Roof32p · 14 filings · 20 docs
ArchitectureGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Supported Scaffold
DATADOG ROOF- GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS ON PART OF 52ND FLOOR AS PER PLANS FILED.
On file for this project
24 documents · 11 drawing sheets
DATADOG ROOF-- MECHANICAL MODIFICATIONS AND INSTALLATIONS RELATED TO ROOF SPACE BUILD-OUT.
On file for this project
12 documents · 1 drawing sheet
DATADOG ROOF- PLUMBING INSTALLATIONS RELATED TO ROOF TERRACE CONSTRUCTION.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Bulkhead6p · 3 filings · 20 docs
ArchitectureStructural
DATADOG ROOF--STRUCTURAL WORK REQUIRED IN CONJUCTION WITH GENERAL CONSTRUCTION AS PER PLANS FILED HEREWITH.
On file for this project
18 documents · 4 drawing sheets
CLEARBRIDGE-- Structural modifications related to access stair removal, slab in-fill, and other structural modifications as shown on plans.
On file for this project
4 documents · 1 drawing sheet
GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR DEMOLITION AND PARTITIONS INSTALLATIONS FOR NEW EGRESS STAIR AND BULKHEAD. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 621p · 1 filing · 20 docs
DM
DATADOG ROOF- GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS ON PART OF 52ND FLOOR AS PER PLANS FILED.
On file for this project
24 documents · 1 drawing sheet
Floor 611p · 1 filing · 6 docs
DM
DATADOG AMENITY- GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS ON PART OF 51ST FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 60
Floor 59
Floor 58
Floor 57
Floor 56
Floor 55
Floor 54
Floor 53
Floor 5218p · 6 filings · 20 docs
ArchitectureLandscapeMechanicalOther
DATADOG-- General construction related to new kitchen construction on 50th floor. No change to use, egress, or occupancy.
On file for this project
6 documents · 1 drawing sheet
DATADOG ROOF- GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS ON PART OF 52ND FLOOR AS PER PLANS FILED.
On file for this project
24 documents · 10 drawing sheets
General construction required for the replacement of guard rail system at several locations. Installation of safety mesh and netting.
On file for this project
10 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 51Under Construction25p · 9 filings · 20 docs
ArchitectureDMMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems
DATADOG-- STRUCTURAL WORK REQUIRED FOR 50th FLOOR KITCHEN INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
DATADOG-- INSTALLATION OF MECHANICAL EQUIPMENT AND DISTRIBUTION FOR 50TH FLOOR KITCHEN. AS PER PLANS FILED.
On file for this project
16 documents
DATADOG AMENITY- PLUMBING INSTALLATIONS RELATED TO NEW AMENITIES SPACE AS PER PLANS FILED.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 5010p · 15 filings · 20 docs
ArchitectureDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Sprinklers
DATADOG-- Interior demolition inclusive of partitions removals as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
4 documents · 2 drawing sheets
DATADOG-- DEMOLITION OF MECHANICAL DUCT AND EQUIPMENT; MODIFICATION OF MECHANICAL PIPING. CAP DUCT/PIPING FOR FUTURE INSTALLATIONS.
On file for this project
2 documents · 1 drawing sheet
DATADOG-- INSTALLATION OF PLUMBING FIXTURES WITH RELATED PIPING MODIFICATIONS AS PER PLANS FILED.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 499p · 5 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
DATADOG-- PLUMBING MODIFICATIONS AND INSTALLATION OF PLUMBING FIXTURES FOR NEW KITCHEN ON 50TH FLOOR AS PER PLANS FILED.
On file for this project
6 documents · 1 drawing sheet
DATADOG-- INSTALLATION OF PLUMBING FIXTURES WITH RELATED PIPING MODIFICATIONS AS PER PLANS FILED.
On file for this project
8 documents · 1 drawing sheet
DATADOG-- STRUCTURAL WORK REQUIRED FOR CONVENIENCE STAIR INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 4 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 4815p · 10 filings · 20 docs
DMFire ProtectionMechanicalPlumbingStructural
ELEVATOR SHAFT-- Installation of hose bibb at 52nd floor elevator bulkhead with related piping on 51st and 52nd floors as per plans filed.
On file for this project
4 documents · 1 drawing sheet
DATADOG-- Interior demolition inclusive of partitions removals as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
DATADOG-- INSTALLATION OF MECHANICAL EQUIPMENT AND NEW DISTRIBUTION AS PER PLANS FILED.
