← Back
Condo, commercial tower (mixed-use) [derived]
Rockefeller Center
1250 AVENUE OF THE AMER · BIN 1076262
💬 Discuss this project
1937Year Built
70Stories
RCBuilding Class
C5-2.5Zoning
2,122,138 sfGross Floor Area
107Units
LL97 Covered34 Open Violations 30 unresolved · 4 paperwork only ▸FISP: SWARMP
Condo, commercial tower (mixed-use) [derived] · Owner of record: ROCKEFELLER CENTER PROPERTIES (RCP) · 107,766 sf lot · 19.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneralOther
Permit Issued — active, not yet Signed-off
Roof17p · 12 filings · 20 docs
Bulkhead6p · 4 filings · 20 docs
Floor 70Under Construction41p · 6 filings · 20 docs
Floor 6954p · 10 filings · 20 docs
Floor 68Under Construction3p · 1 filing · 14 docs
Floor 6755p · 10 filings · 20 docs
Floor 66Under Construction19p · 8 filings · 20 docs
Floor 65Under Construction5p · 3 filings · 20 docs
Floor 64Under Construction7p · 2 filings · 20 docs
Floor 63Under Construction3p · 1 filing · 14 docs
Floor 62Under Construction3p · 1 filing · 14 docs
Floor 61Under Construction4p · 2 filings · 18 docs
Floor 60Under Construction10p · 2 filings · 20 docs
Floor 59Under Construction5p · 3 filings · 20 docs
Floor 58Under Construction10p · 4 filings · 20 docs
Floor 57Under Construction3p · 1 filing · 14 docs
Floor 56Under Construction8p · 2 filings · 20 docs
Floor 55Under Construction6p · 3 filings · 20 docs
Floor 54Under Construction80p · 5 filings · 20 docs
Floor 5325p · 9 filings · 20 docs
Floor 5226p · 12 filings · 20 docs
Floor 51Under Construction5p · 4 filings · 20 docs
Floor 50Under Construction8p · 3 filings · 20 docs
Floor 49Under Construction8p · 3 filings · 20 docs
Floor 48Under Construction13p · 4 filings · 20 docs
Floor 47Under Construction3p · 1 filing · 14 docs
Floor 46Under Construction14p · 7 filings · 20 docs
Floor 4539p · 18 filings · 20 docs
Floor 44Under Construction61p · 12 filings · 20 docs
Floor 43Under Construction35p · 12 filings · 20 docs
Floor 42Under Construction7p · 2 filings · 20 docs
Floor 41Under Construction11p · 5 filings · 20 docs
Floor 40Under Construction3p · 1 filing · 14 docs
Floor 39Under Construction60p · 8 filings · 20 docs
Floor 38Under Construction58p · 9 filings · 20 docs
Floor 37Under Construction46p · 10 filings · 20 docs
Floor 36Under Construction5p · 2 filings · 20 docs
Floor 35Under Construction5p · 3 filings · 20 docs
Floor 34Under Construction4p · 2 filings · 20 docs
Floor 33Under Construction7p · 2 filings · 20 docs
Floor 32Under Construction9p · 4 filings · 20 docs
Floor 31Under Construction4p · 2 filings · 20 docs
Floor 30Under Construction4p · 2 filings · 20 docs
Floor 29Under Construction4p · 2 filings · 20 docs
Floor 28Under Construction4p · 2 filings · 20 docs
Floor 27Under Construction4p · 2 filings · 19 docs
Floor 26Under Construction20p · 7 filings · 20 docs
Floor 25Under Construction50p · 7 filings · 20 docs
Floor 24Under Construction56p · 9 filings · 20 docs
Floor 23Under Construction10p · 7 filings · 20 docs
Floor 2212p · 14 filings · 20 docs
Floor 21Under Construction12p · 8 filings · 20 docs
Floor 20Under Construction28p · 8 filings · 20 docs
Floor 19Under Construction4p · 2 filings · 20 docs
Floor 18Under Construction3p · 1 filing · 14 docs
Floor 17Under Construction4p · 2 filings · 20 docs
Floor 16Under Construction51p · 2 filings · 20 docs
Floor 15Under Construction53p · 3 filings · 20 docs
Floor 14Under Construction3p · 3 filings · 20 docs
Floor 13Under Construction3p · 1 filing · 14 docs
Floor 12Under Construction3p · 1 filing · 14 docs
Floor 11Under Construction13p · 8 filings · 20 docs
Floor 10Under Construction19p · 8 filings · 20 docs
Floor 913p · 21 filings · 20 docs
Floor 845p · 23 filings · 20 docs
Floor 722p · 11 filings · 20 docs
Floor 631p · 13 filings · 20 docs
Floor 5Under Construction10p · 6 filings · 20 docs
Floor 448p · 21 filings · 20 docs
Floor 356p · 14 filings · 20 docs
Floor 2136p · 28 filings · 20 docs
Floor 156p · 21 filings · 20 docs
Mezzanine51p · 8 filings · 20 docs
Cellar211p · 51 filings · 20 docs
Sub-Cellar13p · 12 filings · 20 docs
Sub-Basement4p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
30 ROCKEFELLER PLAZA21408/30/2026
