| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01199698 ↗ | 4695 INDEPENDENCE AVENUE BRONX | Alteration CO | Permit Issued | 12/08/2025 | 08/14/2026 | Design HAL DORFMAN ARCHITECT Contractor SIGNORE & SONS PLBG CORP | NEW SHOWER IN BATHROOM, RELOCATED WASHER/DRYER, NEW BATHROOM 2nD FLOOR. |
| M01398151 ↗ | 36 WEST 40 STREET MANHATTAN | Alteration | Filed — no permit on record | 06/16/2026 | — | Owner MAXWELL-KATES, INC. | — |
| X01321725 ↗ | 3755 HENRY HUDSON PKWY W BRONX | Alteration | Permit Issued | 04/25/2026 | 06/16/2026 | Design HAL DORFMAN ARCHITECT Contractor HUDSON PLBG AND HTG CO IN | To combine units 4A and 4B under TPPN 3/97. Minor interior partition changes, remove kitchen in unit 4B, renovate kitchen in unit 4A, other … |
| X01128634 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 05/20/2025 | 06/01/2026 | Design GACE DPC Contractor JOHN EVAN CONTRACTING COR | Structural work proposed for new building (X00912995) as shown on plans |
| M01148696 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/04/2026 | 05/27/2026 | Design THE LIRO GROUP Owner COLLIERS Contractor DYNAMIC PLBG & SPRKLR COR | The removal of existing medical gases & piping and replace with installation of new medical gases, piping and equipment of the 18th floor in… |
| X01025044 ↗ | 4800 INDEPENDENCE AVENUE BRONX | New Building | Permit Issued | 07/02/2024 | 05/22/2026 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | NEW FOUNDATION FOR NB #X01025044, A 2-STORY BUILDING WITH ROOF DECK |
| Person | Filings | Most recent |
|---|---|---|
| KENRICK PINNOCK | 152 | 06/30/2026 |
| NEORAY AZOUR | 1 | 08/11/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| HAL DORFMAN ARCHITECT | 44 | 05/08/2026 |
| JACK GREEN ASSOCIATES | 15 | 03/17/2023 |
| DAVID STERN ARCHITECTURE | 6 | 09/13/2023 |
| KCE CONSULTING ENGINEERING PLLC | 6 | 07/07/2026 |
| ALL CITY ENGINEERING, P.C. | 3 | 10/09/2024 |
| NICHOLAS PETSCHEK ARCHITECTURE | 3 | 06/16/2026 |
| CSANAD BODNAR ARCHITECT | 2 | 07/08/2024 |
| GACE DPC | 2 | 07/07/2026 |
| HANSEN ENGINEERING, PC | 2 | 07/15/2022 |
| SHARPE ENGINEERING INC | 2 | 11/13/2025 |
| WEXLER ASSOCIATES | 2 | 01/12/2026 |
| A DEGREE OF FREEDOM STRUCTURAL ENGI | 1 | 01/31/2023 |
| AMERILAND BROOK LLC | 1 | 05/07/2026 |
| ANDRE ARCHITECTURE, D.P.C. | 1 | 12/06/2021 |
| CHURCHARCHITECTS LLC | 1 | 10/05/2021 |
| NEW AGE ENGINEERING PLLC | 1 | 04/14/2026 |
| NIELS BENAVIDES ARCHITECT | 1 | 07/25/2025 |
| PETER F. POON ARCHITECT, P.C. | 1 | 10/02/2025 |
| REGENESIS PARTNERS | 1 | 02/21/2023 |
| ROBERT DERECTOR ASSOCIATES | 1 | 09/13/2023 |
| SOLOMON ROSENZWEIG P.E P.C. | 1 | 10/10/2023 |
| SZEKELY ENGINEERING | 1 | 07/16/2021 |
| TD&H ENGINEERING | 1 | 10/05/2021 |
| THE LIRO GROUP | 1 | 03/04/2026 |
| TYLin | 1 | 03/16/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HUDSON PLBG AND HTG CO IN | 10 | 04/25/2026 |
| HIGH END CONSTRUCTION LLC | 9 | 04/25/2026 |
| KEY CONSTRUCTION ASSOC IN | 9 | 05/08/2026 |
| HIGHLAND PLUMBING LLC | 8 | 10/17/2025 |
| CAPITAL IMPROVEMENT SERVI | 7 | 09/13/2023 |
| KEY CONSTRUCTION PARTNER | 6 | 04/14/2026 |
| JOHN EVAN CONTRACTING COR | 5 | 07/07/2026 |
| VILLAGE P & H NY INC | 5 | 08/14/2025 |
| ALLSTATE SPRINKLER CORP | 4 | 09/27/2022 |
| PAUL TOTH EXCAVATION INC | 3 | 10/21/2025 |
| S. TIEGER PLBG. CO., INC | 3 | 04/14/2026 |
| CONSTRUCTION XPERT INC | 2 | 08/14/2025 |
| CUBE BUILDERS GROUP NY | 2 | 06/28/2022 |
| J. PHELAN CONSTRUCTION CO | 2 | 01/31/2023 |
| M&C DESIGN GROUP LLC | 2 | 05/01/2025 |
| MBS CONTRACTING INC | 2 | 05/07/2026 |
| MITIE PLUMBING & HTG CORP | 2 | 09/13/2023 |
| A D RENOVATION SOLUTION | 1 | 03/01/2022 |
| A&A PLUMBING CORP | 1 | 11/29/2022 |