On file for this project
49 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4711p · 11 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
DATADOG-- Interior demolition inclusive of partitions removals as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
4 documents · 1 drawing sheet
DATADOG-- DEMOLITION OF MECHANICAL DUCT AND EQUIPMENT; MODIFICATION OF MECHANICAL PIPING. CAP DUCT/PIPING FOR FUTURE INSTALLATIONS.
On file for this project
2 documents · 1 drawing sheet
DATADOG-- INSTALLATION OF MECHANICAL EQUIPMENT AND NEW DISTRIBUTION AS PER PLANS FILED.
On file for this project
49 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 4612p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction
DATADOG-- MODIFICATIONS TO INTERIOR PARTITIONS TO CREATE 2-HOUR FLOOR SEPARATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 5 drawing sheets
DATADOG-- INSTALLATION OF PLUMBING FIXTURES WITH RELATED PIPING MODIFICATIONS AS PER PLANS FILED.
On file for this project
8 documents · 1 drawing sheet
DATADOG-- STRUCTURAL WORK REQUIRED FOR CONVENIENCE STAIR INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 45Under Construction8p · 3 filings · 12 docs
ArchitectureMechanical
Issued Permit Scope
General Construction
Increase occupant load and create Places of Assembly on 37, 45, 46, 47 and 50 floor. Development HUB consultation held and approved on July 11, 2024.
On file for this project
4 documents
DATADOG-- MODIFICATIONS TO INTERIOR PARTITIONS TO CREATE 2-HOUR FLOOR SEPARATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
No filed description on record for this project.
On file for this project
2 documents
Floor 448p · 3 filings · 13 docs
Fire ProtectionGeneralMechanicalPlumbing
COVINGTON & BURLING-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH NEW PANTRY/ & OFFICE RENOVATIONS.
On file for this project
3 documents · 4 drawing sheets
COVINGTON & BURLING-- PLUMBING MODIFICATIONS AND INSTALLATIONS RELATED TO NEW PANTRY ON PART OF 44TH FLOOR.
On file for this project
8 documents · 3 drawing sheets
COVINGTON & BURLING-- MODIFICATIONS TO MECHANICAL EQUIPMENT ON 44TH FLOOR IN CONJUNCTION WITH RENOVATION AS PER PLANS FILED.
On file for this project
2 documents · 1 drawing sheet
Floor 43
Floor 422p · 1 filing · 9 docs
CivilFire Protection
Covington - Modifications to existing sprinkler system as per plans filed herewith.
On file for this project
9 documents · 2 drawing sheets
Floor 41
Floor 40
Floor 393p · 2 filings · 13 docs
CivilFire ProtectionLandscapePlumbing
Covington - Modifications to existing sprinkler system as per plans filed herewith.
On file for this project
9 documents · 2 drawing sheets
Covington - Modification to plumbing fixtures for office renovation as per plans filed herewith.
On file for this project
4 documents · 1 drawing sheet
Floor 389p · 3 filings · 11 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction
DATADOG-- STRUCTURAL REINFORCEMENT AND INSTALLATION FOR ACCESS STAIR AS PER PLANS FILED HEREWITH.
On file for this project
2 documents · 2 drawing sheets
General construction removing return and supply diffusers, duct extension for new reception space. No unit installation. Filed in conjunction with architectural modifications filed under M00535041-I1. No change to use, egress, or occupancy
On file for this project
5 documents · 1 drawing sheet
Modification to interior partitions for reception area renovation as per plans filed. Filed in conjunction with M00533683-I1. No change to use, egress, or occupancy.
On file for this project
4 documents
Floor 3711p · 9 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction
DATADOG-- MODIFICATIONS TO INTERIOR PARTITIONS TO CREATE 2-HOUR FLOOR SEPARATION. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
DATADOG-- MECHANICAL MODIFICATIONS AND EQUIPMENT INSTALLATIONS FOR 36 & 37 FLOOR OFFICE RENOVATION.
On file for this project
19 documents · 2 drawing sheets
DATADOG-- STRUCTURAL REINFORCEMENT AND INSTALLATION FOR ACCESS STAIR AS PER PLANS FILED HEREWITH.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 3610p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
DATADOG--GENERAL CONSTRUCTION INCLUSIVE OF INTERIOR DEMO AND PARTITIONS INSTALLATION ON FLOORS 36 & 37 AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
DATADOG-- MECHANICAL MODIFICATIONS AND EQUIPMENT INSTALLATIONS FOR 36 & 37 FLOOR OFFICE RENOVATION.
