909 3RD AVENUE
MANHATTAN · BIN 1038570
💬 Discuss this project
1967Year Built
32Stories
O4Building Class
C1-9Zoning
1,321,050 sfGross Floor Area
10Units
LL97 Covered6 Active Violations 0 unresolved · 6 paperwork only ▸FISP: SWARMPFDNY Report ↗
Office, 20+ stories, with or without commercial · Owner of record: 909 Third Holding · 82,341 sf lot · 16.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsVornado Realty TrustUnder Construction1 filing
Floor 30AlixPartnersUnder Construction10p · 3 filings · 19 docs
Floor 29AlixPartnersUnder Construction1p · 2 filings · 14 docs
Floor 28AlixPartnersUnder Construction8p · 2 filings · 14 docs
Floor 27
Floor 26
Floor 25
Floor 24Interpublic Group (IPG)7p · 4 filings · 18 docs
Floor 23
Floor 22
Floor 21
Floor 20Vornado Realty TrustUnder Construction5p · 5 filings · 19 docs
Floor 19CMG-new York9p · 4 filings · 19 docs
Floor 18
Floor 17Vornado Realty TrustUnder Construction3p · 4 filings · 17 docs
Floor 16
Floor 15
Floor 14Vornado Realty Trust6p · 4 filings · 19 docs
Floor 13
Floor 12Cohen Weiss & Simon, Ipg Dxtra-paremoval12p · 11 filings · 19 docs
Floor 11DouglasElliman4p · 1 filing · 12 docs
Floor 10Vornado Realty Trust4p · 4 filings · 19 docs
Floor 9
Floor 8Vornado Realty Trust1 filing · 6 docs
Floor 7Vornado Realty Trust1 filing · 6 docs
Floor 6CMG-new York1p · 2 filings · 6 docs
Floor 5Vornado Realty Trust4p · 4 filings · 19 docs
Floor 4
Floor 3
Floor 2
Floor 1Vornado Realty Trust2p · 2 filings · 6 docs
CellarLobby AC unit replacement1 filing · 3 docs
Site & exteriorVornado Realty TrustUnder Construction5 filings · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Vornado Realty Trust67310/04/2026
909 Third Company13203/21/2026
Mendick Realty Co7903/21/2026
330 West 34th St4203/21/2026
Third603/21/2026
962 Third Avenue Associates407/08/2026
909 3rd403/21/2026
909 Third Compancy403/21/2026
Laszlo N. Tauber & Associates203/21/2026
909 Third Holding103/22/2026
United States Postal Services103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2021$191.7M—909 THIRD FEE OWNER LLC → 909 THIRD HOLDING LLC$145/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants103/21/2026
Archetype Consultants8403/21/2026
Milrose Consultants1403/21/2026
William Vitacco Associates303/21/2026
A1 Expediting Service203/21/2026
Conapac Services Dba103/21/2026
Outsource Consultants403/21/2026
United Fire Protection403/21/2026
Conapac Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Icon InteriorsGeneral Contractor2307/08/2026
Ambassador ConstructionGeneral Contractor1107/08/2026
Starr IndustriesScaffold607/08/2026
Tri-Star ConstructionGeneral Contractor403/21/2026
Andamio ScaffoldingScaffold409/22/2026
A&A PlumbingPlumbing307/08/2026
Clune Construction CoGeneral Contractor307/08/2026
Donnelly Mechanicalspecialty_contractor307/08/2026
PSI PartnersFire Protection307/08/2026
S&E Bridge & ScaffoldScaffold307/08/2026
Sirina Fire ProtectionFire Protection307/08/2026
Upright Fire ProtctnFire Protection207/08/2026
Structure ToneGeneral Contractor207/08/2026
Abco-Peerless SprinklerFire Protection207/08/2026
