Office, 20+ stories, with or without commercial
One Madison Avenue
1 MADISON AVENUE · BIN 1088749
💬 Discuss this project
1932Year Built
26Stories
O4Building Class
C5-3Zoning
1,233,394 sfGross Floor Area
25Units
LL97 Covered9 Open Violations ▸FISP: SAFE
Office, 20+ stories, with or without commercial · Owner of record: 1 MADISON OFFICE FEE LLC · 77,577 sf lot · 15.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction284p · 16 filings · 20 docs
Bulkhead25p · 6 filings · 20 docs
Penthouse2p · 2 filings · 15 docs
Floor 281p · 1 filing · 20 docs
Floor 27Under Construction230p · 6 filings · 20 docs
Floor 26Under Construction242p · 10 filings · 20 docs
Floor 25Under Construction229p · 4 filings · 20 docs
Floor 24Under Construction230p · 4 filings · 20 docs
Floor 23Under Construction238p · 7 filings · 20 docs
Floor 22Under Construction231p · 8 filings · 20 docs
Floor 21Under Construction230p · 8 filings · 20 docs
Floor 20Under Construction228p · 7 filings · 20 docs
Floor 19Under Construction228p · 7 filings · 20 docs
Floor 18Under Construction229p · 8 filings · 20 docs
Floor 17Under Construction228p · 7 filings · 20 docs
Floor 16Under Construction228p · 7 filings · 20 docs
Floor 15Under Construction229p · 8 filings · 20 docs
Floor 14Under Construction233p · 11 filings · 20 docs
Floor 13Under Construction235p · 10 filings · 20 docs
Floor 12Under Construction244p · 13 filings · 20 docs
Floor 11Under Construction251p · 17 filings · 20 docs
Floor 10Under Construction299p · 20 filings · 20 docs
Floor 9Under Construction261p · 18 filings · 20 docs
Floor 8Under Construction267p · 16 filings · 20 docs
Floor 7Under Construction300p · 15 filings · 20 docs
Floor 6Under Construction250p · 11 filings · 20 docs
Floor 5Under Construction243p · 10 filings · 20 docs
Floor 4Under Construction13p · 11 filings · 20 docs
Floor 3Under Construction245p · 15 filings · 20 docs
Floor 2Under Construction317p · 28 filings · 20 docs
Floor 1Under Construction318p · 25 filings · 20 docs
MezzanineUnder Construction300p · 14 filings · 20 docs
CellarUnder Construction403p · 33 filings · 20 docs
Sub-CellarUnder Construction345p · 27 filings · 20 docs
Basement1p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SL GREEN REALTY57909/13/2026
1 MADISON OFFICE FEE403/22/2026
TISHMAN CONSTRUCTION2203/22/2026
CRANES103/22/2026
JT MAGEN COMPANY103/22/2026
CUSHMAN & WAKEFIEL INC47903/22/2026
OWNER OF 1 MADISON AVE NY1003/22/2026
CARLTON ASSOCIATES/THE CA103/22/2026
MET LIFE INS. CO703/22/2026
METRO LIFE INSURANCE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.32203/21/2026
LOUIS STRIAR803/21/2026
AE DESIGN SOLUTION203/21/2026
UNIVERSAL SIGNS SERVICE203/21/2026
NEW YORK SIGN CONSULTANTS203/21/2026
A1 EXPEDITING SERVICE2403/21/2026
SPRING SCAFFOLDING LLC403/21/2026
ADJ ENGINEERING PLLC403/21/2026
EUROCELT EXPEDITING, INC4603/21/2026
VALJATO ENGINEERING P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor7507/08/2026
JT MAGEN & COMPANY INCGeneral Contractor6607/08/2026
L&K PARTNERS, INCGeneral Contractor3008/27/2026
UNIVERSAL BUILD SUPP LLCGeneral Contractor2007/08/2026
SAFWAY ATLANTIC, LLCGeneral Contractor1607/08/2026
DONATO PLUMBING GROUP INCPlumbing1307/08/2026
MANENGEERING BUREAU INCFire Protection1207/08/2026
STRUCTURE TONE, LLCGeneral Contractor1107/08/2026
CPM BUILDERS INCGeneral Contractor908/30/2026
ABCO-PEERLESS SPRKLR CORPFire Protection907/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor907/08/2026
