| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01440597 ↗ | 111 EAST 59 STREET MANHATTAN | — | Permit Issued | — | 09/18/2026 | Owner Lincoln Property Company Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01425719 ↗ | 722 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 09/14/2026 | Owner 133 E. 58TH STREET, LLC Contractor SYNERGY CONSTRUCTION INC Filer BURNHAM NATIONWIDE INC | Interior fit-out of Doctors Office at the existing partial 3rd floor of 133 East 58th Street. No change in use, egress, or occupancy. |
| M01334943 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 06/04/2026 | Contractor JT MAGEN & COMPANY INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE CELLAR, 1-2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU… |
| M01352230 ↗ | 291 BROADWAY MANHATTAN | Alteration CO | Permit Issued | 02/09/2026 | 05/14/2026 | Owner WILLIAM MACKLOWE COMPANY Contractor SYNERGY CONSTRUCTION INC Filer DVA Advisors | Application filed to convert the 17th floor to residential use as shown on filed plans |
| M01138985 ↗ | 56 EAST 54 STREET MANHATTAN | Alteration CO | Permit Issued | 12/02/2024 | 04/16/2026 | Owner EBRO DIQUE GROUP, LLC Contractor MJM CONSTR ASSOCIATES LLC Filer JM ZONING, LLC. | SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS |
| B00655003 ↗ | 19 ROCKWELL PLACE BROOKLYN | New Building | Permit Issued | 02/02/2022 | 04/02/2026 | Owner 19 ROCKWELL PLACE LLC Contractor NY DEVELOPERS & MANAGEMEN Filer JM ZONING, LLC. | Superstructure drawings filed in conjunction with NB |
| Person | Filings | Most recent |
|---|---|---|
| DANIEL GOLDNER | 35 | 08/04/2026 |
| DAVIS ISZARD | 1 | 12/14/2020 |
| Name | Projects together | Most recent |
|---|---|---|
| GEA CONSULTING ENGINEERS | 3 | 05/27/2025 |
| ETTINGER ENGINEERING ASSOCIATES | 2 | 07/30/2026 |
| 2LS CONSULTING ENGINEERING, DPC | 1 | 11/19/2025 |
| AKF ENGINEERS, LLP | 1 | — |
| ANCORA ENGINEERING, PLLC | 1 | 09/08/2026 |
| CHRISTIE ENGINEERING, PC | 1 | 08/19/2021 |
| FMC ENGINEERING | 1 | 03/20/2026 |
| GACE DPC | 1 | 07/30/2026 |
| OSPINO ENGINEERING PLLC | 1 | 07/30/2026 |
| VENTROP ENGINEERING CONSULTING GROU | 1 | 09/08/2026 |
| WEXLER ASSOCIATES | 1 | 11/19/2025 |
| WSP | 1 | 09/08/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| SYNERGY CONSTRUCTION INC | 11 | 08/03/2026 |
| TRITON CONSTRUCTION CO., | 4 | 05/27/2025 |
| ACC CONSTRUCTION CORP | 3 | 11/10/2022 |
| COLGATE RESTORATION CORP | 2 | 08/19/2021 |
| DEMAR MECHANICAL INC | 2 | 05/21/2025 |
| DEMAR PLUMBING CORP | 2 | 05/21/2025 |
| F.S. SITE CORP | 2 | 07/30/2026 |
| MCALPINE CONTRACTING CO | 2 | 10/12/2023 |
| MJM CONSTR ASSOCIATES LLC | 2 | 07/30/2026 |
| ALPS CONTRACTOR INC | 1 | 07/30/2026 |
| BNK COOLING & HEATING COR | 1 | 09/08/2026 |
| CAPITAL CONCRETE NY INC | 1 | 09/08/2026 |
| DEPENDABLE MECH CORP | 1 | — |
| E AND G MODICA CONTRACTIN | 1 | 02/22/2022 |
| EAST RIVER CONTRACTING CO | 1 | 07/02/2021 |
| EBRO DIQUE GROUP, LLC | 1 | 07/30/2026 |
| FIVE BOROUGH NYC LLC | 1 | — |
| GAVASK INC | 1 | 10/18/2021 |
| GREGG NY PLUMBING, INC | 1 | 06/24/2021 |
| JT MAGEN & COMPANY INC | 1 | 12/22/2025 |
| KANARIS CONTRACTING CORP | 1 | 07/09/2018 |
| LEO'S CONTRACTING GROUP C | 1 | 06/24/2021 |
| MJM ASSOCIATES CONSTR LLC | 1 | 09/22/2025 |
| MPI PLUMBING CORP | 1 | 09/08/2026 |
| NORTHEAST SPECIALIST GROU | 1 | 09/22/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| WILLIAM MACKLOWE COMPANY | 8 | 03/20/2026 |
