| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00977042 ↗ | 1776 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/03/2024 | 09/28/2026 | Design GUSTAVSON DUNDES Contractor APCO GROUP INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO TENANTS' RECREATION FACILITY ON THE 44th & 45th FLOORS, AS PER PLANS. NO CHANGE IN … |
| M01428018 ↗ | 165 EAST 89 STREET MANHATTAN | Alteration | Permit Issued | 07/09/2026 | 09/22/2026 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP | REPAIR BALCONY DUE TO EXPOSED STEEL REINFORCEMENT AT APT. 2B ON THE 3RD FLOOR, EXPOSURE #3. FILED TO RESOLVE ECB VIOLATION #39188670J AND 35… |
| M01249944 ↗ | 470 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/15/2025 | 09/08/2026 | Design CES ENGINEERING LLC Contractor NU CREATION MECH INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APT. 4A ON THE FLOOR. AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER TH… |
| M01130619 ↗ | 317 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 02/13/2025 | 08/18/2026 | Owner 304-310 W. 14 REALTY LLC Contractor CPM BUILDERS INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE (VC LOUNGE) IN THE CELLAR. NO CHANGE IN USE, EGRESS, OR O… |
| Q01062870 ↗ | 27-13 DITMARS BOULEVARD QUEENS | Alteration CO | Permit Issued | 07/10/2024 | 07/15/2026 | Design FORMWORKS ARCHITECTURE PLLC Contractor TEKA ENTERPRISES INC | PLUMBING WORK IN CONJUNCTION WITH CONVERSION TO 2-FAMILY DWELLING, ALL AS PER PLANS. |
| M00516940 ↗ | 317 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 05/06/2021 | 06/11/2026 | Design LAWRENCE MAREK ARCHITECT Contractor THE BIG IC LLC | RELOCATE TRASH ROOM ON THE FIRST FLOOR LOBBY, AS PER PLANS. SUPERSEDE DOB APPLICATION#: 121870289. NO CHANGE IN USE, EGRESS OR OCCUPANCY UND… |
| Person | Filings | Most recent |
|---|---|---|
| EINAT DERNER | 246 | 08/10/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| LUKE LICALZI, P.E., P.C. | 22 | 02/03/2025 |
| RUSSELL GOSS ARCHITECT, PC | 17 | 07/11/2023 |
| ROGER BROOME, ARCHITECT P.C. | 16 | 11/17/2025 |
| CBK ENGINEERING | 11 | 07/01/2026 |
| MM ARCHITECT PC | 7 | 07/09/2026 |
| FORMWORKS ARCHITECTURE PLLC | 6 | 04/24/2026 |
| MOTTOLA RINI ENGINEERS | 6 | 08/05/2025 |
| ZACHARY SAPINSLEY LEWIS, R.A. | 6 | 08/19/2026 |
| LAWRENCE MAREK ARCHITECT | 5 | 02/02/2024 |
| GUSTAVSON DUNDES | 4 | 06/16/2026 |
| TAN ENGINEERING PC | 4 | 09/07/2023 |
| AVKE DESIGN ARCHITECTURE PLLC | 3 | 12/29/2021 |
| CLOUDS AO LLC | 3 | 01/07/2025 |
| EDG | 3 | 08/14/2026 |
| Guth DeConzo Consulting Engineers | 3 | 07/02/2025 |
| LL ENGINEERING PC | 3 | 10/26/2021 |
| VASILIOS ARTEMIOU PE | 3 | 07/02/2025 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 2 | 10/03/2022 |
| A.B.A STUDIO D.P.C. | 2 | 03/13/2023 |
| CES ENGINEERING LLC | 2 | 06/16/2026 |
| CONKLIN COSTANTIN ARCHITECTS LLP | 2 | 02/27/2026 |
| IP GROUP | 2 | 10/22/2024 |
| LAURENCE G JONES ARCHITECTS, PLLC | 2 | 06/22/2023 |
| MG ENGINEERING D.P.C. | 2 | 10/20/2020 |
| PROJECT TACTICAL SOLUTIONS, LLC | 2 | 11/09/2022 |
| Name | Projects together | Most recent |
|---|---|---|
| ABC RESTORATION INC | 10 | 08/14/2026 |
| CPM BUILDERS INC | 10 | 08/19/2026 |
| JOHN FITZGERALD PLBG &HTG | 7 | 03/24/2026 |
| KAPNAG HTG & PLBG CORP. | 7 | 07/11/2023 |
| WEST ACCESS MANAGEMENT | 7 | 05/15/2025 |
| EBERHART BROTHERS LLC | 6 | 07/11/2023 |
| ARIEL SERVICES INC | 5 | 01/25/2024 |
| NYC PLUMBING & HEATING IN | 5 | 08/12/2026 |
| POWER PLUMBING & HEATING | 5 | 07/17/2025 |
| ARCTIC HVAC INC | 4 | 02/22/2022 |
| G.R.&J HUB HOME IMPROVE | 4 | 06/22/2023 |
| H.Y.M. CONSTRUCTION CORP | 3 | 08/27/2025 |
| LOCKWOOD CABINET INC | 3 | 11/17/2025 |
| MERRICK REAL ESTATE GP IN | 3 | 11/18/2021 |
| PRIME CONSTRUCTION & REST | 3 | 12/04/2024 |
| ACCURATE MECHANICAL INC | 2 | 07/23/2026 |
| AIRCRAFT AIR COND CORP | 2 | 10/22/2024 |
| ARIANA CONTRACTING INC | 2 | 12/04/2024 |
| AVON PLBG & HTG INC | 2 | 09/07/2023 |
| AXIAK CONSTRUCTION CORP | 2 | 05/04/2023 |
| BEST PLUMBING & HVAC INC | 2 | 07/02/2025 |
| BROAD USA INC | 2 | 07/01/2026 |
| CARGO WORKSHOP INC | 2 | 09/01/2023 |
| EDGECOMBE PLBG & HTG INC | 2 | 05/04/2023 |
| EMPIRE MECHANICAL SVCS* | 2 | 07/23/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| EBERHART BROTHERS LLC | 19 | 07/11/2023 |
