Elevator cooperative
Brooklyn City Railroad Company Building
8 OLD FULTON STREET · Brooklyn Heights · BIN 3001468
💬 Discuss this project
1861Year Built
5Stories
D4Building Class
M2-1Zoning
17,400 sfGross Floor Area
11Units
Rent Stabilized0 Open Violations
Elevator cooperative · Owner of record: 8 FULTON CORP · 3,600 sf lot · 4.83 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 20 docs
Floor 57p · 2 filings · 17 docs
Floor 43p · 1 filing · 5 docs
Floor 34p · 2 filings · 13 docs
Floor 26p · 2 filings · 20 docs
Floor 1Under Construction19p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS807/08/2026
8 FULTON2203/22/2026
BRIGHT STAR LIGHTING CORP103/22/2026
8 FULTON ST CORP103/22/2026
8 OLD FULTON1203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A E C CONSULTING EXPEDITING1003/21/2026
COMMERCIAL CAPITAL USA403/21/2026
ANZALONE ARCHITECTURE1203/21/2026
METROPOLIS GROUP INC803/21/2026
ARSENAL BUILDING CONSULTANTS LLC403/21/2026
BRITZ ENTERPRISES INC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NICK PAWSON LLCGeneral Contractor1004/09/2026
J & G CONSTRUCTION SVCSGeneral Contractor407/08/2026
EUROPEAN ELEGANCE LLCGeneral Contractor306/27/2026
NEW AMSTERDAM PLBG & HTGPlumbing307/08/2026
REYVIN PLBG & HTG CORPPlumbing207/08/2026
A C MORGAN ELECTRIC 002978General Contractor203/22/2026
BEDNARZ CONSTRUCTION LLCGeneral Contractor204/09/2026
RAHMANN CONTRACT CO. LTD*General Contractor203/21/2026
TAFFERA FINE BUILDING ANDGeneral Contractor207/08/2026
DONATO, INCPlumbing107/08/2026
JAN VARJANElectrical103/21/2026
MUZLI BRUNCAJElectrical103/21/2026
METAL CRAFTS BY N BARSILYElectrical103/21/2026
JUMPER ELECTRIC CORP 004309General Contractor103/22/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
P.S.I. MECHANICALPlumbing109/24/2026
RIKE ASSOCIATES INCGeneral Contractor107/08/2026
ALPHONSE, MICHAELElectrical103/21/2026
PEREIRA, WESLLEYElectrical103/21/2026
SILVER, HUGHElectrical103/21/2026
SITRUK, MAURICEElectrical103/21/2026
TOUEY, CHRISTOPHERElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SHAHRISH SHUVO ENGINEERIN8524207/30/2026
INTEGRAL ENGINEERING SERV7659209/26/2025
JACK GREEN ASSOCIATES422609/18/2025
KENDALL ENGINEERING PC4154209/07/2023
PSI AGENCY INC.254304/04/2023
FUHRMANN ARCHITECTURE LLC8109107/19/2022
RIKE TECH ASSOCIATES LLC2965105/27/2022
JAMES SCHAEFER ARCHITECT,3763207/22/2021
Building Lifecycle
All (161)Filed (22)Permit Issued (22)Signed Off (6)Violation (27)Inspection (14)Objection (40)Special Inspection (30)
09/23/2026
Permit issued — Plumbing
B00853920-I1-PL
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
09/16/2026
Objection resolved — Resolved
08/25/2026
Objection raised — Scope
08/25/2026
Objection raised — Other
08/25/2026
Objection raised — Scope
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/30/2026
Filed — Alteration
HEREWITH FILING FOR 1ST FLR RENOVATION OF APT '1S' PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00834633-P1
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Shahrish Shuvo
07/07/2026
Special inspection requirement — Final
Shahrish Shuvo
06/23/2026
Permit issued — General Construction
B00834633-I1-GC
05/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2026
Signed off — Alteration
The Alteration is being filed for the plumbing work on the 5th floor. There is no change in use, egress or occupancy.
