Whole building & multi-floor projectsGas meter installation and riser repair1 filing
Installation of new gas meters, replacement of gas distribution header and repairs to the gas risers.
On file for this project
12 documents
RoofMidboro Management, INC.6p · 7 filings · 14 docs
MechanicalPlumbingStructural
Issued Permit Scope
Boiler Equipment · Mechanical Systems · Plumbing
REPLACEMENT (1) NEW GAS FIRED HOT WATER BOILER. (HALLWAYS) NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
INSTALL (2) NEW ELECTRIC DOMESTIC HOT WATER HEATERS. CONNECT TO EXISTING DOMESTIC EATER STORAGFE TANKS AND EXISTING MIXING VALVES. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
7 documents
Introduce shoring at laundry room and adjacent areas in the cellar space to support spalling at underside of parking garage ramp, as per plans.
On file for this project
2 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
BulkheadMidboro Management, INC.1p · 1 filing · 20 docs
Mechanical
Limited HVAC system upgrade including removal of existing rooftop unit, associated ductwork, and condensate piping; subsequent installation of new units and associated ductwork and piping.
On file for this project
39 documents · 1 drawing sheet
PenthouseUnit PHA1 filing · 8 docs
Plumbing
Issued Permit Scope
Plumbing
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATION OF UNIT 33A ON THE 32ND FLOOR OF A RESIDENTIAL BUILDING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
8 documents
Floor 3410 West 66 Street Corp.1p · 2 filings · 20 docs
MechanicalPlumbing
Issued Permit Scope
Plumbing
REPLACEMENT (1) NEW GAS FIRED HOT WATER BOILER. (HALLWAYS) NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
REPLACE (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS ON 34TH FLOOR MECHANICAL ROOM FOR DOMESTIC WATER. RECONNECT LOW PRESSURE GAS LINE. (2) NEW STORAGE TANKS. REMOVE (2) BOILERS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
On file for this project
11 documents · 1 drawing sheet
Floor 33Unit 33A1 filing · 8 docs
MechanicalPlumbing
Issued Permit Scope
Mechanical Systems · Plumbing
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF EXISTING APARTMENT 33A AND ACCESSORY ROOF BULKHEAD. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
On file for this project
18 documents
Floor 32Unit 32A, Unit 32H, Unit 33A +11p · 5 filings · 8 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Addition of one air-handler including required piping & ductwork for this new zone. Existing Condenser location to be replaced with new condenser which is similar size. No work to any structural slabs, columns, or beams.
On file for this project
11 documents
PLUMBING WORK IN CONJUNCTION W/ INTERIOR RENOVATION OF EXISTING DWELLING UNIT#33G ON THE 32ND FLOOR OF RESIDENTIAL BUILDING TO COMBINED APARTMENTS 33G & 33A, NO CHANGE IN USE, OCCUPANCY, EGRESS, OR ZONING.
On file for this project
3 documents
Interior renovation of existing dwelling unit #33G on the 32nd floor of a residential building to combined apartments 33G & 33A. Architectural work only, no change to use, occupancy, or egress..
On file for this project
3 documents
Latest 3 of 5 filings on this floor.
Floor 31Unit 31A1 filing · 8 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
PLUMBING FIXTURES IN APT 31A. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
17 documents
Floor 30
Floor 29
Floor 28Unit 28A, Unit 28F, Unit 28HUnder Construction6 filings · 16 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing modifications to Duplex Unit 28/29C. No change to use egress or occupancy.
On file for this project
16 documents
ALT @. MINOR DEMO, 6 NEW DOORS, NEW KITCHEN CABINETS & APPLIANCES. REMOVE TUB AND NEW SHOWER, SINK & TOILET. UPGRADE POWDER ROOM. NEW BASEBOARD & CROWN MOULDINGS. PAINT. NO CHANGE IN USE, EGRESS & OCCUPANCY.
On file for this project
7 documents
INTERIOR FIT-OUT OF EXISTING RESIDENTIAL(FLOOR 28) UNIT 28F PROPOSED. INCLUDING PARTITION REMOVAL AND INSTALLATION AS PER PLAN. NO CHANGE OF USE, EGRESS, AND OCCUPANCY UNDER THIS APPALITION.