| EMMUT PROPERTIES CORP | 12 | 07/09/2026 |
| BARRACCO REALTY LLC | 6 | 05/06/2025 |
| First & 73 LLC | 5 | 01/22/2024 |
| DUELL LLC | 4 | 08/19/2026 |
| 771 NINTH PROPERTY LLC | 3 | 09/07/2023 |
| CORE DRIGGS LLC | 3 | 12/14/2022 |
| SHNEM HASAR LLC | 3 | 12/08/2022 |
| GFP REAL ESTATE LLC | 2 | 06/22/2023 |
| HUBB NYC PROPERTIES LLC | 2 | 06/14/2023 |
| LEOR MANAGEMENT CORP | 2 | 08/19/2026 |
| MERINGOFF PROPERTIES, INC. | 2 | 10/20/2020 |
| MHP REAL ESTATE SERVICES | 2 | 04/17/2020 |
| MIDBORO MANAGEMENT | 2 | 10/14/2021 |
| Property owned by J.King & P.Hogue | 2 | 08/27/2025 |
| VICKERS REALTY LTD | 2 | 03/26/2024 |
| 304-310 W. 14 REALTY LLC | 1 | 08/12/2026 |
| 6233 Julep Enterprise LLC | 1 | 03/18/2025 |
| BENJAMIN PARTNERS | 1 | 11/23/2022 |
| CANZONE PLASTER & TILE, INC. | 1 | 08/13/2019 |
| CHELSMORE APTS LLC | 1 | 03/13/2023 |
| Domus Occidentalis Holdings LLC | 1 | 02/27/2026 |
| ISSEY MIYAKE USA CORP. | 1 | 02/08/2023 |
| JEMM MANAGEMENT | 1 | 09/27/2021 |
| MLN REAL ESTATE | 1 | 01/25/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 07/23/2026 |
| LMS-ACE SERVICES | 1 | 07/01/2026 |
| STARK EXPEDITING GROUP, INC | 1 | 06/20/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M00977042 ↗ | 1776 2 AVENUE MANHATTAN | Alteration | Permit Issued | 09/03/2024 | 09/28/2026 | Design GUSTAVSON DUNDES Contractor APCO GROUP INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO TENANTS' RECREATION FACILITY ON THE 44th & 45th FLOORS, AS PER PLANS. NO CHANGE IN … |
| M01428018 ↗ | 165 EAST 89 STREET MANHATTAN | Alteration | Permit Issued | 07/09/2026 | 09/22/2026 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP | REPAIR BALCONY DUE TO EXPOSED STEEL REINFORCEMENT AT APT. 2B ON THE 3RD FLOOR, EXPOSURE #3. FILED TO RESOLVE ECB VIOLATION #39188670J AND 35… |
| M01249944 ↗ | 470 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/15/2025 | 09/08/2026 | Design CES ENGINEERING LLC Contractor NU CREATION MECH INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APT. 4A ON THE FLOOR. AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER TH… |
| M01130619 ↗ | 317 BLEECKER STREET MANHATTAN | Alteration | Permit Issued | 02/13/2025 | 08/18/2026 | Owner 304-310 W. 14 REALTY LLC Contractor CPM BUILDERS INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE (VC LOUNGE) IN THE CELLAR. NO CHANGE IN USE, EGRESS, OR O… |
| Q01062870 ↗ | 27-13 DITMARS BOULEVARD QUEENS | Alteration CO | Permit Issued | 07/10/2024 | 07/15/2026 | Design FORMWORKS ARCHITECTURE PLLC Contractor TEKA ENTERPRISES INC | PLUMBING WORK IN CONJUNCTION WITH CONVERSION TO 2-FAMILY DWELLING, ALL AS PER PLANS. |
| M00516940 ↗ | 317 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 05/06/2021 | 06/11/2026 | Design LAWRENCE MAREK ARCHITECT Contractor THE BIG IC LLC | RELOCATE TRASH ROOM ON THE FIRST FLOOR LOBBY, AS PER PLANS. SUPERSEDE DOB APPLICATION#: 121870289. NO CHANGE IN USE, EGRESS OR OCCUPANCY UND… |
| M01277827 ↗ | 38 WEST 9 STREET MANHATTAN | Alteration | Permit Issued | 11/17/2025 | 06/11/2026 | Design ROGER BROOME, ARCHITECT P.C. Contractor LOCKWOOD CABINET INC | Exterior work only for Apt. #15 on the 2nd floor. Work to include replacement of three (3) windows, as per plans. No change in use, egress, … |
| M01277730 ↗ | 38 WEST 9 STREET MANHATTAN | Alteration | Permit Issued | 10/16/2025 | 06/09/2026 | Design ROGER BROOME, ARCHITECT P.C. Contractor LOCKWOOD CABINET INC | Plumbing work in conjunction with interior renovation to Apt. #15 on the 2nd floor. Changes to plumbing fixtures, as per plans. No change in… |
| B01243005 ↗ | 109 CONGRESS STREET BROOKLYN | Alteration | Permit Issued | 07/17/2025 | 05/28/2026 | Design ROGER BROOME, ARCHITECT P.C. Contractor POWER PLUMBING & HEATING | PLUMBING WORK IN CONNECTION WITH INTERIOR RENOVATION OF UNITS #3 & 4 ON THE 2ND FLOOR, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY … |
| M01365869 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 04/09/2026 | 05/01/2026 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP Contractor B CONTRACTORS GROUP LLC | INTERIOR RENOVATION TP APT. 5I ON THE 5TH FLOOR TO REPAIR WALLS, CEILING, & FLOORING DUE TO WATER DAMAGE. FILED TO CORRECT ECB VIOLATION# 35… |
