| Owner | Filings | Most Recent |
|---|---|---|
| Mount Sinai Health Systems | 182 | 03/22/2026 |
| St Luke's/Roosevelt Hospital | 156 | 03/22/2026 |
| St Lukes Hospital | 67 | 03/21/2026 |
| Continuum Health Partners | 23 | 03/21/2026 |
| Mount Sinai Hospital | 11 | 07/08/2026 |
| Phoenix | 9 | 03/21/2026 |
| Mount Sinai Helth Group | 3 | 03/21/2026 |
| Quantum Design | 2 | 03/21/2026 |
| Westside 59 | 2 | 03/21/2026 |
| Columbus/Amsterdam Associates | 1 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| AKF Engineers | 39 | 09/29/2026 |
| Perkins Eastman | 10 | 08/12/2026 |
| Syska Hennessy Group | 9 | 07/29/2026 |
| Burns Engineering | 10 | 05/07/2026 |
| Studio A+T Architects | 6 | 04/09/2026 |
| Loring Consulting Engineers | 37 | 03/30/2026 |
| Paul Perdek, Prof. Engineering | 1 | 01/29/2026 |
| Richard Puswald PE | 1 | 11/07/2025 |
| Architectural Preservation Studio | 4 | 07/29/2025 |
| Wellworth Consulting | 1 | 06/23/2025 |
| EP Engineering | 3 | 06/16/2025 |
| Simple Architecture | 5 | 05/27/2025 |
| Francis Cauffman Architects | 4 | 10/11/2024 |
| Severud Associates | 3 | 09/16/2024 |
| Lilker Associates Consulting Engineering | 9 | 05/15/2024 |
| Timothy E. Krawetz | 27 | 03/19/2024 |
| Think Design Architecture | 1 | 10/20/2023 |
| ZGF Architects | 1 | 07/28/2023 |
| S. Rejeili Architect | 3 | 05/11/2023 |
| Mohammad Ahead, PE | 2 | 09/01/2022 |
| Brand Access Solutions | 1 | 08/01/2022 |
| Safway Atlantic | 3 | 07/28/2022 |
| Reuther Bowen | 2 | 07/19/2022 |
| Posen Architects | 1 | 07/14/2022 |
| TPG Architecture | 1 | 01/28/2022 |
| BR+A Consulting Engineers | 4 | 06/23/2021 |
| Efh Architecture | 1 | 06/22/2021 |
| G. Blinn Consulting | 1 | 01/05/2021 |
| Universal Builders Supply | 2 | 04/04/2018 |
| Royal T&E | 4 | 03/22/2018 |
| Representative | Filings | Most Recent |
|---|---|---|
| Outsource Consultants | 211 | 03/21/2026 |
| AE Design Solution | 12 | 03/21/2026 |
| United Safety Consultants | 1 | 03/21/2026 |
| A1 Expediting Service | 10 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| Think Design Architecture | 1 | 03/21/2026 |
| Metropolis Group | 6 | 03/21/2026 |
| Eurocelt Expediting | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Unity Construction Services | General Contractor | 44 | 10/21/2026 |
| Nelson Air Device | General Contractor | 19 | 07/08/2026 |
| Cardoza Plumbing | Plumbing | 17 | 07/08/2026 |
| King Rose of NY | General Contractor | 15 | 07/08/2026 |
| Current Fire Protection | Fire Protection | 15 | 07/08/2026 |
| Lendlease (US) Construction | General Contractor | 12 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 11 | 08/20/2026 |
| Phoenix Sutton STR | Scaffold | 11 | 07/08/2026 |
| DNP Builders | General Contractor | 11 | 07/08/2026 |
| Safway Atlantic | Scaffold | 8 | 07/08/2026 |
| Paul M Maintenance | General Contractor | 7 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 7 | 07/08/2026 |
| Capital Contracting P&H | Plumbing | 7 | 09/23/2026 |
| Par Plumbing Co | Plumbing | 6 | 07/08/2026 |
| Alliance Plumbing | Plumbing | 6 | 07/08/2026 |
| E-J Electric Installation Co | Electrical | 5 | 03/22/2026 |
| Rael Automatic Sprinkler Co | Fire Protection | 5 | 08/07/2026 |
| Aggressive Fire Protection | Fire Protection | 5 | 07/08/2026 |
| Med-Tek Contracting | General Contractor | 4 | 03/21/2026 |
| B & A Restoration Contracting | specialty_contractor | 4 | 10/15/2026 |
| Central Consulting & Cont | General Contractor | 4 | 03/21/2026 |
| Consigli Construction Co | General Contractor | 4 | 07/08/2026 |
| Empire General Contracting | General Contractor | 4 | 07/08/2026 |
| S&E Bridge & Scaffold | Scaffold | 3 | 07/08/2026 |
| B.R. Fries & Associates | General Contractor | 3 | 07/08/2026 |
| Rosciti Construction Co | General Contractor | 3 | 03/21/2026 |
| M&T Plumbing and Heating Co | Plumbing | 3 | 07/08/2026 |
| PSI Plumbing | Plumbing | 3 | 07/08/2026 |
| J & N Remodeling | General Contractor | 2 | 04/09/2026 |
| Fresh Meadow Mechanical | specialty_contractor | 2 | 03/21/2026 |
| CJS Industries | General Contractor | 2 | 03/21/2026 |
| Par Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Lawrence J. Levine | Fire Protection | 2 | 03/21/2026 |
| Albin Gustafson Company | Electrical | 2 | 03/21/2026 |
| Marlin Mechanical | specialty_contractor | 2 | 03/21/2026 |
