| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00613188 ↗ | 401 SOUTH END AVENUE MANHATTAN | New Building | Permit Issued | 02/02/2022 | 09/10/2026 | Contractor E.W. HOWELL CO, LLC | Temporary use, 2 workers shed, and 2 Constructor offices. |
| S00500799 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 09/14/2021 | 08/13/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | the installation of solar panels on the new Electrical building (FILING NUMBER: S00500799-I1) to comply to LL92 and LL94 |
| S00877177 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 08/05/2026 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY, WATER SERVICE AND STORM PIPING WITH FIXTURES FOR PUMP STATION BUILDING AND SURROUNDING AREA AS PER PLANS. NO … |
| Q00980851 ↗ | 29-66 137 STREET QUEENS | Alteration | Permit Issued | 12/29/2023 | 07/16/2026 | Design BROWN AND CALDWELL Contractor EMPIRE FIRE SUPPN CO CORP | Temporary relocation of 5 siamese/standpipe connection to adjoining wall 15 feet away. |
| Q00643658 ↗ | 202-12 WILLETS POINT BLVD QUEENS | New Building | Permit Issued | 02/02/2022 | 07/07/2026 | Design BROWN AND CALDWELL Owner NYCDEP Contractor WELKIN MECHANICAL, LLC Filer BROWN & CALDWELL | 'PS-284 CLEARVIEW PUMP STATION RECONSTRUCTION INCLUDES CONSTRUCTION OF A NEW BUILDING ENVELOPE TO HOUSE NEW ELECTRICAL AND MECHANICAL EQUIPM… |
| S01178400 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/12/2025 | 07/02/2026 | Design PS&S Owner NATIONAL GRID Contractor BOND CIVIL & UTILITY CONS Filer NYCD GROUP, INC. | STRUCTURAL WORK ASSOCIATED WITH INTERIOR/EXTERIOR ALTERATIONS TO EXIST. PRIMARY PRESSURE REGULATION BLDG FOR NATIONAL GRID. ASBESTOS ABATED … |
| Name | Projects together | Most recent |
|---|---|---|
| NYC DEP | 6 | 10/30/2023 |
| BROWN AND CALDWELL | 4 | 06/16/2026 |
| WILLIAM B. LOFTUS, P.E. | 3 | 10/23/2023 |
| MILHOUSE ENGINEERING & CONSTRUCTION | 2 | 10/22/2025 |
| OFFICE FOR THE NEXT ENVIRONMENT ARC | 2 | 12/28/2021 |
| WESLER-COHEN ASSOCIATES | 2 | 10/19/2021 |
| AECOM | 1 | 01/17/2023 |
| COSENTINI ASSOCIATES | 1 | 04/24/2024 |
| EDR, D.P.C. | 1 | 06/16/2026 |
| JOSEPH JOHNSTON ENGINEERING, D.P.C. | 1 | 04/24/2025 |
| KS ENGINEERS, P.C. | 1 | 12/28/2021 |
| PS&S | 1 | 06/26/2026 |
| TERENCE HAIRSTON ARCHITECT PLLC | 1 | 04/24/2024 |
| THOMAS PHIFER AND PARTNERS LLP | 1 | 02/18/2026 |
| WADE TRIM | 1 | 08/20/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| JOHN P PICONE INC | 4 | 10/30/2023 |
| NYCC JPL JV | 4 | 12/28/2021 |
| WELKIN ENTERPRISES,LLC | 3 | 08/11/2023 |
| WELKIN MECHANICAL, LLC | 3 | 06/16/2026 |
| E.W. HOWELL CO, LLC | 2 | 02/18/2026 |
| FORSYTHE PLBG & HTG CORP | 2 | 06/26/2026 |
| BOND CIVIL & UTILITY CONS | 1 | 06/26/2026 |
| C. D. E. AIR-CONDITIONING | 1 | 10/22/2025 |
| EMPIRE FIRE SUPPN CO CORP | 1 | 06/10/2026 |
| GBL MECHANICAL INC | 1 | 04/24/2024 |
| GREENWAY USA, LLC | 1 | 04/24/2024 |
| LANE REFRIGERATION CO.,IN | 1 | 04/24/2024 |
| ODYSSIA GLOBAL COMM. CORP | 1 | 04/24/2025 |
| PAR PLUMBING CO., INC | 1 | 05/07/2025 |
| RAEL AUTOMATIC SPR.CO INC | 1 | 05/07/2025 |
| RAILROAD CONSTRUCTION CO | 1 | 08/20/2025 |
| VERTICAL SOLUTIONS INC | 1 | 04/24/2025 |
| WATERMARK PLUMBING CORP | 1 | 06/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BATTERY PARK CITY AUTHORITY | 5 | 02/18/2026 |
| NYCDEP | 2 | 06/16/2026 |
| NATIONAL GRID | 1 | 06/26/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| A1 EXPEDITING SERVICE CORP. | 4 | 10/30/2023 |
| NOEL BUILDING CONSULTING INC | 4 | 02/18/2026 |
| RPO INC. | 4 | 08/20/2025 |
| HDR | 2 | 10/23/2023 |
| AEGIS BUILDING CONSULTANTS, INC | 1 | 04/24/2024 |
| BROWN & CALDWELL | 1 | 06/16/2026 |
| NYCD GROUP, INC. | 1 | 06/26/2026 |
