Whole building & multi-floor projectsWillkie Farr & Gallagher3 filings
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
2 documents
Minor interior demolition. Installation of new pantry fixtures, partitions, flooring, suspended ceilings and finishes as per plans (Willkie Farr Pantry Upgrade.) No change to use, egress or occupancy.
On file for this project
5 documents · 5 drawing sheets
Modifications to the existing HVAC System; Install new AC Unit including BMS Controls and Provide boot and tap at pantries as per plans (Willkie Farr - Pantry Upgrades.) No change to use, egress or occupancy.
On file for this project
7 documents
RoofCommonwealth Partners4p · 7 filings · 20 docs
ArchitectureEquipmentGeneralStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
Roof and Concrete runway Replacement at 6th floor, as shown in drawings filed. No change in use, egress or occupancy.
On file for this project
3 documents
FACADE RESTORATION, INSPECTIONS
On file for this project
14 documents · 1 drawing sheet
9th Floor Roofing Replacement as shown in filed drawings. No change in use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
BulkheadFsp 787 Seventh LLC C/o Commonwealth Parteners2p · 1 filing · 14 docs
Architecture
FACADE RESTORATION, INSPECTIONS
On file for this project
14 documents · 2 drawing sheets
Floor 51Access scaffold for facade work1 filing · 3 docs
Equipment
Issued Permit Scope
Supported Scaffold
Installation of temporary access/supported scaffold for facade work at roof level per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
3 documents
Floor 50
Floor 49
Floor 48Sidley AustinUnder Construction10p · 4 filings · 13 docs
ArchitectureDMEquipmentMechanical
Issued Permit Scope
Mechanical Systems · Supported Scaffold
Modifications to the existing HVAC System: demolition and disconnections of HVAC equipment and ductwork on the 48th Floor as per plans (Sidley NYC/ Demo Phase.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Miscellaneous Demolition and removal of interior non bearing partitions and related finishes on the 48th Floor as per plans (Sidley Austin - Demo Phase.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Disconnect & removal all existing fixtures and related piping in existing Core Toilets and Pantries and cap back to the riser on the 48th Floor as per plans (Sidley NYC/ Demo Phase. ) No change to use, egress or occupancy.
On file for this project
2 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 47Willkie Farr & GallagherUnder Construction21p · 9 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Supported Scaffold
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 9 filings on this floor.
Floor 46Willkie Farr & GallagherUnder Construction11p · 6 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Install new plumbing fixtures (2) HWH, (2) WC, (2) Lavs, (3) DF/BF, (2) Sinks, (1) CM, (1) IM, (1) DW and associated CW/sanitary piping on the 39 & 46th Floors each as per plans (Willkie Farr & Gallagher/ Phase 3 - Package #13.
On file for this project
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary heads and permanent heads and associated sprinkler piping on the 39 and 46th Floors as per plans (WFG/ Phase 3 - Package #13.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 45Willkie Farr & GallagherUnder Construction34p · 13 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and ceilings on the 45th Floor as per plans (WFG/ Phase 1 - Package #5.) No change to use, egress or occupancy.
On file for this project
6 documents · 10 drawing sheets
Structural Modifications on the 45-46th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 45th Floor as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 13 filings on this floor.
Floor 44Willkie Farr & GallagherUnder Construction17p · 10 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 37, 43-44th Floor as per plans (WFG/ Phase 1 - Package #10.) No change to use, egress or occupancy.
On file for this project
12 documents · 8 drawing sheets
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Install (271) new heads, (40) temp heads, remove (251) heads on 37th Floor, Install (238) new, (36) temp and remove (219) on 43rd Floor, Install (236) new, (36) temp and remove (221) heads on 44th Floor as per plans (WFG/ Phase 1 - Package #10.)
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 43Willkie Farr & GallagherUnder Construction17p · 12 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 37, 43-44th Floor as per plans (WFG/ Phase 1 - Package #10.) No change to use, egress or occupancy.
On file for this project
12 documents · 9 drawing sheets
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents
Install (271) new heads, (40) temp heads, remove (251) heads on 37th Floor, Install (238) new, (36) temp and remove (219) on 43rd Floor, Install (236) new, (36) temp and remove (221) heads on 44th Floor as per plans (WFG/ Phase 1 - Package #10.)
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 12 filings on this floor.
