Whole building & multi-floor projectsDebevoise & Plimpton, Pfizer7 filings
Hereby Filing to install new emergency generators as shown on drawing filed herewith. No change to use, occupancy or egress. Fuel Oil filed under DOB#123813631.
On file for this project
7 documents · 1 drawing sheet
Proposed general construction work for interior renovation. No change to use egress or occupancy.
On file for this project
8 documents
Proposed mechanical work filed in conjunction with interior renovation. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 7 filings on this floor.
Roof509 W 34, L.L.C.3p · 4 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
Boiler Equipment · Protection and Mechanical Methods
Use of temporary building maintenance unit (BMU) as per plans filed herewith. This application is filed in conjunction with NB-122885422.
On file for this project
3 documents · 1 drawing sheet
Installation and use of suspended scaffold from building maintenance unit (BMU) as per plans filed herewith. This application is filed in conjunction with NB-122885422.
On file for this project
3 documents
hereby filing to install sprinkler heads with related piping for the bike room as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 67509 W 34, L.L.C.2p · 1 filing · 18 docs
ArchitectureElectricalGeneralMechanical
INSTALLATION OF A TEMPORARY SCAFFOLD ACCESS STAIR TOWER (FIELD LOCATED) AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD STAIR TOWER ACCESS SHALL COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
18 documents · 2 drawing sheets
Floor 66509 W 34, L.L.C.18p · 8 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructuralOtherZ
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Structural
Hereby filing the removal and replacement of three interior panels, one of the panels will become a door in the Clubhouse as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Hereby filing to install structural support for operable partitions as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents · 1 drawing sheet
Hereby filing to install plumbing fixtures, sprinkler heads, and related piping for office lounge as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
8 documents
Latest 3 of 8 filings on this floor.
Floor 65TPG Global, Eisler Capital +1Under Construction29p · 14 filings · 20 docs
ArchitectureDMFire ProtectionGeneralLandscapeMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 5 drawing sheets
INTERIOR NON-STRUCTURAL DEMOLITION OF EXISTING OFFICE TENANT FIT-OUT Including REMOVAL OF EXISTING NON-LOAD-BEARING PARTITIONS, CEILINGS, FINISHES, AND PARTIAL DEMO OF CORE RESTROOMS as shown on plans filed herewith. No change to use, occupancy.
On file for this project
14 documents · 5 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
11 documents
Latest 3 of 14 filings on this floor.
Floor 64TPG GlobalUnder Construction7p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 4 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
11 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 63TPG GlobalUnder Construction8p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 4 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
11 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 62TPG GlobalUnder Construction6p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 3 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
11 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 8 filings on this floor.
Floor 61TPG Global, The SpiralUnder Construction3p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
16 documents · 3 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
3 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 60TPG Global, The SpiralUnder Construction3p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
16 documents · 3 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
3 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 59TPG Global, The SpiralUnder Construction4p · 2 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 4 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
3 documents
Floor 58TPG Global, The SpiralUnder Construction8p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
12 documents · 5 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
3 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 57TPG Global, The SpiralUnder Construction5p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
12 documents · 3 drawing sheets
Hereby filing Addition of new convenience stairs and addition of associated stair openings as shown on plans filed herewith. No changes to use, occupancy or egress.
On file for this project
3 documents
Modification of existing sprinkler system as per the filed the plans. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 56Entiva Capital3p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Hereby filing to remove and install sprinkler heads with related piping for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
33 documents · 3 drawing sheets
Floor 55Tenant and elevator lobby sprinkler renovation7p · 1 filing · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and install sprinkler heads with related piping for tenant and elevator lobby renovation as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
20 documents · 7 drawing sheets
Floor 54TriedgeUnder Construction18p · 5 filings · 20 docs
ArchitectureCivilDMElectricalFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Sprinkler work in conjunction with office renovation on 54th Floor.
On file for this project
16 documents · 12 drawing sheets
Hereby filing to remove & relocate sprinkler heads with related piping for tenant modifications as shown on plans filed herewith.
On file for this project
22 documents · 4 drawing sheets
INTERIOR WORK FOR WALL OPENING ON 54 FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents
Latest 3 of 5 filings on this floor.