| Universal Builders Supply | Scaffold | 2 | 07/08/2026 |
| Elpo Electrical Contg | Electrical | 1 | 03/22/2026 |
| NYC Fire Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Harley Electric Co | Electrical | 1 | 03/21/2026 |
| Commercial Electric Cont | Electrical | 1 | 03/22/2026 |
| J T & T Air Conditioning | specialty_contractor | 1 | 04/09/2026 |
| Eagle Scaffolding Services | Scaffold | 1 | 07/08/2026 |
| Albin Gustafson Company | Electrical | 1 | 03/22/2026 |
| Spring Scaffolding | Scaffold | 1 | 04/09/2026 |
| Interstate Mechanical Services | General Contractor | 1 | 07/08/2026 |
| Ideal Interiors Group | General Contractor | 1 | 07/08/2026 |
| Capital Contracting P & H | Fire Protection | 1 | 07/08/2026 |
| I.M.P. Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| I.M.P. Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Alan Margolin & Associates | 423 | 77 | 09/29/2026 |
| Outsource Special Inspection | 2827 | 64 | 08/21/2026 |
| Mohammad Ahead - Professi | 9286 | 2 | 07/14/2026 |
| Leo Y Lee Associates | 2481 | 3 | 12/19/2025 |
| Scherer Design Group | 7921 | 2 | 06/06/2022 |
| AKF Engineers | 2751 | 8 | 08/31/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Suspended Scaffold | Permit Issued | B&A Restoration Contracting | 10/20/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | B&A Restoration Contracting | 10/20/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Unity Construction Services | 10/20/2026 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Services | 10/19/2026 |
| DOB NOW | General Construction | Permit Issued | B & A Restoration Contracting | 10/14/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 09/22/2026 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 08/27/2026 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 08/18/2026 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 08/06/2026 |
| DOB NOW | Structural | Permit Issued | B & A Restoration Contracting | 07/30/2026 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 07/14/2026 |
| DOB NOW | Standpipe | Permit Issued | Rael Automatic Sprinkler Co | 07/06/2026 |
| DOB NOW | Plumbing | Permit Issued | Alliance Plumbing | 06/03/2026 |
| DOB NOW | Plumbing | Permit Issued | PSI Plumbing | 05/27/2026 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 05/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 05/26/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 05/26/2026 |
| DOB NOW | Standpipe | Permit Issued | Full Capacity Fire | 05/26/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Unity Construction Services | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Services | 05/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 05/21/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 05/19/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Unity Construction Services | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Services | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Services | 05/12/2026 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 04/27/2026 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 04/27/2026 |
| DOB NOW | Sprinklers | Signed-off | Full Capacity Fire | 04/27/2026 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 04/13/2026 |
| DOB NOW | Sprinklers | Permit Issued | Capital Contracting P & H | 03/06/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Unity Construction Services | 03/06/2026 |
| DOB NOW | General Construction | Signed-off | Unity Construction Services | 03/06/2026 |
| DOB NOW | Plumbing | Signed-off | Capital Contracting P&H | 03/05/2026 |
| DOB NOW | Sprinklers | Permit Issued | Full Capacity Fire | 02/18/2026 |
| DOB NOW | Plumbing | Permit Issued | Capital Contracting P&H | 02/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Unity Construction Services | 02/12/2026 |
| DOB NOW | General Construction | Permit Issued | Unity Construction Services | 02/12/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 02/06/2026 |
| DOB NOW | Plumbing | Permit Issued | Par Plumbing Co | 02/06/2026 |
| DOB NOW | Sprinklers | Permit Issued | Rael Automatic Sprinkler Co | 01/29/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/29/2026 | Signed-off | Unity Construction Services | Air Conditioning Systems, Ventilation Systems | |