Floor 42Willkie Farr & GallagherUnder Construction17p · 11 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Supported Scaffold
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this project
4 documents
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 41Willkie Farr & GallagherUnder Construction12p · 8 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this project
4 documents · 1 drawing sheet
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 40Willkie Farr & GallagherUnder Construction13p · 7 filings · 20 docs
ArchitectureElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Supported Scaffold
Install new fixtures: (2) HWH, (2) WC, (2) Lavs, (3) DF/BFs, (2) sinks, (1) CM, (1) DW, (1) IM and associated CW/sanitary piping on 40-42, 47th Floors as per plans (Willkie Farr & Gallagher/ Phase 2 - Package #12.) No change to use, egress or occupancy
On file for this project
4 documents
Remove existing sprinkler heads; Install temporary head and permanent heads and associated sprinkler piping on the 40-42nd and 47th Floors as per plans (WFG/ Phase 2 - Package #12.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 40, 41, 42, 47th Floors as per plans (Willkie Farr Gallagher/ Phase 2 - Package #12.)
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 39Willkie Farr & GallagherUnder Construction15p · 11 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Install new plumbing fixtures (2) HWH, (2) WC, (2) Lavs, (3) DF/BF, (2) Sinks, (1) CM, (1) IM, (1) DW and associated CW/sanitary piping on the 39 & 46th Floors each as per plans (Willkie Farr & Gallagher/ Phase 3 - Package #13.
On file for this project
4 documents
Remove existing sprinkler heads; Install temporary heads and permanent heads and associated sprinkler piping on the 39 and 46th Floors as per plans (WFG/ Phase 3 - Package #13.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Modifications to the existing Standpipe System; Remove (1) FHC per floor, and Install one (1) new Fire Hose Cabinet and associated Standpipe Piping per floor on the 39 & 46th Floors as per plans (Willkie Farr Gallagher/ Phase 3 - Package #13.)
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 11 filings on this floor.
Floor 38Willkie Farr & Gallagher15p · 10 filings · 17 docs
ArchitectureCivilDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modifications to the existing HVAC system; Installation of new duct work, VAV boxes, Grilles, Diffusers and BMS as per plans (Willkie Farr - Buildout Phase.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Remove existing pantry fixtures on the 34, 38 & 45th Floors; Install new: (1) sink, (1) coffeemaker, (1) Ice maker, (1) Water dispenser, (1) EEmax Water Heater and associated piping on 34, 38 and 45th Flrs as per plans. No change to use, egress or occup.
On file for this project
3 documents · 1 drawing sheet
Minor interior demolition. Installation of new flooring, partitions, suspended ceilings, finishes and millwork as per plans (Willkie Farr - Associate Workspace and Lounge.) No change to use, egress or occupancy.
On file for this project
3 documents · 6 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 37Willkie Farr & GallagherUnder Construction34p · 22 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 37, 43-44th Floor as per plans (WFG/ Phase 1 - Package #10.) No change to use, egress or occupancy.
On file for this project
12 documents · 9 drawing sheets
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Install (271) new heads, (40) temp heads, remove (251) heads on 37th Floor, Install (238) new, (36) temp and remove (219) on 43rd Floor, Install (236) new, (36) temp and remove (221) heads on 44th Floor as per plans (WFG/ Phase 1 - Package #10.)
On file for this project
7 documents · 3 drawing sheets
Latest 3 of 22 filings on this floor.
Floor 36Willkie Farr & GallagherUnder Construction27p · 15 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing. Installation of new partitions, doors, finishes and suspended ceilings on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this project
6 documents · 9 drawing sheets
Structural Modifications on the 36th Floor as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Structural Modifications on the 36-37, 43-44th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 15 filings on this floor.
Floor 35Willkie Farr & GallagherUnder Construction48p · 17 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and suspended ceilings on the 34-35th Floor as per plans (WFG/ Phase 1 - Package 3.)
On file for this project
12 documents · 25 drawing sheets
Structural Modifications and installation of stairs on the 34-36th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents · 3 drawing sheets
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34 and 35th Floors as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 34Willkie Farr & GallagherUnder Construction25p · 17 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Miscellaneous Demolition and replacement of existing fireproofing; Installation of new partitions, doors, finishes and suspended ceilings on the 34-35th Floor as per plans (WFG/ Phase 1 - Package 3.)
On file for this project
12 documents · 11 drawing sheets
Structural Modifications and installation of stairs on the 34-36th Floors as per plans (Willkie Farr Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Modifications to the existing HVAC System and redistribution of ductwork and associated accessories on the 34 and 35th Floors as per plans (Willkie Farr & Gallagher - Phase 1.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 17 filings on this floor.