TISHMAN SPEYER40407/08/2026
CALERES307/08/2026
NAYA1107/08/2026
PREPARER907/08/2026
TISHMAN SPEYER PROPERTIES2404/09/2026
SPRING SCAFFOLDING LLC503/22/2026
ROCKKEFELLER CENTER PROPERTIES7403/22/2026
YILDIZ HOLDING A.S.503/22/2026
RCPI LANDMARK PROPERTIES, LLC2,09903/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.25603/21/2026
WALTER T. GORMAN, PE, PC19303/21/2026
GILLMAN CONSULTING9403/21/2026
GILMAN CONSULTANT4803/21/2026
DOMANI CONSULTING6803/21/2026
MUNICIPAL BUILDING CONSULTANTS3703/21/2026
A1 EXPEDITING SERVICE2803/21/2026
RIZZO GROUP1803/21/2026
WILLIAM VITACCO ASSOCIATES1603/21/2026
ABCO-PEERLESS SPRINKLER1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BENCHMARK BUILDERS LLCGeneral Contractor3907/08/2026
ABCO-PEERLESS SPRKLR CORPFire Protection3708/30/2026
SAFWAY ATLANTIC, LLCGeneral Contractor3009/19/2026
STRUCTURE TONE, LLCGeneral Contractor3007/08/2026
MASS CONTRACTING CORPGeneral Contractor3009/07/2026
GEOFFREY A. LAGAS & ASSOCPlumbing2309/18/2026
FIRST CNSTRCTION ZONE INCGeneral Contractor2007/08/2026
DGC CAPITAL CONTRACTING CORPGeneral Contractor1907/08/2026
WINICK PRODUCTIONS, LLCGeneral Contractor1609/17/2026
JT MAGEN & COMPANY INCGeneral Contractor1607/08/2026
COYLE CONTRACTING CORPGeneral Contractor1607/08/2026
GILBANE BUILDING COMPANYGeneral Contractor1407/08/2026
SHAWMUT WOODWORKING & SUPPLYGeneral Contractor1307/08/2026
TURNER CONSTRUCTION COMPANYGeneral Contractor1207/08/2026
W.J. REGAN & COMPANY LLCGeneral Contractor1107/08/2026
TRISTATE PLBG SVCS CORPPlumbing1107/08/2026
LACOR MECHANICAL SYSTEMSGeneral Contractor1007/08/2026
JRM CONSTRUCTION MGMT LLCGeneral Contractor907/08/2026
ARTHUR GROSSMANElectrical903/21/2026
CONSTRUCTION MANAGEMENT &General Contractor903/21/2026
NYFF EVENTS LLCGeneral Contractor807/08/2026
ASHLAR MECHANICAL CORPFire Protection707/08/2026
BLUEWATER PLBG& HTG INCPlumbing707/08/2026
GREG LOGISTICS LLCGeneral Contractor707/08/2026
GANNON CONTRACTING LLCGeneral Contractor707/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALAN MARGOLIN & ASSOC4233608/25/2026
CTHREE ARCHITECTURE + DES1124208/19/2026
CUSTODIO CONSULTING, LLC18351508/07/2026
QUALITY TESTING, LLC7344707/29/2026
CROSSCHECK INSPECTION SER544507/28/2026
METRIC CONSULTING AND INS1803106/17/2026
MEP INSPECTIONS, INC1102406/16/2026
WALTER T. GORMAN, P.E., P2689405/26/2026
WAVIC ENGINEERING PLLC1733104/02/2026
NYC FACADE ARCHITECTURE9035203/30/2026
Building Lifecycle
All (300)Filed (71)Permit Issued (80)Signed Off (28)Violation (5)Inspection (60)Objection (26)Special Inspection (30)
09/23/2026
Permit issued — Structural
M01441006-S1-ST
09/21/2026
Permit issued — Mechanical Systems
M01441006-S2-MS
09/18/2026
Permit issued — Supported Scaffold
M01296454-I1-SF
09/17/2026
Signed off — Alteration
Installation of temp Tent, no alt to exist structures for CJ Hendry Flower Market. TPA is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed upon event completion.
M01276315-I1
09/17/2026
Permit issued — Plumbing
M01444584-S1-PL
09/16/2026
Permit issued — General Construction
M01458928-I1-GC
09/15/2026
Permit issued — General Construction
M01454986-I1-GC
09/15/2026
Permit issued — General Construction
M01441006-I1-GC
08/31/2026
Permit issued — General Construction
M01315316-I1-GC
08/31/2026
Permit issued — Mechanical Systems
M01315331-I1-MS
08/28/2026
Permit issued — General Construction
M01449799-I1-GC
08/28/2026
Permit issued — Mechanical Systems
M01408137-S1-MS
08/27/2026
Permit issued — Sprinklers
M01065582-I1-EW-SP
08/26/2026
Filed — Alteration
M01449799-I1
08/25/2026
Filed — Alteration
INTERIOR RENOVATION WORK ON THE FOURTH FLOOR AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01315316-I1
08/25/2026
Permit issued — General Construction
M01424551-I1-GC
08/21/2026
Special inspection requirement — Final
DANNY TRUJILLO
08/19/2026
Filed — Alteration
Interior improvement on existing retail space at 2nd floor. Install millwork and Modify interior finishes. No changes to use, egress, and occupancy.
M01444584-S1
08/19/2026
Filed — Alteration
Interior improvement on existing retail space at 2nd floor. Install millwork and Modify interior finishes. No changes to use, egress, and occupancy.