S.B.A. PlumbingPlumbing207/08/2026
Skyline Fire Sprinkler CoFire Protection207/08/2026
United Fire ProtectionFire Protection207/08/2026
Polo Electric Corp D/B/AElectrical103/22/2026
Borowide Elect'l ContractorsElectrical103/22/2026
Allstate SprinklerFire Protection107/08/2026
A & M Warshaw Plumbing & HeatingPlumbing107/08/2026
Full Capacity FireFire Protection107/08/2026
George Breslaw PlumbingPlumbing107/08/2026
Par Plumbing CoPlumbing107/08/2026
Borowide Elect'l ContractorsElectrical103/21/2026
Standard Fire ProtectionFire Protection107/08/2026
C. W. GreeneElectrical103/22/2026
Everest ScaffoldingScaffold107/08/2026
LhotseScaffold107/08/2026
LhotseGeneral Contractor107/08/2026
Uni-Lite ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Hansen Engineering81742404/02/2026
PCS Engineering3745104/02/2026
Asda Architecture + Desig2015403/30/2026
Milrose Consultants2003201/29/2026
Skyline Engineering267611/04/2025
Alan D Marcus, PE1761702/18/2025
DNA Controlled Inspection554311/20/2023
Obaid Mian849104/26/2023
G&G Sprinkler Services2782411/02/2022
AK Engineering678303/25/2022
Outsource Special Inspection2827210/07/2019
Building Lifecycle
All (300)Filed (72)Permit Issued (72)Signed Off (43)Facade (FISP) (6)Violation (42)Inspection (35)Special Inspection (30)
09/21/2026
Permit issued — Sidewalk Shed
M01422212-I1-SH
07/20/2026
Signed off — Alteration
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
M01353161-I1
07/09/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01364626-I1
07/07/2026
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01422212-I1
06/30/2026
Permit issued — Sidewalk Shed
M01422212-I1-SH
06/09/2026
Inspection — Pass-Final SP - More than 10 Requested Floors
Pass
View inspection ↗
06/04/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/28/2026
Permit issued — Sidewalk Shed
M01364626-I1-SH
05/22/2026
Permit issued — General Construction
M01359281-I1-GC
04/14/2026
Permit issued — Sprinklers
M01366604-I1-EW-SP
04/14/2026
Permit issued — Plumbing
M01374265-I1-PL
04/10/2026
Permit issued — Sprinklers
M01374188-I1-EW-SP
04/09/2026
Filed — Alteration
Facade work on the 1st through 32nd floor; roof work as indicated on drawings.
M01359281-I1
04/09/2026
Permit issued — Suspended Scaffold
M01381412-I1-SC
04/02/2026
Filed — Alteration
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
M01374188-I1
04/02/2026
Filed — Alteration
Suspended Scaffold for Facade Restoration as Shown on Plans
M01381412-I1
04/02/2026
Permit issued — Mechanical Systems
M01374290-I1-MS
04/01/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
04/01/2026
Special inspection requirement — Post-installed Anchors
Michael Walsh
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ryan Hansen
03/30/2026
Filed — Alteration
Removal of plumbing fixtures on the 17th floor as indicated on drawings.
M01374265-I1
03/30/2026
Filed — Alteration
Mechanical demolition on the 17th floor as indicated on drawings.
M01374290-I1
03/25/2026
Filed — Alteration
Removal of sprinkler heads and installation of temporary sprinkler loop on the 17th floor as indicated on drawings.
