Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofScaffold for facade repair14p · 2 filings · 12 docs
ArchitectureEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Supported Scaffold
ERECT, MAINTAIN & DISMANTLE OF SCAFFOLD FOR FACADE REPAIRS AS PER DRAWINGS ATTACHED HEREWITH.
On file for this project
4 documents
LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 1 drawing sheet
Floor 16Unit 16E19p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
FILING APPLICATION FOR INTERIOR PLUMBING WORK IN APARTMENT 16E ON THE 16TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
8 documents · 2 drawing sheets
FILING APPLICATION FOR THE RENOVATION OF APARTMENT 16E ON THE 16TH FLOOR. NO CHANGE IN USE EGRESS OR OCCUPANCY.
On file for this project
13 documents · 1 drawing sheet
NEW GAS METER TO BE INSTALLED. RELOCATED RANGE WITH ASSOCIATED PIPING. OT FILED SEPARATELY.
On file for this project
12 documents
Floor 15Unit 15B, Unit 15D, Unit 15E33p · 4 filings · 20 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Renovation of an existing apartment including a hallway, kitchen and two bathrooms. The scope of work includes new non-load bearing partitions, new doors, plumbing fixtures and kitchen cabinets. No changes in use, egress or occupancy. No exterior work.
On file for this project
22 documents
Rearranging kitchen and bathroom fixtures within same footprint in Apt. #15D on the 15th floor. No change to use, egress or occupancy.
On file for this project
8 documents
Interior renovation of apartment (#15D) on the 15th floor, including partitions, doors, and finishes. Rearrange kitchen and bathrooms fixtures within the existing footprint. Extend existing vent to relocated dryer. No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 4 filings on this floor.
Floor 14
Floor 13
Floor 12Unit 12B, Unit 12C, Unit 12D +2Under Construction16p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
JOB FILED FOR APARTMENT INTERIOR RENOVATION WITH PLUMBING FIXTURE REPLACEMENT/RELOCATE AS PER PLAN AND REPLACE GAS PIPING AND PERFORMING GAS TESTING. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
18 documents
REMOVE,RELOCATE AND INSTALL NEW PLUMBING FIXTURES AS PER PLANS SUBMITTED HEREWITH.
On file for this project
10 documents
Combination & interior renovation of existing apartment 12B & 12C to include demolition of existing non-structural partitions, new non-structural partitions, lighting fixtures & lighting controls, as per plans. Comply with TPPN 03/97.No change use or egr
On file for this project
9 documents
Floor 11Unit 11F1p · 1 filing · 7 docs
MechanicalPlumbing
Issued Permit Scope
Plumbing
Plumbing work only. Remove and replace fixtures in two bathrooms. Relocate a third bathroom. Relocated a kitchen and relocated a washing machine. Work associated with general construction filed separately. No change in Use, Egress or Occupancy.
On file for this project
7 documents · 1 drawing sheet
Floor 10Unit 10B, Unit 10F7p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PROPOSED INTERIOR ALTERATION AT KITCHEN. RESTORE ACCESSORY BATHROOM, FINISHES, CABINETRY AND DRYWALL. NO CHANGE TO THE USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents
RENOVATION OF TWO EXISTING BATHROOMS IN APT 10F, INCLUDING RELOCATING 2WC, 2LAV, 1TUB AND INSTALL NEW 1LAV, 1SHOWER. NO CHANGE TO USE EGRESS OR OCCUPANCY.
On file for this project
5 documents
HEREWITH FILE APPLICATION TO RENOVATE TWO BATHROOMS IN APT. 10F, INCLUDING THE REMOVING AND INSTALLING OF NON-BEARING PARTITIONS AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
5 documents
Floor 9Unit 9C, Unit 9D6p · 3 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REPLACE FIXTURES IN BATH AT APT. 9C AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Proposed interior modification including the modification of an existing kitchen, the replacement of the gas meter, the modification of two and one-half bathrooms, and the addition of a stacking washing machine with an electric ventless dryer.
On file for this project
7 documents
Proposed non-structural interior modification including a modification at the existing kitchen, the expansion of the eating area, the renovation of two full bathrooms, and one half-bathroom. No change in use, egress, or occupancy is proposed.
On file for this project
10 documents
Floor 8Unit 8E4p · 2 filings · 16 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
INTERIOR RENOVATION OF THE EXISTING DWELING UNIT; APT 8E; NO CHANGE OF USE, OCCUPANCY EGRESS OR ZONING
On file for this project
12 documents
PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION OF THE EXISTING DWELING UNIT; APT 8E; NO CHANGE OF USE, OCCUPANCY EGRESS OR ZONING
On file for this project
4 documents
Floor 7Unit 7A2p · 1 filing · 12 docs
Plumbing
Issued Permit Scope
Plumbing
PLUMBING WORK IN CONJUNCTION WITH AN INTERIOR RENOVATION. GC WORK FILED UNDER JOB #140893451.
On file for this project
12 documents · 1 drawing sheet
Floor 6
Floor 5Unit 5A, Unit 5F11p · 2 filings · 20 docs
ArchitectureDMPlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation as per plans. Four new through wall A/C units. No change in occupancy, use or egress.
On file for this project
7 documents · 3 drawing sheets
FILING APPLICATION FOR THE MODIFICATION TO EXISTING PLUMBING IN APARTMENT 5F ON THE 5TH FLOOR. PLUMBING WORK FILED IN CONJUNCTION WITH BIS APPLICATION # 123777573. relocate (1)bathtub, (1) toilet, (1)shower,(1)residential sink,(1)dishwasher (1)washing machine with laundry standpipe. replace (1)toilet,(1)tub, (1) lav. cap and remove (1)tub. All gas work to be performed by others. there is no gas work under this application. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
14 documents · 2 drawing sheets
Floor 4Unit 4E1 filing · 12 docs
INTERIOR RENOVATION OF APARTMENT #4E INCLUDING NEW NON-LOAD BEARING PARTITIONS, NEW KITCHEN, NEW BATHROOMS, NEW FIXTURES AND NEW FINISHES, AS DESCRIBED HEREIN. NO CHANGE TO USE OCCUPANCY OR EGRESS
On file for this project
12 documents · 7 drawing sheets
Floor 3Unit 3F1p · 1 filing · 20 docs
ArchitectureDMGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
HEREWITH FILE APPLICATION TO RENOVATE TWO EXISTING BATHROOMS IN APT 3F, INCLUDING REMOVING AND INSTALLING NON-BEARING PARTITIONS AND FINISHES AND MISC. MILLWORK; NO CHANGE TO USE, EGRESS OR OCCUPANCY.
On file for this project
20 documents · 1 drawing sheet
Floor 2
Floor 1
Site & exteriorHeavy duty sidewalk shed installation16p · 3 filings · 18 docs
ArchitectureElectricalEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
4 documents · 7 drawing sheets
LIMITED EXTERIOR REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents · 7 drawing sheets
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
6 documents · 6 drawing sheets