PREFERRED SPKLR AND MECHFire Protection907/08/2026
ROGER & SONS CONCRETE INCGeneral Contractor804/09/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor807/08/2026
ASHLAND PLUMBING CORPPlumbing607/08/2026
LEVINE, GEORGEFire Protection603/21/2026
TISHMAN CONSTRUCTION CORPGeneral Contractor603/21/2026
SIRINA FIRE PROT CORPFire Protection607/08/2026
VERSATILE SERVICES LLCGeneral Contractor504/08/2026
PAR FIRE PROTECTION LLCFire Protection507/08/2026
PLATFORM SOLUTIONS, INCGeneral Contractor507/08/2026
BEDROCK PLBG. & HTG., INCPlumbing507/08/2026
P.E. STONE INCElectrical403/22/2026
SPRING SCAFFOLDING LLCGeneral Contractor407/08/2026
BEDROCK MECHANICAL INCFire Protection407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4232808/18/2026
ATLANTIC ENGINEERINGLABOR13818607/26/2026
TAN ENGINEERING, P.C.1291405/14/2026
MILROSE CONSULTANTS LLC20038705/12/2026
ATLAS ATC ENGINEERING INC80112505/06/2026
SOCOTEC ENGINEERING4983504/23/2026
AK ENGINEERING PC6781103/30/2026
METROSPEC SIA6420209/25/2025
DNA CONTROLLED INSPECTION5542108/18/2025
Z & T ENGINEERING, P.C.591107/28/2025
Building Lifecycle
All (300)Filed (64)Permit Issued (80)Signed Off (51)Facade (FISP) (3)Inspection (60)Objection (12)Special Inspection (30)
09/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/28/2026
Permit issued — General Construction
M01433906-I1-GC
08/26/2026
Permit issued — General Construction
M01437321-I1-GC
08/19/2026
Permit issued — Structural
M01433932-I1-ST
08/18/2026
Filed — Alteration
Installation of steel catwalk framing as per plans filed herewith. No change in use, egress or occupancy.
M01433932-I1
08/18/2026
Filed — Alteration
INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES ON FLOORS 4 AND 6 AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01437321-I1
08/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/17/2026
Filed — Alteration
Installation of steel catwalk as per plans filed herewith. No change in use, egress, or occupancy.
M01433906-I1
08/10/2026
Signed off — Alteration
Accessory canopy, temporary and seasonal on the 27th floor, amenity terrace. Occupancy as allowed per the TCO and PofA. Weather management in place by operator. No change in use or egress.
M01066819-I1
08/07/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
08/04/2026
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
08/04/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Christopher O'Malley
08/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Christopher O'Malley
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
07/29/2026
Signed off — Alteration
Modifications to existing Plumbing System as per plans filed herewith. No change in use, egress, or occupancy.
M01312538-I1
07/28/2026
Special inspection requirement — Final
Stephanie Lan
07/27/2026
Signed off — Alteration
Modifications to existing Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
M01377344-I1
07/27/2026
Signed off — Alteration
Provide 1 new DOAS terminal unit and associated ductwork and piping and controls. Relocate 4 existing DOAS terminal units and provide new ductwork distribute to accommodate new layout as per plans filed herewith. No change in use, egress, or occupancy.
M01377301-I1
07/26/2026
Filed — Alteration
Modification to plumbing systems as per plans filed herewith Filed in conjunction with Alt-1# 123742101. No change in use, occupancy or egress.