| M01375026 ↗ | 1347 1 AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2026 | 05/01/2026 | Design CBK ENGINEERING Contractor BROAD USA INC | WALL REMOVAL AND REPLACEMENT IN CONJUNCTION WITH REPLACEMENT OF EXISTING CHILLER ON THE ROOF. MECHANICAL AND STRUCTURAL WORK FILED AS SUBSE… |
| Q01344170 ↗ | 27-13 DITMARS BOULEVARD QUEENS | Alteration | Permit Issued | 01/15/2026 | 04/30/2026 | Design FORMWORKS ARCHITECTURE PLLC Contractor TEKA ENTERPRISES INC | Filing herewith for a temporary construction fence, as per plans. |
| B01271288 ↗ | 109 CONGRESS STREET BROOKLYN | Alteration | Permit Issued | 08/27/2025 | 04/23/2026 | Design ROGER BROOME, ARCHITECT P.C. Contractor H.Y.M. CONSTRUCTION CORP | REPLACE FRONT AND REAR WINDOWS ON THE 2ND FLOOR, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M01375023 ↗ | 1191 2 AVENUE MANHATTAN | Alteration | Permit Issued | 03/24/2026 | 04/03/2026 | Design CBK ENGINEERING Contractor BROAD USA | Replacement of existing chiller in the cellar mechanical room as part of the building's refrigeration system, all as per plans. No change in… |
| M00889227 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration CO | Permit Issued | 07/24/2023 | 03/17/2026 | Design EDG Contractor ABC RESTORATION INC | CONVERSION OF THE FIRST AND SECOND FLOORS FROM OFFICES TO APARTMENTS. WORK TO INCLUDE INTERIOR GENERAL CONSTRUCTION, AS PER PLANS. OBTAIN A … |
| M00962394 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 11/27/2023 | 03/17/2026 | Design EDG Contractor ABC RESTORATION INC | INTERIOR RENOVATION TO AN EXISTING APARTMENT ON THE 3RD FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION ONLY, AS PER PLANS. NO CHANGE IN USE, EG… |
| M01314338 ↗ | 751 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 02/11/2026 | 03/16/2026 | Design GUSTAVSON DUNDES Contractor TRIESTE CONSTRUCTION CORP | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APT. 9G ON THE 9TH FLOOR. AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDE… |
| M01281510 ↗ | 166 WEST 88 STREET MANHATTAN | Alteration CO | Filed — no permit on record | 02/27/2026 | — | — | |
| M01193754 ↗ | 717 8 AVENUE MANHATTAN | Alteration | Permit Issued | 03/28/2025 | 01/09/2026 | Design CBK ENGINEERING Contractor AMI AND ASSOCIATES INC | INSTALL NEW GAS SERVICE AND SPRINKLER HEADS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M01308146 ↗ | 717 8 AVENUE MANHATTAN | Alteration | Filed — no permit on record | 11/17/2025 | — | Design CBK ENGINEERING | — |
| B01256294 ↗ | 1368 NOSTRAND AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/19/2025 | — | Design FORMWORKS ARCHITECTURE PLLC | — |
| M01221378 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 05/23/2025 | 08/18/2025 | Design CBK ENGINEERING Contractor JOHN FITZGERALD PLBG &HTG | PLUMBING WORK IN CONJUNCTION WITH APT. 5B RENOVATION, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M01221383 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Permit Issued | 05/23/2025 | 08/14/2025 | Design CBK ENGINEERING Contractor JOHN FITZGERALD PLBG &HTG | PLUMBING WORK IN CONJUNCTION WITH APT. 5B RENOVATION, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M01051344 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 06/18/2024 | 07/21/2025 | Design CBK ENGINEERING Contractor AIRCRAFT AIR COND | INSTALL NEW AIR CONDITIONING UNITS FOR THE 4TH FLOOR APARTMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01225803 ↗ | 111 EAST 22 STREET MANHATTAN | Alteration | Signed-off | 06/10/2025 | 07/07/2025 | Design MOTTOLA RINI ENGINEERS Contractor RELIABLE PLBG & HTG CORP | addition of new plumbing fixtures & related piping as indicated on plans. |
| Q00943700 ↗ | 60-49 GATES AVENUE QUEENS | Alteration | Signed-off | 10/19/2023 | 06/25/2025 | Design ROGER BROOME, ARCHITECT P.C. Contractor ALL DIMENSION HOME IMPROV | INTERIOR RENOVATION TO EXISTING BASEMENT. WORK TO INCLUDE NEW MINOR, NON-LOAD BEARING PARTITIONS AND DOORS AS PER PLANS. NO CHANGE IN USE, E… |
| M00697482 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 04/12/2022 | 06/16/2025 | Owner EMMUT PROPERTIES CORP Contractor BEST PLUMBING & HVAC INC | PLUMBING WORK TO EXISTING UNITS, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00952454 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 05/05/2025 | 05/16/2025 | Design TITAN ENGINEERS PC Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | STRUCTURAL WORK IN CONJUNCTION WITH NEW PENTHOUSE ON THE ROOF OF THE 15TH FL. FILED IN CONJUNCTION WITH ALT# 101985933 AND JOB# M00751829. N… |