M01366604-I1
03/25/2026
Permit issued — General Construction
M01364692-I1-GC
03/24/2026
Permit issued — General Construction
M01353161-I1-GC
03/23/2026
Filed — Alteration
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
M01364692-I1
03/19/2026
Filed — Alteration
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
M01353161-I1
03/18/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
03/18/2026
Special inspection requirement — Mechanical Systems
Alfonso DElia
03/18/2026
Special inspection requirement — Final
Alfonso DElia
03/05/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01364626-I1
03/05/2026
Permit issued — Sidewalk Shed
M01364626-I1-SH
03/03/2026
Special inspection requirement — Sprinkler Systems
Ryan Hansen
02/26/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alfonso DElia
02/26/2026
Special inspection requirement — Final
Alfonso DElia
02/12/2026
Special inspection requirement — Final
Susanne Mackiw
02/09/2026
Violation issued (ECB, closed)
Elevators
02/06/2026
Permit issued — Mechanical Systems
M01345470-I1-MS
02/06/2026
Permit issued — General Construction
M01342160-I1-GC
01/29/2026
Filed — Alteration
Modification to existing HVAC system as per plans filed herewith. no change in use, egress or occupancy under this application
M01345470-I1
01/29/2026
Filed — Alteration
M01342160-I1
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alfonso DElia
01/29/2026
Special inspection requirement — Final
Alfonso DElia
01/27/2026
Special inspection requirement — Interior lighting power
Christopher Drutjons
01/27/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher Drutjons
01/27/2026
Special inspection requirement — Lighting controls
Christopher Drutjons
01/27/2026
Special inspection requirement — Duct leakage testing, insulation and design
Christopher Drutjons
01/12/2026
Special inspection requirement — Final
Christopher Drutjons
01/12/2026
Special inspection requirement — Mechanical Systems
Christopher Drutjons
11/07/2025
Permit issued — Sprinklers
M01299106-I1-EW-SP
11/06/2025
Permit issued — General Construction
M01244394-I1-GC
11/05/2025
Special inspection requirement — Final
Matthew Wavro
11/05/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
11/05/2025
Special inspection requirement — Sprayed fire-resistant materials
Matthew Wavro
11/05/2025
Special inspection requirement — Sprinkler Systems
Matthew Wavro
11/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
11/04/2025
Filed — Alteration
ALTERATIONS TO EXISTING SPRINKLER SYSTEMS AS PER PLANS FILED HEREWITH
M01299106-P1
11/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Matthew Wavro
11/04/2025
Special inspection requirement — Post-installed Anchors
Matthew Wavro
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding09/21/2026
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding06/30/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding05/28/2026
DOB NOWGeneral ConstructionPermit IssuedLhotse05/22/2026
DOB NOWSprinklersPermit IssuedPSI Partners04/14/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing04/14/2026
DOB NOWSprinklersPermit IssuedPSI Partners04/10/2026
DOB NOWSuspended ScaffoldPermit IssuedLhotse04/09/2026
DOB NOWMechanical SystemsPermit IssuedClune Construction Co04/02/2026
DOB NOWGeneral ConstructionPermit IssuedClune Construction Co03/25/2026
DOB NOWGeneral ConstructionSigned-offClune Construction Co03/24/2026
DOB NOWSidewalk ShedSigned-offAndamio Scaffolding03/05/2026
DOB NOWMechanical SystemsPermit IssuedIcon Interiors02/06/2026
DOB NOWGeneral ConstructionPermit IssuedIcon Interiors02/06/2026
DOB NOWSprinklersPermit IssuedFull Capacity Fire11/07/2025
DOB NOWGeneral ConstructionPermit IssuedIcon Interiors11/06/2025
DOB NOWMechanical SystemsPermit IssuedIcon Interiors10/31/2025
DOB NOWGeneral ConstructionSigned-offIcon Interiors02/21/2025
DOB NOWMechanical SystemsPermit IssuedDonnelly Mechanical09/12/2024
DOB NOWSprinklersSigned-offMora Fire Protection12/05/2023
DOB NOWGeneral ConstructionSigned-offIcon Interiors11/21/2023
