheet
Installation of mechanical equipment related to restaurant renovation/fit out, includes new kitchen, bar, lounge and dining rooms. No change to use egress or occupancy on this application.
On file for this project
14 documents
GC work related to fit out of ilili restaurant on first floor and cellar. No change to use, egress or occupancy on this application.
On file for this project
5 documents
Latest 3 of 25 filings on this floor.
Sub-CellarUnder Construction7p · 9 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
CHANGE OF USE FROM ALL BUSINESS TO BUISNESS (E), DINING (F-4) AND ASSEMBLY (F-1b). 2 HOURFIRE RATED PARTITION TO TERMINATE PUBLIC ASSEMBLY TRAVEL DISTANCE PER CCD-1,
On file for this project
7 documents
HEREWITH FILING FOR STRUCTURAL MODIFICATIONS IN CONJUNCTION WITH ST PETERS CHURCH RENOVATIONS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
7 documents
HEREWITH FILING FOR INTERIOR RENOVATIONS AT THE SUBCELLAR, CELLAR, MEZZANINE AND 1ST LEVEL OF ST PETERS CHURCH PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
8 documents
Latest 3 of 9 filings on this floor.
Site & exteriorUnder Construction8 filings · 17 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Protection and Mechanical Methods · Sidewalk Shed · Supported Scaffold
FILING FOR FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
6 documents · 6 drawing sheets
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE,EGRESS OR OCCUPANCY.
On file for this project
3 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued24 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOtherZ
Removal of interior partitions, interior MEP devices and fixtures, and finishes as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
5 documents · 8 drawing sheets
Modifications to the existing hvac system as per plans filed herewith. No change in use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Modification to existing plumbing fixtures & sprinkler system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 6 drawing sheets
Latest 3 of 24 filings on this floor.