M01444584-I1
08/19/2026
Permit issued — Suspended Scaffold
M01441185-I1-SC
08/18/2026
Permit issued — Sprinklers
M01430293-S3-EW-SP
08/18/2026
Permit issued — Plumbing
M01430293-S2-PL
08/17/2026
Filed — Alteration
INSTALLATION OF PLUMBING FIXTURES ON THE FOURTH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01315345-P1
08/14/2026
Signed off — Alteration
Structural modifications to existing convenience stair opening, replacement of existing convenience stair, and miscellaneous steel for support of feature wall. Approximately 60 LF of proposed steel.
M01065562-I1
08/14/2026
Permit issued — Mechanical Systems
M01433961-I1-MS
08/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
08/13/2026
Filed — No Work
M01437831-I1
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Salvatore Croce
08/13/2026
Special inspection requirement — Interior lighting power
Salvatore Croce
08/13/2026
Special inspection requirement — Final
Salvatore Croce
08/13/2026
Special inspection requirement — Lighting controls
Salvatore Croce
08/12/2026
Filed — Alteration
MODIFICATION OF SPRINKLERS ON THE FOURTH FLOOR. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M01315338-I1
08/12/2026
Filed — Alteration
Replacement of the terrace doors on 6th floor as per plans. No change to use, egress or occupancy.
M01424551-I1
08/12/2026
Filed — Alteration
HVAC INSTALLATION AND MODIFICATION WORK ON THE FOURTH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01315331-I1
08/12/2026
Permit issued — General Construction
M01398001-I1-GC
08/11/2026
Permit issued — Mechanical Systems
M01430293-S1-MS
08/11/2026
Permit issued — General Construction
M01433922-I1-GC
08/11/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/10/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01441185-I1
08/10/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Filed — Alteration
GENERAL CONSTRUCTION WORK ON THE CELLAR LEVEL. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01398001-I1
08/07/2026
Permit issued — General Construction
M01430293-I1-GC
08/06/2026
Signed off — Alteration
M01065572-I1
08/03/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/29/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR NON-STRUCTURAL INTERIOR DEMO AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01430293-S2
07/29/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR NON-STRUCTURAL INTERIOR DEMO AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01430293-I1
07/29/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR NON-STRUCTURAL INTERIOR DEMO AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01430293-S3
07/29/2026
Filed — Alteration
APPLICATION FILED HEREWITH FOR NON-STRUCTURAL INTERIOR DEMO AT 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION
M01430293-S1
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Young Suh
07/29/2026
Special inspection requirement — Post-installed Anchors
Young Suh
07/29/2026
Special inspection requirement — Sprayed fire-resistant materials
Young Suh
07/28/2026
Filed — Alteration
Filing for the Removal of Mechanical systems, related ducts and installation of fire dampers where indicated to create a white box space for future buildout.
M01433961-I1
07/28/2026
Filed — Alteration
Filing for interior removals to create a white box space for future buildout.
M01433922-I1
07/28/2026
Filed — Alteration
Filing for the Plumbing and Sprinkler removals of fixtures, piping, head to create a white box space for future buildout. Filing to for the installation of a Temp Sprinkler loop and related piping.
M01434031-I1
07/28/2026
Permit issued — General Construction
M01430037-I1-GC
07/28/2026
Permit issued — Mechanical Systems
M01413125-I1-MS
07/28/2026
Permit issued — General Construction
M01413119-I1-GC
07/27/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/23/2026
Filed — Alteration
REMOVAL OF PLUMBING FIXTURES ON THE 9TH FLOOR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01413125-S1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedWALKER RIDGE CONST NY LLC09/23/2026
DOB NOWMechanical SystemsPermit IssuedWALKER RIDGE CONST NY LLC09/21/2026
DOB NOWSupported ScaffoldPermit IssuedSAFWAY ATLANTIC, LLC09/18/2026
DOB NOWPlumbingPermit IssuedGEOFFREY A. LAGAS & ASSOC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC09/16/2026
DOB NOWGeneral ConstructionPermit IssuedWALKER RIDGE CONST NY LLC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedJADS PRODUCTIONS, INC09/15/2026
DOB NOWGeneral ConstructionPermit IssuedMASS CONTRACTING CORP08/31/2026
DOB NOWMechanical SystemsPermit IssuedMASS CONTRACTING CORP08/31/2026
DOB NOWMechanical SystemsPermit IssuedMASS CONTRACTING CORP08/28/2026
DOB NOWGeneral ConstructionPermit IssuedWINICK PRODUCTIONS, LLC08/28/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP08/27/2026
DOB NOWGeneral ConstructionPermit IssuedSKYLINE WINDOWS LLC08/25/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTUAL PRESV SYSTEM08/19/2026
DOB NOWPlumbingPermit IssuedHYDROKINETIC PLBG & HTG I08/18/2026