| A&H EXPRESS PLBG&HTG CORP | 1 | 05/01/2025 |
| AAA TOTAL PLUMBING, INC | 1 | 04/01/2025 |
| ABC MADISON BUILDERS INC | 1 | 11/13/2025 |
| ALEKS & F., INC | 1 | 05/06/2021 |
| AMERICAN STANDARD P&H COR | 1 | 09/12/2024 |
| AMOK INC | 1 | 05/30/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| EL AMANECER DE LA ESPERANZA MINISTR | 12 | 07/07/2026 |
| 303 WEST 42ND STREET LLC | 7 | 09/27/2022 |
| 366 WILLIS LLC | 5 | 01/31/2023 |
| FOUR ROSES LLC | 5 | 08/14/2025 |
| TEEN CHALLENGE, INC | 5 | 11/13/2025 |
| COLLIERS TRI-STATE | 4 | 08/19/2021 |
| CAPITAL IMPROVEMENT SERVICES, LLC. | 3 | 03/17/2023 |
| GRANDLOFTCORP@GMAIL.COM | 2 | 09/13/2023 |
| 'FC FOLEY SQUARE ASSOC. LLC' | 1 | 02/21/2023 |
| 3840 GREYSTONE AVENUE C/O PRIME LOC | 1 | 05/13/2021 |
| 636 WEST 230TH LLC | 1 | 07/14/2021 |
| AKAM ASSOCIATES, INC. | 1 | 05/30/2023 |
| COLLIERS | 1 | 03/04/2026 |
| ENTERPRISE ASSET MANAGEMENT, INC | 1 | 05/19/2022 |
| FIRST SERVICE RESIDENTIAL | 1 | 06/07/2021 |
| GARTHCHESTER REALTY | 1 | 07/20/2022 |
| H AND R HOLDINGS NY, LLC | 1 | 12/06/2021 |
| HAYDEN ON THE HUDSON CONDOMINIUM | 1 | 01/29/2026 |
| HUDSONCREST PROPERTIES INC. | 1 | 06/07/2021 |
| KEY CONSTRUCTION | 1 | 10/08/2021 |
| KEY CONSTRUCTION PARTNERS | 1 | 07/14/2021 |
| MAXWELL-KATES, INC. | 1 | 06/16/2026 |
| R. A. COHEN | 1 | 01/10/2024 |
| ROGERS & DAWSON BUILDING CO., LLC | 1 | 10/10/2023 |
| SOLSTICE RESIDENTIAL GROUP, LLC | 1 | 12/17/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| HAL DORFMAN ARCHITECT | 2 | 04/14/2026 |
| AMERILAND BROOK LLC | 1 | 05/07/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| X01199698 ↗ | 4695 INDEPENDENCE AVENUE BRONX | Alteration CO | Permit Issued | 12/08/2025 | 08/14/2026 | Design HAL DORFMAN ARCHITECT Contractor SIGNORE & SONS PLBG CORP | NEW SHOWER IN BATHROOM, RELOCATED WASHER/DRYER, NEW BATHROOM 2nD FLOOR. |
| M01398151 ↗ | 36 WEST 40 STREET MANHATTAN | Alteration | Filed — no permit on record | 06/16/2026 | — | Owner MAXWELL-KATES, INC. | — |
| X01321725 ↗ | 3755 HENRY HUDSON PKWY W BRONX | Alteration | Permit Issued | 04/25/2026 | 06/16/2026 | Design HAL DORFMAN ARCHITECT Contractor HUDSON PLBG AND HTG CO IN | To combine units 4A and 4B under TPPN 3/97. Minor interior partition changes, remove kitchen in unit 4B, renovate kitchen in unit 4A, other … |
| X01128634 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 05/20/2025 | 06/01/2026 | Design GACE DPC Contractor JOHN EVAN CONTRACTING COR | Structural work proposed for new building (X00912995) as shown on plans |
| M01148696 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/04/2026 | 05/27/2026 | Design THE LIRO GROUP Owner COLLIERS Contractor DYNAMIC PLBG & SPRKLR COR | The removal of existing medical gases & piping and replace with installation of new medical gases, piping and equipment of the 18th floor in… |
| X01025044 ↗ | 4800 INDEPENDENCE AVENUE BRONX | New Building | Permit Issued | 07/02/2024 | 05/22/2026 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | NEW FOUNDATION FOR NB #X01025044, A 2-STORY BUILDING WITH ROOF DECK |
| X01342161 ↗ | 4800 INDEPENDENCE AVENUE BRONX | Alteration | Signed-off | 01/09/2026 | 05/14/2026 | Design WEXLER ASSOCIATES Contractor KEY CONSTRUCTION ASSOC IN | Earth work application filed to address missing earth work type on the new building and to address stop work violation 39171635N this applic… |
| X01128647 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 11/07/2024 | 04/30/2026 | Design GACE DPC Contractor JOHN EVAN CONTRACTING COR | footing with new slab on grade |
| M01337880 ↗ | 36 WEST 40 STREET MANHATTAN | Alteration | Filed — no permit on record | 03/16/2026 | — | Design TYLin | — |
