← Back
BROOKLYN
The 1000 Lorimer Street Condominium
992 MANHATTAN AVENUE · BIN 3065591
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
LL97 CoveredRent Stabilized1 Open Violation ▸FDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionCivilGeneral
Permit Issued — active, not yet Signed-off
Roof18p · 10 filings · 20 docs
Bulkhead2p · 2 filings · 20 docs
Floor 54p · 4 filings · 20 docs
Floor 43p · 4 filings · 20 docs
Floor 33p · 4 filings · 20 docs
Floor 23p · 4 filings · 20 docs
Floor 1Under Construction20p · 8 filings · 20 docs
Cellar22p · 9 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY1407/08/2026
SPEARHEAD CONTRACTING11807/08/2026
CLASSIC CONSULTING GROUP707/08/2026
KRANTZ & LEVINSON LLC903/22/2026
PLATINUM SERCES NY LLC103/22/2026
CONTRACTING LLC SPEARHEAD203/22/2026
723 MANHATTAN GL1903/21/2026
WALGREEN303/21/2026
ECKERD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RICHARD WAINER ARCHITECT, PLLC1203/21/2026
ADVANCED BUILDERS SERVICES903/21/2026
LOUIS STRIAR403/21/2026
BURNHAM NATIONWIDE INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPEARHEAD CONTRACTING LLCGeneral Contractor1707/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor1007/08/2026
BEST MECHANICAL SVCS INCPlumbing507/08/2026
DGC CAPITAL CONTRACTING CORPGeneral Contractor407/08/2026
CLASSIC CONSULTING GROUPGeneral Contractor307/08/2026
FULL CAPACITY FIREPlumbing303/22/2026
L S SIGNScaffold207/08/2026
STANISLAV UMANSKIYElectrical203/21/2026
L.S. SIGN CO., INCGeneral Contractor107/08/2026
SHELBY ELECTRICAL CORPElectrical103/22/2026
FULL CAPACITY FIRE CORPFire Protection107/08/2026
RIGHTWAY PLBG AND HTG INCFire Protection107/08/2026
FRANCISCO A NUNEZElectrical103/21/2026
IGNITE PLUMBING & HEATINGPlumbing107/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RYAN SPECIAL ENGINEERING2018810/08/2024
AMERICAN CONSTRUCTION TES9731107/12/2024
REGIONAL TESTING CORP.3941505/29/2024
MOHAMMAD AHEAD - PROFESSI9286105/23/2024
HRF SERVICES CORP5616102/07/2024
Building Lifecycle
All (220)Filed (40)Permit Issued (30)Signed Off (19)Violation (57)Inspection (20)Objection (24)Special Inspection (30)
08/03/2026
Violation issued (ECB, open)
Elevators
12/23/2025
Permit issued — Structural
B01077047-I1-ST
01/24/2025
Signed off — Alteration
B01033446-I1
01/22/2025
Signed off — Alteration
Mechanical modification as per plans filed herewith
B01033499-I1
01/10/2025
Permit issued — Mechanical Systems
B01033499-I1-MS
01/07/2025
Signed off — Alteration
Sprinkler modification work as per plans filed herewith. No change in use, egress or occupancy under our application
B01033518-I1
12/27/2024
Signed off — Alteration
Plumbing work as per plans filed herewith. No change in use, egress or occupancy under our application
B01033510-I1
11/21/2024
Signed off — Alteration
MARQUEE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01049387-I1
11/21/2024
Signed off — Alteration
ILLUMINATED SIGN ON FRONT FASCIA OF MARQUEE FILED UNDER APPLICATION B01049387 - SWEETGREEN. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
B01049381-I1
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
10/08/2024
Filed — Alteration
Plumbing work as per plans filed herewith. No change in use, egress or occupancy under our application
B01033510-P2
09/30/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
09/18/2024
Permit issued — Sign
B01049381-I1-SG
09/18/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/14/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
08/26/2024
Special inspection requirement — Sprinkler Systems
William Ryan
08/22/2024
Filed — Alteration
Sprinkler modification work as per plans filed herewith. No change in use, egress or occupancy under our application
B01033518-P1
08/22/2024
Filed — Alteration
Plumbing work as per plans filed herewith. No change in use, egress or occupancy under our application
B01033510-P1
08/22/2024
Special inspection requirement — Tenant Protection Plan Compliance
William Ryan
08/13/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/12/2024
Filed — Alteration
B01077047-I1
07/03/2024
Permit issued — Structural
B01049387-I1-GC-CX
07/02/2024
Signed off — Alteration
B00998883-I1
07/02/2024
Permit issued — Sign
B01049381-I1-SG
06/24/2024
Signed off — Alteration
PLUMBING WORK FOR AN ALTERATION TO A FIVE (5) STORY MIX USE BUILDING. FILED IN CONJUNCTION WITH ALT TYPE 1 #322046200
B00395403-I1
06/24/2024
Objection resolved — Addressed
06/24/2024
Objection resolved — Addressed
06/21/2024
Signed off — Alteration
Plumbing work for daycare as per plans filed.