| M01020408 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 03/26/2024 | 04/16/2025 | Design CBK ENGINEERING Contractor AIRCRAFT AIR COND | MECHANICAL WORK (EXHAUST FANS AND HVAC UNITS ON ROOF), AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01195283 ↗ | 217 WEST 80 STREET MANHATTAN | Alteration | Permit Issued | 03/18/2025 | 03/24/2025 | Contractor WEST ACCESS MANAGEMENT | ALTERATION TO AN EXISTING MIXED-USE BUILDING. GENERAL CONSTRUCTION TO INCLUDE REMOVAL OF NON-BEARING PARTITIONS, MILLWORK, AND FLOORING, AS … |
| M01077939 ↗ | 52 GROVE STREET MANHATTAN | Alteration | Signed-off | 01/02/2025 | 03/10/2025 | Owner LEOR MANAGEMENT CORP Contractor MEDCON SERVICES, LLC | EXTERIOR RENOVATION TO EXISTING COMMERCIAL STORE ON THR FIRST FLOOR: REPLACE STOREFRONT, NEW AWNING, AS PER PLANS. NO CHANGE IN USE, EGRESS,… |
| M01155155 ↗ | 58 EAST 96 STREET MANHATTAN | Alteration | Signed-off | 01/06/2025 | 03/10/2025 | Design GUSTAVSON DUNDES Contractor ARTUR KALAJ | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APT. 5B. WORK TO INCLUDE PLUMBING WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR O… |
| M00930082 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/14/2023 | 02/25/2025 | Design LUKE LICALZI, P.E., P.C. Contractor ABC RESTORATION INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APTS. 2A, 2B, 3A, 3B, 4A, 4B ON 01-03 FLOORS, AS PER PLANS. NO CHANGE IN USE, EGRES… |
| M08049616 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 12/08/2022 | 02/25/2025 | Design LUKE LICALZI, P.E., P.C. Contractor ABC RESTORATION INC | INTERIOR RENOVATION TO INTERIOR STAIR/ PUBLIC CORRIDORS. MINOR PARTITION WORK, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI… |
| M01138891 ↗ | 200 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 12/04/2024 | 02/05/2025 | Design LUKE LICALZI, P.E., P.C. Contractor PRIME CONSTRUCTION & REST | NTERIOR RENOVATION TO APT. 5B TO INCLUDE GENERAL CONSTRUCTION WORK AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01020406 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 03/25/2024 | 02/04/2025 | Design CBK ENGINEERING Contractor S & L PLUMBING INC | PLUMBING AND SPRINKLER WORK, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q00365212 ↗ | 60-49 GATES AVENUE QUEENS | Alteration | Signed-off | 07/16/2020 | 01/31/2025 | Design ROGER BROOME, ARCHITECT P.C. Contractor FLAVIO MECHANICAL CORP | INTERIOR RENOVATION TO EXISTING 1-FAMILY DWELLING. WORK TO INCLUDE INSTALLATION/ RELOCATION OF PLUMBING FIXTURES AS PER PLANS. FILED IN CONJ… |
| M01143218 ↗ | 40 WEST 55 STREET MANHATTAN | Alteration | Signed-off | 12/17/2024 | 01/23/2025 | Design LUKE LICALZI, P.E., P.C. Contractor BRIGHTWOOD INTERIORS INC | Installation of a convenience door between Apts. 7A & 7B. No change in use, egress, or occupancy under this application. |
| M01103446 ↗ | 717 8 AVENUE MANHATTAN | Alteration | Signed-off | 10/30/2024 | 12/23/2024 | Design CBK ENGINEERING Contractor HEAT | SECONDARY SUPPLY/ DISTRIBUTION WATER LOOP, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M00914483 ↗ | 52 GROVE STREET MANHATTAN | Alteration | Signed-off | 10/01/2023 | 12/19/2024 | Owner DUELL LLC Contractor MEDCON SERVICES, LLC | REPLACE EXISTING CONDENSING UNIT IN THE SAME LOCATION ON THE ROOF. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01146851 ↗ | 3 GREAT JONES STREET MANHATTAN | Alteration | Filed — no permit on record | 12/18/2024 | — | Design CLOUDS AO LLC | — |
| Q01115796 ↗ | 27-10 30 AVENUE QUEENS | Alteration | Signed-off | 10/03/2024 | 11/18/2024 | Design MVN ARCHITECT LLC Contractor ABC RESTORATION INC | JOIST REPAIR LIMITED TO L LINE APARTMENTS ON 02-06 FLOORS, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. |
| M01069471 ↗ | 52 GROVE STREET MANHATTAN | Alteration | Signed-off | 07/17/2024 | 11/13/2024 | Owner DUELL LLC Contractor MEDCON SERVICES, LLC | PROVIDE CENTRAL AIR CONDITIONING SYSTEM & TOILET EXHAUST TO 1ST FL. COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPL… |