| X01206699 ↗ | 5700 ARLINGTON AVENUE BRONX | Alteration | Signed-off | 09/11/2025 | 03/02/2026 | Design HAL DORFMAN ARCHITECT Contractor G. & S. PLUMBING & HTG CO | Apartment Alteration Plumbing work. No changes to egress, use, occupancy, zoning or room count. |
| X01327911 ↗ | 4455 DOUGLAS AVENUE BRONX | Alteration | Permit Issued | 01/29/2026 | 02/20/2026 | Design HAL DORFMAN ARCHITECT Contractor HUDSON PLBG AND HTG CO IN | To alter plumbing fixtures and gas appliances as per plan. Apts 3E & 3F. |
| X00790259 ↗ | TIBBETT AVENUE BRONX | New Building | Permit Issued | 10/27/2022 | 02/13/2026 | Design HAL DORFMAN ARCHITECT Contractor MBS CONTRACTING INC | Structural work for new single family dwelling filed under application X00790259 |
| X00923402 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 02/13/2024 | 02/11/2026 | Contractor JOHN EVAN CONTRACTING COR | shoring installation to support excavation |
| X01110553 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 10/23/2025 | 01/28/2026 | Contractor JOHN EVAN CONTRACTING COR | shoring installation to support excavation along perpendicular property line at 1310 commonwealth avenue |
| X00941405 ↗ | 2475 PALISADE AVENUE BRONX | Alteration CO | Permit Issued | 11/13/2023 | 01/07/2026 | Design HAL DORFMAN ARCHITECT Owner R. A. COHEN Contractor PELHAM BAY CONSTRUCTION L | Interior alteration to cellar level as per plan increase number of apartments in building by one dwelling unit in building. |
| X01267384 ↗ | 5621 PALISADE AVENUE BRONX | Alteration | Permit Issued | 08/27/2025 | 11/05/2025 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | Plumbing work as per plans. |
| X01109728 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Filed — no permit on record | 10/23/2025 | — | — | |
| B00515710 ↗ | 333 14 STREET BROOKLYN | Alteration | Permit Issued | 05/13/2021 | 09/22/2025 | Design SOLOMON ROSENZWEIG P.E P.C. Contractor UNION CONSTRUCTION GROUP | FILING PAA TO ADDRESS AUDIT OBJECTIONS TO APPLICATION FOR INSTALLATION OF A COMPLETE STRUCTURAL AUTOMATED SYSTEM FOR MOTOR VEHICLE CAR PARKI… |
| X01139125 ↗ | 1 BLACKSTONE PLACE BRONX | Alteration CO | Permit Issued | 02/20/2025 | 08/01/2025 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | Interior plumbing alteration as per plan |
| X01258431 ↗ | MC GRAW AVENUE BRONX | Alteration | Permit Issued | 07/25/2025 | 08/01/2025 | Design NIELS BENAVIDES ARCHITECT Contractor JOHN EVAN CONTRACTING COR | Job Description for New Work (printed on work permit):Temporary construction fence 3 ft from the building line, 100 feet along McGraw Avenue… |
| X00961593 ↗ | 3040 SCENIC PLACE BRONX | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 12/27/2023 | 07/30/2025 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION PARTNER | Wood or chain link construction fence |
| X01098522 ↗ | 1769 EAST 172 STREET BRONX | Full Demolition | Signed-off | 11/13/2024 | 07/01/2025 | Contractor PAUL TOTH EXCAVATION INC | application filed for full demolition of existing 2 story & cellar building with on site fill |
| X01145112 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Permit Issued | 01/16/2025 | 06/17/2025 | Contractor PAUL TOTH EXCAVATION INC | application and plans filed for temporary construction fence 3'-0 from property line during construction. |
| X01160219 ↗ | 517 TULFAN TERRACE BRONX | Alteration | Signed-off | 02/19/2025 | 04/28/2025 | Design HAL DORFMAN ARCHITECT Contractor S. TIEGER PLBG. CO., INC | Interior renovation of cellar including bathroom and partitioning work/ finish materials. |
| M01166382 ↗ | 2322 ADAM C POWELL BLVD MANHATTAN | Alteration | Signed-off | 02/21/2025 | 04/08/2025 | Design HAL DORFMAN ARCHITECT Contractor A&H EXPRESS PLBG&HTG CORP | PLUMBING ALTERATION OF EXISTING DWELLING UNIT AT 1st FLR & CELLAR. NO CHANGE IN USE, OCCUPANCY, ZONING, HABITABLE ROOMS, AND EGRESS. |