B00859776-I1
06/18/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/18/2024
Objection resolved — Addressed
06/17/2024
Signed off — Alteration
Interior architectural build-out of daycare as per plans filed.
B00859751-I1
06/17/2024
Signed off — Alteration
B00859773-I1
06/14/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/07/2024
Special inspection requirement — Preliminary
Paul Raymond
06/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/07/2024
Special inspection requirement — Final
Paul Raymond
06/05/2024
Objection raised — Other
06/05/2024
Objection raised — Other
06/04/2024
Objection resolved — Addressed
06/03/2024
Objection raised — Other
05/29/2024
Filed — Alteration
Interior architectural build-out of daycare as per plans filed.
B00859751-P1
05/29/2024
Objection raised — Other
05/29/2024
Objection raised — Scope
05/29/2024
Objection raised — Other
05/29/2024
Objection raised — Scope
05/29/2024
Objection raised — Other
05/29/2024
Special inspection requirement — Maintenance information
Paul Raymond
05/29/2024
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
05/29/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
05/29/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
05/29/2024
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedDGC CAPITAL CONTRACTING CORP12/23/2025
DOB NOWMechanical SystemsSigned-offDGC CAPITAL CONTRACTING CORP01/10/2025
DOB NOWSignSigned-offWEINFELD, ELLIOT09/18/2024
DOB NOWStructuralSigned-offL.S. SIGN CO., INC07/03/2024
DOB NOWSignSigned-offWEINFELD, ELLIOT07/02/2024
DOB NOWPlumbingSigned-offIGNITE PLUMBING & HEATING05/24/2024
DOB NOWSprinklersSigned-offFULL CAPACITY FIRE CORP05/17/2024
DOB NOWGeneral ConstructionSigned-offDGC CAPITAL CONTRACTING CORP05/15/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC05/10/2024
DOB NOWMechanical SystemsSigned-offSPEARHEAD CONTRACTING LLC05/07/2024
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC02/06/2024
DOB NOWConstruction FenceSigned-offSPEARHEAD CONTRACTING LLC10/24/2023
DOB NOWGeneral ConstructionSigned-offSPEARHEAD CONTRACTING LLC06/28/2023
DOB NOWMechanical SystemsSigned-offSPEARHEAD CONTRACTING LLC06/13/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC05/02/2023
DOB NOWStandpipeSigned-offBEST MECHANICAL SVCS INC04/24/2023
DOB NOWPlumbingSigned-offBEST MECHANICAL SVCS INC01/18/2023
DOB NOWSprinklersSigned-offRIGHTWAY PLBG AND HTG INC01/06/2023
DOB NOWMechanical SystemsSigned-offSPEARHEAD CONTRACTING LLC12/16/2022
DOB NOWStructuralSigned-offSPEARHEAD CONTRACTING LLC12/09/2022
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC11/04/2022
DOB NOWConstruction FenceSigned-offSPEARHEAD CONTRACTING LLC11/02/2022
DOB NOWSupported ScaffoldSigned-offCLASSIC CONSULTING GROUP09/24/2022
DOB NOWSidewalk ShedSigned-offCLASSIC CONSULTING GROUP09/23/2022
DOB NOWConstruction FenceSigned-offSPEARHEAD CONTRACTING LLC11/08/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/01/2021
DOB NOWSupported ScaffoldSigned-offPLATINUM SERVICES NY LLC10/01/2021
DOB NOWConstruction FenceSigned-offSPEARHEAD CONTRACTING LLC11/13/2020
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/22/2020
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC10/22/2020
BIS—ISSUEDSPEARHEAD CONTRACTING LLC10/24/2023
BIS—ISSUEDSPEARHEAD CONTRACTING LLC10/18/2023
BIS—ISSUEDSPEARHEAD CONTRACTING LLC11/01/2022
BIS—ISSUEDSPEARHEAD CONTRACTING LLC08/17/2022
BISOTISSUEDSPEARHEAD CONTRACTING LLC06/14/2022
BISOTISSUEDXOLLE DEMO LLC10/07/2021
BIS—ISSUEDSPEARHEAD CONTRACTING LLC09/09/2021
BISOTISSUEDXOLLE DEMO LLC04/09/2021
BISOTISSUEDM. FRIED STORE FIXTURES,03/16/2020
BIS—ISSUEDNORTH SHORE NEON SIGN CO.08/02/2007
+ 3 more permits on file
8 projects · most recent 10/31/2024
General Wiring
FiledStatusContractorScope
10/31/2024CompleteSHELBY ELECTRICAL CORPGeneral Wiring
10/31/2024CompleteSHELBY ELECTRICAL CORP—
07/03/2024CompleteMAXIMUM ELECTRIC CORP.General Wiring
06/14/2024CompleteB.P. ELECTRIC CORPGeneral Wiring
01/04/2024CompleteB.P. ELECTRIC CORPGeneral Wiring
02/16/2023CompleteSTAR ELEC'L CONTRACTORS C—
12/08/2022CompleteRICHARD NEU—
10/13/2020CompleteILLUMINOUS ELECTRIC CORP.—
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/14/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/13/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
07/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/01/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/01/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/01/2023Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