| RIZZO GROUP | 1 | 04/24/2025 |
| SMB CONSULTANT | 1 | 12/28/2021 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00613188 ↗ | 401 SOUTH END AVENUE MANHATTAN | New Building | Permit Issued | 02/02/2022 | 09/10/2026 | Contractor E.W. HOWELL CO, LLC | Temporary use, 2 workers shed, and 2 Constructor offices. |
| S00500799 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 09/14/2021 | 08/13/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | the installation of solar panels on the new Electrical building (FILING NUMBER: S00500799-I1) to comply to LL92 and LL94 |
| S00877177 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 08/05/2026 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY, WATER SERVICE AND STORM PIPING WITH FIXTURES FOR PUMP STATION BUILDING AND SURROUNDING AREA AS PER PLANS. NO … |
| Q00980851 ↗ | 29-66 137 STREET QUEENS | Alteration | Permit Issued | 12/29/2023 | 07/16/2026 | Design BROWN AND CALDWELL Contractor EMPIRE FIRE SUPPN CO CORP | Temporary relocation of 5 siamese/standpipe connection to adjoining wall 15 feet away. |
| Q00643658 ↗ | 202-12 WILLETS POINT BLVD QUEENS | New Building | Permit Issued | 02/02/2022 | 07/07/2026 | Design BROWN AND CALDWELL Owner NYCDEP Contractor WELKIN MECHANICAL, LLC Filer BROWN & CALDWELL | 'PS-284 CLEARVIEW PUMP STATION RECONSTRUCTION INCLUDES CONSTRUCTION OF A NEW BUILDING ENVELOPE TO HOUSE NEW ELECTRICAL AND MECHANICAL EQUIPM… |
| S01178400 ↗ | 467 MOSEL AVENUE STATEN ISLAND | Alteration | Permit Issued | 03/12/2025 | 07/02/2026 | Design PS&S Owner NATIONAL GRID Contractor BOND CIVIL & UTILITY CONS Filer NYCD GROUP, INC. | STRUCTURAL WORK ASSOCIATED WITH INTERIOR/EXTERIOR ALTERATIONS TO EXIST. PRIMARY PRESSURE REGULATION BLDG FOR NATIONAL GRID. ASBESTOS ABATED … |
| S00883599 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 06/09/2023 | 06/04/2026 | Design NYC DEP Contractor JOHN P PICONE INC | STRUCTURAL WORK FOR PUMPING STATION SITE CIVIL CONSTRUCTION INCLUDING GRADING,ASPHALT,PAVERS,CURBS,SIDEWALKS & LANDSCAPING AS PER PLANS FILE… |
| S00500782 ↗ | HANNAH STREET STATEN ISLAND | New Building | Permit Issued | 05/14/2021 | 06/03/2026 | Design NYC DEP Contractor JOHN P PICONE INC Filer HDR | Ventilation System |
| S00879309 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 06/02/2026 | Design WILLIAM B. LOFTUS, P.E. Contractor JOHN P PICONE INC Filer RPO INC. | Support of excavation work in conjunction with application #S00500812-I1. |
| Q00636154 ↗ | 202-12 WILLETS POINT BLVD QUEENS | Alteration | Permit Issued | 02/24/2022 | 03/11/2026 | Design BROWN AND CALDWELL Contractor WELKIN MECHANICAL, LLC | PS-284 CLEARVIEW PUMP STATION RECONSTRUCTION STRUCTURAL WORK INCLUDES CONCRETE AND ROOFING WORK ASSOCIATED WITH A NEW ABOVE GRADE PUMP STATI… |
| Q00825984 ↗ | 202-12 WILLETS POINT BLVD QUEENS | Alteration | Permit Issued | 02/16/2023 | 03/11/2026 | Design BROWN AND CALDWELL Contractor WELKIN MECHANICAL, LLC | PS-284 CLEARVIEW PUMP STATION RECONSTRUCTION FOUNDATION WORK INCLUDES CONCRETE WORK ASSOCIATED WITH CONSTRUCTION OF A NEW ABOVE GRADE PUMP S… |
| M00351406 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 10/19/2021 | 12/31/2025 | Design WESLER-COHEN ASSOCIATES Contractor NYCC JPL JV | INSTALLATION OF (5) ELECTRIC UNIT HEATERS, EXHAUST FAN, DUCTWORK AND ASSOCIATED ACCESSORIES (LOUVERS, DAMPERS, GRILLS, ETC.) FILED IN CONJUN… |
| M00448870 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 12/31/2025 | Contractor NYCC JPL JV | NEW EQUIPMENT SUPPORT BUILDING (NORTH) FOR DEP AS PART OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT IN EAST RIVER PARK. |