| X01139660 ↗ | 5431 ARLINGTON AVENUE BRONX | Alteration | Signed-off | 02/19/2025 | 03/25/2025 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | plumbing work first floor kitchen, 2nd floor bathroom, and basement bathroom |
| M01074541 ↗ | 42 BANK STREET MANHATTAN | Alteration | Signed-off | 07/11/2024 | 12/26/2024 | Design HAL DORFMAN ARCHITECT Owner FOUR ROSES LLC Contractor HONOR CONSTRUCTION INC | layout changes and new interior finishes as per plan. |
| X01145111 ↗ | 3671 HUDSON MANOR TERRACE BRONX | Alteration | Signed-off | 12/17/2024 | 12/20/2024 | Design HAL DORFMAN ARCHITECT Contractor M&C DESIGN GROUP LLC | Interior alteration of Apt 11D, minor partitions and door. Minor interior finishes. |
| X00874283 ↗ | GROSVENOR AVENUE BRONX | New Building | Permit Issued | 12/26/2023 | 12/12/2024 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | Wood or chain link construction fence |
| M01057589 ↗ | 98 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 06/19/2024 | 12/10/2024 | Design HAL DORFMAN ARCHITECT Owner FOUR ROSES LLC Contractor CONSTRUCTION XPERT INC | layout changes and new interior finishes as per plan. |
| M01127371 ↗ | 71 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 10/16/2024 | 12/10/2024 | Design HAL DORFMAN ARCHITECT Owner FOUR ROSES LLC Contractor CONSTRUCTION XPERT INC | RELOCATION OF EXISTING BATHROOM |
| X00970158 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Filed — no permit on record | 10/09/2024 | — | Design ALL CITY ENGINEERING, P.C. | — |
| X00983384 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Filed — no permit on record | 10/09/2024 | — | Design ALL CITY ENGINEERING, P.C. | — |
| M01106315 ↗ | 98 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 09/12/2024 | 09/23/2024 | Design HAL DORFMAN ARCHITECT Owner FOUR ROSES LLC Contractor AMERICAN STANDARD P&H CORORP. | Interior store renovation as per plan including replacing broken storefront glass and wood moldings. removal of existing overhead security … |
| X01064989 ↗ | 1816 CLINTON AVENUE BRONX | Alteration CO | Filed — no permit on record | 07/08/2024 | — | Design CSANAD BODNAR ARCHITECT | — |
| X00832719 ↗ | 5 BLACKSTONE PLACE BRONX | Alteration CO | Permit Issued | 03/15/2023 | 05/30/2024 | Design HAL DORFMAN ARCHITECT Contractor HIGHLAND PLUMBING LLC | New Plumbing and Gas Fixtures as shown on drawings. |
| M01012302 ↗ | 98 THOMPSON STREET MANHATTAN | Alteration | Signed-off | 03/04/2024 | 05/22/2024 | Design HAL DORFMAN ARCHITECT Owner FOUR ROSES LLC Contractor YG SERVICES INC | Apartment combination of Apartment 8 & 9 with layout changes and new interior finishes as per plan. |
| X00922426 ↗ | 640 WEST 249 STREET BRONX | Alteration | Filed — no permit on record | 04/01/2024 | — | Design CSANAD BODNAR ARCHITECT | — |
| Q00703149 ↗ | 50-13 35 STREET QUEENS | Alteration | Signed-off | 04/04/2022 | 01/22/2024 | Design DAVID STERN ARCHITECTURE Contractor CAPITAL IMPROVEMENT SERVI | Revised plans filed herewith to indicated new construction floor plan layout and elevations with all changes bubbled |
| Q00742905 ↗ | 50-13 35 STREET QUEENS | Alteration | Signed-off | 05/31/2022 | 01/22/2024 | Design JACK GREEN ASSOCIATES Contractor CAPITAL IMPROVEMENT SERVI | installation of mechanical equipment on the roof. Demolition of existing mechanical system and installation of new HVAC system |
| X00970099 ↗ | 1769 EAST 172 STREET BRONX | Alteration | Filed — no permit on record | 01/09/2024 | — | Design ALL CITY ENGINEERING, P.C. | — |
