← Back
BuildNYC
Office, 20+ stories, with or without commercial
693 5TH AVENUE
MANHATTAN · BIN 1035742
💬 Discuss this project
1991Year Built
20Stories
O4Building Class
C5-3Zoning
101,319 sfGross Floor Area
4Units
LL97 Covered0 Active ViolationsFISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 693 Fifth Owner · 5,625 sf lot · 18.01 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivil
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofZuckerman Plastic SurgeryUnder Construction9p · 3 filings · 20 docs
BulkheadBulkhead tieback suspended scaffold platform installation1p · 1 filing · 2 docs
Floor 20Interior renovation of office spaces4p · 2 filings · 9 docs
Floor 19Carpenters Workshop8p · 3 filings · 12 docs
Floor 1818th floor plumbing demolition6p · 2 filings · 16 docs
Floor 17Dr. Dale LangeUnder Construction50p · 2 filings · 20 docs
Floor 16Fan coil unit, duct, and exhaust system replacementUnder Construction33p · 2 filings · 20 docs
Floor 15MD2 / Doctor's OfficeUnder Construction48p · 7 filings · 20 docs
Floor 14
Floor 13
Floor 12Zuckerman Plastic Surgery, SavittUnder Construction81p · 7 filings · 20 docs
Floor 11Zuckerman Plastic Surgery, SavittUnder Construction48p · 5 filings · 20 docs
Floor 1010th and 15th Floor Demolition and Sprinkler Work33p · 6 filings · 20 docs
Floor 9Savitt43p · 7 filings · 20 docs
Floor 8Savitt31p · 2 filings · 20 docs
Floor 7
Floor 6Edwynn Houk29p · 4 filings · 20 docs
Floor 5Plumbing Demolition and Sprinkler Modification5p · 4 filings · 19 docs
Floor 4Plumbing Demolition and Sprinkler Modification5p · 4 filings · 19 docs
Floor 3
Floor 2
Floor 1
Sub-Cellar275KW back-up generator and piping3p · 2 filings · 8 docs
Site & exteriorBurberryUnder Construction11p · 5 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Thor 69321603/21/2026
Takashimaya Fifth Ave8303/21/2026
Savitt Partners3203/21/2026
693 Fifth Owner3107/08/2026
G&S Realty 1203/21/2026
The Hardman Group103/22/2026
Thor103/21/2026
Thor Equities103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/10/2016$455.0M—— → —$4,491/sf building
06/10/2016$68.2M—— → —$673/sf building
06/10/2016$1.8M—— → —$17/sf building
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ecostruction GroupGeneral Contractor807/08/2026
LT Fire ProtectionFire Protection607/08/2026
Nucor ConstructionGeneral Contractor403/21/2026
W5 GroupGeneral Contractor407/08/2026
James E FitzgeraldGeneral Contractor407/08/2026
Abcat AssociatesGeneral Contractor407/08/2026
A&A PlumbingPlumbing307/08/2026
Sentinel BuildersGeneral Contractor207/08/2026
J.r.best ElectricElectrical203/21/2026
Structural Preserv SystemGeneral Contractor203/21/2026
Americon ConstructionGeneral Contractor207/08/2026
R.C.M. ElectricElectrical203/21/2026
Mill Brook Fire ProtectionFire Protection207/08/2026
Structural Preserv SystemScaffold203/21/2026
William C. Gerakaris P&HPlumbing207/08/2026
MC SuperstructureScaffold109/16/2026
Spring ScaffoldingScaffold107/08/2026
National MaintenanceSign hanger107/08/2026
Alltype Fire ProtectionFire Protection107/08/2026
Capitol Fire Sprinkler CoFire Protection107/08/2026
Doval Plumbing & HeatingFire Protection107/23/2026
Doval Plumbing & HeatingPlumbing106/28/2026
Encore Fire Protection ServicesFire Protection107/08/2026
Full Capacity FireFire Protection107/08/2026
