| Owner | Filings | Most Recent |
|---|---|---|
| VORNADO REALTY TRUST | 390 | 09/18/2026 |
| ROCK GROUP NY | 14 | 07/08/2026 |
| KING ROSE CONSTRUCTION | 3 | 07/08/2026 |
| PLATINUM SERVICES NY | 11 | 03/22/2026 |
| 770 BROADWAY OWNER LL | 13 | 03/22/2026 |
| L K PARTNERS | 6 | 03/22/2026 |
| JRM CONSTRUCTION MGMT | 2 | 03/22/2026 |
| 770 BORADWAY OWNER LLC | 1 | 03/22/2026 |
| C O VORNADO REALTY TRUST | 1 | 03/22/2026 |
| ELI ACQUISITION | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| PCS ENGINEERING | 1 | 09/03/2026 |
| GOLDMAN COPELAND ASSOCIATES | 23 | 08/25/2026 |
| ROBERT DERECTOR ASSOCIATES | 92 | 07/28/2026 |
| LEON SKVIRSKY PE | 2 | 07/15/2026 |
| GREENBERG FARROW | 16 | 07/13/2026 |
| GILSANZ MURRAY STEFICEK LLP | 19 | 07/10/2026 |
| CONAPAC SERVICES, DBA | 1 | 04/08/2026 |
| TPG ARCHITECTURE, LLP | 11 | 03/13/2026 |
| THORNTON TOMASETTI | 2 | 12/02/2025 |
| SYSKA HENNESSY GROUP | 2 | 12/01/2025 |
| STUDIOS ARCHITECTURE | 3 | 11/05/2025 |
| SSM DESIGN LLP D/B/A SPECTOR GROUP | 5 | 04/23/2025 |
| GRUSKIN ARCHITECTURE + DESIGN PC | 8 | 04/03/2024 |
| CHEN ENGINEERING SERVICES, P.C. | 2 | 02/14/2024 |
| STONEFIELD ENGINEERING & DESIGN | 1 | 10/17/2023 |
| FL&M ENGINEERING DESIGN &INSPECTION | 4 | 11/02/2022 |
| TOHFAZ UDDIN PE PC | 2 | 10/27/2022 |
| PAUL PERDEK, PROF. ENG. PLLC | 1 | 09/20/2022 |
| ASHRAF CORP | 3 | 09/01/2022 |
| SHAABAN ENGINEERING, LLC | 5 | 07/21/2022 |
| VALERIO ASSOCIATES P.C. | 1 | 08/12/2021 |
| SEVERUD ASSOCIATES CONSULTING ENGIN | 1 | 06/11/2021 |
| NEWTEC ENGINEERING | 1 | 02/19/2021 |
| CONCESSI ENGINEERING, P.C. | 2 | 04/23/2020 |
| SAFWAY ATLANTIC LLC | 1 | 01/15/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| RIZZO GROUP | 59 | 03/21/2026 |
| ARCHETYPE CONSULTANTS | 228 | 03/21/2026 |
| DIRECT ACCESS EXPEDITING, INC. | 4 | 03/21/2026 |
| WHIDDEN SILVER | 4 | 03/21/2026 |
| RIGGING CONSULTANTS | 2 | 03/21/2026 |
| PROJECT EXPEDITERS CONSULTING CO. | 2 | 03/21/2026 |
| AE DESIGN SOLUTION | 2 | 03/21/2026 |
| GREEN STUDIO | 6 | 03/21/2026 |
| KAZAM CONSULTANTS | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| L&K PARTNERS, INC | General Contractor | 44 | 07/31/2026 |
| JRM CONSTRUCTION MGMT LLC | General Contractor | 30 | 07/08/2026 |
| GEORGE BRESLAW PLBNG LLC | Plumbing | 13 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 13 | 07/08/2026 |
| B & A RESTORATION CONTRA | General Contractor | 7 | 07/08/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 7 | 07/08/2026 |
| NATIONAL MAINTENANCE | Scaffold | 7 | 07/08/2026 |
| MAC FELDER INC | Plumbing | 6 | 08/26/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 6 | 03/21/2026 |
| W5 GROUP LLC | General Contractor | 6 | 08/26/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 5 | 07/08/2026 |
| TURNER CONSTRUCTION COMPANY | General Contractor | 5 | 07/08/2026 |
| JAMES E FITZGERALD INC | General Contractor | 5 | 07/08/2026 |
| SATO CONSTRUCTION CO.INC | General Contractor | 4 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 4 | 07/08/2026 |
| ROBERT B. SAMUELS, INC. | Electrical | 4 | 03/22/2026 |
| STRUCTURE TONE, LLC | General Contractor | 4 | 03/21/2026 |
| FRESH MEADOW MECHANICAL C | General Contractor | 4 | 03/21/2026 |
| NUCOR CONSTRUCTION CORP | General Contractor | 4 | 04/09/2026 |
| PLATINUM GENERAL SERVICES | General Contractor | 3 | 03/21/2026 |
| COLGATE RESTORATION CORP | General Contractor | 3 | 07/23/2026 |
| CLUNE CONSTRUCTION CO LP | General Contractor | 3 | 03/21/2026 |