DOB NOWMechanical SystemsSigned-offIcon Interiors11/21/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/28/2023
DOB NOWSprinklersSigned-offH.J. Flood08/11/2023
DOB NOWSprinklersSigned-offSkyline Fire Sprinkler Co07/26/2023
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold07/25/2023
DOB NOWMechanical SystemsSigned-offAmbassador Construction07/17/2023
DOB NOWPlumbingSigned-offS.B.A. Plumbing07/13/2023
DOB NOWGeneral ConstructionSigned-offAmbassador Construction07/12/2023
DOB NOWMechanical SystemsSigned-offStructure Tone06/28/2023
DOB NOWSprinklersSigned-offH.J. Flood06/27/2023
DOB NOWPlumbingSigned-offA&A Plumbing06/26/2023
DOB NOWGeneral ConstructionSigned-offIcon Interiors06/09/2023
DOB NOWPlumbingSigned-offA & M Warshaw Plumbing & Heating06/08/2023
DOB NOWGeneral ConstructionSigned-offStructure Tone06/07/2023
DOB NOWPlumbingSigned-offA&A Plumbing05/01/2023
DOB NOWMechanical SystemsSigned-offIcon Interiors04/29/2023
DOB NOWSprinklersSigned-offStandard Fire Supp04/28/2023
DOB NOWMechanical SystemsPermit IssuedDonnelly Mechanical04/26/2023
DOB NOWGeneral ConstructionSigned-offIcon Interiors04/19/2023
+ 60 more permits on file
3 projects · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Permit IssuedPSI Partners92 heads
03/25/2026Permit IssuedPSI Partners247 heads
11/04/2025Permit IssuedFull Capacity Fire80 heads
4 projects · most recent 04/02/2026
Water/Sanitary
FiledStatusContractorScope
04/02/2026———
03/30/2026Permit IssuedA&A PlumbingWater/Sanitary
03/25/2026———
11/04/2025———
25 projects · most recent 04/14/2026
General Wiring Lighting
FiledStatusContractorScope
04/14/2026Permit IssuedCloonagh Electrical—
04/06/2026CompleteA.S.K. ElectricalGeneral Wiring
02/26/2026Permit IssuedBorowide Elect'l Contractors—
12/24/2025CompleteA.S.K. ElectricalGeneral Wiring
11/08/2023CompleteUnited Electric & Lighting CoGeneral Wiring
08/03/2023CompleteC. W. GreeneGeneral Wiring
06/20/2023CompleteUni-Lite ElectricGeneral Wiring
05/01/2023CompleteUnited Electric & Lighting CoGeneral Wiring
04/18/2023CompleteRobert B SamuelsGeneral Wiring
02/07/2023CompletePolo Electric Corp D/B/AGeneral Wiring
01/23/2023CompleteLmec ElectricGeneral Wiring, Lighting
08/02/2022Permit IssuedPolo Electric Corp D/B/A—
05/24/2022Permit IssuedPolo Electric Corp D/B/A4 meters
04/20/2022CompleteNead ElectricGeneral Wiring
03/11/2022CompleteAdco ElectricalGeneral Wiring
2 projects · most recent 06/30/2026
Sidewalk Shed
FiledStatusContractorScope
06/30/2026Permit IssuedAndamio ScaffoldingSidewalk Shed
03/05/2026Signed-offAndamio ScaffoldingSidewalk Shed
1 project · most recent 04/02/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
04/02/2026Permit IssuedLhotseSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
07/07/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
06/09/2026Pass-Final SP - More than 10 Requested FloorsPassView ↗
06/04/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/17/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/22/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/22/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/21/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/01/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/11/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/06/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 124
DateRequirementInspectorRole
04/01/2026Post-installed AnchorsMichael Walshspecial
04/01/2026Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
03/31/2026Fire-Resistant Penetrations and JointsRyan Hansenspecial
03/18/2026Mechanical SystemsAlfonso DEliaspecial
03/18/2026FinalAlfonso DEliaprogress
03/18/2026Sprinkler SystemsRyan Hansenspecial
03/03/2026Sprinkler SystemsRyan Hansenspecial
02/26/2026Fire-Resistant Penetrations and JointsAlfonso DEliaspecial
02/26/2026FinalAlfonso DEliaprogress
02/12/2026FinalSusanne Mackiwprogress
01/29/2026FinalAlfonso DEliaprogress
01/29/2026Fire-Resistant Penetrations and JointsAlfonso DEliaspecial
01/27/2026Lighting controlsChristopher Drutjonsenergy_progress
01/27/2026Interior lighting powerChristopher Drutjonsenergy_progress