G. C. Plumbing & HeatingPlumbing107/08/2026
MPS Plumbing & HeatingFire Protection107/08/2026
MPS Plumbing & HeatingPlumbing107/02/2026
Prostar Plumbing and HeatingPlumbing107/08/2026
RRP PlumbingFire Protection107/08/2026
Vand MechanicalPlumbing107/08/2026
ElecservElectrical103/22/2026
Zatos Plumbing and HeatingPlumbing107/08/2026
Mega Electrical ContractingElectrical103/22/2026
Tri-ElectricElectrical103/21/2026
Deboccia Electric ConstructionElectrical103/21/2026
Defalco Associates, LLC/Electrical103/21/2026
Boilermatic Welding Industriesspecialty_contractor107/08/2026
Four Star Air Con'd CoGeneral Contractor107/01/2026
Great Interior RenovationsGeneral Contractor106/28/2026
Hick HoldingsGeneral Contractor107/08/2026
HNL Construction CompanyGeneral Contractor107/08/2026
Power CoolingGeneral Contractor104/09/2026
Prodigy ConstructionGeneral Contractor104/09/2026
Signa DevelopmentGeneral Contractor106/27/2026
Superior HVACspecialty_contractor104/09/2026
Torovoli ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Outsource Special Inspection2827307/02/2026
Judge Architecture748406/29/2026
Obaid Mian849306/19/2026
Sam Mather Architect773105/21/2026
JMV Consulting Engineering804105/21/2026
Aza Engineering7235205/04/2026
Keyowner Engineering4817102/17/2026
RLM Engineering69131911/26/2025
Vincent J. Liotta P. E1974106/20/2025
Jack Green Associates422111/22/2024
Yorkos Engineering, Desig6991210/12/2024
Atelier NY Architecture2438109/09/2024
Leo Y Lee Associates2481307/10/2024
WB Engineering533307/24/2023
Merritt Engineering Consulting460107/05/2022
Lilker Associates Consulting816304/07/2020
Alan Margolin & Associates423108/23/2019
Building Lifecycle
All (283)Filed (73)Permit Issued (68)Signed Off (32)Facade (FISP) (9)Violation (60)Inspection (41)
09/29/2026
Signed off — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. WORK ON 17TH FLOOR INTERIORS ONLY.
M01349942-I1
09/21/2026
Signed off — Alteration
Filing for the removal of existing hvac units, exhaust fans, and associated ductwork on the 16th floor as per plans filed herewith.
M01322427-S2
09/21/2026
Signed off — Alteration
Filing for the removal of existing hvac units, exhaust fans, and associated ductwork on the 16th floor as per plans filed herewith.
M01322427-S3
09/21/2026
Signed off — Alteration
REPLACEMENT OF EXISTING CHILLER ON FLOOR 019 MER WITH 4 WATER COOLED MODULAR CHILLERS WITH A TOTAL CAPACITY OF 70 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
M01222867-I1
09/15/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01458801-I1
09/15/2026
Permit issued — Supported Scaffold
M01458801-I1-SF
09/11/2026
Filed — Alteration
Demo Access Stair Between 4&5Fl, Portion of Concrete Slab&Slab Opening Guardrails on 5Fl&Infill Slab Openings With Steel,Metal Deck&Concrete&Install F.R. Gyp. Bd. Assembly in Ceiling of 18Fl. to Enclose Under Elevator Pit. NoChange toOccupancy,UseorEgress
M01455310-I1
08/28/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/24/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/22/2026
Permit issued — Sprinklers
M01405932-S2-EW-SP
07/16/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/06/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/02/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. WORK ON 17TH FLOOR INTERIORS ONLY.