| HOPE STREET CAPITAL | 2 | 05/27/2025 |
| Lincoln Property Company | 2 | 07/24/2025 |
| 133 E. 58TH STREET, LLC | 1 | 08/03/2026 |
| 19 ROCKWELL PLACE LLC | 1 | 09/08/2026 |
| 45 JOHN STREET NY LLC | 1 | 10/18/2021 |
| EBRO DIQUE GROUP, LLC | 1 | 07/30/2026 |
| East 54 Hotel Leasehold LLC | 1 | 07/30/2026 |
| SOLOW REALTY & DEVELOPMEN | 1 | 07/27/2022 |
| VERNON ASSOCIATES LLC | 1 | 07/02/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 9 | 07/24/2025 |
| JM ZONING, LLC. | 4 | 09/08/2026 |
| WILLIAM VITACCO ASSOCIATES | 4 | 05/27/2025 |
| BURNHAM NATIONWIDE INC | 1 | 08/03/2026 |
| DVA Advisors | 1 | 03/20/2026 |
| HIGHRISE GROUP NYC, INC | 1 | 07/27/2022 |
| Hierarch-E LLC | 1 | 07/30/2026 |
| IDA GALEA, ARCHITECT | 1 | 08/19/2021 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 10/18/2021 |
| SPEEDY EXPEDITING INC | 1 | 09/08/2026 |
| YBL NY INC | 1 | 06/24/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01440597 ↗ | 111 EAST 59 STREET MANHATTAN | — | Permit Issued | — | 09/18/2026 | Owner Lincoln Property Company Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | SPRINKLER MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01425719 ↗ | 722 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/03/2026 | 09/14/2026 | Owner 133 E. 58TH STREET, LLC Contractor SYNERGY CONSTRUCTION INC Filer BURNHAM NATIONWIDE INC | Interior fit-out of Doctors Office at the existing partial 3rd floor of 133 East 58th Street. No change in use, egress, or occupancy. |
| M01334943 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Permit Issued | 12/22/2025 | 06/04/2026 | Contractor JT MAGEN & COMPANY INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE CELLAR, 1-2ND FLOORS AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCU… |
| M01352230 ↗ | 291 BROADWAY MANHATTAN | Alteration CO | Permit Issued | 02/09/2026 | 05/14/2026 | Owner WILLIAM MACKLOWE COMPANY Contractor SYNERGY CONSTRUCTION INC Filer DVA Advisors | Application filed to convert the 17th floor to residential use as shown on filed plans |
| M01138985 ↗ | 56 EAST 54 STREET MANHATTAN | Alteration CO | Permit Issued | 12/02/2024 | 04/16/2026 | Owner EBRO DIQUE GROUP, LLC Contractor MJM CONSTR ASSOCIATES LLC Filer JM ZONING, LLC. | SUSPENDED SCAFFOLD INSTALLATION FOR FACADE REPAIRS AND INSPECTIONS |
| B00655003 ↗ | 19 ROCKWELL PLACE BROOKLYN | New Building | Permit Issued | 02/02/2022 | 04/02/2026 | Owner 19 ROCKWELL PLACE LLC Contractor NY DEVELOPERS & MANAGEMEN Filer JM ZONING, LLC. | Superstructure drawings filed in conjunction with NB |
| M01323732 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Permit Issued | 12/16/2025 | 03/03/2026 | Contractor SYNERGY CONSTRUCTION INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 12TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01196092 ↗ | 56 EAST 54 STREET MANHATTAN | Alteration | Permit Issued | 04/14/2025 | 10/21/2025 | Contractor MJM ASSOCIATES CONSTR LLC Filer JM ZONING, LLC. | SPRINKLER WORK ASSOCIATED WITH COMMERCIAL SPACE; NO CHANGE IN USE, OCCUPANCY, OR EGRESS |
| M01243521 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Permit Issued | 07/24/2025 | 08/06/2025 | Owner Lincoln Property Company Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR, SUITE 1100 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OC… |
| B01217929 ↗ | 522 PACIFIC STREET BROOKLYN | Alteration | Permit Issued | 05/23/2025 | 06/26/2025 | Owner HOPE STREET CAPITAL Contractor TRITON CONSTRUCTION CO., | Mechanical work for Tenants B and D. |