11/29/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/29/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/29/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/03/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/15/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/31/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/14/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
10/09/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
09/30/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
08/26/2024Sprinkler SystemsWilliam Ryanspecial
08/26/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
08/22/2024Tenant Protection Plan ComplianceWilliam Ryanspecial
06/07/2024Fire-Resistant Penetrations and JointsPaul Raymondspecial
06/07/2024Energy Code Compliance InspectionsPaul Raymondprogress
06/07/2024FinalPaul Raymondprogress
06/07/2024PreliminaryPaul Raymondprogress
05/29/2024Energy Code Compliance InspectionsPaul Raymondprogress
05/29/2024HVAC and service water heating system controls Paul Raymondenergy_progress
05/29/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
05/29/2024Maintenance informationPaul Raymondenergy_progress
05/29/2024HVAC insulation and sealing Paul Raymondenergy_progress
05/29/2024HVAC and service water heating equipment Paul Raymondenergy_progress
05/23/2024Structural Steel - DetailsMOHAMMAD AHEADspecial
05/23/2024Structural Steel - High Strength BoltingMOHAMMAD AHEADspecial
05/20/2024HVAC and service water heating equipment Paul Raymondenergy_progress
05/20/2024Maintenance informationPaul Raymondenergy_progress
05/20/2024HVAC and service water heating system controls Paul Raymondenergy_progress
05/20/2024HVAC insulation and sealing Paul Raymondenergy_progress
05/20/2024Energy Code Compliance InspectionsPaul Raymondprogress
05/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
05/10/2024Tenant Protection Plan ComplianceMOHAMMAD AHEADspecial
05/10/2024FinalADITYA DESAIprogress
Latest 25 of 95.
▾Documents — 406 on file (BIS + DOB NOW)
▸Plans & Drawings43
▸DOB NOWPlans/Sketch20
09/01/2026B00546011-I1Request digital key ↗
08/28/2026B08009484-P1Request digital key ↗
08/28/2026B08009484-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
09/01/2026B00395403-I1Request digital key ↗
09/01/2026B00395403-P2Request digital key ↗
08/15/2026B00395403-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/01/2026B00395406-I1Request digital key ↗
09/01/2026B00395406-P3Request digital key ↗
08/14/2026B00395406-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems3
09/01/2026B00340065-I1Request digital key ↗
09/01/2026B00340065-P2Request digital key ↗
08/15/2026B00340065-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold3
09/02/2026B00411976-P1Request digital key ↗
09/02/2026B00411976-P2Request digital key ↗
09/02/2026B00411976-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/02/2026B00411976-I1Request digital key ↗
09/02/2026B00411976-P2Request digital key ↗
09/02/2026B00411976-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural3
09/01/2026B00334898-I1Request digital key ↗
08/15/2026B00334898-P2Request digital key ↗
08/15/2026B00334898-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
09/01/2026B00395406-S1Request digital key ↗
08/14/2026B00395406-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence2
09/02/2026B00340228-P1Request digital key ↗
09/02/2026B00340228-I1Request digital key ↗
▸Applications & Permits63
▸BISPLAN / WORK APPROVAL APPLICATION55
04/15/2024322046200Open ↗
04/11/2024322114074Open ↗
04/02/2024322046200Open ↗
Showing 3 of 55 on file for this type
▸BISWORK PERMIT APPLICATION5
06/21/2022340753697Open ↗
10/12/2021340753697Open ↗
09/10/2021322046200Open ↗
Showing 3 of 5 on file for this type
▸BISPARTIAL DEMO: 10-DAY NOTICE (FOR AL/EW-OT PERMITS)1
03/05/2021340753697Open ↗
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
08/25/2021322046200Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
11/22/2023302222663Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM2
06/15/2021322046200Open ↗
03/22/2021322046200Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/09/2024322114074Open ↗
▸BISADDRESS VERIFICATION: APPLICATION FORSTREET # & PD1 - HOUSE #S IN RED DO NOT MATCH PW1/SECTION #1. PROVIDE BOTHFOR 1000 LORIMER STREET PRIOR TO FCO.1
07/15/2025322046200Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
02/05/2021322046200Open ↗
▸BISVERIFY TAX LOT1
11/06/2023322046200Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/15/2025322046200Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
02/05/2021322046200Open ↗
▸Seals & Professional Certifications107