Floor 33
Floor 32Stifel Financial2p · 2 filings · 9 docs
ArchitectureEquipmentStructural
Issued Permit Scope
General Construction · Structural · Supported Scaffold
Minor interior demo. Installation of new low interior partitions, doors, exit signs and finishes on the 32nd floor as per plans (Stifel Swing Space - Interior Updates.) No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Structural Modifications: Removal of tenant staircase, install structural steel beams, metal decking, structural restoration and concrete slab infill on the 32nd Floor as per plans (Tenant Demo & Whitebox.) No change to use, egress or occupancy.
On file for this project
5 documents
Floor 31Holland & Knight18p · 12 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this project
7 documents · 1 drawing sheet
Install new plumbing fixtures: (4) HWH, (2) IM, (4) WD, (7) CM, (1) FD, (3) DW, (3) sink, (9) WC, (9) lavatories, (2) urinals and associated CW/sanitary piping on the 31st Floor as per plans (Holland & Knight.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Installation of (263) new sprinkler heads and associated piping on the 31st Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 30Holland & Knight16p · 10 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Elevator Lobby Slab Replacement at 30th floor as shown in filed drawings. No change in Use, Egress or Occupancy.
On file for this project
5 documents · 1 drawing sheet
Install new plumbing fixtures: (1) FD, (3) IM, (2) DW, (4) sinks, (3) HWH, (4) CM, (1) WD, (8) lavatories, (8) WC, (2) UR and associated CW/sanitary piping on the 30th Floor as per plans (Holland & Knight Renovation.) No change to use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Install (267) new sprinkler heads and associated piping on the 30th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
11 documents · 1 drawing sheet
Latest 3 of 10 filings on this floor.
Floor 29Holland & Knight13p · 8 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modifications to the existing Sprinkler System: Installation of (276) new sprinkler heads and associated Sprinkler piping on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Install new plumbing fixtures: (5) CM, (4) IM, (4) sink, (4) HWH, (1) DW, (1) WD, (8) lavatories, (8) WCs, (2) urinals and associated CW/sanitary piping on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 29th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
3 documents · 5 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 28Holland & Knight14p · 8 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Minor interior demolition. Installation of new interior partitions, doors, suspended ceilings, flooring and finishes on the 28th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
5 documents · 6 drawing sheets
Modifications to the existing Sprinkler System, Installation of (262) new sprinkler heads and associated piping on the 28th Floor as per plans (Holland & Knight Renovations.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Install new plumbing fixtures: (1) FD, (3) IM, (4) sinks, (2) DW, (3) HWHs, (4) CMs, (1) WD, (8) Lavatories, (8) WCs, (2) Urinals and associated CW/sanitary piping on the 28th Floor as per plans (Holland & Knight.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 27BNP Paribas21p · 8 filings · 18 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Standpipe · Structural · Supported Scaffold
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this project
7 documents
Increase in occupancy load on 27th floor. Minor interior construction work is proposed.
On file for this project
6 documents · 2 drawing sheets
Structural modifications; Install structural steel and metal deck at stair infill as per plans (BNP Paribas - Buildout.) No change to use, egress or occupancy.
On file for this project
5 documents
Latest 3 of 8 filings on this floor.
Floor 26Sidley Austin14p · 3 filings · 18 docs
EquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
9 documents · 1 drawing sheet
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
10 documents · 5 drawing sheets
FILING FOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents · 8 drawing sheets
Floor 25Sidley Austin6p · 3 filings · 18 docs
EquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
9 documents · 1 drawing sheet
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
10 documents · 2 drawing sheets
FILING FOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents · 3 drawing sheets
Floor 24Sidley Austin4p · 3 filings · 18 docs
EquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Filing for Structural modifications as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
9 documents
Filing for alteration to Mechanical system as per plans filed herewith. No change to use, egress or occupancy under this application.
On file for this project
10 documents · 2 drawing sheets
FILING FOR MODIFICATIONS TO EXISTING PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents · 2 drawing sheets
Floor 23Sidley Austin29p · 7 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modifications to existing sprinkler system as per plans filed herewith.
On file for this project
12 documents · 6 drawing sheets
FILING FOR HVAC MODIFICATIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
39 documents · 5 drawing sheets
Modifications to existing mechanical systems as per plans filed herewith.