M01349942-P1
06/30/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/29/2026
Filed — Alteration
RENOVATE EXISTING 12TH FLOOR OFFICE SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERIOR DOORS, NEW MILLWORK, FLOORING & FINISHES NO CHANGE OF EGRESS, USE OR OCCUPANCY
M01371858-P1
06/29/2026
Permit issued — Mechanical Systems
M01405932-S3-MS
06/26/2026
Permit issued — General Construction
M01405932-I1-GC
06/26/2026
Permit issued — Plumbing
M01405932-S1-PL
06/19/2026
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW OFFICE LAYOUT AND PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01405932-S2
06/18/2026
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW OFFICE LAYOUT AND PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01405932-S1
06/18/2026
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW OFFICE LAYOUT AND PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01405932-S3
06/04/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
M01199170-P1
06/02/2026
Permit issued — Suspended Scaffold
M01199170-I1-SC
05/27/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/21/2026
Filed — Alteration
MODIFY EXISTING SPRINKLER SYSTEM FOR NEW OFFICE LAYOUT AND PER PLANS FILED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01405932-I1
05/18/2026
Permit issued — Sprinklers
M01371858-S3-EW-SP
05/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2026
Permit issued — Mechanical Systems
M01371858-S2-MS
05/05/2026
Permit issued — General Construction
M01371858-I1-GC
05/04/2026
Filed — Alteration
RENOVATE EXISTING 12TH FLOOR OFFICE SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERIOR DOORS, NEW MILLWORK, FLOORING & FINISHES NO CHANGE OF EGRESS, USE OR OCCUPANCY
M01371858-S2
05/04/2026
Filed — Alteration
RENOVATE EXISTING 12TH FLOOR OFFICE SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERIOR DOORS, NEW MILLWORK, FLOORING & FINISHES NO CHANGE OF EGRESS, USE OR OCCUPANCY
M01371858-S3
04/28/2026
Permit issued — Plumbing
M01371858-S1-PL
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/17/2026
Filed — Alteration
RENOVATE EXISTING 12TH FLOOR OFFICE SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERIOR DOORS, NEW MILLWORK, FLOORING & FINISHES NO CHANGE OF EGRESS, USE OR OCCUPANCY
M01371858-S1
04/17/2026
Filed — Alteration
RENOVATE EXISTING 12TH FLOOR OFFICE SPACE TO NEW PROFESSIONAL (MEDICAL) OFFICE - NO AMENDED CO. NEW NON-LOAD BEARING PARTITIONS, NEW LIGHTING, NEW CEILINGS, NEW INTERIOR DOORS, NEW MILLWORK, FLOORING & FINISHES NO CHANGE OF EGRESS, USE OR OCCUPANCY
M01371858-I1
03/05/2026
Permit issued — Sprinklers
M01349942-S3-EW-SP
03/02/2026
Permit issued — Plumbing
M01349942-S1-PL
02/26/2026
Permit issued — General Construction
M01349942-I1-MS
02/26/2026
Permit issued — Mechanical Systems
M01349942-I1-GC
02/17/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. WORK ON 17TH FLOOR INTERIORS ONLY.
M01349942-I1
02/17/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. WORK ON 17TH FLOOR INTERIORS ONLY.
M01349942-S3
02/17/2026
Filed — Alteration
WORK TO INCLUDE NEW PLUMBING FIXTURES FOR NEW TOILET, EXAM ROOMS, INFUSION SUITES, PANTRY & TOILETS. RELOCATION OF SELECT SPRINKLER HEADS. WORK ON 17TH FLOOR INTERIORS ONLY.
M01349942-S1
02/11/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/30/2025
Permit issued — Sprinklers
M01322455-S1-EW-SP
12/15/2025
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH OFFICE RENOVATION AS PER PLANS FILED.,
M01041001-I1
12/12/2025
Signed off — Alteration
MECHANICAL WORK ASSOCIATED WITH OFFICE RENOVATION AS PER PLANS FILED.,
M01041001-S2
12/03/2025
Permit issued — Mechanical Systems
M01322483-S3-MS
12/03/2025
Permit issued — General Construction
M01322455-S2-GC
12/03/2025
Permit issued — Mechanical Systems
M01322455-S3-MS
12/03/2025
Permit issued — Mechanical Systems
M01322397-S3-MS
12/03/2025
Permit issued — General Construction
M01322397-S2-GC
12/03/2025
Permit issued — General Construction
M01322483-S2-GC
12/02/2025
Permit issued — Mechanical Systems
M01322427-S3-MS
12/02/2025
Permit issued — General Construction
M01322427-S2-GC
11/26/2025
Filed — Alteration
Filing for the removal of existing sprinkler heads and piping on the 17th floor and installation of temporary sprinkler loop as per plans filed herewith.
M01322455-S1
11/26/2025
Filed — Alteration
Filing for the removal of entire plumbing system on the 12th floor as per plans filed herewith.
M01322397-S2
11/26/2025
Filed — Alteration
Filing for the removal of existing sprinkler heads and piping on the 18th floor and installation of temporary sprinkler loop as per plans filed herewith.
M01322483-S1
11/26/2025
Filed — Alteration
Filing for the removal of existing hvac units, exhaust fans, and associated ductwork on the 16th floor as per plans filed herewith.