Floor 53Netapp, The SpiralUnder Construction6p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to remove and construct interior partitions, ceilings and doors for tenant space as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
9 documents · 3 drawing sheets
Hereby filing to construct interior partitions, ceilings and doors for tenant spaces as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
12 documents · 2 drawing sheets
hereby filing to remove and install sprinkler heads with related piping, and install new fire hose valve cabinets for tenant spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents
Latest 3 of 6 filings on this floor.
Floor 52Debevoise & Plimpton27p · 8 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Filing for a NEW Water Cooled split Condensing unit and related piping.
On file for this project
5 documents · 1 drawing sheet
APPLICATION FILED FOR INTERIOR RENOVATION AT THE 52ND FLOOR, INCLUDING INSTALLATION OF CONVENIENCE STAIR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL TRADES TO BE FILED SEPARATELY
On file for this project
26 documents · 4 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 52ND FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
29 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 51Debevoise & Plimpton20p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
PLUMBING, SPRINKLER, STANDPIPE FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 51ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 6 drawing sheets
STRUCTURAL SCOPE IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 51ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 37th - 50th FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 5 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 50Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
APPLICATION FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH & 50TH FLOORS, INCLUDING INSTALLATION OF CONVENIENCE STAIR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL TRADES TO BE FILED SEPARATELY
On file for this project
27 documents · 4 drawing sheets
PL/SP/SD FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH AND 50TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 49Debevoise & Plimpton10p · 6 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
APPLICATION FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH & 50TH FLOORS, INCLUDING INSTALLATION OF CONVENIENCE STAIR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL TRADES TO BE FILED SEPARATELY
On file for this project
27 documents · 4 drawing sheets
PL/SP/SD FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH AND 50TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 48Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
APPLICATION FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH & 50TH FLOORS, INCLUDING INSTALLATION OF CONVENIENCE STAIR. NO CHANGE TO USE, EGRESS OR OCCUPANCY. ALL TRADES TO BE FILED SEPARATELY
On file for this project
27 documents · 4 drawing sheets
PL/SP/SD FILED FOR INTERIOR RENOVATION AT THE 48TH, 49TH AND 50TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
13 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 47Debevoise & Plimpton11p · 6 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
PL/ SP/ SD FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 3 drawing sheets
MECHANICAL WORK FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 46Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
PL/ SP/ SD FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 4 drawing sheets
MECHANICAL WORK FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 45Debevoise & Plimpton10p · 6 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjunctions with interior renovation. No change of use, egress or occupancy.
On file for this project
2 documents
PL/ SP/ SD FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
9 documents · 3 drawing sheets
MECHANICAL WORK FOR INTERIOR RENOVATION AT THE 45TH, 46TH AND 47TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 44Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjuction with interior renovation. No change of use, egress or occupancy.
On file for this project
6 documents
FILING FOR INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 4 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 43Debevoise & Plimpton10p · 6 filings · 8 docs
ArchitectureCivilElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjuction with interior renovation. No change of use, egress or occupancy.
On file for this project
6 documents
FILING FOR INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 4 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 42Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Proposed Sprinkler work in conjuction with interior renovation. No change of use, egress or occupancy.
On file for this project
6 documents
FILING FOR INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
24 documents · 4 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 42ND, 43RD AND 44TH FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
26 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 41Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Proposed Sprinkler work in conjuction with interior renovation. No change of use, egress or occupancy.
On file for this project
6 documents
PLUMBING/ SPRINKLER/ STANDPIPE WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 40TH AND 41ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
7 documents · 3 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 40TH AND 41ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 40Debevoise & Plimpton10p · 5 filings · 8 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Proposed Sprinkler work in conjuction with interior renovation. No change of use, egress or occupancy.
On file for this project
6 documents
PLUMBING/ SPRINKLER/ STANDPIPE WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 40TH AND 41ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY
On file for this project
7 documents · 3 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 40TH AND 41ST FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
23 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 39Scaffold installation1 filing · 4 docs
Structural
Issued Permit Scope
Protection and Mechanical Methods
INSTALLATION OF A TEMPORARY SCAFFOLD TYPE WORK PLATFORMS AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. WORK PLATFORMS TO COMPLY WITH 2014 NYC BUILDING CODE, CHAPTER 33.
