| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01430672 ↗ | 99 PARK AVENUE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 8TH FLOOR PUBLIC CORRIDOR AND RESTROOMS, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, AND FIXTURES AS PER PLANS FILED HEREW… |
| M01409338 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR, INSTALLATION OF 2-HOUR RATED DEMISING PARTITIONS FOR TENANT SPACES AND ELEVATOR CORRIDOR AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01430489 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANG… |
| M01441303 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR NORTH TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY … |
| M01441803 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 09/14/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 35TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGR… |
| M01193832 ↗ | 15 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 09/11/2026 | Design GARO GUMUSYAN Owner AKAM ASSOCIATES, INC. Contractor EDR CONST & MGMT INC | At apartment 12U/12V, removal and installation of interior partitions and finishes as per plans filed here with. No change to use, egress, o… |
| Person | Filings | Most recent |
|---|---|---|
| Saro Gumusyan | 40 | 08/05/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| GARO GUMUSYAN | 28 | 08/12/2026 |
| M.A. RUBIANO, P.E., P.C. | 6 | 01/21/2026 |
| RYAN SOAMES ENGINEERING | 2 | 03/08/2023 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 1 | 03/09/2021 |
| WAVIC ENGINEERING PLLC | 1 | 11/11/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| PRIME CONSTRUCTION MGMT | 5 | 07/13/2026 |
| STRUCTURE TONE, LLC | 5 | 08/12/2026 |
| TRI-STAR CONSTRUCTION COR | 5 | 08/12/2026 |
| INNER GAZE FURNITURE | 2 | 07/28/2025 |
| JRM CONSTRUCTION MGMT LLC | 2 | 05/07/2026 |
| MACREDDIN PLBG & HTG INC | 2 | 07/28/2025 |
| TULLA CONTRACTING CORP | 2 | 07/15/2025 |
| TVS MECHANICAL CORP | 2 | 03/08/2023 |
| A & E GENERAL PAINTING IN | 1 | 03/03/2026 |
| BT'S PLUMBING AND HEATING | 1 | 01/21/2026 |
| CHINATOWN P&H INC | 1 | 11/11/2021 |
| DEVO FIRE PROTECTION INC | 1 | 03/09/2021 |
| EDR CONST & MGMT INC | 1 | 05/05/2026 |
| FOUR STREETS COOL AIR INC | 1 | 04/28/2023 |
| GALICJA PLBG AND HTG.CORP | 1 | 11/11/2021 |
| GANIC PLUMBING & HTG INC | 1 | 12/30/2019 |
| GLOBAL HOLDINGS MGMT (US) | 1 | 06/10/2025 |
| INTERSTATE INTERIORS INC | 1 | 02/26/2021 |
| ISLAND INTERIORS DESIGN | 1 | 10/15/2025 |
| LOTUS METROPOLITAN CONSTR | 1 | 01/30/2024 |
| REVIT GROUP LLC | 1 | 10/28/2025 |
| TMS PLUMBING & HTG CORP | 1 | 03/09/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| 1250 BROADWAY ASSOCIATES LLC | 13 | 08/12/2026 |
| 99 PARK AVENUE ASSOCIATES LP | 9 | 08/12/2026 |
| 875 3RD AVENUE LLC | 2 | 04/07/2025 |
| 466 TENANTS CORP. | 1 | 04/10/2024 |
| 545 8TH AVENUE ASSOCIATES, LLC | 1 | 10/28/2025 |
| AKAM ASSOCIATES, INC. | 1 | 05/05/2026 |
| GLOBAL HOLDINGS | 1 | 10/14/2025 |
| UNIQUE REALTY | 1 | 11/11/2021 |
| WERWAISS & COMPANY, INC. | 1 | 01/30/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01430672 ↗ | 99 PARK AVENUE MANHATTAN | — | Permit Issued | — | 09/24/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 8TH FLOOR PUBLIC CORRIDOR AND RESTROOMS, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, AND FIXTURES AS PER PLANS FILED HEREW… |
| M01409338 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/06/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR, INSTALLATION OF 2-HOUR RATED DEMISING PARTITIONS FOR TENANT SPACES AND ELEVATOR CORRIDOR AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01430489 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 07/23/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR SOUTH TENANT SPACE AND SHARED CORRIDOR, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANG… |
| M01441303 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 09/16/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 27TH FLOOR NORTH TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY … |
| M01441803 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 08/12/2026 | 09/14/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 35TH FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGR… |
| M01193832 ↗ | 15 WEST 72 STREET MANHATTAN | Alteration | Permit Issued | 05/05/2026 | 09/11/2026 | Design GARO GUMUSYAN Owner AKAM ASSOCIATES, INC. Contractor EDR CONST & MGMT INC | At apartment 12U/12V, removal and installation of interior partitions and finishes as per plans filed here with. No change to use, egress, o… |