On file for this project
19 documents · 3 drawing sheets
DATADOG-- STRUCTURAL REINFORCEMENT AND INSTALLATION FOR ACCESS STAIR AS PER PLANS FILED HEREWITH.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
Floor 35
Floor 34
Floor 33Under Construction16p · 3 filings · 18 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
On file for this project
8 documents
Seyfarth Shaw-- Plumbing modifications and installations on floors 31, 32, and 33 as per plans filed.
On file for this project
5 documents · 1 drawing sheet
Seyfarth Shaw-- Mechanical system modifications and installations in conjunction with renovations as per plans filed herewith.
On file for this project
5 documents · 1 drawing sheet
Floor 32Under Construction26p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Sprinklers
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
On file for this project
8 documents
Seyfarth Shaw-- Plumbing modifications and installations on floors 31, 32, and 33 as per plans filed.
On file for this project
5 documents · 1 drawing sheet
Seyfarth Shaw-- General construction inclusive of partitions modifications for amenity upgrade on 32nd floor. No change to use, egress, or occupancy.
On file for this project
5 documents · 9 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 31Under Construction16p · 3 filings · 18 docs
ArchitectureFire ProtectionPlumbing
Issued Permit Scope
Sprinklers
Seyfarth Shaw-- Modifications to existing sprinkler system on parts of the 31st, 32nd, and 33rd floors.
On file for this project
8 documents
Seyfarth Shaw-- Plumbing modifications and installations on floors 31, 32, and 33 as per plans filed.
On file for this project
5 documents · 1 drawing sheet
Seyfarth Shaw-- Mechanical system modifications and installations in conjunction with renovations as per plans filed herewith.
On file for this project
5 documents · 1 drawing sheet
Floor 3027p · 13 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction
INTERIOR NON-STRUCTURAL DEMOLITION ON FLOORS 26, 29, & 30; MINOR CONSTRUCTION ON FLOOR 26 FOR SHAFT ENCLOSURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
DATADOG-- STRUCTURAL WORK for the installation of access stair.
On file for this project
2 documents · 1 drawing sheet
Datadog-- General construction inclusive of installation of interior partitions for office build-out.
On file for this project
4 documents · 10 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2923p · 10 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
INTERIOR NON-STRUCTURAL DEMOLITION ON FLOORS 26, 29, & 30; MINOR CONSTRUCTION ON FLOOR 26 FOR SHAFT ENCLOSURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
DATADOG-- MODIFICATIONS TO EXISTING SPRINKLER SYSTEM INCLUSIVE OF TEMP LOOP AND NEW DISTRIBUTION AS PER PLANS FILED.
On file for this project
3 documents · 2 drawing sheets
DATADOG-- PLUMBING MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH OFFICE BUILD-OUT.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 284p · 3 filings · 8 docs
Fire ProtectionPlumbing
DATADOG-- PLUMBING MODIFICATIONS AND INSTALLATIONS IN CONJUNCTION WITH OFFICE BUILD-OUT.
On file for this project
4 documents · 1 drawing sheet
Installation of plumbing fixtures on part of the 28th floor as per plans filed.
On file for this project
2 documents · 1 drawing sheet
Modification to existing sprinkler system on part of the 28th floor.
On file for this project
2 documents · 2 drawing sheets
Floor 274p · 1 filing · 6 docs
ArchitectureDMMechanical
Goodwin - General construction inclusive of interior non-structural demo and partitions installation for21st floor office renovation. Filed in conjunction with No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Floor 261p · 1 filing · 2 docs
DM
INTERIOR NON-STRUCTURAL DEMOLITION ON FLOORS 26, 29, & 30; MINOR CONSTRUCTION ON FLOOR 26 FOR SHAFT ENCLOSURE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
Floor 255p · 4 filings · 20 docs
ArchitectureDMFire Protection
Modifications to existing sprinkler system on part of the 22nd floor; install TCSP. Remove and install one fire hose cabinet with related piping modifications.
On file for this project
14 documents · 1 drawing sheet
GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS FOR OFFICE RENOVATIONS ON PART OF THE 22ND FLOOR.NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 4 drawing sheets
Goodwin - General construction inclusive of interior non-structural demo and partitions installation for21st floor office renovation. Filed in conjunction with No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 24
Floor 235p · 2 filings · 20 docs
ArchitectureDMFire ProtectionGeneral
Goodwin - General construction inclusive of interior non-structural demo and partitions installation for21st floor office renovation. Filed in conjunction with No change to use, egress or occupancy.