DOB NOWSprinklersPermit IssuedANESIS SERVICES CORP08/18/2026
DOB NOWMechanical SystemsPermit IssuedWALKER DESIGN STUDIOS LLC08/14/2026
DOB NOWGeneral ConstructionPermit IssuedMASS CONTRACTING CORP08/12/2026
DOB NOWMechanical SystemsPermit IssuedWALKER RIDGE CONST NY LLC08/11/2026
DOB NOWGeneral ConstructionPermit IssuedAIRCON HTNG COOLING COR08/11/2026
DOB NOWGeneral ConstructionPermit IssuedWALKER RIDGE CONST NY LLC08/07/2026
DOB NOWGeneral ConstructionPermit IssuedASK CONTRACTING CORP07/28/2026
DOB NOWMechanical SystemsPermit IssuedMASS CONTRACTING CORP07/28/2026
DOB NOWGeneral ConstructionPermit IssuedMASS CONTRACTING CORP07/28/2026
DOB NOWPlumbingPermit IssuedGEOFFREY A. LAGAS & ASSOC07/17/2026
DOB NOWStandpipePermit IssuedARCHER CONSULTANTS GROUP07/16/2026
DOB NOWStandpipePermit IssuedARCHER CONSULTANTS GROUP07/16/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/15/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP07/15/2026
DOB NOWPlumbingPermit IssuedGEOFFREY A. LAGAS & ASSOC07/13/2026
DOB NOWGeneral ConstructionPermit IssuedMASS CONTRACTING CORP07/13/2026
DOB NOWPlumbingPermit IssuedGEOFFREY A. LAGAS & ASSOC07/10/2026
DOB NOWMechanical SystemsPermit IssuedSTRUCTURE TONE, LLC07/01/2026
DOB NOWSuspended ScaffoldPermit IssuedPULLMAN SST INC07/01/2026
DOB NOWStructuralPermit IssuedSTRUCTURE TONE, LLC06/24/2026
DOB NOWSprinklersPermit IssuedABCO-PEERLESS SPRKLR CORP06/24/2026
DOB NOWGeneral ConstructionPermit IssuedSTRUCTURE TONE, LLC06/23/2026
DOB NOWSidewalk ShedPermit IssuedSPRING SCAFFOLDING LLC06/18/2026
DOB NOWMechanical SystemsPermit IssuedMASS CONTRACTING CORP06/17/2026
DOB NOWGeneral ConstructionPermit IssuedMASS CONTRACTING CORP06/17/2026
+ 60 more permits on file
12 projects · most recent 08/12/2026
Air Conditioning Systems Ventilation Systems Others Heating and Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedMASS CONTRACTING CORPVentilation Systems
Ventilation
Klimak KCD160 10,000 CFM ×1
Multiaqua MHCFC4W-04 380 CFM ×1
06/16/2026Permit IssuedSTRUCTURE TONE, LLCAir Conditioning Systems
Cooling
Iec HPY-16 1,200 CFM · Fan Coil Indoor ×2
HPY-8 550 CFM · Fan Coil Indoor ×1
Above Air HKX-018R-3-0000-****-0M CA0U-00-1AV-00 1,750 CFM · Crac Unit ×1
Johnson Controls AMI-10 4,000 CFM · Ahu ×1
06/05/2026Permit IssuedMASS CONTRACTING CORPHeating and Air Conditioning Systems
Heat / Cool
Johnson Controls AMI-V17/6NNM001845 8,000 CFM · Chiller ×2
York XTI-78x72/CAPMXT0259 14,000 CFM · Heat Pump Outdoor ×2
06/04/2026Permit IssuedMASS CONTRACTING CORPAir Conditioning Systems
Cooling
Multiaqua MHCFC4W-04 380 CFM · Fan Coil Indoor ×1
01/06/2026Permit IssuedJRM CONSTRUCTION MGMT LLCAir Conditioning Systems
Cooling
Iec HPY20 1,450 CFM · Fan Coil Indoor ×2
11/21/2025Permit IssuedMASS CONTRACTING CORPOthers
Other
N/A N/A 1 BTU ×1
02/07/2025Signed-offBENCHMARK BUILDERS LLCAir Conditioning Systems
Cooling
Price FCHG 60 1,500 CFM · Doas ×16
FCHG 50 1,200 CFM · Doas ×14
BCHD 8 800 CFM · Doas ×12
BCHD 16 1,500 CFM · Doas ×10
BCHD 12 1,200 CFM · Doas ×7
BCHD12 1,000 CFM · Doas ×3
FCHG 40 600 CFM · Doas ×3
FCHG 30 400 CFM · Doas ×1
FCHG 40b 700 CFM · Doas ×1
Above Air MCC-007X 950 CFM · Crac Unit ×2
08/01/2024Signed-offGILBANE BUILDING COMPANYOthers
Other
Daikin CAC018GDAM 8,300 CFM · Ahu ×2
Trane JCI AMI-V12 5,500 CFM · Ahu ×2
12/29/2022Permit IssuedFIRST CNSTRCTION ZONE INCAir Conditioning Systems
Cooling
Iec HPY10 800 CFM · Fan Coil Indoor ×1
HPY20 1,854 CFM · Fan Coil Indoor ×1
10/26/2021Permit IssuedLACOR MECHANICAL SYSTEMSAir Conditioning Systems, Ventilation Systems
Cooling
N/A N/A 3,500 CFM · Fan Coil Indoor ×2
Ventilation
N/A N/A 9,100 CFM · Ahu ×1
10/14/2021——Air Conditioning Systems
Cooling
— IEC CXB06 12,600 BTU · Fan Coil Indoor ×1
04/27/2021Permit IssuedKAYE MECHANICAL CONT LLCAssociated Ducts and Piping
Ducts & Piping
Iec HPY16 52,800 BTU · Fan Coil Indoor ×1
25 projects · most recent 08/12/2026
FiledStatusContractorScope
08/12/2026——78 heads
07/29/2026Permit IssuedTHOMAS FAY—
07/28/2026———
07/23/2026——94 heads
06/29/2026Permit IssuedABCO-PEERLESS SPRKLR CORP45 heads
06/16/2026Permit IssuedARCHER CONSULTANTS GROUP—
06/04/2026Permit IssuedABCO-PEERLESS SPRKLR CORP28 heads
05/26/2026Permit IssuedPSI PARTNERS, LLC325 heads
04/02/2026Signed-offASHLAR MECHANICAL CORP19 heads
01/06/2026Permit IssuedA PLUS PLUMBING CORP289 heads
11/21/2025Permit IssuedABCO-PEERLESS SPRKLR CORP75 heads
11/21/2025Permit IssuedABCO-PEERLESS SPRKLR CORP38 heads
01/30/2025Signed-offSKH MECHANICAL CORP—
08/12/2024Signed-offKG SPRINKLER CORP50 heads
07/17/2024Permit IssuedABCO-PEERLESS SPRKLR CORP1 heads
25 projects · most recent 08/19/2026
Water/Sanitary Gas Storm
FiledStatusContractorScope
08/19/2026Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
08/17/2026Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
08/12/2026———
07/29/2026Permit IssuedHYDROKINETIC PLBG & HTG IWater/Sanitary
07/28/2026——Water/Sanitary
07/23/2026——Water/Sanitary
06/29/2026Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
06/16/2026Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