On file for this project
4 documents
Floor 38
Floor 37Debevoise & Plimpton4p · 2 filings · 13 docs
Fire ProtectionMechanical
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Sprinklers · Standpipe
PLUMBING, SPRINKLER, STANDPIPE FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 51ST FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
19 documents · 2 drawing sheets
MECHANICAL WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION AT THE 37th - 50th FLOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
28 documents · 2 drawing sheets
Floor 36Turner17p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to install section of fin tub radiators and slot diffuser as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
6 documents · 1 drawing sheet
Hereby filing demolition and construction for partial area on 35th and 36th floors where base building hoist has been removed and curtain wall assembly has been completed as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 2 drawing sheets
Install sprinkler heads with related piping for tenant fit out as shown on plan filed herewith. No change of use, occupancy or egress.
On file for this project
7 documents
Latest 3 of 8 filings on this floor.
Floor 35Turner11p · 8 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Hereby filing to install section of fin tub radiators and slot diffuser as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
6 documents
Hereby filing demolition and construction for partial area on 35th and 36th floors where base building hoist has been removed and curtain wall assembly has been completed as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 3 drawing sheets
Install sprinkler heads with related piping for tenant fit out as shown on plan filed herewith. No change of use, occupancy or egress.
On file for this project
7 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 34Alliance Bernstein, Vontobel29p · 2 filings · 15 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
REMOVAL AND INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
15 documents · 13 drawing sheets
Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
44 documents · 16 drawing sheets
Floor 33Marshall Wace46p · 5 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
62 documents · 31 drawing sheets
Hereby filing to modify gas piping for service to 33rd floor as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents
hereby filing to remove and install sprinkler heads with related piping for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
32 documents · 7 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 32Marshall Wace41p · 3 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
50 documents · 29 drawing sheets
hereby filing to remove and install sprinkler heads with related piping for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
32 documents · 1 drawing sheet
No filed description on record for this project.
On file for this project
11 documents · 11 drawing sheets
Floor 31Point 72, HSBC Bank16p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to modify standpipe system as shown on plans filed herewith. No change to use, occupancy or egress
On file for this project
27 documents · 14 drawing sheets
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
32 documents · 1 drawing sheet
Hereby filing to remove and install plumbing fixtures with related piping for office fit as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
35 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 30HSBC Bank28p · 16 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
32 documents · 12 drawing sheets
Hereby filing to remove and install plumbing fixtures with related piping for office fit as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
35 documents · 1 drawing sheet
HEREBY FILING structural support and reinforce existing beams and slabs FOR OFFICE FIT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPACNY OR EGRESS.
On file for this project
21 documents
Latest 3 of 16 filings on this floor.
Floor 29HSBC Bank53p · 16 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to remove and install plumbing fixtures with related piping for office fit as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
35 documents · 14 drawing sheets
HEREBY FILING structural support and reinforce existing beams and slabs FOR OFFICE FIT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPACNY OR EGRESS.
On file for this project
21 documents · 4 drawing sheets
Hereby filing to remove and install sprinkler heads with related piping for the renovations of the corridors and elevator lobby as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
Latest 3 of 16 filings on this floor.
Floor 28AB NY, Proshares34p · 9 filings · 17 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
hereby filing to remove and install sprinkler heads with related piping and install new fire standpipe hose stations as shown for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
17 documents · 10 drawing sheets
Hereby filing structural work consisting of ADDITION OF 3 NEW STAIRS AND OF ASSOCIATED STAIR OPENINGS, ADDITION OF MOVABLE PARTITION WALLS/FIRE SHUTTER AND OTHER MINOR MODIFICATIONS as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Hereby filing to install ac unit and associated ductwork and piping as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents
Latest 3 of 9 filings on this floor.
