RoofUnder Construction5p · 6 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
GENERAL CONSTRUCTION & STRUCTURAL MODIFICATIONS TAKING PLACE ON FACADE AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
On file for this project
4 documents · 1 drawing sheet
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Harold Sanchez
On file for this project
3 documents · 1 drawing sheet
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 6 filings on this floor.
Penthouse1p · 1 filing · 5 docs
Structural
Steel installation for cooling tower dunnage on the roof as per plans. No change to use, egress or occupancy.
On file for this project
5 documents · 1 drawing sheet
Floor 361p · 1 filing · 6 docs
Mechanical
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 36TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
6 documents · 1 drawing sheet
Floor 35
Floor 3415p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Installation of 11 and direct removal of 6 plumbing fixtures as indicated on plans.
On file for this project
4 documents · 4 drawing sheets
Sprinkler heads installation, removal and relocate as indicated on plans.
On file for this project
8 documents · 6 drawing sheets
Architectural changes as well as Interior Demo of non-load bearing partitions and finishes as indicated on plans.
On file for this project
4 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 33
Floor 32Under Construction85p · 10 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler head changes as indicated on plans.
On file for this project
13 documents
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
On file for this project
3 documents · 1 drawing sheet
Modification to existing HVAC system, including removal & installation of ductwork & piping, installation of VRF heat pump, replacement of diffusers, air outlets, dampers & controls on the 32nd Floor as per plans. No changes to use, egress, or occupancy.
On file for this project
14 documents · 1 drawing sheet
Latest 3 of 8 filings on this floor.
Floor 311p · 1 filing · 20 docs
Fire Protection
No filed description on record for this project.
On file for this project
23 documents · 1 drawing sheet
Floor 30
Floor 291p · 1 filing · 2 docs
Fire Protection
No filed description on record for this project.
On file for this project
2 documents · 1 drawing sheet
Floor 28
Floor 275p · 4 filings · 17 docs
ArchitectureFire ProtectionMechanicalPlumbing
Railing modification as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 2 drawing sheets
Removal of existing plumbing fixtures and associated piping on the 27th floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Removal of existing sprinkler system with installation of a temporary loop on the 27th floor as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 4 filings on this floor.
Floor 2634p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers
Sprinkler Head changes as indicated on plans.
On file for this project
13 documents · 2 drawing sheets
Sprinkler Fixture changes as indicated on plans.
On file for this project
8 documents · 2 drawing sheets
Removal of Plumbing Fixtures and all associated plumbing piping back to active building risers.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 25
Floor 24Under Construction61p · 8 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Sprinkler head changes as indicated on plans.
On file for this project
13 documents
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
On file for this project
3 documents · 2 drawing sheets
Sprinkler head changes as indicated on plans.
On file for this project
13 documents · 4 drawing sheets
Latest 3 of 8 filings on this floor.
Floor 2319p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Sprinkler Fixture changes as indicated on plans.
On file for this project
4 documents · 6 drawing sheets
Filed herewith is a PAA showing the addition of plumbing fixtures previously omitted in error.
On file for this project
6 documents · 3 drawing sheets
Removal of ductwork and all associated piping.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 22
Floor 2112p · 4 filings · 18 docs
DMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
Sprinklers
Modifications to the existing sprinkler system on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents · 1 drawing sheet
Modifications to the existing plumbing system on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Floor 208p · 3 filings · 15 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
Sprinklers
Modifications to the existing sprinkler system on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
7 documents
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Modifications to the existing HVAC system on the 20th and 21st floors (Reitler Kailas & Rosenblatt LLC) as per plans. No change to use, egress or occupancy.
On file for this project
4 documents · 1 drawing sheet
Floor 1930p · 5 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Issued Permit Scope
Plumbing · Sprinklers
Sprinkler Fixture changes as indicated on plans.
On file for this project
8 documents · 2 drawing sheets
Removal of Plumbing Fixtures and all associated plumbing piping back to active building risers.
On file for this project
3 documents · 5 drawing sheets
Architectural changes as per plans.
On file for this project
10 documents · 9 drawing sheets
Latest 3 of 5 filings on this floor.
Floor 186p · 1 filing · 9 docs
ElectricalFire ProtectionMechanicalPlumbing
Sprinkler Head changes as indicated on plans.
On file for this project
9 documents · 6 drawing sheets
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 1016p · 6 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbing
Railing modification as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Sprinkler modifications as indicated on plans.
On file for this project
3 documents · 5 drawing sheets
Filed herewith is a PAA showing plumbing fixtures previously omitted in error.
On file for this project
6 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 920p · 6 filings · 20 docs
ArchitectureFire ProtectionGeneralMechanicalPlumbing
Sprinkler Fixture changes as indicated on plans.
On file for this project
4 documents · 6 drawing sheets
Filed herewith is a PAA showing plumbing fixtures previously omitted in error.
On file for this project
6 documents · 5 drawing sheets
Removal of ductwork and all associated piping.
On file for this project
4 documents · 3 drawing sheets
Latest 3 of 6 filings on this floor.
Floor 83p · 2 filings · 20 docs
ArchitectureStructural
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
No filed description on record for this project.
On file for this project
23 documents · 1 drawing sheet
Floor 72p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 62p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 52p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 42p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 32p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 22p · 1 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Floor 1Under Construction63p · 10 filings · 20 docs
ArchitectureCivilEquipmentFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation, removal, and modifications to plumbing fixtures and piping, as per plans. No change to use, egress, or occupancy.
On file for this project
18 documents
Minor demolition and interior renovation of existing restaurant space, including partitions, doors, ceilings (MAMO) as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents
Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy.
On file for this project
12 documents
Latest 3 of 8 filings on this floor.
MezzanineUnder Construction30p · 3 filings · 20 docs
ArchitectureFire ProtectionMechanical
Issued Permit Scope
General Construction · Mechanical Systems · Sprinklers
Modifications to the existing sprinkler system as per plans (MAMO). No change to use, egress, or occupancy.
On file for this project
7 documents
Minor demolition and interior renovation of existing restaurant space, including partitions, doors, ceilings (MAMO) as per plans. No change to use, egress, or occupancy.
On file for this project
6 documents
Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy.
On file for this project
12 documents
CellarUnder Construction57p · 4 filings · 20 docs
ArchitectureFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
Installation, removal, and modifications to plumbing fixtures and piping, as per plans. No change to use, egress, or occupancy.
On file for this project
18 documents · 3 drawing sheets
Modifications to the existing sprinkler system as per plans (MAMO). No change to use, egress, or occupancy.
On file for this project
7 documents · 2 drawing sheets
Mechanical changes to existing restaurant space (MAMO), including removal and installation of ductwork and piping, as per plans. No changes to use, egress, or occupancy.
On file for this project
12 documents
Latest 3 of 4 filings on this floor.
Sub-Cellar10p · 5 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbing
Issued Permit Scope
General Construction
Partition and millwork for a non-place of assembly under 74 person eating and drinking establishment (cafe) business occupancy on the first floor.
On file for this project
5 documents
Modifications to the existing HVAC system on the cellar and 1st floors (Lobby Renovation) as per plans. No change to use, egress or occupancy.
On file for this project
8 documents · 1 drawing sheet
Removal of existing plumbing fixtures and associated piping in the sub-cellar as per plans. No change to use, egress or occupancy.
On file for this project
3 documents · 2 drawing sheets
Latest 3 of 5 filings on this floor.