M01322427-S1
11/26/2025
Filed — Alteration
Filing for the removal of existing sprinkler heads and piping on the 18th floor and installation of temporary sprinkler loop as per plans filed herewith.
M01322483-S2
Latest 60 of 283 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedMC Superstructure09/15/2026
DOB NOWSprinklersPermit IssuedDoval Plumbing & Heating07/22/2026
DOB NOWMechanical SystemsPermit IssuedFour Star Air Con'd Co06/29/2026
DOB NOWGeneral ConstructionPermit IssuedGreat Interior Renovations06/26/2026
DOB NOWPlumbingPermit IssuedDoval Plumbing & Heating06/26/2026
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System06/02/2026
DOB NOWSprinklersPermit IssuedMPS Plumbing & Heating05/18/2026
DOB NOWMechanical SystemsPermit IssuedHNL Construction Company05/13/2026
DOB NOWGeneral ConstructionPermit IssuedSigna Development05/05/2026
DOB NOWPlumbingPermit IssuedMPS Plumbing & Heating04/28/2026
DOB NOWSprinklersPermit IssuedAlltype Fire Protection03/05/2026
DOB NOWPlumbingSigned-offZatos Plumbing and Heating03/02/2026
DOB NOWGeneral ConstructionSigned-offSuperior HVAC02/26/2026
DOB NOWMechanical SystemsSigned-offProdigy Construction02/26/2026
DOB NOWSprinklersPermit IssuedEncore Fire Protection Services12/30/2025
DOB NOWMechanical SystemsPermit IssuedEcostruction Group12/03/2025
DOB NOWGeneral ConstructionPermit IssuedEcostruction Group12/03/2025
DOB NOWMechanical SystemsPermit IssuedEcostruction Group12/03/2025
DOB NOWMechanical SystemsPermit IssuedEcostruction Group12/03/2025
DOB NOWGeneral ConstructionPermit IssuedEcostruction Group12/03/2025
DOB NOWGeneral ConstructionPermit IssuedEcostruction Group12/03/2025
DOB NOWMechanical SystemsSigned-offEcostruction Group12/02/2025
DOB NOWGeneral ConstructionSigned-offEcostruction Group12/02/2025
DOB NOWSprinklersSigned-offRalph W. Landolfi JR06/24/2025
DOB NOWMechanical SystemsSigned-offPower Cooling06/23/2025
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System03/26/2025
DOB NOWMechanical SystemsSigned-offSentinel Builders11/22/2024
DOB NOWSprinklersSigned-offLeguci Piping & Heating11/08/2024
DOB NOWPlumbingSigned-offProstar Plumbing and Heating11/07/2024
DOB NOWGeneral ConstructionSigned-offAbcat Associates10/03/2024
DOB NOWMechanical SystemsSigned-offAbcat Associates10/03/2024
DOB NOWSprinklersSigned-offLT Fire Protection09/26/2024
DOB NOWPlumbingSigned-offG. C. Plumbing & Heating09/25/2024
DOB NOWGeneral ConstructionSigned-offSentinel Builders09/13/2024
DOB NOWGeneral ConstructionSigned-offTorovoli Construction09/11/2024
DOB NOWMechanical SystemsSigned-offAbcat Associates07/30/2024
DOB NOWPlumbingSigned-offVand Mechanical07/24/2024
DOB NOWSprinklersSigned-offLT Fire Protection07/17/2024
DOB NOWGeneral ConstructionSigned-offAbcat Associates05/24/2024
DOB NOWPlumbingSigned-offA&A Plumbing06/26/2023
+ 60 more permits on file
3 projects · most recent 07/02/2026
Ventilation Systems Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/02/2026Signed-offSuperior HVACHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Titus Titus DTFS-F 41,400 BTU · Vav Box ×2
TITUS - DTFS-F 24,400 BTU ×1
Titus - DTFS-F 18,300 BTU ×1
Price Price FDC Series Fan Powered Terminal Unit FD-1-3-30 *does not have an efficiency rating in COP/EER/SEER 42,000 BTU · Exhaust Fan ×3
Price FDC Series Fan Powered Terminal Unit FDC-1-3-20 *does not have an efficiency rating in COP/EER/SEER 19,000 BTU · Exhaust Fan ×1
Ventilation
Panasonic PANASONIC - FV-0511VKS1 80 CFM · Exhaust Fan ×2
Greenheck Bathroom Exhaust Fan SP-AP0511W 80 CFM · Exhaust Fan ×2
06/19/2026Permit IssuedFour Star Air Con'd CoAir Conditioning Systems, Ventilation Systems
Cooling
Iec HDY06 15,751 BTU · Fan Coil Indoor ×2
HDY10 37,160 BTU · Fan Coil Indoor ×1
HDY20 63,916 BTU · Fan Coil Indoor ×1
Ventilation
Greenheck CSP-A390-VG 140 CFM · Exhaust Fan ×1
CSP-A700-VG 300 CFM · Exhaust Fan ×1