M00255564-A5
07/21/2026
Special inspection requirement — Structural Steel - Details
Young Suh
07/21/2026
Special inspection requirement — Final
Young Suh
07/21/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Young Suh
07/21/2026
Special inspection requirement — Structural Steel - Welding
Young Suh
07/21/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/17/2026
Signed off — Alteration
Modifications to existing Sprinkler and Standpipe Systems per plans filed herewith. No change in use, egress, or occupancy.
M01312531-I1
07/14/2026
Signed off — Alteration
Minor low pressure ductwork modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy.
M01362907-I1
07/14/2026
Signed off — Alteration
CONSTRUCTION OF INTERIOR PARTITIONS, CEILINGS AND FINISHES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01377288-I1
07/14/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/13/2026
Signed off — Alteration
LIMITED INTERIOR DEMOLITION OF FINISHES AND INTERIOR PARTITIONS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M01371121-I1
07/07/2026
Signed off — Alteration
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
M01296310-I1
07/07/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
06/25/2026
Filed — Alteration
Modifications to existing Plumbing System as per plans filed herewith. No change in use, egress, or occupancy.
M01312538-P2
06/24/2026
Permit issued — Sprinklers
M01373644-I1-PL
06/24/2026
Permit issued — Plumbing
M01373644-I1-EW-SP
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
06/24/2026
Special inspection requirement — Post-installed Anchors
Young Suh
06/23/2026
Signed off — Alteration
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
M01136143-I1
06/22/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Christopher O'Malley
06/22/2026
Special inspection requirement — Post-installed Anchors
Christopher O'Malley
06/22/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Christopher O'Malley
06/22/2026
Special inspection requirement — High-Pressure Fuel-Gas Piping (Welding)
Christopher O'Malley
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
Christopher O'Malley
06/17/2026
Permit issued — Plumbing
M00255564-I1-PL
06/15/2026
Signed off — Alteration
Structural modifications as per plans filed herewith. Operable Partition Support, Concrete Curb + Pad Installation, MEP Opening Framing. No change in use, egress or occupancy.
M01296337-I1
06/12/2026
Signed off — Alteration
M01362014-I1
06/01/2026
Signed off — Alteration
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
M01312521-I1
06/01/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/27/2026
Signed off — Alteration
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
M01090615-I1
05/27/2026
Signed off — Alteration
Installation of interior non-bearing partitions and related finishes as per plans filed herewith. No change in use, occupancy or egress.
M01295698-I1
05/27/2026
Permit issued — General Construction
M01373567-I1-GC
05/26/2026
Permit issued — Mechanical Systems
M01373606-I1-MS
05/21/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/21/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
05/18/2026
Signed off — Alteration
Modifications to existing Plumbing and Sprinkler Systems as per plans filed herewith. No change in use, egress, or occupancy.
M01284483-I1
05/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/15/2026
Signed off — Alteration
Modifications to existing HVAC System, installation of new split AC unit for AV Room as per plans filed herewith. No change in use, egress, or occupancy.