| 07/29/2026 | Signed-off | Unity Construction Services | Ventilation Systems | Ventilation Price ×4 |
| 07/16/2026 | Signed-off | Unity Construction Services | Air Conditioning Systems, Heating Systems, Ventilation Systems | Cooling Mitsubishi Electric PKA-AK36NL 37,000 BTU · Vrf Indoor ×2 PUY-AK36NL 37,000 BTU · Heat Pump Outdoor ×2 Heating Precision Coils HW58S01A08-9x12-RH 9,500 BTU · Ductwork ×6 HW58S01A07-7.5x12-RH 6,800 BTU · Ductwork ×4 HW58S01A07-9x12-RH 9,500 BTU · Ductwork ×4 HW58S01A06-12x16-RH 15,200 BTU · Ductwork ×2 HW58S01A06-9x12-RH 7,500 BTU · Ductwork ×2 HW58S01A06-9x14-RH 9,900 BTU ×2 HW58S01A06-9x18-RH 14,900 BTU · Ductwork ×2 HW58S01A06-9x20-RH 14,400 BTU · Ductwork ×2 HW58S01A06-9x22-RH 15,800 BTU · Ductwork ×2 HW58S01A07-9x14-RH 9,300 BTU · Ductwork ×2 HW58S01B06-12x24-RH 20,900 BTU · Ductwork ×2 |
| 03/30/2026 | Permit Issued | Unity Construction Services | Ventilation Systems | Ventilation Greenheck USF-04-B7 500 CFM · Exhaust Fan ×1 |
| 02/13/2026 | Permit Issued | Unity Construction Services | Heating Systems, Ventilation Systems | |
| 12/03/2025 | — | — | Ventilation Systems | Ventilation |
| 07/08/2025 | Permit Issued | J T & T Air Conditioning | Ventilation Systems | Ventilation |
| 11/22/2024 | Signed-off | Unity Construction Services | Ventilation Systems | Ventilation Anemostat n/a 1,250 CFM · Exhaust Fan ×4 |
| 07/27/2023 | Permit Issued | King Rose of NY | Ventilation Systems | — |
| 01/28/2020 | Permit Issued | Marlin Mechanical | Air Conditioning Systems, Associated Ducts and Piping | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/29/2026 | Signed-off | Full Capacity Fire | 39 heads |
| 08/21/2026 | — | — | 36 heads |
| 07/29/2026 | Signed-off | Full Capacity Fire | 9 heads |
| 07/16/2026 | Signed-off | Full Capacity Fire | 288 heads |
| 06/25/2026 | — | — | 16 heads |
| 05/07/2026 | Permit Issued | Rael Automatic Sprinkler Co | 152 heads, 1 outlets |
| 05/07/2026 | Permit Issued | Rael Automatic Sprinkler Co | 3,959 heads, 10 outlets |
| 03/30/2026 | Permit Issued | Full Capacity Fire | 85 heads |
| 12/03/2025 | — | — | — |
| 11/06/2025 | Permit Issued | Full Capacity Fire | 80 heads |
| 11/22/2024 | — | — | — |
| 07/27/2023 | — | — | 6 heads |
| 03/11/2020 | — | — | 4 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/29/2026 | Signed-off | Capital Contracting P&H | Water/Sanitary |
| 08/21/2026 | — | — | Water/Sanitary |
| 07/29/2026 | Signed-off | Capital Contracting P&H | Water/Sanitary |
| 07/16/2026 | Signed-off | Capital Contracting P&H | Medical Gas, Water/Sanitary |
| 05/07/2026 | Permit Issued | Par Plumbing Co | Water/Sanitary |
| 05/07/2026 | Permit Issued | Par Plumbing Co | Storm, Water/Sanitary |
| 03/30/2026 | Permit Issued | Cardoza Plumbing | Water/Sanitary |
| 12/03/2025 | Permit Issued | Capital Contracting P&H | Water/Sanitary |
| 11/06/2025 | Permit Issued | Capital Contracting P&H | Water/Sanitary |
| 07/08/2025 | Permit Issued | Cardoza Plumbing | Medical Gas |
| 11/26/2024 | Permit Issued | Par Plumbing Co | Medical Gas, Water/Sanitary |
| 11/22/2024 | Signed-off | Par Plumbing Co | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/24/2026 | Permit Issued | NJS Electrical Services | General Wiring |
| 08/24/2026 | Permit Issued | Hatzel and Buehler | General Wiring |
| 07/10/2026 | Permit Issued | E-J Electric Installation Co | General Wiring |
| 06/08/2026 | Permit Issued | NJS Electrical Services | General Wiring |
| 05/27/2026 | Permit Issued | NJS Electrical Services | General Wiring |
| 05/27/2026 | Permit Issued | NJS Electrical Services | General Wiring |
| 05/19/2026 | Permit Issued | Hatzel and Buehler | General Wiring |
| 04/21/2026 | Permit Issued | Off Shore Electric | General Wiring |
| 02/17/2026 | Permit Issued | Hatzel and Buehler | General Wiring |
| 02/17/2026 | Permit Issued | Hatzel and Buehler | General Wiring |
| 12/23/2025 | Permit Issued | E-J Electric Installation Co | — |
| 12/19/2025 | Permit Issued | Albin Gustafson Company | HVAC Wiring |
| 12/18/2025 | Permit Issued | Rigid Electric | General Wiring |
| 11/12/2025 | Permit Issued | Corporate Electric Group | — |
| 09/12/2025 | Permit Issued | Albin Gustafson Company | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/30/2026 | Permit Issued | Cardoza Plumbing | Steel |