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/02/2026B00411976-I1Open ↗
09/02/2026B00411976-P1Open ↗
09/02/2026B00411976-P2Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWProgress Inspector Seal & Signature34
09/01/2026B00395403-I1Open ↗
09/01/2026B00395403-I1Open ↗
09/01/2026B00395403-I1Open ↗
Showing 3 of 34 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/01/2026B00395403-I1Open ↗
09/01/2026B01033518-I1Open ↗
09/01/2026B00334898-I1Open ↗
Showing 3 of 27 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
01/12/2021340798239Open ↗
Showing 1 of 3 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment6
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
12/01/2023322046200Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
02/12/2024322046200Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
12/01/2023322046200Open ↗
▸BISSPRINKLER SYSTEMS1
12/01/2023322046200Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/11/2024322046200Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
03/27/2024322046200Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
07/07/2023340798239Open ↗
08/25/2021322046200Open ↗
▸BISSTREET TREE CHECKLIST2
01/12/2021340798239Open ↗
Showing 1 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
01/12/2021340798239Open ↗
▸BISSTREET TREE SIGNOFF1
05/27/2024322046200Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report25
08/25/2026B01033510-I1Open ↗
08/25/2026B01033510-P1Open ↗
08/25/2026B01033446-I1Open ↗
Showing 3 of 25 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/03/2021322046200Open ↗
02/04/2021340753697Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
11/28/2023322046200Open ↗
11/21/2023322046200Open ↗
07/29/2021322046200Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00395403-I1Open ↗
08/13/2026B00340065-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/01/2023322046200Open ↗
▸BISFENESTRATION AREAS1
12/01/2023322046200Open ↗
▸BISHVAC INSULATION AND SEALING1
01/11/2024322046200Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/01/2023322046200Open ↗
▸BISLIGHTING IN DWELLING UNITS1
12/01/2023322046200Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
12/01/2023322046200Open ↗
▸Inspections & Test Reports26
▸BISTECHNICAL REPORT: RESPONSIBILITY15
11/28/2023322046200Open ↗
11/28/2023322046200Open ↗
11/20/2023340753697Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION2
02/05/2021322046200Open ↗
02/05/2021322046200Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/29/2021322046200Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/01/2023322046200Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/01/2023322046200Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
12/01/2023322046200Open ↗
▸BISMASONRY1
12/01/2023322046200Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/01/2023322046200Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
12/01/2023322046200Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/01/2023322046200Open ↗
▸BISSOIL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs38
▸BISSCHEDULE A - OCCUPANCY / USE32
04/15/2024322046200Open ↗
04/02/2024322046200Open ↗
02/08/2024322046200Open ↗
Showing 3 of 32 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION4
05/09/2024322114074Open ↗
01/12/2024322046200Open ↗
12/07/2023322046200Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
11/21/2023340753697Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
03/01/2021322046200Open ↗
Showing 1 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE3
10/12/2021340753697Open ↗
08/25/2021322046200Open ↗
03/05/2021340753697Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW32
12/11/2023322046200Open ↗
11/20/2023340753697Open ↗
▸Filing & Intake Forms21
▸BISADDITIONAL INFORMATION13
04/19/2024322046200Open ↗
01/12/2024322046200Open ↗
12/07/2023322046200Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET5
04/11/2024322114074Open ↗
Showing 1 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
01/12/2021340798239Open ↗
Showing 1 of 3 on file for this type
▸Other Documents11
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
11/24/2023322046200Open ↗
06/15/2021322046200Open ↗
03/01/2021322046200Open ↗
Showing 3 of 4 on file for this type
▸BISUNDERPINNING (2014)2
12/01/2023322046200Open ↗
12/01/2023322046200Open ↗
▸BISPLOT DIAGRAM2
01/12/2024322046200Open ↗
Showing 1 of 2 on file for this type
▸BISSUSTAINABLE ROOF ZONE FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/01/2023322046200Open ↗
▸BISMAINTENANCE INFORMATION1
12/01/2023322046200Open ↗