06/04/2026Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
05/26/2026Permit IssuedA&A PLUMBING CORPWater/Sanitary
04/02/2026———
01/08/2026Permit IssuedLAB PLBG & HTG CO INCWater/Sanitary
01/06/2026———
11/21/2025Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
11/21/2025Permit IssuedGEOFFREY A. LAGAS & ASSOCWater/Sanitary
25 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedUNITY ELECTRIC CO., IncGeneral Wiring
09/21/2026Permit IssuedGREEN APPLE ELECTRICAL SERVICES LLCGeneral Wiring
08/05/2026Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
07/11/2026Permit IssuedRAIDEN ELECTRIC LLCGeneral Wiring
06/12/2026Permit IssuedATLAS-ACON ELEC. SERVICEGeneral Wiring
06/09/2026Permit IssuedEMPIRE STATE ELEC MAINT &—
06/08/2026CompleteEMPIRE STATE ELEC MAINT &General Wiring
05/25/2026Permit IssuedWESTRISE ELECTRIC LLCGeneral Wiring
04/22/2026Permit IssuedJAM ELECTRICAL CORP—
04/08/2026Permit IssuedINTER CONNECTION ELETRIC—
04/08/2026CompleteINTER CONNECTION ELETRIC—
04/02/2026CompleteMIKOMA ELECTRIC LLCGeneral Wiring
03/31/2026CompleteINFINITY ELECTRIC, INCGeneral Wiring
03/26/2026CompleteREDGRAVE ELECTL MAINTNCEGeneral Wiring
03/24/2026CompleteINTER CONNECTION ELETRICGeneral Wiring
3 projects · most recent 06/17/2026
Steel Concrete
FiledStatusContractorScope
06/17/2026Permit IssuedSTRUCTURE TONE, LLCSteel
01/12/2026Signed-offJRM CONSTRUCTION MGMT LLCSteel, Concrete
08/09/2024Signed-offJT MAGEN & COMPANY INC1 scope_items
5 projects · most recent 10/02/2025
Scaffold Fence
FiledStatusContractorScope
10/02/2025Permit IssuedSAFWAY ATLANTIC, LLCScaffold
10/31/2024Permit IssuedSAFWAY ATLANTIC, LLCScaffold
04/05/2024Permit IssuedSAFWAY ATLANTIC, LLCFence
11/08/2021Permit IssuedSAFWAY ATLANTIC, LLCScaffold
10/06/2020Permit IssuedKING HOIST & SCAFFOLDINGScaffold
2 projects · most recent 08/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
08/10/2026Permit IssuedSTRUCTUAL PRESV SYSTEM—
03/17/2026Permit IssuedPULLMAN SST INCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 299
DateTypeResultReport
08/11/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/10/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/03/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/27/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/12/2026Under Review Boiler Equipment InspectionUnder ReviewView ↗
05/29/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/27/2026Pass-Final General Construction Non-Directive 14PassView ↗
05/26/2026Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/28/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/27/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/16/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/15/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/09/2026Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2026Fail-Final General Construction Non-Directive 14FailView ↗
03/31/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
Latest 25 of 299.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/21/2026FinalDANNY TRUJILLOprogress
08/14/2026Fire-Resistant Penetrations and JointsSalvatore Crocespecial
08/13/2026Fire-Resistant Penetrations and JointsSalvatore Crocespecial
08/13/2026FinalSalvatore Croceprogress
08/13/2026Lighting controlsSalvatore Croceenergy_progress
08/13/2026Interior lighting powerSalvatore Croceenergy_progress
07/29/2026Post-installed AnchorsYoung Suhspecial
07/29/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/29/2026Sprayed fire-resistant materialsYoung Suhspecial
07/29/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
07/21/2026Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
07/21/2026FinalEUGENE BIFULCOprogress
07/21/2026Sprayed fire-resistant materialsEUGENE BIFULCOspecial
07/21/2026FinalEUGENE BIFULCOprogress
07/21/2026Sprinkler SystemsEUGENE BIFULCOspecial
07/21/2026Mechanical SystemsEUGENE BIFULCOspecial
07/13/2026FinalKEVIN SNEDEKERprogress
07/13/2026Mechanical SystemsKEVIN SNEDEKERspecial
07/13/2026FinalMary Langanprogress
07/08/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/30/2026FinalRichard DeMarcoprogress
06/18/2026Post-installed AnchorsYoung Suhspecial
06/18/2026Post-installed AnchorsYoung Suhspecial
06/18/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
06/18/2026Fire-Resistant Penetrations and JointsYoung Suhspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
NBC StudiosOfficeFloors 3, 4
Project M01315331 Alteration · Approved · 08/12/2026
Project M01315338 Alteration · Approved · 08/12/2026
Project M00706344 Alteration · LOC Issued · 04/28/2022
Project M00483114 Alteration · LOC Issued · 04/07/2021
Project M00247689 Alteration · Permit Entire · 12/11/2019
Project M00267483 Alteration · Permit Entire · 12/10/2019
FAO Schwarz JellycatRetailFloor 1
Project M01430037 Alteration · Permit Entire · 07/21/2026
WithersOfficeFloor 54
Project M01389928 Alteration · Permit Entire · 06/17/2026
Project M01389923 Alteration · Permit Entire · 06/16/2026
Project M01363827 Alteration · Permit Entire · 06/15/2026
Sheppard MullinOfficeFloors 24, 37–39