| VARIANT SERVICES INC | General Contractor | 3 | 07/08/2026 |
| SKYLINE FIRE SPRINKLER CO | Fire Protection | 3 | 07/08/2026 |
| PATRIOT ELECTRIC CORP | Electrical | 2 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| PCS ENGINEERING | 3745 | 4 | 09/03/2026 |
| HANSEN ENGINEERING PC | 8174 | 45 | 08/25/2026 |
| CODEGREEN | 510 | 47 | 04/29/2026 |
| AK ENGINEERING PC | 678 | 10 | 12/02/2025 |
| JOSEPH MARTINES PE, PLLC | 1428 | 2 | 12/01/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 1 | 07/22/2025 |
| GILSANZ MURRAY STEFICEK | 240 | 7 | 04/03/2024 |
| BECKER ENGINEERING, PC | 633 | 8 | 03/22/2024 |
| VALERIO ASSOCIATES, P.C. | 1379 | 6 | 02/14/2024 |
| ALAN D MARCUS, PE | 1761 | 3 | 06/28/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | L.S. SIGN CO., INC | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | L.S. SIGN CO., INC | 09/11/2026 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 08/10/2026 |
| DOB NOW | Sign | Permit Issued | SERVICE SIGN ERECTORS CO | 08/10/2026 |
| DOB NOW | Plumbing | Permit Issued | MAC FELDER INC | 08/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 07/30/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 07/24/2026 |
| DOB NOW | Plumbing | Permit Issued | MAC FELDER INC | 07/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 07/22/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 05/15/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 05/15/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | COLGATE RESTORATION CORP | 04/13/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | COLGATE RESTORATION CORP | 04/08/2026 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 03/30/2026 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 01/27/2026 |
| DOB NOW | General Construction | Permit Issued | COLGATE RESTORATION CORP | 01/23/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | VARIANT SERVICES INC | 01/07/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 12/26/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | COLGATE RESTORATION CORP | 12/24/2025 |
| DOB NOW | Sprinklers | Permit Issued | MORA FIRE PROTECTION LLC | 12/08/2025 |
| DOB NOW | Structural | Permit Issued | NUCOR CONSTRUCTION CORP | 12/08/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | NUCOR CONSTRUCTION CORP | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | NUCOR CONSTRUCTION CORP | 11/12/2025 |
| DOB NOW | Sprinklers | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 07/24/2025 |
| DOB NOW | Plumbing | Permit Issued | MICHAEL BURNS P&H CORP | 02/26/2025 |
| DOB NOW | Plumbing | Signed-off | GEORGE BRESLAW PLBNG LLC | 01/17/2025 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 01/14/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | VARIANT SERVICES INC | 01/09/2025 |
| DOB NOW | General Construction | Signed-off | CLUNE CONSTRUCTION CO LP | 11/19/2024 |
| DOB NOW | Plumbing | Signed-off | MAC FELDER INC | 11/07/2024 |
| DOB NOW | Plumbing | Signed-off | GEORGE BRESLAW PLBNG LLC | 09/04/2024 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 08/27/2024 |
| DOB NOW | Sprinklers | Permit Issued | SIRINA FIRE PROT CORP | 08/19/2024 |
| DOB NOW | Sprinklers | Signed-off | SIRINA FIRE PROT CORP | 07/17/2024 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 07/11/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 07/11/2024 |