| X00932996 ↗ | 4625 INDEPENDENCE AVENUE BRONX | Alteration CO | Permit Issued | 09/18/2023 | 12/20/2023 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | VERTICAL ENLARGEMENT TO EXISTING SINGLE FAMILY DWELLING + MINOR INTERIOR CHANGES |
| X00912995 ↗ | 1769 EAST 172 STREET BRONX | New Building | Filed — no permit on record | 11/02/2023 | — | — | |
| X00945757 ↗ | 4821 ARLINGTON AVENUE BRONX | Alteration | Signed-off | 10/17/2023 | 10/26/2023 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION PARTNER | New Plumbing and Gas Fixtures as shown on drawings. |
| B00383687 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/20/2020 | 10/06/2023 | Design SHARPE ENGINEERING INC Owner TEEN CHALLENGE, INC Contractor ABC MADISON BUILDERS | filing TO PROVIDE REMOVAL OF EXISTING STEAM HVAC SYSTEM, BOILER & PIPING, STEAM RADIATOR & ASSOCIATED STEAM & CONDENSATE PIPING. INSTALLATI… |
| M00857935 ↗ | 1652 BROADWAY MANHATTAN | Alteration | Signed-off | 04/24/2023 | 09/21/2023 | Design ROBERT DERECTOR ASSOCIATES Contractor PEAK PLUMBING SOLUTIONS L | REPLACE PLUMBING FIXTURES WITH NEW AT EXISTING ROUGHING (41 WC, 41 LAVS, 1 SINK); REMOVE PLUMBING FIXTURES (40 TUBS) AND INSTALL NEW PLUMBIN… |
| M00604935 ↗ | 1185 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2022 | 09/20/2023 | Contractor JOHNNY NANHU | remove proposed gas dryer and replace with electrical dryer. Revise gas riser diagram. |
| M00604934 ↗ | 1185 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2022 | 09/19/2023 | Contractor VINCENT FRANCO CONSULT DE | Partial apartment interior demolition and construction of interior non-bearing partitions, doors for the renovation of existing apartment wi… |
| B00383724 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/20/2020 | 09/12/2023 | Design SHARPE ENGINEERING INC Owner TEEN CHALLENGE, INC Contractor T & T PLUMBING INC | APPLICATION FILED TO PROVIDE REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING - AND REPLACE/ RELOCATE WITH NEW - ALL AS PER PLANS… |
| M00849934 ↗ | 75 GRAND STREET MANHATTAN | Alteration | Signed-off | 05/19/2023 | 07/26/2023 | Design DAVID STERN ARCHITECTURE Owner GRANDLOFTCORP@GMAIL.COM Contractor ARCO PLBG AND HTG INC | New installation of plumbing fixtures and piping |
| X00908061 ↗ | 5 BLACKSTONE PLACE BRONX | Alteration | Signed-off | 07/21/2023 | 07/24/2023 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION ASSOC IN | Temporary construction fence. |
| M08019300 ↗ | 12 WEST 19 STREET MANHATTAN | Alteration | Signed-off | 11/09/2022 | 07/05/2023 | Design DAVID STERN ARCHITECTURE Owner 366 WILLIS LLC Contractor J PHELAN CONSTRUCTION | Demolition and construction of interior partition and suspended ceilings for new ground floor and mezzanine commercial establishment |
| M00848976 ↗ | 28 WEST 38 STREET MANHATTAN | Alteration | Signed-off | 05/30/2023 | 06/20/2023 | Design HAL DORFMAN ARCHITECT Owner AKAM ASSOCIATES, INC. Contractor PROFOUND CONSTRUCTION LLC | Minor alteration to the interior of unit 11E as per plans. |
| M00849921 ↗ | 75 GRAND STREET MANHATTAN | Alteration | Signed-off | 05/19/2023 | 05/26/2023 | Design DAVID STERN ARCHITECTURE Owner GRANDLOFTCORP@GMAIL.COM Contractor CAPITAL IMPROVEMENT SERVI | installation of new mechanical HVAC system, ducts and units |
| X00412141 ↗ | 3333 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 12/11/2020 | 03/30/2023 | Design HAL DORFMAN ARCHITECT Contractor HUDSON PLBG AND HTG CO IN | Replacement and new plumbing / gas fixtures as part of alteration type 2 no 240297273 an apartment alteration / combination. |
| M00803578 ↗ | 12 WEST 19 STREET MANHATTAN | Alteration | Signed-off | 01/31/2023 | 02/14/2023 | Owner 366 WILLIS LLC Contractor J PHELAN CONSTRUCTION | New Mechanical platform at mezzanine level and installation of structural steel dunnage at roof and bulk head on existing roof |