| M01370496 | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/13/2026 | 07/16/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 23RD FLOOR TERRACE, INSTALLATION OF A PASSIVE RECREATION SPACE IN COMPLIANCE WITH DOB BULLETIN #BB2018-002 AS PER PLANS FILED HEREWITH. N… |
| M01330264 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/03/2026 | 06/16/2026 | Design GARO GUMUSYAN Contractor A & E GENERAL PAINTING IN | AT 3RD-38TH FLOOR, REMOVAL OF EXISTING PLATE GLASS WINDOWS AND INSTALLATION OF NEW GLASS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCU… |
| M01396973 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 05/07/2026 | 06/16/2026 | Design GARO GUMUSYAN Contractor JRM CONSTRUCTION MGMT LLC | AT 1ST FLOOR TENANT SPACE, REMOVAL OF EXISTING PARTITIONS, CEILINGS, LIGHTING, AND FINISHES AS PER PLANS FILED HEREWITH. |
| B01228488 ↗ | 732 HALSEY STREET BROOKLYN | Alteration | Signed-off | 10/15/2025 | 04/01/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor ISLAND INTERIORS DESIGN | INSTALLATION OF NEW AIR CONDITIONING UNITS TO PROVIDE COOLING AND HEATING TO THE BUILDING. |
| B01265258 ↗ | 732 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 10/16/2025 | 03/30/2026 | Design M.A. RUBIANO, P.E., P.C. Contractor BT'S PLUMBING AND HEATING | SCOPE OF WORK: SCOPE OF WORK: INSTALLATION OF PLUMBING FIXTURES AND CONNECTING PIPING AND VALVES FOR ENTIRE BUILDING. |
| M01261884 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 02/27/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 2ND FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING, AND INTERIOR CONVENIENCE STAIR AS PER PLANS FIL… |
| M01261907 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 02/24/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 5TH FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01340890 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 01/15/2026 | 02/10/2026 | Design GARO GUMUSYAN Contractor STRUCTURE TONE, LLC | AT 33RD FLOOR TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRES… |
| M01238403 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 06/24/2025 | 01/29/2026 | Design GARO GUMUSYAN Contractor TULLA CONTRACTING CORP | AT 27TH FLOOR PUBLIC BATHROOMS, INSTALLATION OF INTERIOR PARTITIONS & FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR E… |
| M01299756 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 10/21/2025 | 01/20/2026 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 35TH FLOOR TENANT SPACE AND BATHROOMS, REMOVAL OF INTERIOR PARTITIONS, FINISHES, AND FIXTURES. AT BATHROOMS, INSTALLATION OF NEW PARTITIO… |
| M01261898 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 09/26/2025 | 01/14/2026 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 3RD FLOOR TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS, FINISHES, CEILING, FLOORING AS PER PLANS FILED HEREWITH. NO CHAN… |
| M01331079 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 12/19/2025 | — | Design GARO GUMUSYAN | — |
| M01259683 ↗ | 15 CENTRAL PARK WEST MANHATTAN | Alteration | Signed-off | 08/01/2025 | 12/02/2025 | Design GARO GUMUSYAN Owner GLOBAL HOLDINGS Contractor JRM CONSTRUCTION MGMT LLC | AT SUBCELLAR, CELLAR, AND 1ST FLOOR, REMOVAL OF EXISTING EXTERIOR STOREFRONT, PARTITIONS, CEILINGS, LIGHTING, AND FINISHES. AT FIRST FLOOR, … |
| M01299607 ↗ | 545 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/28/2025 | 11/24/2025 | Design GARO GUMUSYAN Contractor REVIT GROUP LLC | AT 18TH FLOOR TENANT SPACE #1810, INSTALLATION OF INTERIOR NON BEARING PARTITIONS AND DOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, O… |
| M01169863 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 02/12/2025 | 11/13/2025 | Design SARO GUMUSYAN ARCHITECTURE Contractor INNER GAZE FURNITURE | MODIFICATION TO EXISTING PLUMBING FIXTURES INCLUDING REMOVALS & NEW INSTALLATION. |
| M01231686 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2025 | 09/12/2025 | Design GARO GUMUSYAN Contractor GLOBAL HOLDINGS MGMT (US) | AT 99 PARK AVENUE SIDEWALK, REMOVAL OF OUTDOOR TEMPORARY STRUCTURE TO DISMISS VIOLATION #39139325H. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M01235803 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2025 | 08/29/2025 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 4TH FLOOR NORTH TENANT SPACE, INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR … |
| M01252373 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 07/15/2025 | 07/16/2025 | Design GARO GUMUSYAN Contractor TULLA CONTRACTING CORP | AT 26TH FLOOR SOUTH TENANT SPACE, REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AND FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE TO USE… |
| M01198183 ↗ | 99 PARK AVENUE MANHATTAN | Alteration | Signed-off | 05/12/2025 | 06/05/2025 | Design GARO GUMUSYAN Contractor PRIME CONSTRUCTION MGMT | AT 19TH FLOOR TENANT SPACE AND HALLWAYS, REMOVAL OF INTERIOR PARTITIONS & FINISHES AND INSTALLATION OF NEW PARTITIONS & FINISHES AS PER PLA… |
| M01214234 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 05/14/2025 | 05/20/2025 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 5TH AND 7TH FLOOR TENANT SPACES, MODIFICATION AND REPAIR WORK INCLUDING NEW CEILING, FLOORING, MILLWORK, DOORS, AND FINISHES AS PER PLANS… |
| M01197616 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 04/07/2025 | — | Design GARO GUMUSYAN Owner 875 3RD AVENUE LLC | — |
| M01188807 ↗ | 99 PARK AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 04/01/2025 | — | Design GARO GUMUSYAN | — |
| M01195230 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Signed-off | 03/20/2025 | 03/24/2025 | Design GARO GUMUSYAN Contractor TRI-STAR CONSTRUCTION COR | AT 4TH, 6TH, AND 32ND FLOOR TENANT SPACE, REPAIR WORK INCLUDING NEW CEILING, FLOORING, MILLWORK, DOORS, AND FINISHES AS PER PLANS FILED HERE… |
| Q00994241 ↗ | 38-78 REVIEW AVENUE QUEENS | Alteration | Signed-off | 01/30/2024 | 05/10/2024 | Design M.A. RUBIANO, P.E., P.C. Owner WERWAISS & COMPANY, INC. Contractor LOTUS METROPOLITAN CONSTR | REPLACE EXISYING CONDENSING UNIT ON ROOF AND AC UNIT AT CEILING OF FIRST FLOOR WITH NEW EQUIPMENT. CONNECTING CONDENSING UNIT TO AC UNIT BY … |
| M00891539 ↗ | 466 WASHINGTON STREET MANHATTAN | Alteration | Signed-off | 06/27/2023 | 11/02/2023 | Design SARO GUMUSYAN ARCHITECTURE Owner 466 TENANTS CORP. Contractor INNER GAZE FURNITURE | Installation of two new air conditioning split systems to provide cooling and heating to Apartment 7W. |
| M00832024 ↗ | 353 WEST 39 STREET MANHATTAN | Alteration | Signed-off | 04/28/2023 | 05/04/2023 | Design M.A. RUBIANO, P.E., P.C. Contractor FOUR STREETS COOL AIR INC | INSTALLATION OF NEW AIR CONDITIONING SPLIT SYSTEM AT APT 7W ON 7TH FLOOR. NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M00395076 ↗ | 38 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 09/16/2020 | 09/30/2022 | Design RYAN SOAMES ENGINEERING Contractor TVS MECHANICAL CORP | At 2nd floor, removal and installation of plumbing fixtures. |
| M00196202 ↗ | 36 WEST 44 STREET MANHATTAN | Alteration | Signed-off | 07/19/2019 | 07/07/2022 | Design WAVIC ENGINEERING PLLC Owner UNIQUE REALTY Contractor CHINATOWN P&H INC | Application amended to include Post-Installed Anchors Special Inspection & Fire-Resistant Rated Construction Progress Inspection. |
| M00476634 ↗ | 875 3 AVENUE MANHATTAN | Alteration | Signed-off | 02/26/2021 | 07/09/2021 | Design GARO GUMUSYAN Owner 875 3RD AVENUE LLC Contractor INTERSTATE INTERIORS INC | AT CELLAR, REMOVAL AND INSTALLATION OF INTERIOR STOREFRONT PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO OCCUPANCY OR MEANS OF EGRESS… |
| M00480011 ↗ | 1240 BROADWAY MANHATTAN | Alteration | Permit Issued | 03/09/2021 | 06/15/2021 | Contractor DEVO FIRE PROTECTION INC | AT 24TH FLOOR, REMOVAL/MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00395499 ↗ | 38 WEST 26 STREET MANHATTAN | Alteration | Signed-off | 09/15/2020 | 05/04/2021 | Design RYAN SOAMES ENGINEERING Contractor TVS MECHANICAL CORP | At 2nd floor, removal of existing sprinkler heads and installation of new. |
| M00288589 ↗ | 641 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/30/2019 | 01/08/2020 | Design GARO GUMUSYAN Contractor GANIC PLUMBING & HTG INC | Interior renovation at apt. 25F, plumbing work including replacement, relocation and installation of plumbing fixtures. Filed in conjunction… |
| Building | Filings | Most Recent |
|---|---|---|
| 1240 BROADWAY ↗ | 14 | 08/05/2026 |
| 99 PARK AVENUE ↗ | 11 | 05/28/2026 |
| 15 CENTRAL PARK WEST ↗ | 3 | 05/04/2026 |
| 732 HALSEY STREET ↗ | 3 | 12/19/2025 |
| 545 8 AVENUE ↗ | 1 | 10/08/2025 |
| 875 3 AVENUE ↗ | 2 | 03/19/2025 |
| 15 WEST 72 STREET ↗ | 1 | 03/12/2025 |
| 1 5 AVENUE ↗ | 1 | 02/24/2025 |
| 38-78 REVIEW AVENUE ↗ | 1 | 01/22/2024 |
| 466 WASHINGTON STREET ↗ | 1 | 07/28/2023 |
| 38 WEST 26 STREET ↗ | 6 | 03/07/2023 |
| 353 WEST 39 STREET ↗ | 1 | 02/20/2023 |
| 36 WEST 44 STREET ↗ | 3 | 11/05/2021 |
| 641 5 AVENUE ↗ | 1 | 12/29/2019 |