| B00697334 ↗ | 862 STERLING PLACE BROOKLYN | Alteration | Signed-off | 03/28/2022 | 10/23/2024 | Design ROGER BROOME, ARCHITECT P.C. Contractor POWER PLUMBING & HEATING | RENOVATION TO EXISTING TWO- FAMILY HOUSE. WORK TO INCLUDE MINOR NON-LOAD BEARING PARTITIONS, CLOSETS, DOORS AND FINISHES AS PER PLANS. NO CH… |
| M00985813 ↗ | 326 EAST 58 STREET MANHATTAN | Alteration CO | Permit Issued | 01/22/2024 | 10/22/2024 | Design LUKE LICALZI, P.E., P.C. Owner First & 73 LLC Contractor ARIANA CONTRACTING INC | LEGALIZING APARTMENT 1B AT CELLAR & FIRST FLOOR. CREATE RECREATION SPACE IN CELLAR ASSOCIATED WITH APARTMENT ON THE FIRST FLOOR. NO CHANGE I… |
| B00804345 ↗ | 141 QUINCY STREET BROOKLYN | Alteration | Signed-off | 02/01/2023 | 09/24/2024 | Design ROGER BROOME, ARCHITECT P.C. Contractor PRO-ONE CONTRACTING CORP | STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION AND ENLARGEMENT OF EXISTING 2-FAMILY HOUSE. |
| M00982584 ↗ | 547 HUDSON STREET MANHATTAN | Alteration | Permit Issued | 01/25/2024 | 09/18/2024 | Design LUKE LICALZI, P.E., P.C. Owner MLN REAL ESTATE Contractor MLN REAL ESTATE | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF APT.#3 ON THE 4TH FLOOR. FILED TO ADDRESS VIOLATION# 35656493R. NO CHANGE IN USE, … |
| M08053763 ↗ | 135 CENTRAL PARK WEST MANHATTAN | Alteration CO | Permit Issued | 01/11/2023 | 08/15/2024 | Design MULLEN PALANDRANI ARCHITECTS Contractor TARCON GENERAL CONTRACTIN | PLUMBING WORK FILED IN CONJUNCTION WITH DOB NOW GC. |
| M00930138 ↗ | 113 7 AVENUE SOUTH MANHATTAN | Alteration | Signed-off | 09/14/2023 | 07/02/2024 | Design LUKE LICALZI, P.E., P.C. Contractor ABC RESTORATION INC | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO APTS. 4A & 4B ON THE 3RD FLOOR, AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANC… |
| M00881798 ↗ | 2 HORATIO STREET MANHATTAN | Alteration | Signed-off | 07/05/2023 | 06/11/2024 | Contractor FOY MECH AND SONS LLC | PLUMBING WORK IN CONJUNCTION WITH COMBINATION AND RENOVATION OF APTS. 6P& 6R ON THE 6TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER T… |
| M01026063 ↗ | 870 8 AVENUE MANHATTAN | Alteration | Permit Issued | 04/09/2024 | 05/23/2024 | Design RGCE Contractor LINEAL CONSTRUCTION & RES | REPAIR OF GARAGE AT CELLAR, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00920811 ↗ | 23 EAST 74 STREET MANHATTAN | Alteration | Signed-off | 08/29/2023 | 05/06/2024 | Design LUKE LICALZI, P.E., P.C. Contractor AIK RENOVATION INC | PLUMBING WORK ASSOCIATED WITH APARTMENT 7E RENOVATION ON THE 7TH FLOOR. REPLACE PLUMBING FIXTURES, AS PER PLANS. NO CHANGE IN USE, EGRESS OR… |
| X01012011 ↗ | 101 FATHER ZEISER PLACE BRONX | Alteration | Signed-off | 03/26/2024 | 04/24/2024 | Design LUKE LICALZI, P.E., P.C. Owner VICKERS REALTY LTD Contractor V&G MECHANICAL CORP | REPLACEMENT OF EXISTING CONDENSER UNIT ON THE ROOF, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00916526 ↗ | 52 GROVE STREET MANHATTAN | Alteration | Signed-off | 11/28/2023 | 04/19/2024 | Owner DUELL LLC Contractor MEDCON SERVICES, LLC | EXTERIOR RENOVATION TO EXISTING COMMERCIAL STORE (PISELLINO) ON THR DIRST FLOOR: REPLACE STOREFRONT, NEW AWNING, AS PER PLANS. NO CHANGE IN … |
| M08026112 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Permit Issued | 10/24/2022 | 02/12/2024 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | INTERIOR RENOVATION TO EXISTING BUILDING ON THE CELLAR, 01-03 FLOORS TO INCLUDE GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. FILED… |
| X00953920 ↗ | 767 EAST 132 STREET BRONX | Alteration | Signed-off | 01/03/2024 | 02/12/2024 | Design ARCO ENGINEERING PC Contractor GODFREYS REFRIGERATION | REMOVE EXISTING HVAC UNIT (ORIGINALLY INSTALLED UNDER DOB APPLICATION# 200048876) AND REPLACE WITH NEW UNIT ON THE ROOF AS PER PLANS. EXISTI… |
| M00751829 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Permit Issued | 06/06/2022 | 02/05/2024 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | INTERIOR RENOVATION TO EXISTING APARTMNETS ON THE 4TH-5TH AND 11TH-15TH FLOORS TO INCLUDE GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREW… |
| M00710065 ↗ | 312 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 01/29/2024 | Design MOTTOLA RINI ENGINEERS Owner BARRACCO REALTY LLC Contractor MEDCON SERVICES, LLC | new air conditioning & kitchen ventilation systems for renovated restaurant space as indicated on plans. |