On file for this project
8 documents · 6 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 22Sidley Austin47p · 7 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
FILING FOR HVAC MODIFICATIONS AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
39 documents · 6 drawing sheets
FILING FOR MODIFICATION TO PLUMBING FIXTURES, SPRINKLER HEADS AND INSTALLING A TEMPORARY SPRINKLER LOOP AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
10 documents · 15 drawing sheets
Filing structural steel and concrete per plans filed herewith. No change in use, egress or occupancy.
On file for this project
23 documents · 4 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 21Sidley Austin3p · 4 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Modifications to existing sprinkler system as per plans filed herewith.
On file for this project
12 documents · 1 drawing sheet
Removal and installation of non bearing partitions and interior finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
9 documents · 1 drawing sheet
additions/modifications to existing sprinkler system as per plans filed herewith . No change in use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 20Sidley Austin1p · 2 filings · 15 docs
EquipmentFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers · Supported Scaffold
additions/modifications to existing sprinkler system as per plans filed herewith . No change in use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
ADDITIONS/ MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS AS PER PLANS FILED HEREWITH . NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
7 documents
Floor 19
Floor 18Sidley Austin3 filings · 9 docs
EquipmentGeneralMechanical
Issued Permit Scope
Mechanical Systems · Supported Scaffold
removal of FM- 200 system as shown on plans filed herewith. No change in use, egress or occupancy
On file for this project
5 documents
No filed description on record for this project.
On file for this project
2 documents
No filed description on record for this project.
On file for this project
2 documents
Floor 17
Floor 16
Floor 15Sidley Austin30p · 4 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Filing for removal and installation of sprinkler heads and related piping as per plans filed herewith.
On file for this project
8 documents · 9 drawing sheets
Filing for plumbing fixture and associated piping removal and installation in pantry and bathrooms as per plans filed herewith.
On file for this project
9 documents · 7 drawing sheets
Demolition of the 15th floor in preparation for construction of new workspace on those floors with new offices, team rooms, lighting, finishes and MEP systems.
On file for this project
10 documents · 5 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 14Sprinkler system modification14p · 3 filings · 20 docs
ArchitectureDMElectricalEquipmentFire ProtectionGeneralMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Modification to existing Sprinkler system as per plans filed herewith.
On file for this project
8 documents · 2 drawing sheets
Level 13 Remove and relocate compliance door. Level 14 Remove and relocate compliance door, remove hallway closets, Demo walls to adjust office layout.
On file for this project
21 documents · 8 drawing sheets
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 4 drawing sheets
Floor 13UBS Renovations1p · 2 filings · 20 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Supported Scaffold
Level 13 Remove and relocate compliance door. Level 14 Remove and relocate compliance door, remove hallway closets, Demo walls to adjust office layout.
On file for this project
21 documents
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
On file for this project
4 documents · 1 drawing sheet
Floor 12Stifel Financial4p · 4 filings · 18 docs
EquipmentFire ProtectionMechanical
Issued Permit Scope
Mechanical Systems · Sprinklers · Supported Scaffold
Modifications to the existing HVAC system; Ductwork, Insulation, New Air Outlets, Relocate thermostats as per plans (1919 Investment Counsel/ Stifel.) No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Modifications to the HVAC system installation of duct work, insulation, acoustical lining, air grills, VAV boxes, controls and balancing as per plans (Stifel Financial.) No change to use, egress or occupancy.
On file for this project
9 documents · 2 drawing sheets
Modifications to the existing Sprinkler System as per plans (Stifel Financial.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 11Stifel Financial9p · 8 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Supported Scaffold
Modifications to the existing Sprinkler System: Install (6) new sprinkler heads on the 4th Floor and (237) new sprinkler heads and associated piping on the 11th Floor as per plans (Stifel Buildout & Restrooms.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Install (6) Lavs, (5) WCs, (2) UR on the 4th Floor and Install (8) Lavs, (7) WCs, (3) UR, (2) CM, (1) DW, (1) Water Dispenser, (1) Icemaker, (2) Sink, (1) refrigerator, (1) HWH on the 11th Floor and associated CW/sanitary piping on both as per plans.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing HVAC System: Install new ductwork, insulations, VAV boxes, acoustical lining, air outlets, controls, control wiring & air balancing on the 4th and 11th Floors as per plans (Stifel - Restrooms and Buildout.)