M01336389-I1
05/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
05/15/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCPM BUILDERS INC08/28/2026
DOB NOWGeneral ConstructionPermit IssuedL&K PARTNERS, INC08/26/2026
DOB NOWStructuralPermit IssuedCPM BUILDERS INC08/19/2026
DOB NOWSprinklersPermit IssuedCOPPER PLUMBING INC06/24/2026
DOB NOWPlumbingPermit IssuedARIANA CONTRACTING INC06/24/2026
DOB NOWPlumbingPermit IssuedDONATO PLUMBING GROUP INC06/17/2026
DOB NOWGeneral ConstructionPermit IssuedCPM BUILDERS INC05/27/2026
DOB NOWMechanical SystemsPermit IssuedCPM BUILDERS INC05/26/2026
DOB NOWMechanical SystemsSigned-offJT MAGEN & COMPANY INC05/13/2026
DOB NOWGeneral ConstructionSigned-offJT MAGEN & COMPANY INC05/12/2026
DOB NOWMechanical SystemsPermit IssuedTRANE U.S. INC05/07/2026
DOB NOWSprinklersPermit IssuedBEDROCK MECHANICAL INC04/22/2026
DOB NOWMechanical SystemsPermit IssuedJT MAGEN & COMPANY INC04/21/2026
DOB NOWPlumbingPermit IssuedBEDROCK PLBG. & HTG., INC04/21/2026
DOB NOWGeneral ConstructionPermit IssuedJT MAGEN & COMPANY INC04/21/2026
DOB NOWStructuralPermit IssuedJT MAGEN & COMPANY INC04/20/2026
DOB NOWSprinklersPermit IssuedLAWRENCE J. LEVINE04/10/2026
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC04/08/2026
DOB NOWMechanical SystemsSigned-offJRM CONSTRUCTION MGMT LLC04/02/2026
DOB NOWGeneral ConstructionSigned-offJRM CONSTRUCTION MGMT LLC03/26/2026
DOB NOWGeneral ConstructionPermit IssuedALCHEMY DEVELOPMENT03/20/2026
DOB NOWSignSigned-offUNIVERSAL SIGNS & SVC INC03/06/2026
DOB NOWMechanical SystemsSigned-offL&K PARTNERS, INC01/08/2026
DOB NOWStructuralSigned-offSTRUCTURE TONE, LLC12/16/2025
DOB NOWStandpipeSigned-offABCO-PEERLESS SPRKLR CORP12/11/2025
DOB NOWPlumbingSigned-offGEOFFREY A. LAGAS & ASSOC12/11/2025
DOB NOWStandpipeSigned-offABCO-PEERLESS SPRKLR CORP12/11/2025
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC12/11/2025
DOB NOWPlumbingPermit IssuedPREFERRED MECHANICAL INC12/05/2025
DOB NOWSprinklersPermit IssuedPREFERRED SPKLR AND MECH12/05/2025
DOB NOWStandpipePermit IssuedPREFERRED SPKLR AND MECH12/05/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC12/04/2025
DOB NOWMechanical SystemsSigned-offSTRUCTURE TONE, LLC12/02/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURE TONE, LLC12/01/2025
DOB NOWStructuralSigned-offCOOPER WORKS10/28/2025
DOB NOWMechanical SystemsSigned-offCOOPER WORKS10/01/2025
DOB NOWGeneral ConstructionSigned-offCOOPER WORKS10/01/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO09/29/2025
DOB NOWPlumbingSigned-offACCURATE MECHANICAL INC09/29/2025
DOB NOWStructuralSigned-offJT MAGEN & COMPANY INC08/14/2025
+ 60 more permits on file
5 projects · most recent 03/30/2026
Ventilation Systems Air Conditioning Systems Heating Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/30/2026Signed-offJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
03/26/2026Permit IssuedCPM BUILDERS INCHeating Systems, Ventilation Systems
Heating
__Junk__ AWFA4005CW 160 CFM ×1
AWFA8005CW 320 CFM ×1
Ventilation
Tcf DSI 120 CFM ×1
12/31/2025Signed-offL&K PARTNERS, INCAir Conditioning Systems
Cooling
Mitsubishi Electric MUZ-FX24NLHZ 2,204 CFM · Split System ×1
09/25/2025Signed-offCOOPER WORKS INCHeating and Air Conditioning Systems, Heating Systems, Ventilation Systems
Heat / Cool
Trane GEHE0481 1,600 CFM · Wshp ×6
Heating
Greenheck CLD10-2072E 3,374 CFM · Air Curtain ×2
Ventilation
Greenheck SP-B110 75 CFM · Exhaust Fan ×1
SQ-070-VG 175 CFM · Exhaust Fan ×1
SQ-120-VG 900 CFM · Exhaust Fan ×1
07/28/2025Permit IssuedALCHEMY DEVELOPMENTHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Heat Controller HBH024A1C30CCS 800 CFM ×1
HBH060A4C30CCS 2,000 CFM ×1
Ventilation
Greenheck CSP-A390-VG 170 CFM · Exhaust Fan ×2
SP-A50-90-VG 70 CFM · Exhaust Fan ×1
6 projects · most recent 05/14/2026
FiledStatusContractorScope
05/14/2026Signed-offACCURATE MECHANICAL INC49 heads
05/12/2026Permit IssuedPREFERRED SPKLR AND MECH2,217 heads, 12 outlets
04/08/2026Signed-offABCO-PEERLESS SPRKLR CORP713 heads, 3 outlets
03/30/2026Permit IssuedPAR FIRE PROTECTION LLC93 heads
03/26/2026Permit IssuedARIANA CONTRACTING INC47 heads
12/05/2024——113 heads, 1 outlets