| 07/29/2025 | Permit Issued | B & A Restoration Contracting | Masonry |
| 04/24/2025 | Permit Issued | B & A Restoration Contracting | Masonry |
| 07/25/2023 | Permit Issued | King Rose of NY | Steel |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/14/2026 | Permit Issued | B&A Restoration Contracting | Suspended Scaffold (SC) |
| 12/19/2025 | Permit Issued | B&A Restoration Contracting | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/11/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Finish | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Roughing | Certified | View ↗ |
| 08/28/2026 | Certified Medical Gas - MG - PL - Test | Certified | View ↗ |
| 08/27/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 08/19/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/19/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/07/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 08/04/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/23/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/04/2026 | Certified StandPipe-Fire Pump (SD)-Fire Pump Test | Certified | View ↗ |
| 06/04/2026 | Certified StandPipe-SD-Fixtures-Finish-SD | Certified | View ↗ |
| 06/01/2026 | Certified StandPipe-SD-Piping-Hydrostatic Test | Certified | View ↗ |
| 05/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/08/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/05/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/20/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/17/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/17/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/14/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/19/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/15/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/15/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/18/2026 | Mechanical Systems | Young Suh | special |
| 09/18/2026 | Energy Code Compliance Inspections | Young Suh | progress |
| 09/18/2026 | Exhaust and Vent Systems in Plenums and Ducts | Young Suh | special |
| 09/18/2026 | Ventilation and air distribution system | Young Suh | energy_progress |
| 09/18/2026 | Heating Systems | Young Suh | special |
| 09/18/2026 | Duct leakage testing, insulation and design | Young Suh | energy_progress |
| 09/18/2026 | Final | Young Suh | progress |
| 09/18/2026 | Shutoff dampers | Young Suh | energy_progress |
| 09/18/2026 | HVAC-R and service water piping design and insulation | Young Suh | energy_progress |
| 08/14/2026 | Duct leakage testing, insulation and design | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Exhaust and Vent Systems in Plenums and Ducts | JONAR MADRIAGA | special |
| 08/14/2026 | High Temperature Hot Water Piping (Welding) | JONAR MADRIAGA | special |
| 08/14/2026 | Heating Systems | JONAR MADRIAGA | special |
| 08/14/2026 | HVAC-R and service water heating system controls | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | HVAC-R and service water heating equipment | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Ventilation and air distribution system | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Energy Code Compliance Inspections | JONAR MADRIAGA | progress |
| 08/14/2026 | HVAC-R and service water piping design and insulation | JONAR MADRIAGA | energy_progress |
| 08/14/2026 | Fire-Resistant Penetrations and Joints | JONAR MADRIAGA | special |
| 08/09/2026 | Post-installed Anchors | Young Suh | special |
| 08/09/2026 | Sprinkler Systems | Young Suh | special |
| 08/09/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| 07/31/2026 | Sprinkler Systems | Young Suh | special |
| 07/31/2026 | Post-installed Anchors | Young Suh | special |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | Young Suh | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Mount Sinai Health System | Medical / Healthcare | Entire building | Project M01436118 Project M01418257 Project M01318000 Project M01349240 Project M01318057 Project M01300369 Project M01301210 Project M01303570 Project M01291621 Project M01222974 Project M01217538 Project M01209336 |
| Mount Sinai - West Cafe | Restaurant / Food Service | Floor 2 | Project M00943127 |
| X Mount ENNESSY | Office | Cellar | Project M00533021 |