Rent Stabilized0 Active Violations
Elevator cooperative · Owner of record: 8 Fulton · 3,600 sf lot · 4.83 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Roof4p · 2 filings · 20 docs
Floor 5Unit 5S36p · 5 filings · 20 docs
Floor 4New Window Openings4p · 2 filings · 8 docs
Floor 3Unit 3N7p · 4 filings · 20 docs
Floor 2Unit 2N23p · 2 filings · 20 docs
Floor 1Unit 1SUnder Construction19p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installation5p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
8 Fulton3203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AEC Consulting Expediting1003/21/2026
Commercial Capital USA403/21/2026
Anzalone Architecture1203/21/2026
Metropolis Group803/21/2026
Arsenal Building Consultants403/21/2026
Britz Enterprises203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nick PawsonGeneral Contractor1004/09/2026
J & G Construction ServicesScaffold407/08/2026
European EleganceGeneral Contractor306/27/2026
New Amsterdam Plumbing & HeatingPlumbing307/08/2026
Reyvin Plumbing & HeatingPlumbing207/08/2026
A C Morgan ElectricGeneral Contractor203/22/2026
Bednarz ConstructionGeneral Contractor204/09/2026
Rahmann Contract Co. Ltd*General Contractor203/21/2026
Taffera Fine Building andGeneral Contractor207/08/2026
Fused Electric ContngElectrical103/21/2026
P.S.I. MechanicalPlumbing109/24/2026
Rike AssociatesGeneral Contractor107/08/2026
Bestco General Electric MainElectrical103/21/2026
Joseph Weinstein ElectricElectrical103/22/2026
DonatoPlumbing107/08/2026
Jumper ElectricElectrical103/21/2026
Foster Electrical ServiceElectrical103/21/2026
Jumper ElectricGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Shahrish Shuvo Engineering8524207/30/2026
Integral Engineering Service7659209/26/2025
Jack Green Associates422609/18/2025
Kendall Engineering4154209/07/2023
PSI Agency254304/04/2023
Fuhrmann Architecture8109107/19/2022
Rike Tech Associates2965105/27/2022
James Schaefer Architect3763207/22/2021
Building Lifecycle
10/19/2026
Signed off — Alteration
This Alteration application is being filed for the general construction & mechanical work for the interior renovation of apt 5S on 5th floor. There are no change in use, egress or occupancy.
B00618193-I1
09/28/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2026
Permit issued — Plumbing
B00853920-I1-PL
09/16/2026
Objection resolved — Resolved
09/01/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
182 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedP.S.I. Mechanical09/23/2026
DOB NOWGeneral ConstructionPermit IssuedEuropean Elegance06/23/2026
DOB NOWMechanical SystemsSigned-offNick Pawson03/25/2026
DOB NOWStructuralPermit IssuedEuropean Elegance12/12/2025
DOB NOWMechanical SystemsPermit IssuedEuropean Elegance12/12/2025
DOB NOWGeneral ConstructionSigned-offNick Pawson09/23/2025
DOB NOWPlumbingSigned-offEdward Fitzsimmons08/15/2024
DOB NOWMechanical SystemsSigned-offBednarz Construction07/17/2024
DOB NOWGeneral ConstructionSigned-offBednarz Construction07/17/2024
DOB NOWGeneral ConstructionSigned-offNick Pawson05/22/2024
DOB NOWGeneral ConstructionPermit IssuedRahmann Contract Co. Ltd*08/29/2023
DOB NOWStructuralSigned-offNick Pawson05/30/2023
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services05/17/2023
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services05/17/2023
DOB NOWGeneral ConstructionSigned-offNick Pawson01/20/2023
DOB NOWPlumbingSigned-offReyvin Plumbing & Heating11/25/2022
DOB NOWMechanical SystemsSigned-offRike Associates06/07/2022