8 projects · most recent 07/26/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
07/26/2026Permit IssuedDONATO PLUMBING GROUP INCGas, Storm, Water/Sanitary
06/25/2026Signed-offGEOFFREY A. LAGAS & ASSOCWater/Sanitary
05/14/2026Signed-offQPR MECHANICAL INCGas, Water/Sanitary
05/12/2026Permit IssuedPREFERRED MECHANICAL INCWater/Sanitary
03/30/2026———
03/26/2026Permit IssuedCOPPER PLUMBING INCWater/Sanitary
12/05/2024——Water/Sanitary
11/08/2021——Water/Sanitary
25 projects · most recent 08/31/2026
General Wiring
FiledStatusContractorScope
08/31/2026Permit IssuedHESO ELECTRICAL INCGeneral Wiring
07/14/2026CompleteHESO ELECTRICAL INCGeneral Wiring
06/23/2026Permit IssuedPOWER-TECH INSTALL. ELEC'General Wiring
04/24/2026Permit IssuedM.C. ELECTRICAL NY INCGeneral Wiring
04/13/2026CompleteHESO ELECTRICAL INCGeneral Wiring
04/09/2026CompleteFOREST ELECTRIC CORP.General Wiring
01/12/2026CompleteP.E. STONE INCGeneral Wiring
12/05/2025CompleteROBERT B SAMUELS, INCGeneral Wiring
08/18/2025CompleteALLRAN ELECTRIC OF NY LLCGeneral Wiring
08/04/2025Permit IssuedALLRAN ELECTRIC OF NY LLCGeneral Wiring
07/16/2025CompleteTEAM ELECTRIC, INCGeneral Wiring
07/09/2025CompleteM.C. ELECTRICAL NY INCGeneral Wiring
06/09/2025CompleteP.E. STONE INCGeneral Wiring
03/27/2025CompleteP.E. STONE INCGeneral Wiring
03/18/2025CompleteELECTRIC ESSENTIALS CORPGeneral Wiring
6 projects · most recent 08/18/2026
Steel Concrete
FiledStatusContractorScope
08/18/2026Permit IssuedL&K PARTNERS, INC1 scope_items
08/18/2026Permit IssuedCPM BUILDERS INCSteel
05/11/2026Signed-offSTRUCTURE TONE, LLCSteel, Concrete
03/25/2026Permit IssuedJT MAGEN & COMPANY INCSteel, Concrete
07/28/2025Permit IssuedALCHEMY DEVELOPMENTSteel
02/26/2020——Concrete
▾Field Inspections (DOB CAP) — 202
DateTypeResultReport
09/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/14/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/07/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/01/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/21/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/21/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
05/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/15/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/15/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/15/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
05/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/24/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/14/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/24/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/20/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/17/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/17/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/05/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/03/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
Latest 25 of 202.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/04/2026Energy Code Compliance InspectionsChristopher O'Malleyprogress
08/04/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationChristopher O'Malleyspecial
08/04/2026Post-installed AnchorsChristopher O'Malleyspecial
08/04/2026Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
08/04/2026High-Pressure Fuel-Gas Piping (Welding)Christopher O'Malleyspecial
07/28/2026FinalStephanie Lanprogress
07/21/2026Structural Steel - DetailsYoung Suhspecial
07/21/2026FinalYoung Suhprogress
07/21/2026Post-installed AnchorsYoung Suhspecial
07/21/2026Structural Steel - WeldingYoung Suhspecial
07/21/2026Structural Steel - High Strength BoltingYoung Suhspecial
06/24/2026Post-installed AnchorsYoung Suhspecial
06/24/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/22/2026Fire-Resistant Penetrations and JointsChristopher O'Malleyspecial
06/22/2026Post-installed AnchorsChristopher O'Malleyspecial
06/22/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationChristopher O'Malleyspecial
06/22/2026Energy Code Compliance InspectionsChristopher O'Malleyprogress
06/22/2026High-Pressure Fuel-Gas Piping (Welding)Christopher O'Malleyspecial
05/15/2026HVAC-R and service water heating equipmentRoger Tanenergy_progress