B00621650-I1
03/25/2026
Permit issued — Mechanical Systems
B00618193-I1-MS
03/11/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Permit issued — Structural
B00837958-I1-ST
12/12/2025
Permit issued — Mechanical Systems
B00834530-I1-MS
11/17/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-S2
11/17/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-I1
11/17/2025
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-S1
10/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Signed off — Alteration
Reinforcement of 5th floor's ceiling joists as shown on plans. No change in use egress or occupancy
B00842798-I1
09/26/2025
Filed — Alteration
Reinforcement of 5th floor's ceiling joists as shown on plans. No change in use egress or occupancy
B00842798-P1
09/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
09/25/2025
Special inspection requirement — Wood – Seismic Resistance
09/25/2025
Special inspection requirement — Wood – Metal-Plate-Connected Trusses
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Structural Steel - High Strength Bolting
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Structural Steel - Details
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Masonry
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Preliminary
SIRUS MIANDOABI
09/25/2025
Special inspection requirement — Final
SIRUS MIANDOABI
09/23/2025
Permit issued — General Construction
B00842798-I1-ST
09/18/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-P3
08/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/31/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-P2
01/06/2025
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-P1
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
11/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2024
Permit issued — Plumbing
B00993008-S2-PL
07/17/2024
Permit issued — Mechanical Systems
B00993008-S1-MS
07/17/2024
Permit issued — General Construction
B00993008-I1-GC
05/22/2024
Permit issued — General Construction
B00842798-I1-GC
04/10/2024
Violation issued (HPD, closed)
A
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/08/2024
Objection resolved — Addressed
04/03/2024
Objection raised — Accessibility
04/03/2024
Objection raised — Other
04/03/2024
Objection raised — Accessibility
04/03/2024
Objection raised — Scope
03/28/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-S2
03/28/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-S1
03/27/2024
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH RENOVATION OF EXISTING APT 2N. RELOCATE EXISTING AIR HANDLER UNIT. INSTALL TOILET EXHAUST. INSTALL ASSOCIATED DUCTS AND DIFFUSERS.
B00993008-I1
02/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
JACK GREEN
02/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
Max Worrell
Latest 60 of 161 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedP.S.I. MECHANICAL09/23/2026
DOB NOWGeneral ConstructionPermit IssuedEUROPEAN ELEGANCE LLC06/23/2026
DOB NOWMechanical SystemsSigned-offNICK PAWSON LLC03/25/2026
DOB NOWStructuralPermit IssuedEUROPEAN ELEGANCE12/12/2025
DOB NOWMechanical SystemsPermit IssuedEUROPEAN ELEGANCE12/12/2025
DOB NOWGeneral ConstructionSigned-offNICK PAWSON LLC09/23/2025
DOB NOWPlumbingSigned-offEDWARD FITZSIMMONS08/15/2024
DOB NOWMechanical SystemsSigned-offBEDNARZ CONSTRUCTION LLC07/17/2024
DOB NOWGeneral ConstructionSigned-offBEDNARZ CONSTRUCTION LLC07/17/2024
DOB NOWGeneral ConstructionSigned-offNICK PAWSON LLC05/22/2024
DOB NOWGeneral ConstructionPermit IssuedRAHMANN CONTRACT CO. LTD*08/29/2023
DOB NOWStructuralSigned-offNICK PAWSON LLC05/30/2023
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS05/17/2023
DOB NOWSidewalk ShedPermit IssuedJ & G CONSTRUCTION SVCS05/17/2023
DOB NOWGeneral ConstructionSigned-offNICK PAWSON LLC01/20/2023
DOB NOWPlumbingSigned-offREYVIN PLBG & HTG CORP11/25/2022
DOB NOWMechanical SystemsSigned-offRIKE ASSOCIATES INC06/07/2022
DOB NOWPlumbingSigned-offREYVIN PLBG & HTG CORP04/04/2022
DOB NOWGeneral ConstructionSigned-offNICK PAWSON LLC03/09/2022
DOB NOWGeneral ConstructionPermit IssuedTAFFERA FINE BUILDING AND12/14/2021
DOB NOWPlumbingSigned-offDONATO, INC10/22/2021
DOB NOWGeneral ConstructionPermit IssuedTAFFERA FINE BUILDING AND08/24/2021
BISOTISSUEDBRIGHT STAR LIGHTING CORP07/09/2020
BISMHISSUEDBRIGHT STAR LIGHTING CORP05/01/2019
BISOTISSUEDBRIGHT STAR LIGHTING CORP05/01/2019