On file for this project
18 documents
Latest 3 of 6 filings on this floor.
Floor 27Unit 27GUnder Construction2 filings · 16 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing modifications to Duplex Unit 28/29C. No change to use egress or occupancy.
On file for this project
16 documents
GENERAL PLUMBING MODIFICATIONS IN CONNECTION WITH INTERIOR APARTMENT RENOVATION FOR UNIT 27G; THERE IS NO CHANGE TO OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
On file for this project
4 documents
Floor 26Unit 26F, Unit 26DE, Unit 26GHUnder Construction3p · 3 filings · 20 docs
ArchitectureGeneralPlumbingOther
Issued Permit Scope
General Construction · Plumbing
Alt2 for plumbing work to be performed in unit #26GH on the 26th floor. Initial general construction application to be filed. All in accordance with submitted plans no changes to use, egress, or occupancy under this application.
On file for this project
23 documents
Interior renovation & apartment combination of existing dwelling unit #26DE on the 26th floor of a residential building. Plumbing work only, no change to use, occupancy, or egress
On file for this project
12 documents · 1 drawing sheet
PLUMBING WORK IN CONJUNCTION W/INTERIOR RENOVATION OF EXISTING DWELLING UNIT #26F ON THE 26TH FLOOR OF RESIDENTIAL BUILDING, NO CHANGE IN USE, OCCUPANCY, EGRESS, OR ZONING.
On file for this project
18 documents · 2 drawing sheets
Floor 25Unit 25B, Unit 25K3 filings · 15 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
ALT TYPE 2. MINOR DEMOLITION TO INSTALL NEW KITCHEN CABINETS AND APPLIANCES. UPGRADE BATHROOM & POWDER ROOM. NEW DOORS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
15 documents
INTERIOR RENOVATION OF APARTMENT 25B ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 25B ON THE 25TH FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Floor 24Unit 24G1p · 1 filing · 8 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
plumbing work in conjunction w/interior renovation of existing dwelling unit #24G on the 24th floor of residential building, no change in use, occupancy, egress or zoning.
On file for this project
9 documents · 1 drawing sheet
Floor 23
Floor 22
Floor 21
Floor 20
Floor 19Unit 19E, Unit 19F, Unit 19EF2 filings · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Interior renovation of an existing building at apt 19EF. No change in use, egress or occupancy under this application
On file for this project
4 documents
PLUMBING WORK TO ACCOMMODATE THE COMBINATION OF UNITS (19E & 19F) AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
Floor 18Unit 18D1 filing · 6 docs
Plumbing
Issued Permit Scope
Plumbing
HEREWITH FILING NEW ALT2 APPLICATION FOR PLUMBING WORK IN AN EXISTING UNIT 18D ON THE 18TH FLOOR. ALL IN ACCORDANCE WITH SUBMITTED PLANS. NO CHANGES TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents
Floor 17
Floor 16Unit 17B, Unit 17C1 filing · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PL WORK TO COMBINE APTS FILED IN CONJUNCTION WITH DOB NOW GC. NO CHANGE TO USE, OCCUPANCY OR EGRESS. FILING SUB DOCUMENT AS A PAA BECAUSE YOU CANNOT AMEND LEGALIZATIONS. NO NEW WORK SIMPLY UPDATING PLANS AS PER INSPECTOR COMMENTS TO ADD FLOOR PLANS
On file for this project
13 documents
Floor 15
Floor 14
Floor 13Unit 14EF1p · 1 filing · 8 docs
Plumbing
Issued Permit Scope
Plumbing
PLUMBING WORK FOR APARTMENT SEPARATION TO APARTMENT 14EF AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,EGRESS OR OCCUPANCY.
On file for this project
12 documents · 1 drawing sheet
Floor 12
Floor 11
Floor 10Unit 10B, Unit 10K2p · 3 filings · 8 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUCTION WITH INTERIOR RENOVATION OF EXISTING DWELLING UNIT #10K ON THE 10TH FLOOR OF RESIDENTIAL BUILDING> NO CHNAGE IN USE< OCCUPANCY EGRESS OR ZONING..