Project M01323735 Alteration · Permit Entire · 01/14/2026
Project M01323725 Alteration · Permit Entire · 01/08/2026
Project M01323749 Alteration · Permit Entire · 01/08/2026
Project M01323754 Alteration · Permit Entire · 01/07/2026
Project M00883644 Alteration · LOC Issued · 07/12/2023
Project M00883659 Alteration · LOC Issued · 07/11/2023
Project M00883686 Alteration · LOC Issued · 07/11/2023
Project M00328733 Alteration · LOC Issued · 06/23/2020
Haynes BooneOfficeFloors 10, 22, 23, 25, 32, 33, 42, 45, 49, 50
Project M01323364 Alteration · Permit Entire · 01/12/2026
Project M01322678 Alteration · Permit Entire · 01/06/2026
Project M01322606 Alteration · Permit Entire · 12/30/2025
Project M01322118 No Work · TA Certificate of Operation Issued · 11/21/2025
Project M01248228 No Work · Approved · 10/14/2025
Project M01141926 Alteration CO · Permit Entire · 02/03/2025
Project M01157515 Alteration · Permit Entire · 02/03/2025
Project M01157530 Alteration · Permit Entire · 01/30/2025
NBCUOfficeFloors 2, 6, 7, 9, 10, 27
Project M01278637 Alteration · Permit Entire · 11/21/2025
Project M00957842 Alteration · LOC Issued · 12/01/2023
Project M00917451 Alteration · LOC Issued · 11/16/2023
Project M00894150 Alteration · LOC Issued · 06/22/2023
Project M08035233 Alteration · LOC Issued · 12/13/2022
Project M00717526 Alteration · LOC Issued · 06/08/2022
Pret A MangerRestaurant / Food ServiceCellar
Project M01270624 Alteration · LOC Issued · 10/21/2025
Baker BottsOfficeFloors 44, 45
Project M01065556 Alteration · Permit Entire · 09/24/2025
Project M01065572 Alteration · LOC Issued · 09/22/2025
Project M01065582 Alteration · Permit Entire · 09/22/2025
Project M01065557 Alteration · LOC Issued · 08/28/2024
Project M01065565 Alteration · LOC Issued · 08/22/2024
Project M01065585 Alteration · LOC Issued · 08/22/2024
Project M01065562 Alteration · LOC Issued · 08/09/2024
Project M01027407 Alteration CO · Permit Entire · 05/30/2024
CJ Hendry Flower MarketOther—
Project M01276315 Alteration · LOC Issued · 08/29/2025
Rough TradeRetailCellar, Ground, Concourse
Project M01198456 No Work · Approved · 04/30/2025
Project M01166402 Alteration CO · On Hold – Administrative Action · 04/23/2025
Project M01166153 Alteration · LOC Issued · 01/23/2025
Maiko Matcha CafeRestaurant / Food Service—
Project M01170623 Alteration · LOC Issued · 03/10/2025
Lobel'sRetail—
Project M01140887 Alteration · LOC Issued · 12/13/2024
Project M01140892 Alteration · LOC Issued · 12/13/2024
Madras Dosa CompanyRestaurant / Food ServiceCellar
Project M00954229 Alteration · LOC Issued · 11/25/2024
Project M00954236 Alteration · LOC Issued · 11/25/2024
Project M01103484 Alteration · LOC Issued · 11/25/2024
StarbucksRestaurant / Food ServiceCellar
Project M01097473 Alteration · LOC Issued · 10/09/2024
Land RoverOther—
Project M01114869 Alteration · Permit Entire · 09/26/2024
Daily ProvisionsRestaurant / Food ServiceCellar, Concourse
Project M01047246 Alteration · LOC Issued · 07/22/2024
DeloitteOfficeFloor 41
Project M00956777 Alteration · LOC Issued · 12/22/2023
LazardOfficeFloors 48, 56, 58, 60, 64
Project M00962969 Alteration · LOC Issued · 12/20/2023
Project M00970855 Alteration · Filing Withdrawn · 12/20/2023
Project M00962451 Alteration · LOC Issued · 12/13/2023
Project M00962580 Alteration · LOC Issued · 12/13/2023
Project M00956813 Alteration · LOC Issued · 12/12/2023
Project M00962421 Alteration · LOC Issued · 12/12/2023
Cool SipsRestaurant / Food Service—
Project M00970290 Alteration · LOC Issued · 12/04/2023
Ace's PizzaRestaurant / Food ServiceCellar
Project M00954241 Alteration · LOC Issued · 11/30/2023
Project M00954524 Alteration · LOC Issued · 11/27/2023
Casa DragonesOther—
Project M00938776 Alteration · LOC Issued · 10/18/2023
NBC UniversalOfficeFloors 7, 11, 53
Project M00730186 Alteration · LOC Issued · 09/22/2023
Project M08046603 Alteration · LOC Issued · 12/08/2022
Project M00308693 Alteration · LOC Issued · 04/02/2020
Project M00259233 Alteration · LOC Issued · 11/27/2019
Project M00250799 Alteration · LOC Issued · 11/21/2019
Project M00250821 Alteration · LOC Issued · 11/21/2019
30 Rock Gift Shop & VIP LoungeRetailConcourse
Project M00913273 Alteration · LOC Issued · 09/05/2023
Mieke Fonteyn % ArabicaRestaurant / Food ServiceCellar, Floor 1
Project M00906209 Alteration · LOC Issued · 08/17/2023
Project M00906223 Alteration · LOC Issued · 08/17/2023
ArabicaRestaurant / Food ServiceCellar, Floor 1
Project M00906065 Alteration · LOC Issued · 07/27/2023
Top of the Rock - New FrontiersOther—
Project M00851387 Alteration · LOC Issued · 03/29/2023
Frenchette KioskRestaurant / Food ServiceConcourse
Project M08040079 Alteration · Approved · 01/24/2023
Project M08040093 Alteration · Approved · 01/24/2023
Tipsy BakerRestaurant / Food ServiceCellar
Project M08035762 Alteration · LOC Issued · 01/19/2023
21 Greenpoint RestaurantRestaurant / Food ServiceCellar
Project M00729745 Alteration · LOC Issued · 05/20/2022
Project M00729771 Alteration · LOC Issued · 05/16/2022
Hombre TacoRestaurant / Food ServiceCellar