06/20/2025Signed-offPower CoolingAir Conditioning Systems
Cooling
Carrier 30MPW0665S-20117 70 tons · Chiller ×4
7 projects · most recent 06/29/2026
Sprinkler System
FiledStatusContractorScope
06/29/2026Permit IssuedMPS Plumbing & Heating75 heads
06/19/2026Permit IssuedDoval Plumbing & HeatingSprinkler System
11/26/2025———
11/26/2025——44 heads
11/26/2025Permit IssuedEncore Fire Protection Services46 heads
11/26/2025———
03/24/2023Signed-offLT Fire Protection—
8 projects · most recent 06/29/2026
Water/Sanitary
FiledStatusContractorScope
06/29/2026Permit IssuedMPS Plumbing & HeatingWater/Sanitary
06/19/2026Permit IssuedDoval Plumbing & HeatingWater/Sanitary
11/26/2025——Water/Sanitary
11/26/2025——Water/Sanitary
11/26/2025——Water/Sanitary
11/26/2025——Water/Sanitary
11/22/2024——Water/Sanitary
03/24/2023——Water/Sanitary
15 projects · most recent 09/13/2026
General Wiring
FiledStatusContractorScope
09/13/2026CompleteA&L Electric & AutomationGeneral Wiring
07/15/2026Permit IssuedCobra Electrical NYCGeneral Wiring
05/06/2026Permit IssuedR & T ElectricalGeneral Wiring
03/07/2025CompleteA.S.K. ElectricalGeneral Wiring
09/09/2024CompleteElecserv5 meters
08/23/2024Permit IssuedMega Electrical ContractingGeneral Wiring
07/24/2024CompleteAL-Lectric Elect'l ContractingGeneral Wiring
10/03/2023CompleteCrosswire ElectricalGeneral Wiring
01/13/2023CompleteMetropolis ElectricGeneral Wiring
10/24/2022CompleteCommercial Electric ContGeneral Wiring
08/26/2022CompleteTop Shelf Electric—
08/15/2022CompletePatriot ElectricGeneral Wiring
12/18/2020CompleteFlag Electric—
11/12/2020CompleteUpdate Systems ElectricalGeneral Wiring
03/31/2020CompleteE-J Electric Installation CoGeneral Wiring
1 project · most recent 09/11/2026
Steel Concrete
FiledStatusContractorScope
09/11/2026——Steel, Concrete
1 project · most recent 06/04/2026
FiledStatusContractorScope
06/04/2026Permit IssuedStructural Preservation System—
▾Field Inspections (DOB CAP) — 41
DateTypeResultReport
08/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/24/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/06/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/27/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/11/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/18/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/18/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2025Certified Sprinkler - SP - RoughingCertifiedView ↗
01/16/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/14/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/14/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/24/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 41.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/03/2026Concrete - Cast-In-PlacePrabhu Perumalsamyspecial
09/03/2026Fire-Resistance Rated ConstructionPrabhu Perumalsamyprogress
09/03/2026Structural Stability – Alterations of existing buildingsPrabhu Perumalsamyspecial
09/03/2026Sprayed fire-resistant materialsPrabhu Perumalsamyspecial
09/03/2026Structural Steel - DetailsPrabhu Perumalsamyspecial
09/03/2026FinalPrabhu Perumalsamyprogress
09/03/2026Structural Steel - WeldingPrabhu Perumalsamyspecial
09/03/2026Structural Steel - High Strength BoltingPrabhu Perumalsamyspecial
09/03/2026Fire-Resistant Penetrations and JointsPrabhu Perumalsamyspecial
07/07/2026HVAC-R and service water heating system controlsJONAR MADRIAGAenergy_progress
07/07/2026Lighting controlsJONAR MADRIAGAenergy_progress
07/07/2026HVAC-R and service water piping design and insulationJONAR MADRIAGAenergy_progress
07/07/2026Maintenance informationJONAR MADRIAGAenergy_progress
07/07/2026HVAC-R and service water heating equipmentJONAR MADRIAGAenergy_progress
07/07/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
07/07/2026Post-installed AnchorsJONAR MADRIAGAspecial
07/07/2026Mechanical SystemsJONAR MADRIAGAspecial