| M00982837 ↗ | 56 MAC DOUGAL STREET MANHATTAN | Alteration | Signed-off | 01/10/2024 | 01/26/2024 | Design LUKE LICALZI, P.E., P.C. Owner SANZ PROPERTY MANAGEMENT Contractor ELITE GC NY INC | INTERIOR RENOVATION TO EXISTING COMMERCIAL SPACE (RESTAURANT) ON THE FIRST FLOOR. WORK TO INCLUDE GENRAL CONSTRUCTION, AS PER PLANS. NO CHAN… |
| B00902357 ↗ | 255 6 AVENUE BROOKLYN | Alteration | Signed-off | 07/12/2023 | 01/22/2024 | Design ROGER BROOME, ARCHITECT P.C. Contractor JOHN FITZGERALD PLBG &HTG | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF UNIT#3 ON THE 2ND FLOOR. WORK TO INCLUDE REPLACEMENT/ RELOCATION/ REMOVAL OF PLUMBI… |
| M00860805 ↗ | 330 EAST 38 STREET MANHATTAN | Alteration | Signed-off | 04/19/2023 | 10/13/2023 | Design ROGER BROOME, ARCHITECT P.C. Contractor GTN RENOVATION INC | PLUMBING WORK IN CONNECTION WITH INTERIOR RENOVATION TO EXISTING OFFICE SPACE #302 ON THE 2ND FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY … |
| M00832705 ↗ | 52 GROVE STREET MANHATTAN | Alteration | Signed-off | 03/01/2023 | 09/26/2023 | Owner DUELL LLC Contractor MEDCON SERVICES, LLC | NON STRUCTURAL DEMOLITION OF INTERIOR NON-LOAD BEARING PARTITIONS AND FINISHES, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER TH… |
| M00789703 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 08/29/2022 | 09/20/2023 | Owner EMMUT PROPERTIES CORP Contractor BEST PLUMBING & HVAC INC | MODIFICATION TO EXISTING SPRINKLER SYSTEM, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B00910880 ↗ | 48 HENRY STREET BROOKLYN | Alteration | Signed-off | 09/01/2023 | 09/14/2023 | Design FORMWORKS ARCHITECTURE PLLC Contractor CARGO WORKSHOP INC | EXTERIOR RENOVATION TO EXISTING STOREFRONT, NEW AWNING, AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00768973 ↗ | 427 EAST 83 STREET MANHATTAN | Alteration CO | Permit Issued | 07/12/2022 | 08/17/2023 | Design LUKE LICALZI, P.E., P.C. Owner SW MANAGEMENT LLC Contractor EDGECOMBE PLBG & HTG INC | PLUMBING WORK IN CONNECTION WITH TENANTS' LAUNDRY ROOM IN THE CELLAR. INSTALL/ REMOVE AND REPLACE PLUMBING FIXTURES, AS PER PLANS. |
| M00619910 ↗ | 717 8 AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2021 | 08/03/2023 | Design CBK ENGINEERING Contractor ARIEL SERVICES INC | PLUMBING WORK IN THE CELLAR AS PER PLANS. WORK INCLUDES INSTALLATION OF NEW GAS SERVICE AND WATER HEATER. NO CHANGE TO USE, EGRESS, OR OCCUP… |
| M00889209 ↗ | 206 5 AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2023 | 08/02/2023 | Owner GFP REAL ESTATE LLC Contractor RELIABLE PLBG & HTG CORP | PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION TO 5TH FL. SCHOOL. RELOACTE AND INSTALL PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN U… |
| M00708966 ↗ | 312 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 04/07/2022 | 06/28/2023 | Design MOTTOLA RINI ENGINEERS Owner BARRACCO REALTY LLC Contractor NYC PLUMBING & HEATING IN | INSTALL PLUMBING FIXTURES AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00860828 ↗ | 805 9 AVENUE MANHATTAN | Alteration | Signed-off | 04/26/2023 | 05/24/2023 | Design TAN ENGINEERING PC Owner 771 NINTH PROPERTY LLC Contractor I DO PLUMBING & HTG INC | PLUMBING AND SPRINKLER WORK IN CONNECTION WITH TENANT FIT-OUT WORK AT EXISTING COMMERCIAL SPACE AT CELLAR AND FIRST FLOOR, AS PER PLANS. NO … |
| M00860823 ↗ | 805 9 AVENUE MANHATTAN | Alteration | Signed-off | 04/21/2023 | 05/22/2023 | Owner 771 NINTH PROPERTY LLC Contractor WECUSTOM INC | INTERIOR RENOVATION (TENANT FIT-OUT) TO EXISTING COMMERCIAL STORE AT CELLAR AND FIRST FLOOR. WORK TO INCLUDE GENERAL CONSTRUCTION WORK AS PE… |
| M00860832 ↗ | 805 9 AVENUE MANHATTAN | Alteration | Signed-off | 04/26/2023 | 05/22/2023 | Design TAN ENGINEERING PC Owner 771 NINTH PROPERTY LLC Contractor WECUSTOM INC | MECHANICAL WORK IN CONNECTION WITH TENANT FIT-OUT WORK AT EXISTING COMMERCIAL SPACE AT CELLAR AND FIRST FLOOR, AS PER PLANS. NO CHANGE IN US… |
| M00760562 ↗ | 14 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 06/27/2022 | 05/04/2023 | Design TIMOTHY C MCCABE Contractor INSPIRIT DEVELOPMENT & CO | PLUMBING WORK IN APT. 4N, AS PER PLANS. FILED IN CONJUNCTION WITH GC APPLICATION#: M00760562-I1. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER… |