01/27/2026Duct leakage testing, insulation and designChristopher Drutjonsenergy_progress
01/27/2026Energy Code Compliance InspectionsChristopher Drutjonsprogress
01/12/2026Mechanical SystemsChristopher Drutjonsspecial
01/12/2026FinalChristopher Drutjonsprogress
11/05/2025Sprayed fire-resistant materialsMatthew Wavrospecial
11/05/2025FinalMatthew Wavroprogress
11/05/2025Sprinkler SystemsMatthew Wavrospecial
11/05/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
11/05/2025Post-installed AnchorsMatthew Wavrospecial
11/04/2025Fire-Resistant Penetrations and JointsMatthew Wavrospecial
11/04/2025Post-installed AnchorsMatthew Wavrospecial
Latest 25 of 124.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
AlixPartnersOfficeFloors 28–30
Project M01342160 Alteration · Permit Entire · 01/29/2026
Project M01345470 Alteration · Permit Entire · 01/29/2026
Project M01244394 Alteration · Permit Entire · 10/24/2025
Project M01299106 Alteration · Permit Entire · 10/24/2025
Project M01299092 Alteration · Permit Entire · 10/23/2025
Cohen Weiss & SimonOfficeFloor 12
Project M00878186 Alteration · LOC Issued · 07/11/2023
Project M00878212 Alteration · LOC Issued · 07/11/2023
Project M00878172 Alteration · LOC Issued · 07/10/2023
Project M00878206 Alteration · LOC Issued · 07/10/2023
CMG-new YorkOfficeFloors 6, 19
Project M00846395 Alteration · LOC Issued · 04/27/2023
Project M00846412 Alteration · LOC Issued · 04/10/2023
Project M00846427 Alteration · LOC Issued · 04/10/2023
Project M00226986 Alteration · LOC Issued · 10/07/2019
Project M00227050 Alteration · LOC Issued · 10/07/2019
Interpublic Group (IPG)OfficeFloor 24
Project M00688667 Alteration · LOC Issued · 03/25/2022
Project M00682929 Alteration · LOC Issued · 03/23/2022
Project M00688680 Alteration · LOC Issued · 03/23/2022
Project M00683696 Alteration · LOC Issued · 03/22/2022
Ipg Dxtra-paremovalOfficeFloor 12
Project M00448570 Alteration · LOC Issued · 01/25/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 4,385 on file (BIS + DOB NOW)
▸Plans & Drawings73
▸DOB NOWPlans/Sketch64
09/06/2026M01353161-I1Request digital key ↗
09/06/2026M00049562-I1Request digital key ↗
09/02/2026M00683696-I1Request digital key ↗
Showing 3 of 64 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler4
09/05/2026M00226986-I1Request digital key ↗
09/04/2026M00373295-I1Request digital key ↗
09/03/2026M00448570-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
09/05/2026M00227050-I1Request digital key ↗
09/04/2026M00373248-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
09/04/2026M00383266-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00392688-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/04/2026M00373287-I1Request digital key ↗
▸Applications & Permits742
▸BISPLAN / WORK APPROVAL APPLICATION423
08/22/2025123276506Open ↗
08/25/2023123397715Open ↗
07/28/2023123397715Open ↗
Showing 3 of 423 on file for this type
▸BISWORK PERMIT APPLICATION314
11/02/2020140958079Open ↗
10/21/2020140958079Open ↗
10/05/2020140945468Open ↗
Showing 3 of 314 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications1,152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION659
05/06/2020123913079Open ↗
05/06/2020123913079Open ↗
03/17/2020123722196Open ↗
Showing 3 of 659 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST133
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 133 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT100
09/25/2020140958079Open ↗
08/31/2020140945468Open ↗
08/07/2020140936414Open ↗
Showing 3 of 100 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature71
09/06/2026M01353161-I1Open ↗
09/06/2026M00049562-I1Open ↗
09/05/2026M00227050-I1Open ↗
Showing 3 of 71 on file for this type
▸DOB NOWProgress Inspector Seal & Signature51
10/04/2026M00846395-P3Open ↗
10/04/2026M00846395-P3Open ↗
10/04/2026M00846395-P3Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature40
10/18/2026M01366604-I1Open ↗
10/04/2026M00846395-P3Open ↗
09/29/2026M00846427-I1Open ↗
Showing 3 of 40 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