| M00614468 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Signed-off | 03/31/2022 | 09/09/2025 | Design AECOM Contractor E.W. HOWELL CO, LLC | New (3) Story mix use building. |
| S00876836 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 09/05/2025 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY AND STORM PIPING WITH FIXTURES FOR CONED BUILDING AND SURROUNDING AREA AS PER PLANS NO CHANGE IN USE, EGRESS OR… |
| S00877060 ↗ | HANNAH STREET STATEN ISLAND | Alteration | Permit Issued | 05/24/2023 | 09/05/2025 | Design NYC DEP Contractor WELKIN ENTERPRISES,LLC | FILING HEREWITH FOR SANITARY AND STORM PIPING WITH FIXTURES FOR ELECTRICAL BUILDING AND SURROUNDING AREA AS PER PLANS. NO CHANGE IN USE, EGR… |
| X01197486 ↗ | 5921 PALISADE AVENUE BRONX | Alteration | Signed-off | 04/24/2025 | 08/27/2025 | Contractor ODYSSIA GLOBAL COMM. CORP Filer RIZZO GROUP | Installation of antennas and associated equipment -AT&T as per plans. No change to use, egress or occupancy. |
| X00933464 ↗ | 1 WHITE PLAINS ROAD BRONX | Alteration | Permit Issued | 09/13/2023 | 07/30/2025 | Design WADE TRIM Owner NYCDEP Contractor RAILROAD CONSTRUCTION CO Filer RPO INC. | The Bronx River CSO-BXR-HP-011 site construction will include; construction of new regulator, installation of new SCADA enclosure, and the d… |
| M00653432 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Signed-off | 04/04/2022 | 05/20/2025 | Contractor PAR PLUMBING CO., INC | installation of plumbing, water service piping, and sprinkler system related to New Building application |
| M00653429 ↗ | 401 SOUTH END AVENUE MANHATTAN | Alteration | Signed-off | 04/04/2022 | 03/05/2025 | Contractor C. D. E. AIR-CONDITIONING | Installation of mechanical systems. Work related to NB application M00613188-I1. |
| M00933405 ↗ | 70 BATTERY PLACE MANHATTAN | Alteration | Signed-off | 10/18/2023 | 01/14/2025 | Design COSENTINI ASSOCIATES Contractor GREENWAY USA | PLUMBING IN CONJUNCTION WITH COMPOSTING EQUIPMENT UPGRADE |
| M00448896 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 04/12/2021 | 12/15/2023 | Contractor NYCC JPL JV Filer SMB CONSULTANT | NEW EQUIPMENT SUPPORT BUILDING (SOUTH) FOR DEP AS PART OF EAST SIDE COASTAL RESILIENCY (ESCR) PROJECT. |
| M00391629 ↗ | 01 MANHATTAN PLAZA MANHATTAN | Alteration | Permit Issued | 10/19/2021 | 12/08/2023 | Design WESLER-COHEN ASSOCIATES Contractor NYCC JPL JV Filer SMB CONSULTANT | INSTALLATION OF (5) ELECTRIC UNIT HEATERS, EXHAUST FAN, DUCTWORK AND ASSOCIATED ACCESSORIES (LOUVERS, DAMPERS, GRILLS, ETC.) FILED IN CONJUN… |
| Building | Filings | Most Recent |
|---|---|---|
| 29-66 137 STREET ↗ | 4 | 06/10/2026 |
| 401 SOUTH END AVENUE ↗ | 11 | 02/18/2026 |
| 1 WHITE PLAINS ROAD ↗ | 4 | 08/20/2025 |
| 467 MOSEL AVENUE ↗ | 3 | 07/16/2025 |
| 5921 PALISADE AVENUE ↗ | 1 | 04/24/2025 |
| HANNAH STREET ↗ | 5 | 10/23/2023 |
| 70 BATTERY PLACE ↗ | 1 | 10/18/2023 |
| HANNAH STREET ↗ | 6 | 06/09/2023 |
| HANNAH STREET ↗ | 2 | 05/24/2023 |
| 202-12 WILLETS POINT BLVD ↗ | 3 | 02/16/2023 |
| 01 MANHATTAN PLAZA ↗ | 6 | 12/28/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 06/15/2026 | Sprinkler Systems | 29-66 137 STREET | ABDUL SOMAT | special |
| 06/04/2026 | Sprinkler Systems | 29-66 137 STREET | ABDUL SOMAT | special |