| M00816345 ↗ | 12 WEST 19 STREET MANHATTAN | Alteration | Permit Issued | 11/29/2022 | 12/28/2022 | Design JACK GREEN ASSOCIATES Owner 366 WILLIS LLC Contractor A&A PLUMBING CORP | installation of new plumbing fixtures and piping on the mezzanine and first floor level. all as shown on drawings filed herewith. no change … |
| M08037185 ↗ | 12 WEST 19 STREET MANHATTAN | Alteration | Signed-off | 11/29/2022 | 12/28/2022 | Design JACK GREEN ASSOCIATES Owner 366 WILLIS LLC Contractor CAPITOL FIRE SPRINKLER CO | installation of new sprinkler system heads and piping on the mezzanine and first floor level. all as shown on drawings filed herewith. no ch… |
| M00786365 ↗ | 675 WEST 43 STREET MANHATTAN | Alteration | Signed-off | 09/27/2022 | 12/06/2022 | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC Contractor ALLSTATE SPRINKLER LLC | New sprinkler system with heads and piping to attach to tie in to existing system for 1st floor all as shown on drawings filed herewith |
| Q08037250 ↗ | 35-15 GREENPOINT AVENUE QUEENS | Alteration | Signed-off | 11/29/2022 | 12/01/2022 | Design JACK GREEN ASSOCIATES Contractor MITIE PLUMBING & HTG CORP | installation of new plumbing system with piping and fixtures on first floor. all as shown on drawings filed herewith. no change in use of eg… |
| M08037164 ↗ | 12 WEST 19 STREET MANHATTAN | Alteration | Filed — no permit on record | 11/29/2022 | — | Design JACK GREEN ASSOCIATES Owner 366 WILLIS LLC | — |
| B00757202 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Permit Issued | 06/28/2022 | 08/16/2022 | Design HANSEN ENGINEERING, PC Owner TEEN CHALLENGE, INC Contractor CUBE BUILDERS GROUP NY | THE SCOPE OF WORK IS TO PROVIDE SUPPORT OF EXCAVATION AND UNDERPINNING DRAWINGS FOR THE PROPOSED rear extension in conjunction with alterati… |
| X00744706 ↗ | 3725 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 07/08/2022 | 08/16/2022 | Design HAL DORFMAN ARCHITECT Owner GARTHCHESTER REALTY Contractor RANDY ROSE CORP | To combine apartments 10E and 10F under TTPN 3/97. Interior minor partition changes, install washer & dryer and interior finishes. No change… |
| X00664984 ↗ | 3755 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 02/24/2022 | 08/12/2022 | Design HAL DORFMAN ARCHITECT Contractor A D RENOVATION SOLUTION | To combine units 5E and 5F under TPPN 3/97. Minor interior partition changes, remove kitchen in unit 5F, renovate kitchen in unit 5E, other … |
| B00581057 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Signed-off | 08/23/2021 | 07/26/2022 | Design TD&H ENGINEERING Owner TEEN CHALLENGE, INC Contractor CUBE BUILDERS GROUP NY | Provide foundation for extension. |
| X00462365 ↗ | 716 WEST 231 STREET BRONX | Alteration | Signed-off | 02/11/2021 | 07/18/2022 | Design HAL DORFMAN ARCHITECT Contractor HUDSON PLBG AND HTG CO IN | Original: To replace, relocate or install new (19) plumbing and / (2) gas fixtures. PAA: To show on plan and riser diagram existing gas boil… |
| B00756897 ↗ | 412 CLINTON AVENUE BROOKLYN | Alteration | Filed — no permit on record | 07/15/2022 | — | Design HANSEN ENGINEERING, PC Owner TEEN CHALLENGE, INC | — |
| Q00758156 ↗ | 109-20 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 06/27/2022 | 07/13/2022 | Design REGENESIS PARTNERS Contractor TP INTERIORS LLC | REDESIGN OF BATHROOM AND KITCHENETTE AREA FOR RENOVATION OF THE EXISTING APARTMENTS 3I, 5F AND 5K |
| M00714460 ↗ | 132 WEST 125 STREET MANHATTAN | Alteration | Signed-off | 05/19/2022 | 06/23/2022 | Contractor CAPITAL IMPROVEMENT SERVI | Demolition and installation of the HVAC system for Replacement with connection to existing ductwork |