09/25/2020140958079Open ↗
08/31/2020140945468Open ↗
08/07/2020140936414Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
08/31/2020140945468Open ↗
08/07/2020140936414Open ↗
Showing 2 of 5 on file for this type
▸Trade Schedules & Equipment469
▸BISSELF-CERT PLUMBING NOTICE134
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 134 on file for this type
▸BISSCHEDULE B - PLUMBING105
09/18/2020123579715Open ↗
Showing 1 of 105 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE70
01/22/2020123684717Open ↗
Showing 1 of 70 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA64
06/30/2025122226769Open ↗
06/22/2023123762384Open ↗
06/08/2022123072664Open ↗
Showing 3 of 64 on file for this type
▸BISEQUIPMENT USE PERMITS47
03/13/2020123722196Open ↗
03/13/2020123722196Open ↗
Showing 2 of 47 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT20
03/13/2020123722196Open ↗
Showing 1 of 20 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8519
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-846
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos394
▸BISASBESTOS: CERTIFICATION (DEP ACP5)185
08/31/2020140945468Open ↗
08/07/2020140936414Open ↗
06/02/2020123913079Open ↗
Showing 3 of 185 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'108
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 108 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report66
09/06/2026M01353161-I1Open ↗
09/05/2026M00227050-I1Open ↗
09/04/2026M00373287-I1Open ↗
Showing 3 of 66 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISASBESTOS: EXEMPTION (ASB4)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance190
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS128
03/17/2020123722196Open ↗
03/17/2020123722196Open ↗
03/02/2020123716657Open ↗
Showing 3 of 128 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS36
01/08/2021123913079Open ↗
11/13/2020123376587Open ↗
10/22/2020140936414Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
01/08/2021123913079Open ↗
11/13/2020123376587Open ↗
10/22/2020140936414Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/07/2020140936414Open ↗
Showing 1 of 2 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWEN2: As Built Energy Analysis1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports33
▸BISTECHNICAL REPORT: RESPONSIBILITY20
07/31/2023123397715Open ↗
07/27/2023123397715Open ↗
02/09/2023123397715Open ↗
Showing 3 of 20 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/09/2023123397715Open ↗
▸Approvals, Objections & Sign-offs375
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST209
07/01/2025122226769Open ↗
08/28/2023123397715Open ↗
06/23/2023123762384Open ↗
Showing 3 of 209 on file for this type
▸BISADMINISTRATIVE OBJECTIONS111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 111 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION38
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 38 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL2
02/09/2023123397715Open ↗
01/27/2022140958079Open ↗
▸Cost, Insurance & Ownership484
▸BISCOST AFFIDAVIT480
06/14/2023123762384Open ↗
01/25/2022140945468Open ↗
01/21/2022140945468Open ↗
Showing 3 of 480 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW34
03/26/2025122226769Open ↗
06/14/2023123762384Open ↗
02/09/2023123397715Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms424
▸BISEFILING COVER SHEET270
05/06/2020123913079Open ↗
Showing 1 of 270 on file for this type
▸BISBOROUGH INTAKE FORM82
05/15/2020123415330Open ↗
05/01/2020123684717Open ↗
03/17/2020123722196Open ↗
Showing 3 of 82 on file for this type
▸BISADDITIONAL INFORMATION57
04/01/2021140958079Open ↗
02/14/2020123716657Open ↗
01/31/2020123722196Open ↗
Showing 3 of 57 on file for this type
▸BISeFiling Job Application Cover Sheet15
09/25/2020140958079Open ↗
08/31/2020140945468Open ↗
08/07/2020140936414Open ↗
Showing 3 of 15 on file for this type
▸Other Documents18
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSupporting Document: Fee Exempt2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type