BISOTISSUEDBRIGHT STAR LIGHTING CORP03/29/2019
BISMHISSUEDBRIGHT STAR LIGHTING CORP03/11/2019
BISOTISSUEDMRCR INC09/19/2018
BISEQISSUEDCROSS COUNTY CONTRACTING10/12/2016
BISOTISSUEDCROSS COUNTY CONTRACTING10/12/2016
BISPLISSUEDMARTIN PLG & HTG INC11/13/2014
BISOTISSUEDDECONSTRUCTION INC11/06/2014
BISOTISSUEDN & L DECKS R US INC10/02/2012
BISPLISSUEDGREGG NY PLUMBING, INC06/28/2011
BISMHISSUEDS.I VICTORY CONST. & DEVE06/21/2011
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD06/11/2008
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD06/11/2008
BISEQISSUEDCERINA GENERAL CONTR INC04/18/2008
BISEQISSUEDCERINA GENERAL CONTR INC04/11/2008
BISEQISSUEDPERIMETER BRIDGE & SCAFFOLD05/05/2005
+ 4 more permits on file
1 project · most recent 04/04/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2023Permit IssuedP.S.I. MECHANICALGas, Water/Sanitary
7 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedFUSED ELECTRIC CONTNG CORGeneral Wiring
07/30/2025CompleteJUMPER ELECTRIC CORPGeneral Wiring
07/01/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
11/10/2023Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
05/02/2023Permit IssuedRICHARD NEU—
07/23/2021CompleteNYCO ELECTRIC CORPGeneral Wiring
12/03/2018CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
1 project · most recent 09/07/2023
FiledStatusContractorScope
09/07/2023Signed-offNICK PAWSON LLC1 scope_items
1 project · most recent 09/21/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/21/2023Permit IssuedJ & G CONSTRUCTION SVCSScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/11/2026Pass-Final CND-Occupancy InspectionPassView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/21/2022Pass-Final General Construction Non-Directive 14PassView ↗
03/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/07/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/07/2026FinalShahrish Shuvoprogress
09/26/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
09/25/2025Wood – Seismic Resistance—special
09/25/2025Wood – Metal-Plate-Connected TrussesSIRUS MIANDOABIspecial
09/25/2025Structural Steel - High Strength BoltingSIRUS MIANDOABIspecial
09/25/2025Structural Steel - DetailsSIRUS MIANDOABIspecial
09/25/2025MasonrySIRUS MIANDOABIspecial
09/25/2025Structural Stability – Alterations of existing buildingsSIRUS MIANDOABIspecial
09/25/2025PreliminarySIRUS MIANDOABIprogress
09/25/2025FinalSIRUS MIANDOABIprogress
11/14/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
02/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
02/28/2024Fire-Resistance Rated ConstructionMax Worrellprogress
01/19/2024FinalMax Worrellprogress
06/07/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
04/10/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
04/05/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/04/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
04/04/2023Post-installed AnchorsMAURICIO ANDRADEspecial
03/02/2023FinalMAURICIO ANDRADEprogress
02/24/2023FinalShahrish Shuvoprogress
02/24/2023Mechanical SystemsMAURICIO ANDRADEspecial
02/24/2023FinalMAURICIO ANDRADEprogress
12/08/2021Fire-Resistance Rated ConstructionGregory Sharpprogress
Latest 25 of 40.
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch21
09/01/2026B00549491-I1Request digital key ↗
08/29/2026B00745359-I1Request digital key ↗
08/29/2026B00776305-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸Applications & Permits62
▸BISWORK PERMIT APPLICATION22
07/25/2019321015502Open ↗
05/03/2019321912025Open ↗
05/03/2019321912025Open ↗
Showing 3 of 22 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION20
03/31/2022321912025Open ↗
02/08/2022321912025Open ↗
12/16/2019321669208Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit18
08/29/2026B00745359-I1Open ↗
08/27/2026B00834633-P1Open ↗
08/25/2026B00993008-P1Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/11/2019321912025Open ↗
01/10/2019321669208Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
03/07/2012320195070Open ↗
▸Seals & Professional Certifications82
▸DOB NOWDPL-1: Design Professional Seal & Signature21
09/01/2026B00549491-I1Open ↗
09/01/2026B00549472-I1Open ↗
08/29/2026B00745359-I1Open ↗
Showing 3 of 21 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION20
01/16/2020321669208Open ↗
08/09/2019321015502Open ↗
03/01/2019321912025Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/02/2026B00834530-I1Open ↗