On file for this project
6 documents · 4 drawing sheets
Goodwin - Installation of fire hose valve and cabinet with related standpipe piping. Modification to existing sprinkler system inclusive of demolition, installation of TCSP, and installation of sprinkler heads and related piping.
On file for this project
20 documents · 1 drawing sheet
Floor 2211p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Modifications to existing sprinkler system on part of the 22nd floor; install TCSP. Remove and install one fire hose cabinet with related piping modifications.
On file for this project
14 documents · 4 drawing sheets
PLUMBING MODIFICATIONS IN CONJUNCTION WITH PARTIAL 22ND FLOOR OFFICE RENOVATION.
On file for this project
2 documents · 2 drawing sheets
MECHANICAL DUCT MODIFICATIONS AND INSTALLATION OF FCU FOR PARTIAL 22ND FLOOR OFFICE RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
11 documents · 5 drawing sheets
Floor 218p · 3 filings · 20 docs
Fire ProtectionMechanicalPlumbingStructural
Goodwin - Plumbing modifications and fixtures installations for office renovation as per plans filed herewith.
On file for this project
2 documents · 2 drawing sheets
Goodwin - Installation of fire hose valve and cabinet with related standpipe piping. Modification to existing sprinkler system inclusive of demolition, installation of TCSP, and installation of sprinkler heads and related piping.
On file for this project
20 documents · 4 drawing sheets
Modifications to mechanical systems and installation of equipment for office renovation as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
6 documents · 2 drawing sheets
Floor 2015p · 6 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructuralOther
General construction for office renovations inclusive of interior demo erection of partitions.
On file for this project
5 documents · 3 drawing sheets
Mechanical modifications in conjunction with office renovations inclusive of equipment relocations and air handler installations
On file for this project
7 documents · 4 drawing sheets
Plumbing modifications for office renovations inclusive of fixtures removals and installations.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 1914p · 7 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
General construction for office renovations inclusive of interior demo erection of partitions.
On file for this project
5 documents · 3 drawing sheets
Mechanical modifications in conjunction with office renovations inclusive of equipment relocations and air handler installations
On file for this project
7 documents · 4 drawing sheets
Plumbing modifications for office renovations inclusive of fixtures removals and installations.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 182p · 1 filing · 5 docs
Architecture
TP-ICAP: General Construction and Interior Demo to remove two convenience stairs and in-fill slab. No change to Use, Occupancy or Egress.
On file for this project
5 documents · 2 drawing sheets
Floor 17
Floor 167p · 2 filings · 8 docs
ArchitectureDMFire ProtectionGeneral
NYT-- Modification to existing sprinkler system on part of the 16th floor as per plans filed herewith.
On file for this project
3 documents · 1 drawing sheet
General construction inclusive of modifications to interior partitions on part of the 16th floor as per plans filed herewith. No change to use, egress, or occupancy.
On file for this project
5 documents · 6 drawing sheets
Floor 151p · 1 filing · 2 docs
General
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 142p · 2 filings · 9 docs
GeneralMechanical
Modifications to mechanical equipment and duct work in conjunction with creation of gender neutral bathrooms.
On file for this project
7 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 132p · 2 filings · 9 docs
ArchitectureFire Protection
General construction inclusive of interior partitions modifications for 3rd, 6th, 8th, 9th, 10th & 13th full and partial floor renovations. No change to use egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Limited addition of sprinkler heads, max. 2 per floor.
On file for this project
5 documents · 1 drawing sheet
Floor 12
Floor 116p · 1 filing · 8 docs
ArchitectureDMGeneral
General construction inclusive of interior partitions modifications for 11th floor renovation. No change to use egress or occupancy.
On file for this project
8 documents · 6 drawing sheets
Floor 101p · 1 filing · 4 docs
Architecture
General construction inclusive of interior partitions modifications for 3rd, 6th, 8th, 9th, 10th & 13th full and partial floor renovations. No change to use egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 91p · 1 filing · 4 docs
General
General construction inclusive of interior partitions modifications for 3rd, 6th, 8th, 9th, 10th & 13th full and partial floor renovations. No change to use egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 85p · 4 filings · 20 docs
Fire ProtectionGeneralMechanicalPlumbing
General construction inclusive of interior partitions modifications for 3rd, 6th, 8th, 9th, 10th & 13th full and partial floor renovations. No change to use egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Sprinkler modifications in conjunction with new gender neutral bathrooms.