| M00679670 ↗ | 227 EAST 96 STREET MANHATTAN | Alteration | Permit Issued | 02/17/2022 | 04/28/2023 | Design RUSSELL GOSS ARCHITECT, PC Owner EBERHART BROTHERS LLC Contractor EBERHART BROTHERS LLC | REPLACEMENT OF NATURAL GAS PIPING SERVICING EXISTING RESIDENTIAL COOKING FROM CELLAR-05 FLOOR. REMOVE EXISTING 20 GAS METERS AND INSTALL TWO… |
| M00708968 ↗ | 312 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 04/07/2022 | 04/26/2023 | Design MOTTOLA RINI ENGINEERS Owner BARRACCO REALTY LLC Contractor NYC PLUMBING & HEATING IN | INTERIOR PLUMBING WORK IN CONNECTION WITH INTERIOR COMMERCIAL SPACE RENOVATION. CHANGES TO PLUMBING FIXTURES PER PLANS. NO CHANGE IN USE, E… |
| M00679817 ↗ | 316 EAST 84 STREET MANHATTAN | Alteration | Signed-off | 02/17/2022 | 04/25/2023 | Design RUSSELL GOSS ARCHITECT, PC Owner EBERHART BROTHERS LLC Contractor ALL PRO PLBG & HTG INC | INTERIOR RENOVATION TO APT. 3W. WORK TO INCLUDE PLUMBING WORK: INSTALL, AND REPLACE PLUMBING FIXTURES AS PER PLANS. GC WORK FILED UNDER SEPA… |
| M00839757 ↗ | 528 9 AVENUE MANHATTAN | Alteration | Permit Issued | 03/09/2023 | 04/24/2023 | Design LUKE LICALZI, P.E., P.C. Contractor ANDRINO CONTRACTING LLC | INTERIOR RENOVATION TO APTS. 2R, 3R & 4R ON THE 2ND, 3RD & 4TH FLOORS. WORK TO INCLUDE MINOR PARTITION AND CEILING RESTORATION WORK, ALL AS … |
| M00669504 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 04/05/2022 | 04/19/2023 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | INTERIOR RENOVATION TO EXISTING APARTMNETS ON THE 4TH, 6TH-10TH FLOORS TO INCLUDE GENERAL CONSTRUCTION WORK AS PER PLANS FILED HEREWITH. FIL… |
| M00848306 ↗ | 530 9 AVENUE MANHATTAN | Alteration CO | Filed — no permit on record | 04/10/2023 | — | Design LUKE LICALZI, P.E., P.C. | — |
| M00776773 ↗ | 73 EAST 79 STREET MANHATTAN | Alteration | Signed-off | 10/28/2022 | 04/06/2023 | Design CLOUDS AO LLC Contractor C-SQUARED CONTRACTING INC | PLUMBING WORK FILED IN CONJUNCTION WITH INTERIOR RENOVATION TO EXISTING APT. ON THE 5TH FL. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS… |
| M00820398 ↗ | 128 WOOSTER STREET MANHATTAN | Alteration | Filed — no permit on record | 02/08/2023 | — | Design CLOUDS AO LLC Owner ISSEY MIYAKE USA CORP. | — |
| M00798045 ↗ | 124 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2022 | 01/24/2023 | Owner HUBB NYC PROPERTIES LLC Contractor AVON PLBG & HTG INC | PLUMBING AND SPRINKLER WORK IN CONJUNCTION WITH GC RENOVATION TO EXISTING 1-STORY COMMERCIAL SPACE, AS PER PLANS. NO CHANGE IN USE, EGRESS O… |
| M00765676 ↗ | 111 EAST 22 STREET MANHATTAN | Alteration | Signed-off | 07/07/2022 | 01/12/2023 | Design MOTTOLA RINI ENGINEERS Owner SHNEM HASAR LLC Contractor G.R.&J HUB HOME IMPROVE | MECHANICAL WORK FILED IN CONJUNCTION WITH 3RD FLOOR RENOVATION TO INCLUDE INSTALLATION OF 3 HEATPUMP UNITS AS PER PLANS. FILED IN CONJUNCTIO… |
| M00693692 ↗ | 233 EAST 96 STREET MANHATTAN | Alteration | Signed-off | 03/14/2022 | 12/21/2022 | Owner EBERHART BROTHERS LLC Contractor A.M. SAGE PLG & HTG LLC | INTERIOR RENOVATION TO APT. 5FE. WORK TO INCLUDE PLUMBING WORK: INSTALL, RELOCATE AND REPLACE PLUMBING FIXTURES AS PER PLANS. GC WORK FILED … |
| M08019475 ↗ | 149 MERCER STREET MANHATTAN | Alteration | Permit Issued | 11/23/2022 | 12/07/2022 | Design MICHAEL LI, PE Owner BENJAMIN PARTNERS Contractor VULPIS & VULPIS PLBG INC | MODIFICATION TO EXISTING SPRINKLER SYSTEM IN THE CELLAR AND FIRST FLOOR EXISTING COMMERCIAL SPACE (ALAIA). NO CHANGE IN USE, EGRESS OR OCCUP… |
| B00781107 ↗ | 658 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 08/03/2022 | 12/02/2022 | Design A.B.A STUDIO D.P.C. Owner CORE DRIGGS LLC Contractor CARGO WORKSHOP INC | Tenant fit out- interior renovation to existing eating and drinking establishment on the first floor and cellar as per plans. Work to includ… |
| B07995324 ↗ | 47 LEXINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 09/01/2022 | 11/28/2022 | Design ROGER BROOME, ARCHITECT P.C. Contractor AMOS & CLIVE CONSTRUCTION | INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH RENOVATION AND HORIZONTAL EXTENSION OF 1-FAMILY HOUSE FILED UNDER JOB… |