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 10BNP Paribas5p · 5 filings · 20 docs
EquipmentMechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing · Structural · Supported Scaffold
Modifications to the existing HVAC system on the 9th and 10th Floors including rangehood cooking exhaust system as per plans (BNPP - NYC HQ.) No change to use, egress or occupancy.
On file for this project
19 documents · 1 drawing sheet
Structural Modifications; Reinforcement of existing steel and miscellaneous steel supports on the 9th and 10th Floors as per plans (BNP - NYC HQ Renovation/ Upper Stack.) No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
REM: (13) Lav, (13) WC, (4) UR and (3) sinks on 9; NEW: (13) Lav, (11) WC, (2) UR, (24) FD, (1) SH, (17) sinks, (2) DF & associated CW/San Piping on 9; (1) HWH, (1) FD, (1) Grease Interceptor (1) RPZ secondary on 10. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Latest 3 of 5 filings on this floor.
Floor 9BNP Paribas24p · 10 filings · 20 docs
ArchitectureDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this project
7 documents
Increase in occupancy load on 27th floor. Minor interior construction work is proposed.
On file for this project
6 documents
Interior gut demolition of floor; Installation of new partitions, doors, floor finishes and suspended ceilings on the 9th Floor as per plans (BNP - NYC HQ.) No change to use, egress or occupancy.
On file for this project
3 documents · 10 drawing sheets
Latest 3 of 10 filings on this floor.
Floor 8BNP Paribas17p · 12 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 7-8th Floors as per plans (BNP/ Restroom Expansion.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 7-8th floors as per plans (BNPP - Restroom Expansion.) No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Modifications to the existing Sprinkler System: Relocate (4) existing Sprinkler heads and Install (1) new sprinkler head and associated piping each on the 7th and 8th Floors as per plans (BNP/ Restroom Expansion)
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 12 filings on this floor.
Floor 7BNP Paribas17p · 10 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural · Supported Scaffold
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 7-8th Floors as per plans (BNP/ Restroom Expansion.) No change to use, egress or occupancy.
On file for this project
7 documents
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 7-8th floors as per plans (BNPP - Restroom Expansion.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing Sprinkler System: Relocate (4) existing Sprinkler heads and Install (1) new sprinkler head and associated piping each on the 7th and 8th Floors as per plans (BNP/ Restroom Expansion)
On file for this project
5 documents
Latest 3 of 10 filings on this floor.
Floor 6Stifel Financial2p · 4 filings · 20 docs
ArchitectureEquipmentFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers · Supported Scaffold
Modifications to the existing Sprinkler Systems: Relocation of eight (8) existing sprinkler heads and associated piping on the 6th Floor as per plans (Stifel Buildout.) No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing HVAC system: Installation of new ductwork, insulation, air outlets, VAV box and controls on the 6th Floor as per plans (Stifel - Buildout.) No change to use, egress or occupancy.
On file for this project
10 documents · 1 drawing sheet
Minor interior renovations: Cut down existing partitions, prep for new glass, install new glass sliding door, new suspended ceilings, patch flooring and finishes on the 6th Floor as per plans (Stifel - Buildout.) No change to use, egress or occupancy.
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Floor 5Stifel Financial, L'Ami Pierre +422p · 24 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructuralOther
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Supported Scaffold
Modifications to the existing Sprinkler System: Install (125) new sprinkler heads and associated piping on the 5th Floor as per plans (Stifel/ North Floor Buildout.) No change to use, egress or occupancy.
On file for this project
11 documents · 2 drawing sheets
Install New Fixtures: (2) HWH, (2) WD, (4) CM, (3) IM, (2) DW, (2) refrigerator, (4) sinks, (1) sump pump, (2) Funnel drains on 5; and Install (1) grease interceptor on 4 and associated CW/sanitary piping as per plans (Stifel/ North Floor Buildout.)
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 5th Floor as per plans (Stifel/ North Floor Buildout.) No change to use, egress or occupancy.
On file for this project
12 documents
Latest 3 of 24 filings on this floor.
Floor 4BNP Paribas, Stifel Financial +2Under Construction32p · 25 filings · 20 docs
ArchitectureCivilDMEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Supported Scaffold
Modifications to the existing Sprinkler System: Remove (108) existing heads, Install (97) new sprinkler heads, (16) temporary core heads and associated piping on the 4th Floor as per plans (BNP/ Asset Mgmt.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Install Plumbing fixtures for New bathrooms, pantry and wellness room and associated CW/sanitary piping on the 4th Floor as per plans (BNP Paribas Annex.) No change to use, egress or occupancy.