05/15/2026Sprinkler SystemsRoger Tanspecial
05/15/2026HVAC-R and service water piping design and insulationRoger Tanenergy_progress
05/15/2026HVAC-R and service water heating system controlsRoger Tanenergy_progress
05/15/2026Fire-Resistant Penetrations and JointsRoger Tanspecial
05/14/2026Sprinkler SystemsChristopher Drutjonsspecial
05/14/2026FinalChristopher Drutjonsprogress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
HarveyOfficeFloors 4, 6
Project M01437321 Alteration · Permit Entire · 08/18/2026
Franklin Templeton InvestmentsOfficeFloors 11–21
Project M01362907 Alteration · LOC Issued · 04/23/2026
Project M01362879 Alteration · Permit Entire · 04/09/2026
Project M01042192 Alteration · LOC Issued · 08/15/2024
Project M01042412 No Work · PA Certificate of Operation Issued · 08/15/2024
Project M01042196 Alteration · LOC Issued · 08/09/2024
Project M01043709 Alteration · LOC Issued · 08/08/2024
Project M01044032 Alteration · LOC Issued · 06/17/2024
Project M01044023 Alteration · LOC Issued · 06/13/2024
Project M01044029 Alteration · LOC Issued · 06/13/2024
Project M01044020 Alteration · LOC Issued · 06/05/2024
Project M01005195 Alteration · LOC Issued · 03/07/2024
Project M01005221 Alteration · LOC Issued · 03/07/2024
CoinbaseOfficeFloor 23
Project M01377288 Alteration · LOC Issued · 03/27/2026
Project M01138857 Alteration · LOC Issued · 12/17/2024
Project M01138937 Alteration · LOC Issued · 12/16/2024
Project M01148743 Alteration · LOC Issued · 12/16/2024
Project M01120652 Alteration · LOC Issued · 10/08/2024
IBMOfficeFloors 1–3, 7–11
Project M01296337 Alteration · LOC Issued · 12/10/2025
Project M00893613 Alteration · LOC Issued · 06/26/2023
Project M00847946 Alteration · LOC Issued · 05/11/2023
Project M00848679 Alteration · LOC Issued · 05/11/2023
Project M00848728 Alteration · LOC Issued · 05/11/2023
Project M00848776 Alteration · LOC Issued · 05/11/2023
Project M00848851 Alteration · LOC Issued · 05/11/2023
Project M00848866 Alteration · LOC Issued · 05/11/2023
Project M00863512 Alteration · LOC Issued · 05/11/2023
Project M00847959 Alteration · LOC Issued · 05/09/2023
Project M00848691 Alteration · LOC Issued · 05/09/2023
Project M00848854 Alteration · LOC Issued · 05/09/2023
International Business MachinesOfficeFloor 7
Project M01296297 Alteration · Permit Entire · 12/09/2025
Los Tacos No. 1Restaurant / Food ServiceGround, Floor 1
Project M01284483 Alteration · LOC Issued · 09/25/2025
Project M01285339 Alteration · LOC Issued · 09/25/2025
AlidoroRestaurant / Food ServiceCellar, Floor 1
Project M01232371 Alteration · Permit Entire · 07/28/2025
Project M01232383 Alteration · Permit Entire · 07/28/2025
Project M01232408 Alteration · Permit Entire · 07/28/2025
FanDuelOfficeFloors 23, 26, 27
Project M01215721 Alteration · LOC Issued · 05/27/2025
Project M01136137 Alteration · LOC Issued · 03/19/2025
Project M01136143 Alteration · LOC Issued · 12/05/2024
Project M01136147 Alteration · Approved · 12/05/2024
Project M01136174 Alteration · LOC Issued · 12/05/2024
Project M01109799 Alteration · LOC Issued · 10/30/2024
Project M01109834 Alteration · LOC Issued · 10/30/2024
Project M01109764 Alteration · LOC Issued · 10/24/2024
The Dinex GroupRestaurant / Food ServiceSub-cellar, Cellar
Project M01163246 Alteration · LOC Issued · 02/03/2025
Project M01162660 Alteration · LOC Issued · 01/31/2025
Project M01162644 Alteration · LOC Issued · 01/23/2025
Palo Alto NetworksOfficeFloor 25
Project M01101289 No Work · PA Certificate of Operation Issued · 12/05/2024
Project M01090636 Alteration · LOC Issued · 08/23/2024
SweetgreenRestaurant / Food ServiceFloor 1
Project M01116267 Alteration · LOC Issued · 11/14/2024
Palo AltoOfficeFloors 25, 26
Project M01090615 Alteration · LOC Issued · 08/23/2024
Project M01090628 Alteration · LOC Issued · 08/23/2024
Madison FitnessFitness / RecreationSub-cellar, Cellar
Project M00963433 Alteration · LOC Issued · 12/01/2023
Chelsea PiersFitness / RecreationSub-cellar, Cellar, Floors 1, 2
Project M00915197 Alteration · LOC Issued · 08/23/2023
Project M00898526 Alteration · LOC Issued · 08/21/2023
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 4,990 on file (BIS + DOB NOW)