On file for this project
5 documents · 2 drawing sheets
Install plumbing fixtures for new gender neutral bathrooms.
On file for this project
9 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 72p · 1 filing · 2 docs
ArchitectureGeneral
General construction for minor office renovations parts of the 7th floor.
On file for this project
2 documents · 2 drawing sheets
Floor 61p · 1 filing · 4 docs
Architecture
General construction inclusive of interior partitions modifications for 3rd, 6th, 8th, 9th, 10th & 13th full and partial floor renovations. No change to use egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 5Under Construction6p · 1 filing · 4 docs
DMMechanical
Issued Permit Scope
Mechanical Systems
NYT-RECONFIGURATION OF COGEN HEAT REJECTION SYSTEM INCLUSIVE OF SILENCER REPLACEMENT AND RELATED MECHANICAL PIPING MODIFICATIONS AS PER PLANS FILED.
On file for this project
4 documents · 2 drawing sheets
Floor 47p · 3 filings · 19 docs
ArchitectureElectricalFire Protection
Energy code for lighting in conjunction with GC M00673178-I1.
On file for this project
3 documents · 1 drawing sheet
General construction to renovate existing 4th floor terrace as per plans filed herewith.
On file for this project
11 documents · 5 drawing sheets
Minor addition of sprinkler heads (1-2 per floor) to existing sprinkler system as per plans filed herewith.
On file for this project
5 documents · 1 drawing sheet
Floor 32p · 2 filings · 17 docs
Fire Protection
NYT Masthead Conference Room-- Sprinkler system modifications in conjunction with conference room construction.
On file for this project
12 documents · 1 drawing sheet
Minor addition of sprinkler heads (1-2 per floor) to existing sprinkler system as per plans filed herewith.
On file for this project
5 documents · 1 drawing sheet
Floor 23p · 3 filings · 20 docs
ArchitectureFire Protection
DATADOG ROOF- GENERAL CONSTRUCTION INCLUSIVE OF PARTITIONS MODIFICATIONS ON PART OF 52ND FLOOR AS PER PLANS FILED.
On file for this project
24 documents · 1 drawing sheet
General construction required for the replacement of guard rail system at several locations. Installation of safety mesh and netting.
On file for this project
10 documents · 1 drawing sheet
Minor addition of sprinkler heads (1-2 per floor) to existing sprinkler system as per plans filed herewith.
On file for this project
5 documents · 1 drawing sheet
Floor 130p · 11 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Plumbing · Sprinklers
Temporary exhibit structures for a Tractor Supply event at The Times Center. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
4 documents · 1 drawing sheet
Install of temp scenic partition no alt to exist structures for NY Times Kiosk. No TPA required. Producer responsible to monitor site safety. All production equipment removed upon event completion.
On file for this project
2 documents
INTERIOR NON-STRUCTURAL DEMOLITION AND GENERAL CONSTRUCTION IN EXISTING COMMERCIAL SPACE TO CREATE WHITE BOX CONDITION.
On file for this project
5 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Mezzanine21p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
ELEVATOR SHAFT-- Installation of hose bibb at 52nd floor elevator bulkhead with related piping on 51st and 52nd floors as per plans filed.
On file for this project
4 documents · 2 drawing sheets
DATADOG AMENITY- SPRINKLER MODIFICATION AND INSTALLATIONS ON PART OF 51ST FLOOR AS PER PLANS FILED HEREWITH.
On file for this project
3 documents · 1 drawing sheet
DATADOG AMENITY--STRUCTURAL WORK REQUIRED FOR RESTROOM CEILING AND MECHANICAL ACCESS PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Cellar12p · 7 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
NYT-REMOVAL AND INSTALLATION OF CRAC UNITS WITH RELATED MECHANICAL PIPING MODIFICATIONS AS PER PLANS FILED.
On file for this project
5 documents · 1 drawing sheet
Temporary exhibit structures for a Tractor Supply event at The Times Center. Removed at the end of the programing. No changes to existing structures, use or egress.
On file for this project
4 documents · 1 drawing sheet
CLEARBRIDGE-- MODIFICATIONS TO EXISITING SPRINKER SYSTEM INCLUSIVE OF HEAD RELOCATIONS/REMOVALS AND SAPPHIRE SYSTEM EQUIPMENT REMOVAL. NEW PIPING CONNECTION TO EXISTING SP HEADS ON 50TH FLOOR.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.