07/07/2026MeteringJONAR MADRIAGAenergy_progress
07/07/2026FinalJONAR MADRIAGAprogress
07/07/2026Energy Code Compliance InspectionsJONAR MADRIAGAprogress
07/07/2026Interior lighting powerJONAR MADRIAGAenergy_progress
06/10/2026Fire-Resistant Penetrations and JointsJONAR MADRIAGAspecial
06/10/2026MeteringJONAR MADRIAGAenergy_progress
06/10/2026Interior lighting powerJONAR MADRIAGAenergy_progress
06/10/2026Lighting controlsJONAR MADRIAGAenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Zuckerman Plastic SurgeryMedical / HealthcareFloors 11, 12, Roof
Project M01371858 Alteration · Permit Entire · 04/17/2026
Dr. Dale LangeMedical / HealthcareFloor 17
Project M01349942 Alteration · Permit Issued · 02/17/2026
Edwynn HoukArts / Culture / EntertainmentFloor 6
Project M01091729 Alteration · LOC Issued · 10/12/2024
Project M01124308 Alteration · LOC Issued · 10/12/2024
Project M01091740 Alteration · LOC Issued · 08/16/2024
BurberryRetailFloor 1
Project M00856307 Alteration · LOC Issued · 04/28/2023
MD2 / Doctor's OfficeMedical / HealthcareFloor 15
Project M08040970 Alteration · LOC Issued · 01/04/2023
Project M08039273 Alteration · LOC Issued · 12/21/2022
Project M08040996 Alteration · LOC Issued · 12/20/2022
Carpenters WorkshopArts / Culture / EntertainmentFloor 19
Project M00587460 Alteration · LOC Issued · 07/06/2022
SavittOfficeFloors 8, 9, 11, 12
Project M00246821 Alteration · LOC Issued · 04/07/2020
Project M00247003 Alteration · LOC Issued · 04/07/2020
Project M00212787 Alteration · LOC Issued · 09/06/2019
Project M00212719 Alteration · LOC Issued · 09/05/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 2,000 on file (BIS + DOB NOW)
▸Plans & Drawings69
▸DOB NOWPlans/Sketch62
10/13/2026M01458801-I1Request digital key ↗
10/04/2026M01455310-I1Request digital key ↗
09/02/2026M00761305-I1Request digital key ↗
Showing 3 of 62 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00212787-I1Request digital key ↗
09/05/2026M00246821-S1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00212719-I1Request digital key ↗
09/05/2026M00246821-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/05/2026M00247003-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00212798-I1Request digital key ↗
▸Applications & Permits374
▸BISPLAN / WORK APPROVAL APPLICATION235
09/20/2023100075133Open ↗
09/11/2023100075133Open ↗
09/08/2023100075133Open ↗
Showing 3 of 235 on file for this type
▸BISWORK PERMIT APPLICATION138
10/08/2020140945636Open ↗
06/13/2020123875404Open ↗
06/13/2020123875404Open ↗
Showing 3 of 138 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications646
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION259
03/30/2020123770883Open ↗
03/30/2020123770883Open ↗
03/26/2020123875404Open ↗
Showing 3 of 259 on file for this type
▸DOB NOWProgress Inspector Seal & Signature96
10/08/2026M08040811-I1Open ↗
10/05/2026M01455310-I1Open ↗
09/23/2026M00783903-I1Open ↗
Showing 3 of 96 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT67
10/05/2020140945636Open ↗
03/26/2020123875404Open ↗
03/26/2020123875404Open ↗
Showing 3 of 67 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature67
10/04/2026M01455310-I1Open ↗
09/17/2026M01458801-I1Open ↗
09/05/2026M00212719-I1Open ↗
Showing 3 of 67 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST63
03/26/2020123875404Open ↗
09/05/2019123770883Open ↗
07/02/2019123755221Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature54
10/08/2026M08040811-I1Open ↗
10/05/2026M01455310-I1Open ↗
10/03/2026M01322427-S1Open ↗
Showing 3 of 54 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM23
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION8
10/05/2020140945636Open ↗
Showing 1 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY8
10/05/2020140945636Open ↗
Showing 1 of 8 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment161
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE46