09/02/2026B00618193-I1Open ↗
09/02/2026B00618193-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/02/2026B00834530-I1Open ↗
09/02/2026B00618193-I1Open ↗
08/31/2026B00853920-I1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
03/01/2019321912025Open ↗
11/06/2014321015502Open ↗
06/15/2011320316706Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
06/15/2011320316706Open ↗
06/11/2008310153794Open ↗
06/11/2008310153801Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
03/01/2019321912025Open ↗
11/06/2014321015502Open ↗
▸Trade Schedules & Equipment17
▸BISSELF-CERT PLUMBING NOTICE5
07/02/2012320316706Open ↗
04/11/2012320316706Open ↗
01/30/2012320316706Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
07/22/2019321015502Open ↗
09/12/2018321669208Open ↗
06/12/2015321015502Open ↗
Showing 3 of 4 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
05/07/2022321912025Open ↗
05/07/2022321912025Open ↗
03/01/2019321912025Open ↗
▸BISEQUIPMENT USE PERMITS2
05/07/2022321912025Open ↗
05/07/2022321912025Open ↗
▸BISSCHEDULE B - PLUMBING2
01/20/2012320316706Open ↗
06/15/2011320316706Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
03/30/2022321912025Open ↗
▸Safety & Tenant Protection4
▸BISTenant Protection Plan and Notes3
06/28/2019321015502Open ↗
03/01/2019321912025Open ↗
09/12/2018321669208Open ↗
▸BISSTREET TREE CHECKLIST1
05/19/2016321378237Open ↗
▸Environmental & Asbestos28
▸DOB NOWDEP ACP-5: Asbestos Assessment Report18
09/01/2026B00549491-I1Open ↗
08/29/2026B00776305-I1Open ↗
08/27/2026B00842798-I1Open ↗
Showing 3 of 18 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
07/27/2010320195070Open ↗
06/11/2008310153794Open ↗
06/11/2008310153801Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)4
03/01/2019321912025Open ↗
09/12/2018321669208Open ↗
11/04/2015321171753Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/15/2011320316706Open ↗
▸Energy Compliance13
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
08/09/2019321015502Open ↗
03/01/2019321912025Open ↗
09/12/2018321669208Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
01/16/2020321669208Open ↗
08/09/2019321015502Open ↗
07/26/2012320316706Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/26/2026B00618193-I1Open ↗
08/15/2026B00621650-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
09/16/2021321912025Open ↗
▸BISTECHNICAL REPORT: ENERGY1
06/15/2011320316706Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/16/2021321912025Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY17
02/24/2022321912025Open ↗
02/24/2022321912025Open ↗
02/24/2022321912025Open ↗
Showing 3 of 17 on file for this type
▸BISMECHANICAL SYSTEMS2
03/31/2022321912025Open ↗
03/31/2022321912025Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/27/2021321912025Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
12/27/2021321912025Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
12/27/2021321912025Open ↗
▸Approvals, Objections & Sign-offs29
▸BISLANDMARKS APPROVAL10
03/01/2019321912025Open ↗
09/12/2018321669208Open ↗
07/02/2018320195070Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
04/05/2022321912025Open ↗
01/16/2020321669208Open ↗
01/08/2020321669208Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
11/06/2014321015502Open ↗
06/13/2011320316706Open ↗
07/27/2010320195070Open ↗
Showing 3 of 7 on file for this type
▸BISLANDMARKS SIGNOFF1
12/30/2021321912025Open ↗
▸BISFINAL1
12/27/2021321912025Open ↗
▸DOB NOWLandmark Approval1
08/13/2026B00618193-P2Open ↗
▸Cost, Insurance & Ownership20
▸BISCOST AFFIDAVIT19
02/24/2022321912025Open ↗
10/08/2021321912025Open ↗
01/08/2020321669208Open ↗
Showing 3 of 19 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
04/04/2022321912025Open ↗
▸Filing & Intake Forms25
▸BISEFILING COVER SHEET12
03/01/2019321912025Open ↗
03/01/2019321912025Open ↗
09/12/2018321669208Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM7
07/08/2020321912025Open ↗
01/16/2020321669208Open ↗
01/08/2020321669208Open ↗
Showing 3 of 7 on file for this type
▸BISADDITIONAL INFORMATION6
08/10/2019321912025Open ↗
06/28/2019321015502Open ↗
03/01/2019321912025Open ↗
Showing 3 of 6 on file for this type
▸Other Documents6
▸DOB NOWProof of Historic Building6
08/27/2026B00834633-P1Open ↗
08/13/2026B00776305-I1Open ↗
08/13/2026B00834633-I1Open ↗
Showing 3 of 6 on file for this type