| B00862078 ↗ | 539 VANDERBILT AVENUE BROOKLYN | Alteration | Permit Issued | 02/05/2025 | 03/15/2025 | Contractor TRITON CONSTRUCTION CO., | Sprinkler work for medical office fitout (Maimonides) |
| B00862010 ↗ | 544 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 05/15/2024 | 09/12/2024 | Contractor DEMAR PLUMBING CORP | Sprinkler/Standpipe work for commercial space (Medical Tenant F - Maimonides) |
| M01068048 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 08/23/2024 | 08/27/2024 | Contractor SYNERGY CONSTRUCTION INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01072051 ↗ | 100 BROAD STREET MANHATTAN | No Work | Filed — no permit on record | 06/28/2024 | — | — | — |
| M01013615 ↗ | 721 COLUMBUS AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 06/12/2024 | — | Filer JM ZONING, LLC. | — |
| M01024549 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 05/15/2024 | 05/23/2024 | Contractor SYNERGY CONSTRUCTION INC | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 6TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00990073 ↗ | 156 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 01/19/2024 | 01/24/2024 | Owner WILLIAM MACKLOWE COMPANY Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00915615 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 10/12/2023 | 10/20/2023 | Contractor MCALPINE CONTRACTING CO | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M08014530 ↗ | 323 EAST 61ST STREET MANHATTAN | Alteration | Signed-off | 11/10/2022 | 11/21/2022 | Owner WILLIAM MACKLOWE COMPANY Contractor ACC CONSTRUCTION CORP Filer RIZZO GROUP | General construction to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy. |
| M07997568 ↗ | 323 EAST 61ST STREET MANHATTAN | Alteration | Signed-off | 09/14/2022 | 09/27/2022 | Contractor ACC CONSTRUCTION CORP | General construction to the 1st floor as per plans filed herewith. No change in use, egress, or occupancy. |
| B00706412 ↗ | 522 PACIFIC STREET BROOKLYN | Alteration | Signed-off | 06/15/2022 | 08/08/2022 | Owner HOPE STREET CAPITAL Contractor TRITON CONSTRUCTION CO., | General Construction associated with medical office build out at retail space as shown on plans |
| M00756905 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 06/27/2022 | 07/07/2022 | Owner WILLIAM MACKLOWE COMPANY Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 7TH AND 8TH FLOOR AS PER DRAWINGS FILED HEREWITH.NO CHANGE IN USE, EGRESS OR OCCUPANC… |
| M00742975 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 06/02/2022 | 06/13/2022 | Owner WILLIAM MACKLOWE COMPANY Contractor SYNERGY CONSTRUCTION INC Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 4TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00655030 ↗ | 323 EAST 61ST STREET MANHATTAN | Alteration | Signed-off | 06/07/2022 | 06/10/2022 | Owner WILLIAM MACKLOWE COMPANY Contractor ACC CONSTRUCTION CORP Filer RIZZO GROUP | General construction modifications to the cellar and floors 1-6 as per plans filed herewith. No change in use, egress, or occupancy. |
| M00675032 ↗ | 156 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 02/22/2022 | 05/17/2022 | Contractor E AND G MODICA CONTRACTIN | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 5TH, 8TH AND 10TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR … |
| M00503093 ↗ | 186 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2021 | 01/24/2022 | Contractor COLGATE RESTORATION CORP Filer IDA GALEA, ARCHITECT | Structural work for storefront as per plans filed herewith. |
| M00651864 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 01/04/2022 | 01/22/2022 | Contractor OMARA ORGANIZATION INC | General Construction modifications taking place on the 8th floor per plans filed herewith. No change in use, egress, or occupancy. |
| M00564382 ↗ | 1113 YORK AVENUE MANHATTAN | Alteration | Permit Issued | 08/26/2021 | 12/29/2021 | Contractor SECOND AVE SOLOW DEV CORP Filer HIGHRISE GROUP NYC, INC | INTERIOR BUILDOUT ON GROUND FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00580394 ↗ | 45 JOHN STREET MANHATTAN | Alteration | Permit Issued | 09/02/2021 | 10/06/2021 | Owner 45 JOHN STREET NY LLC Contractor GAVASK INC | Herewith Filing Interior Renovations at the Cellar, 1st Floor Lobby and individual apartments as outlined on the attached plans. Related Plu… |
| Q00440237 ↗ | 8-12 37 AVENUE QUEENS | Alteration | Signed-off | 07/02/2021 | 09/23/2021 | Owner VERNON ASSOCIATES LLC Contractor JRM CONSTRUCTION MANAGEME | Direct replacement of Two roof top packaged units with 5 ton and 15 ton cooling capacity. New units are to be installed on existing steel du… |
| M00485580 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 04/05/2021 | 07/27/2021 | Owner WILLIAM MACKLOWE COMPANY Contractor MCALPINE CONTRACTING CO Filer RIZZO GROUP | General construction modification on the 1st floor (retail demise) as per plans filed herewith. No change in use, egress, or occupancy. |
| M00531879 ↗ | 156 WILLIAM STREET MANHATTAN | Alteration | Signed-off | 06/24/2021 | 07/21/2021 | Contractor SYNERGY CONSTRUCTION INC | General construction modification within 3rd floor (tenant suites) as per plans filed herewith. No change in use, egress, or occupancy. |
| B00501890 ↗ | 4 AGATE COURT BROOKLYN | Alteration | Signed-off | 05/21/2021 | 07/01/2021 | Contractor LEO'S CONTRACTING GROUP C Filer YBL NY INC | PLUMBING WORK |
| M00503080 ↗ | 186 5 AVENUE MANHATTAN | Alteration | Signed-off | 04/15/2021 | 06/16/2021 | Contractor COLGATE RESTORATION CORP | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE |
| M00485885 ↗ | 111 EAST 59 STREET MANHATTAN | Alteration | Signed-off | 04/05/2021 | 05/12/2021 | Owner WILLIAM MACKLOWE COMPANY Contractor RENAISSANCE 1 CORP Filer RIZZO GROUP | General construction modification within ground floor as per plans filed herewith. No change in use, egress, or occupancy. |
| M00050631 ↗ | 186 5 AVENUE MANHATTAN | Alteration | Signed-off | 07/09/2018 | 07/23/2018 | Contractor KANARIS CONTRACTING CORP | installation of construction fence as per plans |
| Building | Filings | Most Recent |
|---|---|---|
| 722 LEXINGTON AVENUE ↗ | 1 | 07/02/2026 |
| 56 EAST 54 STREET ↗ | 5 | 06/25/2026 |
| 19 ROCKWELL PLACE ↗ | 12 | 01/09/2026 |
| 111 EAST 59 STREET ↗ | 13 | 06/18/2025 |
| 522 PACIFIC STREET ↗ | 5 | 04/29/2025 |
| 544 CLINTON AVENUE ↗ | 2 | 02/19/2025 |
| 721 COLUMBUS AVENUE ↗ | 2 | 03/01/2024 |
| 156 WILLIAM STREET ↗ | 3 | 01/12/2024 |
| 539 VANDERBILT AVENUE ↗ | 1 | 04/19/2023 |
| 323 EAST 61ST STREET ↗ | 3 | 10/03/2022 |
| 1113 YORK AVENUE ↗ | 2 | 07/14/2022 |
| 45 JOHN STREET ↗ | 3 | 10/13/2021 |
| 186 5 AVENUE ↗ | 5 | 08/16/2021 |
| 4 AGATE COURT ↗ | 4 | 06/18/2021 |
| 8-12 37 AVENUE ↗ | 1 | 12/14/2020 |
| 100 BROAD STREET ↗ | 1 | — |
| 291 BROADWAY ↗ | 1 | — |