| DOB NOW | Plumbing | Signed-off | MAC FELDER INC | 07/10/2024 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 05/06/2024 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 03/19/2024 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 03/19/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 12/01/2025 | Permit Issued | VARIANT SERVICES INC | Air Conditioning Systems | Cooling Task TYC043 48,000 BTU ×4 TYC063 70,700 BTU · Condensing Unit ×4 THS08-3 168,400 BTU · Fan Coil Indoor ×2 TYE043 48,000 BTU ×2 TYE063 70,700 BTU · Packaged Unit ×2 |
| 08/29/2024 | Permit Issued | L&K PARTNERS, INC | Ventilation Systems | Ventilation Seasons 4 AHXXX1SJA15-053A-S19.9-08MU 7,500 CFM ×1 |
| 08/21/2024 | Signed-off | L&K PARTNERS, INC | Air Conditioning Systems | Cooling Climatemaster SC-024 24,000 BTU · Wshp ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | Permit Issued | SKYLINE FIRE SPRINKLER CO | 1,030 heads |
| 11/05/2025 | Permit Issued | PSI PARTNERS, LLC | 5 heads |
| 07/22/2025 | Permit Issued | ABCO-PEERLESS SPRKLR CORP | 82 heads |
| 08/09/2024 | Permit Issued | SIRINA FIRE PROT CORP | — |
| 04/18/2023 | Permit Issued | SKYLINE FIRE SPRINKLER CO | 520 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/25/2026 | — | — | — |
| 07/20/2026 | Permit Issued | MAC FELDER INC | Gas, Water/Sanitary |
| 11/05/2025 | — | — | — |
| 07/22/2025 | — | — | — |
| 08/09/2024 | Signed-off | GEORGE BRESLAW PLBNG LLC | Water/Sanitary |
| 07/16/2024 | Permit Issued | FRESH MEADOW MECH PLBG LL | Gas |
| 11/14/2023 | — | — | Water/Sanitary |
| 04/12/2023 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/28/2026 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 09/28/2026 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 09/18/2026 | Permit Issued | NEAD ELECTRIC INC. | — |
| 08/07/2026 | Permit Issued | B & G ELECL CONTR OF NY I | General Wiring |
| 07/08/2026 | Permit Issued | T. DIRUSSO ELEC'L CONT IN | HVAC Wiring |
| 04/07/2026 | Complete | PREMIER ELECTRIC, INC | General Wiring |
| 04/02/2026 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 02/13/2025 | Complete | NEAD ELECTRIC INC. | General Wiring |
| 12/22/2024 | Permit Issued | OMD ELECTRICAL CORP | 1 meters, 1 new_meters |
| 10/16/2024 | Permit Issued | PATRIOT ELECTRIC CORP | General Wiring |
| 10/16/2024 | Permit Issued | PATRIOT ELECTRIC CORP | — |
| 09/13/2024 | Permit Issued | C. W. GREENE INC | General Wiring |
| 07/29/2024 | Permit Issued | PATRIOT ELECTRIC CORP | General Wiring |
| 04/21/2024 | Permit Issued | JAM ELECTRICAL CORP | General Wiring |
| 04/21/2024 | Permit Issued | JAM ELECTRICAL CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/02/2025 | Permit Issued | NUCOR CONSTRUCTION CORP | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/08/2026 | Permit Issued | COLGATE RESTORATION CORP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/03/2026 | — | — | Suspended Scaffold (SC) |
| 05/26/2026 | Permit Issued | COLGATE RESTORATION CORP | Suspended Scaffold (SC) |
| 04/06/2026 | Permit Issued | COLGATE RESTORATION CORP | — |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/10/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/03/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/29/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 07/29/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 06/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/07/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 01/07/2026 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 01/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/07/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/07/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 10/28/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 08/06/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/29/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/23/2025 | Fail-Final PL - More than 10 Requested Floors | Fail | View ↗ |