Floor 27AB NY8p · 2 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
hereby filing to remove and install sprinkler heads with related piping and install new fire standpipe hose stations as shown for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
17 documents · 7 drawing sheets
Hereby filing structural work consisting of ADDITION OF 3 NEW STAIRS AND OF ASSOCIATED STAIR OPENINGS, ADDITION OF MOVABLE PARTITION WALLS/FIRE SHUTTER AND OTHER MINOR MODIFICATIONS as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Floor 26AB NY9p · 3 filings · 20 docs
ArchitectureElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
hereby filing to remove and install sprinkler heads with related piping and install new fire standpipe hose stations as shown for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
17 documents · 8 drawing sheets
Hereby filing to remove and install sprinkler heads with related piping, install hose station as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
23 documents · 5 drawing sheets
Hereby filing structural work consisting of ADDITION OF 3 NEW STAIRS AND OF ASSOCIATED STAIR OPENINGS, ADDITION OF MOVABLE PARTITION WALLS/FIRE SHUTTER AND OTHER MINOR MODIFICATIONS as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Floor 25AB NY25p · 6 filings · 20 docs
ArchitectureElectricalFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
hereby filing to remove and install sprinkler heads with related piping and install new fire standpipe hose stations as shown for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
17 documents
Hereby filing to remove and install sprinkler heads with related piping, install hose station as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
23 documents · 14 drawing sheets
Hereby filing structural work consisting of ADDITION OF 3 NEW STAIRS AND OF ASSOCIATED STAIR OPENINGS, ADDITION OF MOVABLE PARTITION WALLS/FIRE SHUTTER AND OTHER MINOR MODIFICATIONS as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Floor 24Tishman Speyer - Coworking10p · 5 filings · 13 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing to install new ac unit with associated ductwork as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
5 documents · 1 drawing sheet
hereby filing to remove and install sprinkler heads, firehose station and modify/install piping for office buildout as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
11 documents · 1 drawing sheet
hereby filing to remove and install plumbing fixtures with related piping for office buildout as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
11 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 23Tishman Speyer - Coworking7p · 5 filings · 13 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
Hereby filing demolition and construction for partial area on 23rd floor where base building hoist has been removed and curtain wall assembly has been completed as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents
hereby filing construct interior partitions, ceiling and doors for tenant fit out for 23rd floor as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
14 documents · 6 drawing sheets
Hereby filing to remove and install sprinkler heads with related piping, modify standpipe for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 22The Spiral, Baker Tilly17p · 11 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe
FILING HEREWITH FOR THE ADDITION/MODIFICATION TO AN EXISTING SPRINKLER SYSTEM. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
3 documents
FILING HEREWITH FOR MECHANICAL WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
On file for this project
11 documents
Hereby filing to remove and install plumbing fixtures for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
33 documents
Latest 3 of 11 filings on this floor.
Floor 21Balyasny Asset Management, The Spiral24p · 6 filings · 20 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbing
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers
Hereby filing to relocate sprinkler heads with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
29 documents · 15 drawing sheets
Hereby filing to remove and install plumbing fixtures with related piping for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 5 drawing sheets
Hereby filing to construct interior partitions, ceilings and doors for tenant spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
12 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 20SEGAL&CO7p · 1 filing · 20 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Structural
Hereby filing to remove and install sprinkler heads with related piping for office fit out as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
32 documents · 7 drawing sheets
Floor 19TopUnder Construction7p · 1 filing · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Standpipe · Structural
OFFICE RENOVATION INCLUDING FEATURE STAIR, EQUIPMENT PADS, AND ART SUPPORT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
42 documents · 7 drawing sheets
Floor 18Top, PfizerUnder Construction11p · 3 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
OFFICE RENOVATION INCLUDING FEATURE STAIR, EQUIPMENT PADS, AND ART SUPPORT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
42 documents · 10 drawing sheets
APPLICATION FILE FOR SPRINKLER MODIFICATION FOR THE 18TH FLOOR ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Hereby filing to construct Partitions for temporary offices and storage rooms as shown on plans filed herewith. No change in egress, use, or occupancy.