| M00679663 ↗ | 161 EAST 88 STREET MANHATTAN | Alteration | Signed-off | 02/22/2022 | 11/28/2022 | Design LUKE LICALZI, P.E., P.C. Contractor ARCTIC HVAC INC | LEGALIZATION OF INTERIOR RENOVATION TO APT. 3D ON THE 3RD FLOOR. WORK TO INCLUDE REPLACEMENT OF PLUMBING FIXTURES AS PER PLANS FILED HEREWIT… |
| M00693678 ↗ | 233 EAST 96 STREET MANHATTAN | Alteration | Signed-off | 03/14/2022 | 11/15/2022 | Owner EBERHART BROTHERS LLC Contractor EBERHART BROTHERS LLC | INTERIOR RENOVATION TO APT. 5FE ON THE 5TH FLOOR. WORK TO INLCUDE MINOR PARTITIONS, CLOSETS AND FINISHES AS PER PLANS. PLUMBING WORK FILED U… |
| B00552088 ↗ | 1859 MADISON PLACE BROOKLYN | Alteration | Signed-off | 08/24/2021 | 11/04/2022 | Contractor BELL CONSTRUCTION OF NY | Interior renovation of an existing 1-family house. Work to include general construction work. All other required work-types (structural, plu… |
| B08000804 ↗ | 658 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 09/14/2022 | 11/02/2022 | Design TAN ENGINEERING PC Owner CORE DRIGGS LLC Contractor DG MECHANICAL HEATING INC | PLUMBING WORK IN CONJUNCTION WITH COMMERCIAL SPACE RENOVATION IN THE CELLAR AND FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THI… |
| M00791347 ↗ | 124 7 AVENUE MANHATTAN | Alteration | Signed-off | 08/23/2022 | 10/31/2022 | Design CCS ARCHITECTURE Owner HUBB NYC PROPERTIES LLC Contractor CDS DESIGN AND CONSULTING | INTERIOR AND EXTERIOR RENOVATION TO EXISTING 1-STORY COMMERCIAL SPACE., AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLI… |
| B08000819 ↗ | 658 DRIGGS AVENUE BROOKLYN | Alteration | Signed-off | 09/14/2022 | 10/26/2022 | Design TAN ENGINEERING PC Owner CORE DRIGGS LLC Contractor STANDARD FIRE SUPP CORP | MODIFICATION TO SPRINKLER SYSTEM IN CONJUNCTION WITH COMMERCIAL SPACE RENOVATION IN THE CELLAR AND FIRST FLOOR. NO CHANGE IN USE, EGRESS OR … |
| M00793513 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 09/12/2022 | 09/16/2022 | Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | Installation of toilet exhaust for residential apartments. No change in use, egress or occupancy under this application. |
| B00746278 ↗ | 685 ARGYLE ROAD BROOKLYN | Alteration | Signed-off | 05/31/2022 | 09/13/2022 | Design ROGER BROOME, ARCHITECT P.C. Contractor JONATHAN R POPE | Plumbing work in conjunction with interior renovation to existing 1-family house, as per plans. No change in use, egress or occupancy under … |
| M00785228 ↗ | 45 WEST 81ST STREET MANHATTAN | Alteration | Signed-off | 08/03/2022 | 08/30/2022 | Design MM ARCHITECT PC Owner EMMUT PROPERTIES CORP Contractor WEST ACCESS MANAGEMENT | REFILE EXISTING A/C UNITS FOR THE 1ST FLOOR FILED PREVIOUSLY UNDER APP# 104920828, AND EXISTING A/C UNITS AT 2 FL. AND UPPER ROOF FILED UNDE… |
| M00716430 ↗ | 308 EAST 82 STREET MANHATTAN | Alteration | Permit Issued | 04/26/2022 | 08/24/2022 | Design RUSSELL GOSS ARCHITECT, PC Owner EBERHART BROTHERS LLC Contractor EBERHART BROTHERS LLC | INTERIOR RENOVATION TO APT. 2E ON THE 2ND FLOOR. WORK TO INLCUDE MINOR PARTITIONS, CLOSETS AND FINISHES AS PER PLANS. PLUMBING WORK FILED UN… |
| M00759493 ↗ | 111 EAST 22 STREET MANHATTAN | Alteration | Signed-off | 07/06/2022 | 07/11/2022 | Owner SHNEM HASAR LLC Contractor G.R.&J HUB HOME IMPROVE | INTERIOR RENOVATION TO EXISTING SCHOOL ON THE 3RD FLOOR ONLY. WORK TO INCLUDE GENERAL CONSTRUCTION, NEW PARTITIONS AND DOORS AS PER PLANS. N… |
| M00728846 ↗ | 307 WEST 93 STREET MANHATTAN | Alteration | Signed-off | 06/01/2022 | 06/24/2022 | Design A.B.A STUDIO D.P.C. Owner CHELSMORE APTS LLC Contractor ARIEL SERVICES INC | PROPOSED WORK TO RESOLVE ECB VIOL.#: 35181646M, 35181645K, 35125779J. INSTALL NEW GAS PIPING FOR GAS DRYERS IN THE CEL LAUNDRY ROOM & REPLAC… |
| B00708797 ↗ | 317 EAST 25 STREET BROOKLYN | Alteration | Signed-off | 04/08/2022 | 06/14/2022 | Design ROGER BROOME, ARCHITECT P.C. Contractor JONATHAN R POPE | RENOVATION TO THE FIRST FLOOR OF EXISTING TWO-FAMILY HOUSE. WORK TO INCLUDE NEW PARTITIONS, DOORS, CLOSETS, KITCHEN AND NEW DECK, AS PER PLA… |
| M00494805 ↗ | 27 WEST 8 STREET MANHATTAN | Alteration | Signed-off | 07/02/2021 | 05/19/2022 | Design LAWRENCE MAREK ARCHITECT Contractor EDGECOMBE PLBG & HTG INC | INTERIOR RENOVATION TO APT. #5 ON THE 4TH FL. WORK TO INCLUDE REMOVAL/ INSTALLATION OF NEW PLUMBING FIXTURES AS PER PLANS. ARCHITECTURAL/ GC… |