On file for this project
9 documents · 1 drawing sheet
Interior renovation of existing dwelling unit #10K on the 10th floor of a residential building . Architectural work only NO CHANGE TO USE OCCUPANCY OR EGRESS.
On file for this project
7 documents · 1 drawing sheet
INTERIOR RENOVATION IN APT 10B. REMOVE/REPLACE NON BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS. PL FILED ON A LAA. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
4 documents
Floor 9Unit 9BUnder Construction1 filing · 11 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
ALT TYP 2. Minor Demolition of kitchen and bathroom. New Kitchen at existing location/size. New retractable wall. One new bathroom upgrade at existing bathroom. No change in use, egress and occupancy.
On file for this project
11 documents
Floor 8
Floor 7
Floor 6Unit 6B1 filing · 4 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Alt 2 Interior Alteration of Apt 6B. New framing for new wall with 2 pocket doors. No change in use, occupancy or egress.
On file for this project
4 documents
Floor 5
Floor 4
Floor 3Unit 3C, Unit 3E, Unit 3GUnder Construction3 filings · 8 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
filing herewith for the modifications to existing plumbing systems
On file for this project
8 documents
ALT TYPE 2. MINOR DEMOLITION TO INSTALL NEW KITCHEN CABINETS AND APPLIANCES. COMBINE TWO CLOSET TO ONE CLOSET. NEW DOORS AND FINISHES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
8 documents
Interior renovation of Apt 3G as shown on plans. No change in use, egress or occupancy under this application.
On file for this project
3 documents
Floor 2
Floor 1Garage repairs2p · 1 filing · 8 docs
ArchitecturePlumbingStructural
Issued Permit Scope
Plumbing · Structural
Garage repairs as per plans; no change to egress, use, or occupancy.
On file for this project
10 documents · 2 drawing sheets
CellarSprinkler replacement, 7th and 8th floors3p · 4 filings · 8 docs
ArchitectureFire ProtectionPlumbingStructural
Issued Permit Scope
General Construction · Plumbing · Sprinklers · Standpipe · Structural
REPLACEMENT OF SPRINKLERS IN LAUNDRY ROOM FOR GAS DRYERS WITH NEW PIPING TAKEN OFF BUILDING STANDPIPE.
On file for this project
7 documents
Garage repairs as per plans; no change to egress, use, or occupancy.
On file for this project
10 documents · 2 drawing sheets
Introduce shoring at laundry room and adjacent areas in the cellar space to support spalling at underside of parking garage ramp, as per plans.
On file for this project
2 documents
Latest 3 of 4 filings on this floor.
Sub-CellarSubcellar demolitionUnder Construction7p · 4 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
Plumbing · Structural
Herewith filing demolition and replacement of Sub-Cellar concrete slab as per plans. No Change in Use, Egress, or Occupancy is proposed under this application.
On file for this project
4 documents · 3 drawing sheets
REPLACE (1) NEW GAS FIRED HOT WATER HEATER WITH INTEGRAL BURNER IN THE SUB-CELLAR. RECONNECT LOW PRESSURE GAS LINE, EXIST STORAGE TANKS. Remove 1 boiler. Gas connection for replace of 1 HW boiler on roof done under M01362634-I1. boiler reconnect to exis
On file for this project
7 documents
Garage repairs as per plans; no change to egress, use, or occupancy.
On file for this project
10 documents · 2 drawing sheets
Latest 3 of 4 filings on this floor.
Site & exteriorMidboro Management, INC.8 filings · 20 docs
ArchitectureEquipmentGeneralMechanicalStructural
Issued Permit Scope
Construction Fence · General Construction · Sidewalk Shed · Supported Scaffold
FACADE REPAIR AS PER PLANS FILED HEREWITH TO COMPLY WITH LOCAL LAWS.
On file for this project
4 documents · 1 drawing sheet
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents · 8 drawing sheets
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
2 documents · 3 drawing sheets
Latest 3 of 8 filings on this floor.
Filed — no permit issued1 filing
Project M01474661Pending Plan Examiner Assignment
Window Inspection