| M00656328 ↗ | 1185 PARK AVENUE MANHATTAN | Alteration | Signed-off | 02/07/2022 | 06/14/2022 | Design JACK GREEN ASSOCIATES Contractor HAMILTON AIR COMPANY, INC. | installation of new mechanical ventilation, air conditioning and duct work. |
| X00502289 ↗ | 3755 HENRY HUDSON PKWY W BRONX | Alteration | Signed-off | 07/15/2021 | 06/06/2022 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | Replacement and relocation of 5 plumbing fixtures and 3 gas fixtures in Kitchens of Apartments 6A 7A, 6th and 7th floor only. |
| X00589240 ↗ | 2575 PALISADE AVENUE BRONX | Alteration | Signed-off | 09/22/2021 | 03/02/2022 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | Replacement of 6 bath fixtures on same roughing and location. Removal of exist kitchen in unit 14C and renovation of kitchen fixtures in uni… |
| M00650033 ↗ | 2 BOND STREET MANHATTAN | Alteration | Signed-off | 12/27/2021 | 02/23/2022 | Design HAL DORFMAN ARCHITECT Contractor IPS PLUMBING CORP | Interior Alteration to Exist Bath, Kitchen and minor partition changes in Unit 2, Second floor only. No change to use, occupancy, egress, zo… |
| X00501918 ↗ | 3840 GREYSTONE AVENUE BRONX | Alteration | Signed-off | 04/28/2021 | 02/22/2022 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | Replace plumbing fixtures in two bathrooms and kichen of apt unit 5 J S. No change to egress, occupancy, use, zoning or room count. |
| X00670260 ↗ | 600 WEST 249 STREET BRONX | Alteration | Signed-off | 02/07/2022 | 02/18/2022 | Design HAL DORFMAN ARCHITECT Contractor HIGHLAND PLUMBING LLC | Interior alteration of exist single family dwelling including replacement of windows & interior staircases, alter kitchen & bathrooms, new b… |
| M00607498 ↗ | 165 CHAMBERS STREET MANHATTAN | Alteration | Signed-off | 12/06/2021 | 02/17/2022 | Design ANDRE ARCHITECTURE, D.P.C. Owner H AND R HOLDINGS NY, LLC Contractor ORCHARD CONSTRUCTION GROU | new partition wall for bedroom in apartment 6D on the 6th floor |
| M00536167 ↗ | 349 CONVENT AVENUE MANHATTAN | Alteration | Permit Issued | 10/26/2021 | 12/14/2021 | Design HAL DORFMAN ARCHITECT Contractor R&S CONSTRUCTION & DEVELO | To alter existing 2 apartments on 4th floor to adjust the demising partition between units as per plan. Renovate exist bathrooms and kitchen… |
| X00499077 ↗ | 2550 INDEPENDENCE AVENUE BRONX | Alteration | Signed-off | 05/21/2021 | 11/16/2021 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | To alter existing kitchen, non bearing partitions and interior finish material in combined unit 3PR. No change to egress, occupancy, use, zo… |
| M00499033 ↗ | 120 CABRINI BOULEVARD MANHATTAN | Alteration | Signed-off | 05/26/2021 | 10/21/2021 | Design HAL DORFMAN ARCHITECT Contractor MERCHAN CONTRACTING INC | To create opening between units 138 /139 in non bearing partition, removal electric range / renovation in kitchen of unit 138. |
| M00535169 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 10/04/2021 | 10/05/2021 | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC Contractor VILLAGE P & H NY INC | Plumbing work on fifth floor for office space all as shown on drawings filed herewith. No change in use egress or occupancy under this appli… |
| M00535145 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Filed — no permit on record | 10/04/2021 | — | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC | — |
| M00501349 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 04/20/2021 | 09/22/2021 | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC Contractor VILLAGE P & H NY INC | Plumbing work on ninth floor for office space |