▸Plans & Drawings416
▸DOB NOWPlans/Sketch269
09/03/2026M00502826-I1Request digital key ↗
09/03/2026M00542239-I1Request digital key ↗
09/03/2026M00542239-P1Request digital key ↗
Showing 3 of 269 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸DOB NOWPlans/Sketch - Plumbing21
09/05/2026M00270843-I1Request digital key ↗
09/04/2026M00228775-I1Request digital key ↗
09/03/2026M00427811-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Standpipe19
09/04/2026M00316547-P1Request digital key ↗
09/04/2026M00316547-I1Request digital key ↗
09/04/2026M00415172-I1Request digital key ↗
Showing 3 of 19 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems18
09/03/2026M00427804-I1Request digital key ↗
09/03/2026M00255490-P8Request digital key ↗
09/03/2026M00255490-P7Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold9
09/04/2026M00368926-I1Request digital key ↗
09/04/2026M00452097-I1Request digital key ↗
Showing 2 of 9 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWPlans/Sketch - Structural8
09/05/2026M00270845-I1Request digital key ↗
Showing 1 of 8 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed8
09/05/2026M00270210-I1Request digital key ↗
09/03/2026M00353744-I1Request digital key ↗
09/03/2026M00353744-P6Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00452145-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00397774-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
09/04/2026M00351811-I1Request digital key ↗
▸Applications & Permits745
▸BISPLAN / WORK APPROVAL APPLICATION532
01/07/2026103626088Open ↗
01/07/2026103047542Open ↗
01/07/2026103418142Open ↗
Showing 3 of 532 on file for this type
▸BISWORK PERMIT APPLICATION213
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 213 on file for this type
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications1,723
▸DOB NOWProgress Inspector Seal & Signature429
09/29/2026M01116254-P1Open ↗
09/28/2026M00352959-P1Open ↗
09/28/2026M00352959-P1Open ↗
Showing 3 of 429 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature406
09/05/2026M00270210-I1Open ↗
09/05/2026M00270845-I1Open ↗
09/04/2026M00351811-I1Open ↗
Showing 3 of 406 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature385
09/29/2026M01116254-P1Open ↗
09/28/2026M00848776-I1Open ↗
09/28/2026M01207577-I1Open ↗
Showing 3 of 385 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION281
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 281 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST72
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 72 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM56
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 56 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT48
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 48 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY19
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 19 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment226
▸BISSELF-CERT PLUMBING NOTICE78
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 78 on file for this type
▸BISSCHEDULE B - PLUMBING54
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 54 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA28
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 28 on file for this type
▸BISEQUIPMENT USE PERMITS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8514
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸DOB NOWFDNY: Letter of No Objection13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Safety & Tenant Protection8
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISST-1 Street Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Environmental & Asbestos379
▸DOB NOWDEP ACP-5: Asbestos Assessment Report249
09/04/2026M00316547-P2Open ↗
09/04/2026M00316547-I1Open ↗
09/04/2026M00296570-P1Open ↗
Showing 3 of 249 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'66
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 66 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)52
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 52 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