Project M00734991 Alteration · Permit Entire · 05/18/2022
NBC PeacockOfficeFloors 52, 53
Project M00680985 Alteration · LOC Issued · 04/19/2022
Project M00413861 Alteration · LOC Issued · 10/28/2020
Project M00308353 Alteration · LOC Issued · 04/03/2020
Project M00308410 Alteration · LOC Issued · 04/02/2020
Project M00308742 Alteration · Permit Issued · 04/02/2020
Project M00331213 Alteration · Filing Withdrawn · 04/02/2020
Project M00331216 Alteration · Filing Withdrawn · 04/02/2020
Cafe GrumpyRestaurant / Food ServiceConcourse
Project M00542827 Alteration · LOC Issued · 07/01/2021
Project M00542831 Alteration · LOC Issued · 07/01/2021
Project M00542845 Alteration · LOC Issued · 07/01/2021
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 19,987 on file (BIS + DOB NOW)
▸Plans & Drawings634
▸DOB NOWPlans/Sketch449
09/06/2026M00002175-I1Request digital key ↗
09/06/2026M00024814-I1Request digital key ↗
09/06/2026M00064871-I1Request digital key ↗
Showing 3 of 449 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly50
09/05/2026M00119442-I1Request digital key ↗
09/05/2026M00151874-I1Request digital key ↗
09/05/2026M00189612-I1Request digital key ↗
Showing 3 of 50 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler39
09/05/2026M00210985-I1Request digital key ↗
09/05/2026M00226744-I1Request digital key ↗
09/05/2026M00192283-S2Request digital key ↗
Showing 3 of 39 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems37
09/05/2026M00210958-I1Request digital key ↗
09/05/2026M00192283-I1Request digital key ↗
09/05/2026M00255543-I1Request digital key ↗
Showing 3 of 37 on file for this type
▸DOB NOWPlans/Sketch - Plumbing34
09/05/2026M00226739-I1Request digital key ↗
09/05/2026M00255646-I1Request digital key ↗
09/05/2026M00250799-I1Request digital key ↗
Showing 3 of 34 on file for this type
▸DOB NOWPlans/Sketch - Structural10
09/05/2026M00229514-I1Request digital key ↗
09/05/2026M00232143-I1Request digital key ↗
09/05/2026M00259233-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Standpipe4
09/05/2026M00210684-I1Request digital key ↗
09/05/2026M00250853-I1Request digital key ↗
09/05/2026M00331216-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold4
09/05/2026M00251513-I1Request digital key ↗
09/04/2026M00384290-I1Request digital key ↗
09/04/2026M00408648-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - General Construction3
09/04/2026M00448374-I1Request digital key ↗
Showing 1 of 3 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sign1
09/05/2026M00146818-I1Request digital key ↗
▸Applications & Permits4,060
▸BISPLAN / WORK APPROVAL APPLICATION2,269
12/03/2025100947512Open ↗
10/21/2025102423780Open ↗
10/21/2025101063019Open ↗
Showing 3 of 2,269 on file for this type
▸BISWORK PERMIT APPLICATION1,327
04/03/2025123580446Open ↗
Showing 1 of 1,327 on file for this type
▸DOB NOWLPC Approval/Permit414
09/05/2026M00210958-I1Open ↗
09/05/2026M00192283-I1Open ↗
09/05/2026M00226739-I1Open ↗
Showing 3 of 414 on file for this type
▸BISPLACE OF ASSEMBLY42
01/22/2025121026111Open ↗
01/21/2025121389201Open ↗
08/06/2024104232000Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWHouse Number Verification: TOPO Stamp4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications5,511
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2,800
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2,800 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature617
09/06/2026M00002175-I1Open ↗
09/06/2026M00001326-I1Open ↗
09/06/2026M00024814-I1Open ↗
Showing 3 of 617 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST577
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 577 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT480
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 480 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature346
09/29/2026M01388272-I1Open ↗
09/28/2026M08035831-I1Open ↗
09/27/2026M01109855-I1Open ↗
Showing 3 of 346 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM344
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 344 on file for this type
▸DOB NOWProgress Inspector Seal & Signature256
09/29/2026M01388272-I1Open ↗
09/28/2026M08035831-I1Open ↗
09/27/2026M00954524-I1Open ↗
Showing 3 of 256 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISPC FULL REPORT14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISProfessional and Owner Certification (POC3)11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸Trade Schedules & Equipment1,767
▸BISSELF-CERT PLUMBING NOTICE582
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 582 on file for this type
▸BISSCHEDULE B - PLUMBING433
01/07/2025123580446Open ↗
04/05/2024123580446Open ↗
04/04/2024123580446Open ↗
Showing 3 of 433 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE354
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 354 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA210
01/23/2025122033913Open ↗
09/13/2024122368277Open ↗
07/24/2024122368286Open ↗
Showing 3 of 210 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8595