DOB NOWPlumbingSigned-offReyvin Plumbing & Heating04/04/2022
DOB NOWGeneral ConstructionSigned-offNick Pawson03/09/2022
DOB NOWGeneral ConstructionPermit IssuedTaffera Fine Building and12/14/2021
DOB NOWPlumbingSigned-offDonato10/22/2021
DOB NOWGeneral ConstructionPermit IssuedTaffera Fine Building and08/24/2021
BISOTISSUEDBright Star Lighting07/09/2020
BISMHISSUEDBright Star Lighting05/01/2019
BISOTISSUEDBright Star Lighting05/01/2019
BISOTISSUEDBright Star Lighting03/29/2019
BISMHISSUEDBright Star Lighting03/11/2019
BISOTISSUEDMRCR09/19/2018
BISEQISSUEDCross County Contracting10/12/2016
BISOTISSUEDCross County Contracting10/12/2016
BISPLISSUEDMartin PLG & Heating11/13/2014
BISOTISSUEDDeconstruction11/06/2014
BISOTISSUEDN & L Decks R US10/02/2012
BISPLISSUEDGregg NY Plumbing06/28/2011
BISMHISSUEDS.I. Victory Construction & Development06/21/2011
BISEQISSUEDPerimeter Bridge & Scaffold06/11/2008
BISEQISSUEDPerimeter Bridge & Scaffold06/11/2008
BISEQISSUEDCerina General Contracting04/18/2008
BISEQISSUEDCerina General Contracting04/11/2008
BISEQISSUEDPerimeter Bridge & Scaffold05/05/2005
+ 4 more permits on file
1 project · most recent 04/04/2023
Gas Water/Sanitary
FiledStatusContractorScope
04/04/2023Permit IssuedP.S.I. MechanicalGas, Water/Sanitary
7 projects · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedFused Electric ContngGeneral Wiring
07/30/2025CompleteJumper ElectricGeneral Wiring
07/01/2025CompleteA.C. Morgan ElectricGeneral Wiring
11/10/2023Permit IssuedEcny Electrical ContractorsGeneral Wiring
05/02/2023Permit IssuedRichard Neu—
07/23/2021CompleteNyco ElectricGeneral Wiring
12/03/2018CompleteJoseph Weinstein ElectricGeneral Wiring
1 project · most recent 09/07/2023
FiledStatusContractorScope
09/07/2023Signed-offNick Pawson—
1 project · most recent 09/21/2023
Scaffold Sidewalk Shed
FiledStatusContractorScope
09/21/2023Permit IssuedJ & G Construction ServicesScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
09/28/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2026Pass-Final PL - UndergroundPassView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/20/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
07/07/2026Fire-Resistant Penetrations and JointsShahrish Shuvospecial
07/07/2026FinalShahrish Shuvoprogress
09/26/2025Fire-Resistant Penetrations and JointsJACK GREENspecial
09/25/2025Wood – Metal-Plate-Connected TrussesSIRUS MIANDOABIspecial
09/25/2025PreliminarySIRUS MIANDOABIprogress
09/25/2025FinalSIRUS MIANDOABIprogress
09/25/2025Wood – Seismic Resistance—special
09/25/2025Structural Steel - High Strength BoltingSIRUS MIANDOABIspecial
09/25/2025Structural Steel - DetailsSIRUS MIANDOABIspecial
09/25/2025Structural Stability – Alterations of existing buildingsSIRUS MIANDOABIspecial
09/25/2025MasonrySIRUS MIANDOABIspecial
11/14/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
02/28/2024Fire-Resistant Penetrations and JointsJACK GREENspecial
02/28/2024Fire-Resistance Rated ConstructionMax Worrellprogress
01/19/2024FinalMax Worrellprogress
06/07/2023Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
04/10/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
04/05/2023Fire-Resistant Penetrations and JointsShahrish Shuvospecial
04/04/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
04/04/2023Post-installed AnchorsMAURICIO ANDRADEspecial
03/02/2023FinalMAURICIO ANDRADEprogress
02/24/2023FinalShahrish Shuvoprogress
02/24/2023Mechanical SystemsMAURICIO ANDRADEspecial
02/24/2023FinalMAURICIO ANDRADEprogress
12/08/2021Fire-Resistance Rated ConstructionGregory Sharpprogress