On file for this project
5 documents · 2 drawing sheets
Minor demolition. Installation of new partitions, floor finishes and suspended ceilings on the 4th Floor as per plans (BNP Asset Mgmt - Annex.) No change to use, egress or occupancy.
On file for this project
4 documents
Latest 3 of 25 filings on this floor.
Floor 3Willkie Farr & Gallagher, L'Ami Pierre +415p · 23 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this project
21 documents
ILLUMINATED NON-ADVERTISING MULTIFACE PROJECTING ACCESSORY SIGN - IN PROPERTY LINES - LAMI PIERRE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
ILLUMINATED NON-ADVERTISING MULTIFACE PROJECTING ACCESSORY SIGN - IN PROPERTY LINES - LAMI PIERRE . NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 23 filings on this floor.
Floor 2BNP Paribas, Willkie Farr & Gallagher +4Under Construction15p · 24 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Standpipe · Structural · Supported Scaffold
Modifications to the existing Sprinkler System: Install (2) new sprinkler heads and associated piping each on the 2nd Floor as per plans (BNP/ Huddle Room.) No change to use, egress or occupancy.
On file for this project
6 documents · 1 drawing sheet
Minor interior demo. Installation of new interior partitions, suspended ceiling, millwork, flooring and finishes on the 2nd Floor as per plans (BNPP - Huddle Rooms.) No change to use, egress or occupancy.
On file for this project
3 documents
Modifications to the existing HVAC System: Installation of ductwork, insulations, air outlets, controls, control wiring & accessories on the 2nd Floor as per plans (BNP/ Huddle Rooms.) No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 24 filings on this floor.
Floor 1BNP Paribas, L'Ami Pierre +45p · 20 filings · 20 docs
ArchitectureEquipmentFire ProtectionGeneralMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Sign · Sprinklers · Supported Scaffold
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this project
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this project
15 documents
ILLUMINATED NON-ADVERTISING MULTIFACE PROJECTING ACCESSORY SIGN - IN PROPERTY LINES - LAMI PIERRE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
3 documents
Latest 3 of 20 filings on this floor.
MezzanineWillkie Farr & Gallagher, BNP Paribas5p · 11 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers · Structural
Modifications to add Places of Assembly on the 35th, 36th and 45th Floors as per plans (Willkie Farr Gallagher - Phase 1.)
On file for this project
21 documents
Creation of a Place of Assembly space on the 31st floor (Meeting Hall), accessory to business occupancy.
On file for this project
7 documents
Increase in occupancy load on 27th floor. Minor interior construction work is proposed.
On file for this project
6 documents
Latest 3 of 11 filings on this floor.
CellarBNP Paribas4 filings · 20 docs
ArchitectureMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this project
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this project
15 documents
Installation of fire rated partitions, walls and door with Fire Stopping Closet as per plans (ATS Closet.) No change to use, egress or occupancy.
On file for this project
7 documents
Latest 3 of 4 filings on this floor.
Sub-CellarBNP Paribas, Sidley Austin7p · 5 filings · 20 docs
ArchitectureFire ProtectionGeneral
Issued Permit Scope
General Construction
Superseding Alt 1 job number 122669549. Increase in office population, decrease in PA population.
On file for this project
15 documents
Change use on part of Subcellar Mezz parking garage to business/offices. Reduce occupancy load on 7th and 8th floors.
On file for this project
15 documents · 2 drawing sheets
Interior Renovations: Installation of new partitions, doors, floor finishes and suspended ceilings on the P1 Level (Marketing)/ Cellar Mezz (CO) as per plans (Publicis Groupe.) No change to use, egress or occupancy.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 5 filings on this floor.
Site & exteriorCommonwealth PartnersUnder Construction8 filings · 18 docs
ArchitectureCivilEquipmentGeneralMechanicalStructural
Issued Permit Scope
General Construction · Sidewalk Shed · Supported Scaffold
PLYWOOD ENCLOSURE & LOADING SCAFFOLD AS PER PLANS. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
On file for this project
2 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
On file for this project
4 documents · 5 drawing sheets
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents · 7 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issuedCondition Assessment1 filing · 2 docs
ArchitectureSC
IRA to assist in Condition Assessment.
On file for this project
2 documents · 5 drawing sheets