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 95 on file for this type
▸BISEQUIPMENT USE PERMITS33
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 33 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISSTANDPIPE INSP REPORT : FP-8414
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos1,559
▸BISASBESTOS: CERTIFICATION (DEP ACP5)627
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 627 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report461
09/05/2026M00210985-I1Open ↗
09/05/2026M00226744-I1Open ↗
09/05/2026M00210958-I1Open ↗
Showing 3 of 461 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'299
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 299 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form36
09/05/2026M00192283-I1Open ↗
09/05/2026M00192283-S2Open ↗
09/05/2026M00255646-I1Open ↗
Showing 3 of 36 on file for this type
▸BISASBESTOS INSPECTION REPORT35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 22 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸Energy Compliance192
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 111 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS34
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 34 on file for this type
▸BISTECHNICAL REPORT: ENERGY24
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 24 on file for this type
▸BISTR8: Energy Code Progress Inspections10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISENERGY CODE 1ST REVIEW COMPLETE10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Inspections & Test Reports169
▸BISTECHNICAL REPORT: RESPONSIBILITY123
02/04/2025123847588Open ↗
12/11/2024121186117Open ↗
12/11/2024121186117Open ↗
Showing 3 of 123 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 31 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)15
12/01/2025123575210Open ↗
03/17/2025123580446Open ↗
11/20/2024123479654Open ↗
Showing 3 of 15 on file for this type
▸Approvals, Objections & Sign-offs1,912
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST668
12/16/2025123575210Open ↗
10/01/2025121003350Open ↗
05/09/2025122874540Open ↗
Showing 3 of 668 on file for this type
▸BISLANDMARKS APPROVAL569
09/25/2024122264281Open ↗
Showing 1 of 569 on file for this type
▸BISADMINISTRATIVE OBJECTIONS405
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 405 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION104
12/13/2024121186117Open ↗
12/11/2024121186117Open ↗
12/11/2024121186117Open ↗
Showing 3 of 104 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE60
08/19/2025120988752Open ↗
08/11/2025120988752Open ↗
02/04/2025120988752Open ↗
Showing 3 of 60 on file for this type
▸BISLANDMARKS SIGNOFF48
01/28/2025122874540Open ↗
08/15/2024122368286Open ↗
08/15/2024122368277Open ↗
Showing 3 of 48 on file for this type
▸BISFINAL24
12/02/2025123575210Open ↗
04/24/2025123784182Open ↗
03/17/2025123580446Open ↗
Showing 3 of 24 on file for this type
▸BISSUPERSEDING LETTER15
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWLandmark Approval7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership1,765
▸BISCOST AFFIDAVIT1,723
04/01/2024123530269Open ↗
03/19/2024140881482Open ↗
03/19/2024140882793Open ↗
Showing 3 of 1,723 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW342
10/01/2025121003350Open ↗
03/18/2025123580446Open ↗
01/23/2025122874540Open ↗
Showing 3 of 42 on file for this type
▸Filing & Intake Forms2,017
▸BISEFILING COVER SHEET1,067
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1,067 on file for this type
▸BISADDITIONAL INFORMATION463
02/18/2025120988752Open ↗
02/04/2025123580446Open ↗
02/04/2025121026111Open ↗
Showing 3 of 463 on file for this type
▸BISBOROUGH INTAKE FORM420
04/03/2025123580446Open ↗
Showing 1 of 420 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET64
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 64 on file for this type
▸DOB NOWAI1 Form (from plan PDF)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Other Documents222
▸DOB NOWProof of Historic Building138
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 138 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION57
06/18/2024103098933Open ↗
Showing 1 of 57 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 211
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 171
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 61
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStructural Peer Review Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 81
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 31
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 141
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 51
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 231
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 201
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 191
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 181
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAlternate Plan 221
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type