| 02/17/2026 | Fenestration areas | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Air barrier — testing | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Interior lighting power | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Fenestration air leakage | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Lowest Floor Elevation | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 02/17/2026 | Fire-Resistance Rated Construction | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 02/17/2026 | Energy Code Compliance Inspections | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 02/17/2026 | Metering | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Masonry | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 02/17/2026 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 02/17/2026 | Fire-Resistant Penetrations and Joints | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 02/17/2026 | Concrete - Precast | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 02/17/2026 | Concrete - Cast-In-Place | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 02/17/2026 | Insulation placement and R values | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Lighting controls | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Exterior lighting power | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Fenestration and door U-factor and product ratings | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Air barrier - visual inspection | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Maintenance information | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 02/17/2026 | Protection of exposed foundation insulation | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 09/04/2025 | Sprinkler Systems | 29-66 137 STREET | ABDUL SOMAT | special |
| 08/20/2025 | Final | 1 WHITE PLAINS ROAD | ABDUL SOMAT | progress |
| 08/20/2025 | Concrete - Cast-In-Place | 1 WHITE PLAINS ROAD | ABDUL SOMAT | special |
| 08/20/2025 | Demolition | 1 WHITE PLAINS ROAD | ABDUL SOMAT | special |
| 08/20/2025 | Excavations - Sheeting, Shoring, and Bracing | 1 WHITE PLAINS ROAD | Jan Cermak | special |
| 07/16/2025 | Concrete - Cast-In-Place | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 07/16/2025 | Concrete - Precast | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 07/16/2025 | Fire-Resistant Penetrations and Joints | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 07/16/2025 | Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable) | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 07/16/2025 | Masonry | 401 SOUTH END AVENUE | ABDUL SOMAT | special |
| 07/16/2025 | Energy Code Compliance Inspections | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 07/16/2025 | Fire-Resistance Rated Construction | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 07/16/2025 | Lowest Floor Elevation | 401 SOUTH END AVENUE | ABDUL SOMAT | progress |
| 07/16/2025 | Maintenance information | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Fenestration areas | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Fenestration and door U-factor and product ratings | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Air barrier - visual inspection | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Protection of exposed foundation insulation | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Lighting controls | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Interior lighting power | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Fenestration air leakage | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Air barrier — testing | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Insulation placement and R values | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Exterior lighting power | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/16/2025 | Metering | 401 SOUTH END AVENUE | ABDUL SOMAT | energy_progress |
| 07/02/2025 | Fire-Resistant Penetrations and Joints | 467 MOSEL AVENUE | ABDUL SOMAT | special |
| 07/02/2025 | Energy Code Compliance Inspections | 467 MOSEL AVENUE | ABDUL SOMAT | progress |
| 07/02/2025 | Final | 467 MOSEL AVENUE | ABDUL SOMAT | progress |