| 04/22/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 03/20/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/24/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/15/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 01/15/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/15/2025 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/09/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/03/2026 | Post-installed anchors in masonry | Michael Walsh | special |
| 08/19/2026 | Post-installed Anchors | Michael Walsh | special |
| 07/10/2026 | Final | Susanne Mackiw | progress |
| 07/09/2026 | HVAC-R and service water heating equipment | Ryan Hansen | energy_progress |
| 07/09/2026 | HVAC-R and service water piping design and insulation | Ryan Hansen | energy_progress |
| 07/09/2026 | HVAC-R and service water heating system controls | Ryan Hansen | energy_progress |
| 07/09/2026 | Fire-Resistant Penetrations and Joints | Ryan Hansen | special |
| 06/08/2026 | Sprinkler Systems | Ryan Hansen | special |
| 06/03/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 06/03/2026 | Post-installed Anchors | Michael Walsh | special |
| 05/20/2026 | Sprinkler Systems | Ryan Hansen | special |
| 05/12/2026 | Final | Ryan Hansen | progress |
| 05/12/2026 | Mechanical Systems | Ryan Hansen | special |
| 04/29/2026 | Sprinkler Systems | HATIM ELSAID | special |
| 04/29/2026 | Post-installed Anchors | HATIM ELSAID | special |
| 04/29/2026 | Fire-Resistant Penetrations and Joints | HATIM ELSAID | special |
| 04/02/2026 | Alternative Materials - OTCR Buildings Bulletin Number | Michael Walsh | special |
| 04/02/2026 | Post-installed Anchors | Michael Walsh | special |
| 02/17/2026 | Sprayed fire-resistant materials | Ryan Hansen | special |
| 12/09/2025 | Final | LEON SKVIRSKY | progress |
| 12/09/2025 | Final | LEON SKVIRSKY | progress |
| 12/01/2025 | HVAC-R and service water piping design and insulation | JOSEPH MARTINES | energy_progress |
| 12/01/2025 | Final | JOSEPH MARTINES | progress |
| 12/01/2025 | Duct leakage testing, insulation and design | JOSEPH MARTINES | energy_progress |
| 12/01/2025 | Energy Code Compliance Inspections | JOSEPH MARTINES | progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Wegmans Food Markets | Restaurant / Food Service | Sub-cellar, Cellar, Floor 1, Mezzanine, Roof | Project M01401098 Project M01401101 Project M01405012 Project M01309270 Project M01079357 Project M01079367 Project M01079371 Project M00965265 Project M00965274 Project M00965280 Project M00965286 Project M00838410 |
| Yahoo! Studio | Office | Floor 9 | Project M01283029 Project M01283014 Project M01283027 Project M01283028 |
| Meta | Office | Sub-cellar, Cellar, Floors 1–3, 10–15 | Project M01225405 Project M01006501 Project M01006542 Project M00971909 Project M00972128 |
| Bank of America | Office | Floor 1 | Project M01132759 |
| Yahoo | Office | Floor 9 | Project M00853914 |
| Office | Floors 7, 11, 12, Roof | Project M00414042 Project M00230274 | |
| Verizon Media | Office | Floor 5 | Project M00348786 |
| Kmart | Retail | Floor 1 | Project M00144923 |