On file for this project
3 documents · 6 drawing sheets
Floor 17Pfizer15p · 7 filings · 11 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
9 documents · 2 drawing sheets
Hereby filing to install sprinkler heads and related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 16Pfizer13p · 7 filings · 11 docs
ArchitectureElectricalEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
9 documents · 2 drawing sheets
Hereby filing to install sprinkler heads and related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 15Pfizer15p · 7 filings · 11 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
9 documents · 1 drawing sheet
Hereby filing to install sprinkler heads and related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 14Pfizer24p · 8 filings · 11 docs
ArchitectureCivilEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Hereby filing to install plumbing fixtures with related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
9 documents · 2 drawing sheets
Hereby filing to install sprinkler heads and related piping for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents · 3 drawing sheets
hereby filing INTERIOR BUILD-OUT OF OFFICE SPACE AND RELATED SUPPORT SPACES as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
20 documents · 9 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 13Pfizer11p · 7 filings · 11 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install structural framework for convenience stair between levels as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents
Hereby filing to install ac units with associated ductwork and piping for office fit out as shown on plan filed herewith. NO change to use, occupancy or egress.
On file for this project
18 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 12Pfizer11p · 7 filings · 11 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install structural framework for convenience stair between levels as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents
Hereby filing to install ac units with associated ductwork and piping for office fit out as shown on plan filed herewith. NO change to use, occupancy or egress.
On file for this project
18 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 11Pfizer10p · 7 filings · 11 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install structural framework for convenience stair between levels as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents · 1 drawing sheet
Hereby filing to install ac units with associated ductwork and piping for office fit out as shown on plan filed herewith. NO change to use, occupancy or egress.
On file for this project
18 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 10Pfizer15p · 7 filings · 11 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
hereby filing to install new sprinkler heads and related piping for new phone booths as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
3 documents · 1 drawing sheet
Hereby filing to install structural framework for convenience stair between levels as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents
Hereby filing to install ac units with associated ductwork and piping for office fit out as shown on plan filed herewith. NO change to use, occupancy or egress.
On file for this project
18 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 9Pfizer30p · 7 filings · 11 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Hereby filing Interior fit-out of partitions, commercial kitchen, ceilings, conference and office spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
24 documents · 19 drawing sheets
Hereby filing to modify standpipe system as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 2 drawing sheets
Hereby filing to install new plumbing fixtures with related piping as shown on plans filed herewith. No change to use, occupancy, or egress.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 8Pfizer41p · 17 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralLandscapeMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Hereby filing Interior fit-out of partitions, commercial kitchen, ceilings, conference and office spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
24 documents · 6 drawing sheets
Hereby filing to modify standpipe system as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 2 drawing sheets
Hereby filing to install new plumbing fixtures with related piping as shown on plans filed herewith. No change to use, occupancy, or egress.
On file for this project
22 documents · 2 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 7Pfizer59p · 22 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural
Hereby filing to modify the terrace for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
10 documents · 3 drawing sheets
INSTALLATION OF A TEMPORARY ENCLOSURE SYSTEM AS PER PLANS IN CONJUNCTION WITH NB CONSTRUCTION. NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION. ENCLOSURE TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
On file for this project
3 documents
Hereby filing Interior fit-out of partitions, commercial kitchen, ceilings, conference and office spaces as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
24 documents · 8 drawing sheets
Latest 3 of 22 filings on this floor.
Floor 6NewYork-Presbyterian, HSBC Bank +130p · 20 filings · 13 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPIRAL: Modification to ductwork, piping, and equipment to accommodate the new out patient facility in the existing Spiral Building.
On file for this project
22 documents · 3 drawing sheets
HEREBY FILING structural support and reinforce existing beams and slabs FOR OFFICE FIT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPACNY OR EGRESS.
On file for this project
21 documents · 2 drawing sheets
hereby filing to install new plumbing fixtures and related piping for office suite fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 20 filings on this floor.
Floor 5NewYork-Presbyterian, HSBC Bank38p · 17 filings · 13 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
SPIRAL: Modification to ductwork, piping, and equipment to accommodate the new out patient facility in the existing Spiral Building.
On file for this project
22 documents
HEREBY FILING structural support and reinforce existing beams and slabs FOR OFFICE FIT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPACNY OR EGRESS.