09/04/2026M00228775-I1Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWACP5/20/21 or V52
09/04/2026M00228775-I1Open ↗
Showing 1 of 2 on file for this type
▸Energy Compliance102
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification17
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTR8: Energy Code Progress Inspections7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)5
02/14/2025123742101Open ↗
Showing 1 of 5 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports144
▸BISTECHNICAL REPORT: RESPONSIBILITY117
03/14/2025141021579Open ↗
03/14/2025141021579Open ↗
03/14/2025141007345Open ↗
Showing 3 of 117 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPOST-INSTALLED ANCHORS4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSPRAYED FIRE-RESISTANT MATERIALS3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs386
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST149
02/06/2026103133734Open ↗
03/17/2025103055756Open ↗
03/17/2025101916688Open ↗
Showing 3 of 149 on file for this type
▸BISADMINISTRATIVE OBJECTIONS65
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 65 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION62
10/27/2025103157762Open ↗
10/27/2025103140717Open ↗
08/27/2025104710449Open ↗
Showing 3 of 62 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE40
11/14/2025123742101Open ↗
11/12/2025123742101Open ↗
11/06/2025123742101Open ↗
Showing 3 of 40 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLANDMARKS APPROVAL13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSUPERSEDING LETTER12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISFINAL10
10/25/2024141019216Open ↗
10/21/2024140951806Open ↗
Showing 2 of 10 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWDEP Variance (V5) letter8
09/04/2026M00228775-I1Open ↗
09/04/2026M00316547-I1Open ↗
Showing 2 of 8 on file for this type
▸BISLANDMARKS SIGNOFF6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Cost, Insurance & Ownership275
▸BISCOST AFFIDAVIT251
03/14/2025141021579Open ↗
03/14/2025141007345Open ↗
02/27/2025141021579Open ↗
Showing 3 of 251 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW313
11/13/2024104640667Open ↗
10/17/2024104832228Open ↗
10/17/2024110103986Open ↗
Showing 3 of 13 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Filing & Intake Forms308
▸BISADDITIONAL INFORMATION124
11/21/2025123742101Open ↗
05/05/2025123742101Open ↗
01/14/2025123742101Open ↗
Showing 3 of 124 on file for this type
▸BISEFILING COVER SHEET110
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 110 on file for this type
▸BISBOROUGH INTAKE FORM41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸DOB NOWAI1 Form (from plan PDF)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Other Documents159
▸DOB NOWAlternate Plan 123
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 23 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸DOB NOWAlternate Plan 215
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸DOB NOWAlternate Plan 313
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸DOB NOWAlternate Plan 412
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWAlternate Plan 512
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸DOB NOWAlternate Plan 68
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWStructural Peer Review Report7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWAlternate Plan 74
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 124
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 94
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 114
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 84
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAlternate Plan 152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 132
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 142
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 182
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 192
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 172
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWAlternate Plan 162
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWThe Wind Tunnel Test Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type