07/02/2019123755221Open ↗
04/05/2019123730891Open ↗
Showing 2 of 46 on file for this type
▸BISSELF-CERT PLUMBING NOTICE41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISEQUIPMENT USE PERMITS20
12/17/2018140720548Open ↗
Showing 1 of 20 on file for this type
▸BISSCHEDULE B - PLUMBING18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA14
03/23/2023122542098Open ↗
02/10/2023123130209Open ↗
12/07/2022122195043Open ↗
Showing 3 of 14 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT11
12/17/2018140720548Open ↗
Showing 1 of 11 on file for this type
▸BISSPRINKLER INSP REPORT : FP-858
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BIS* FIRE PROTECTION PLAN (FPP): FDNY APPROVAL1
09/26/2023100075133Open ↗
▸BISSTANDPIPE (SD) SIGNOFF1
09/26/2023100075133Open ↗
▸Safety & Tenant Protection2
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos70
▸DOB NOWDEP ACP-5: Asbestos Assessment Report32
10/04/2026M01455310-I1Open ↗
09/01/2026M08026937-I1Open ↗
09/01/2026M08021985-I1Open ↗
Showing 3 of 32 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER20
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 20 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance125
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS66
03/26/2020123875404Open ↗
09/05/2019123770883Open ↗
04/05/2019123730891Open ↗
Showing 3 of 66 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS36
12/09/2020140945636Open ↗
12/02/2020123875404Open ↗
03/30/2020123770883Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY6
12/02/2020123875404Open ↗
10/05/2020140945636Open ↗
06/13/2020123875404Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS5
10/05/2020140945636Open ↗
Showing 1 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWEN2: As Built Energy Analysis2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLIGHTING IN DWELLING UNITS1
06/13/2020123875404Open ↗
▸Inspections & Test Reports19
▸BISTECHNICAL REPORT: RESPONSIBILITY14
12/09/2020140945636Open ↗
12/09/2020140945636Open ↗
12/02/2020123875404Open ↗
Showing 3 of 14 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS2
07/02/2019123755221Open ↗
Showing 1 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs132
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST80
03/27/2023122542098Open ↗
03/16/2023122209065Open ↗
03/16/2023122209065Open ↗
Showing 3 of 80 on file for this type
▸BISADMINISTRATIVE OBJECTIONS27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
09/08/2023100075133Open ↗
07/26/2023100075133Open ↗
10/28/2020100075133Open ↗
Showing 3 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISMaster Plumber Seal Temporary Approval Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership177
▸BISCOST AFFIDAVIT171
03/27/2023122542098Open ↗
03/06/2023122551345Open ↗
03/06/2023122195043Open ↗
Showing 3 of 171 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
03/27/2023122542098Open ↗
03/16/2023122209065Open ↗
03/07/2023122551345Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Filing & Intake Forms213
▸BISEFILING COVER SHEET123
03/26/2020123875404Open ↗
03/26/2020123875404Open ↗
09/05/2019123770883Open ↗
Showing 3 of 123 on file for this type
▸BISADDITIONAL INFORMATION52
09/26/2023100075133Open ↗
10/28/2020100075133Open ↗
Showing 2 of 52 on file for this type
▸BISBOROUGH INTAKE FORM28
10/21/2020100075133Open ↗
03/30/2020123770883Open ↗
09/20/2019123399722Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
10/05/2020140945636Open ↗
Showing 1 of 10 on file for this type
▸Other Documents8
▸DOB NOWIRA Certification3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISOTCR MONITOR CERTFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENVIRONMENTAL "E" DEP NOTICE TO PROCEED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRIOR TO FINAL CO PROVIDE EVIDENCE OFBUILDER PAVEMENT PLAN OR EXEMPTION1
09/26/2023100075133Open ↗