On file for this project
21 documents · 2 drawing sheets
hereby filing to install new plumbing fixtures and related piping for office suite fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 4HSBC Bank, NewYork-Presbyterian44p · 19 filings · 20 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Hereby filing to remove, relocate, and install new sprinkler heads with related piping for new bathrooms as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
30 documents · 15 drawing sheets
SPIRAL: Modification to ductwork, piping, and equipment to accommodate the new out patient facility in the existing Spiral Building.
On file for this project
22 documents
Hereby filing to remove, relocate, and install plumbing fixtures, sprinkler heads and related piping for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
6 documents
Latest 3 of 19 filings on this floor.
Floor 3NewYork-Presbyterian, HSBC Bank36p · 13 filings · 13 docs
ArchitectureDMElectricalFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
SPIRAL: Modification to ductwork, piping, and equipment to accommodate the new out patient facility in the existing Spiral Building.
On file for this project
22 documents · 1 drawing sheet
HEREBY FILING structural support and reinforce existing beams and slabs FOR OFFICE FIT AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPACNY OR EGRESS.
On file for this project
21 documents · 2 drawing sheets
hereby filing to install new plumbing fixtures and related piping for office suite fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 2Papa San Restaurant, NewYork-Presbyterian +257p · 9 filings · 20 docs
ArchitectureDMFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Structural · Supported Scaffold
Hereby filing to remove and construct new interior partitions, doors, and ceilings for restaurant fit out. No change of use, occupancy, or egress.
On file for this project
80 documents · 1 drawing sheet
SPIRAL: Modification to ductwork, piping, and equipment to accommodate the new out patient facility in the existing Spiral Building.
On file for this project
22 documents · 46 drawing sheets
structural work including concrete placement to accommodate the preliminary work for the new out patient facility on 2nd floor in the existing Spiral Building.
On file for this project
13 documents · 5 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 1GK Cafe, HSBC Bank +5Under Construction78p · 24 filings · 20 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sprinklers · Standpipe · Structural · Supported Scaffold
Hereby filing to remove and install sprinkler heads with related piping for lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
18 documents · 3 drawing sheets
Hereby filing to install plumbing fixtures with related piping for cafe as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 9 drawing sheets
Hereby filing to renovate existing lobby as shown on plan filed herewith. No change to use, occupancy or egress.
On file for this project
36 documents · 20 drawing sheets
Latest 3 of 24 filings on this floor.
MezzanineGK Cafe, Gabriel Kreuther Restaurant +4Under Construction39p · 25 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural
Hereby filing to install plumbing fixtures with related piping for cafe as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 1 drawing sheet
Hereby filing to remove, relocate and install new plumbing fixtures with related piping for restaurant fit out as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
48 documents · 2 drawing sheets
Hereby filing to remove and construct new interior partitions, doors, and ceilings for restaurant fit out. No change of use, occupancy, or egress.
On file for this project
80 documents · 8 drawing sheets
Latest 3 of 25 filings on this floor.
CellarGK Cafe, Gabriel Kreuther Restaurant +4Under Construction56p · 24 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sprinklers · Standpipe · Structural · Supported Scaffold
Hereby filing to install plumbing fixtures with related piping for cafe as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
21 documents · 8 drawing sheets
Hereby filing to install shower and related piping as shown on plans filed herewith. No change to use, occupancy or egress.
On file for this project
6 documents
Hereby filing to remove, relocate and install new plumbing fixtures with related piping for restaurant fit out as shown on plans filed herewith. NO change to use, occupancy or egress.
On file for this project
48 documents · 15 drawing sheets
Latest 3 of 24 filings on this floor.
Sub-Cellar509 W 34, L.L.C.1p · 1 filing · 5 docs
Architecture
Installation of suspended parking stackers at partial cellar floor per OTCR approval (Submittal Code #08-22); no change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Site & exterior509 W 34, L.L.C.8 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · Protection and Mechanical Methods · Sidewalk Shed
INSTALLATION OF 300 PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
2 documents · 12 drawing sheets
INSTALLATION OF WORK PLATFORM AS PER PLANS. PLYWOOD FENCE SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
On file for this project
4 documents · 12 drawing sheets
Installation of construction fence during NB Construction (Filed separately under BIS # 122885422) per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
11 documents · 12 drawing sheets
Latest 3 of 8 filings on this floor.