| M00497614 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Filed — no permit on record | 09/21/2021 | — | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC | — |
| M00497644 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Signed-off | 09/03/2021 | 09/10/2021 | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC Contractor ALLSTATE SPRINKLER LLC | sprinkler work on 4th floor for office space |
| M00501345 ↗ | 669 WEST 42 STREET MANHATTAN | Alteration | Permit Issued | 04/20/2021 | 09/10/2021 | Design JACK GREEN ASSOCIATES Owner 303 WEST 42ND STREET LLC Contractor ALLSTATE SPRINKLER LLC | Sprinkler work on ninth floor for office space |
| M00520313 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/10/2021 | 08/13/2021 | Design JACK GREEN ASSOCIATES Owner COLLIERS TRI-STATE Contractor ALLSTATE SPRINKLER LLC | installation of new sprinkler piping and sprinkler heads for office tenant on the 18th floor all as shown on plans filed herewith |
| M00520324 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/10/2021 | 08/11/2021 | Design JACK GREEN ASSOCIATES Owner COLLIERS TRI-STATE Contractor VILLAGE P & H NY INC | installation of medical gasses oxygen and vacuum lines |
| X00558425 ↗ | 330 COLLEGE ROAD BRONX | Alteration | Signed-off | 07/21/2021 | 08/03/2021 | Design HAL DORFMAN ARCHITECT Owner KEY CONSTRUCTION Contractor KEY CONSTRUCTION PARTNER | To replace, relocate or install new (22) plumbing and / (4) gas fixtures as per plans in Existing Single Family Dwelling. |
| X00556779 ↗ | WEST 230 STREET BRONX | Alteration | Signed-off | 07/14/2021 | 07/16/2021 | Design HAL DORFMAN ARCHITECT Contractor KEY CONSTRUCTION PARTNER | installation of new curb cut in association with new building number 220651890 |
| X00556851 ↗ | FAIRFIELD AVENUE BRONX | Alteration | Signed-off | 07/14/2021 | 07/16/2021 | Design HAL DORFMAN ARCHITECT Owner 636 WEST 230TH LLC Contractor KEY CONSTRUCTION PARTNER | installation of new curb cut |
| X00558317 ↗ | 3755 HENRY HUDSON PKWY W BRONX | Alteration | Filed — no permit on record | 07/16/2021 | — | Design SZEKELY ENGINEERING | — |
| M00520329 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2021 | 06/28/2021 | Design DAVID STERN ARCHITECTURE Owner COLLIERS TRI-STATE Contractor CAPITAL IMPROVEMENT SERVI | New support for movable partition all as shown on drawings filed herewith. General Construction of interior non-bearing partitions, floors a… |
| X00446680 ↗ | 3135 JOHNSON AVENUE BRONX | Alteration | Signed-off | 05/05/2021 | 06/08/2021 | Design HAL DORFMAN ARCHITECT Owner STILLMAN MANAGEMENT Contractor VOKA MECHANICAL CORP | To relocate or replace existing plumbing fixtures as per attached plan. Cap Range unit 12D. |
| M00489828 ↗ | 503 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/22/2021 | 04/02/2021 | Design DAVID STERN ARCHITECTURE Owner COLLIERS TRI-STATE Contractor CAPITAL IMPROVEMENT SERVI | removal of interior partitions and finishes all as shown on drawings filed herewith |
| X00460889 ↗ | 716 WEST 231 STREET BRONX | Alteration | Signed-off | 02/11/2021 | 03/10/2021 | Design HAL DORFMAN ARCHITECT Contractor RANDY ROSE CORP | To alter the existing single family dwelling interior as per plan, new windows & doors, alteration to dormers. No change to egress, occupanc… |
| X00475058 ↗ | 6040 SPENCER AVENUE BRONX | Alteration | Filed — no permit on record | 02/24/2021 | — | Design HAL DORFMAN ARCHITECT | — |
| X00414535 ↗ | FAIRFIELD AVENUE BRONX | Alteration | Signed-off | 11/02/2020 | 01/11/2021 | Design HAL DORFMAN ARCHITECT Contractor HIGHLAND PLUMBING LLC | Amend fixture count and show water riser diagram (for associated sprinkler app). Original: Installation of new plumbing fixtures and equipme… |