| Owner | Filings | Most Recent |
|---|---|---|
| 1250 Broadway Associates LLPC | 622 | 10/13/2026 |
| SL Green Realty | 223 | 03/21/2026 |
| Murray Hill Properties | 202 | 03/21/2026 |
| JT MH 1250 Owner | 30 | 03/21/2026 |
| E.S. Gordon Co | 30 | 03/21/2026 |
| Global Holdings | 16 | 10/17/2026 |
| 875 3rd Avenue | 16 | 07/08/2026 |
| Edward S. Gordon Co | 11 | 03/21/2026 |
| S L Green Oper Partner | 8 | 03/21/2026 |
| 3832 Associates | 3 | 03/21/2026 |
| GHM Inc (US) | 2 | 03/21/2026 |
| Company | 2 | 03/21/2026 |
| Insigna | 2 | 03/21/2026 |
| Avs Architectural Visual Solutions | 1 | 03/22/2026 |
| JKHKH | 1 | 03/21/2026 |
| MHP Real Estate Services | 1 | 03/21/2026 |
| 277 Park Avenue-21st Floor | 1 | 03/21/2026 |
| Visiting Nurse Service | 1 | 03/21/2026 |
| 38-32 Asso | 1 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 11/01/2016 | $565.0M | — | — → — | $841/sf building |
| Representative | Filings | Most Recent |
|---|---|---|
| LMS-Ace Services | 42 | 03/21/2026 |
| Garo Gumusyan | 103 | 03/21/2026 |
| K M DOB Consulting | 20 | 03/21/2026 |
| A1 Expediting Service | 6 | 03/21/2026 |
| KD Designs | 1 | 03/21/2026 |
| Saro Gumusyan Architecture | 11 | 03/21/2026 |
| Milrose Consultants | 8 | 03/21/2026 |
| Basic Groups | 8 | 03/21/2026 |
| Gilman Consultant | 26 | 03/21/2026 |
| Codegreen | 5 | 03/21/2026 |
| BMB Building Consulting | 2 | 03/21/2026 |
| Synergy Building Consultants | 5 | 03/21/2026 |
| Louis Striar | 4 | 03/21/2026 |
| Spring Scaffolding | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Arsenal Scaffold | Scaffold | 35 | 07/08/2026 |
| Tri-Star Construction | General Contractor | 35 | 07/08/2026 |
| Tulla Contracting | General Contractor | 24 | 10/04/2026 |
| Interstate Interiors | General Contractor | 11 | 07/08/2026 |
| Signal USA | General Contractor | 10 | 07/08/2026 |
| Structure Tone | General Contractor | 9 | 09/17/2026 |
| Benchmark Builders | General Contractor | 7 | 07/08/2026 |
| A&A Plumbing | Plumbing | 7 | 09/18/2026 |
| Ransd Design | General Contractor | 7 | 07/08/2026 |
| City/Suburban Plumbing | Plumbing | 7 | 07/08/2026 |
| Arch Plumbing & Heating | Plumbing | 6 | 07/08/2026 |
| Tristate Air Conditioning | specialty_contractor | 6 | 03/21/2026 |
| PSI Partners | Fire Protection | 6 | 07/08/2026 |
| RJB Contracting Carting | General Contractor | 6 | 07/08/2026 |
| Devo Fire Protection | Fire Protection | 6 | 07/08/2026 |
| JT Magen & Company | General Contractor | 5 | 07/08/2026 |
| Capital Cooling Systems | General Contractor | 5 | 07/08/2026 |
| Standard Fire Supp | Fire Protection | 5 | 07/08/2026 |
| F1 Mechanical | Plumbing | 4 | 07/08/2026 |
| Five Borough NYC | Fire Protection | 4 | 10/04/2026 |
| Par Plumbing Co | Plumbing | 4 | 07/08/2026 |
| Sirina Fire Protection | Fire Protection | 4 | 07/08/2026 |
| JRM Construction Management | General Contractor | 4 | 03/21/2026 |
| Allpro General Cntrting | General Contractor | 3 | 03/21/2026 |
| Bna Services | General Contractor | 3 | 03/21/2026 |
| Corniel Construction | General Contractor | 3 | 03/21/2026 |
| Art + 1 | General Contractor | 3 | 03/21/2026 |
| HD HVAC of NY | specialty_contractor | 3 | 04/09/2026 |
| Evergreen Mechanical | Fire Protection | 2 | 07/08/2026 |
| L.S. Sign Co | Sign hanger | 2 | 07/08/2026 |
| Domenici Michael | Electrical | 2 | 03/21/2026 |
| A & E General Painting | General Contractor | 2 | 07/08/2026 |
| TMS Plumbing & Heating | Fire Protection | 2 | 07/08/2026 |
| Tristate Plumbing Services | Plumbing | 2 | 07/08/2026 |
| Tristate Plumbing Services | Fire Protection | 2 | 07/08/2026 |
| S&E Bridge & Scaffold | Scaffold | 2 | 07/08/2026 |
| Bedrock Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Atrium Industries | General Contractor | 2 | 07/08/2026 |
| Prime Construction Management | General Contractor | 2 | 04/09/2026 |
| Ashland Plumbing | Plumbing | 2 | 07/08/2026 |
| Aamway Service Co | General Contractor | 2 | 03/21/2026 |
| Accurate Mechanical | Fire Protection | 2 | 07/08/2026 |
| Frankie Plumbing & Heating | Plumbing | 2 | 07/08/2026 |
| Full Capacity Fire | Fire Protection | 2 | 07/08/2026 |
| Air Stream Air Conditioning | specialty_contractor | 2 | 03/21/2026 |
| Par Fire Protection | Fire Protection | 2 | 07/08/2026 |
| Plumbing NYC | Fire Protection | 2 | 07/08/2026 |
| Wellbuilt Construction | General Contractor | 2 | 03/21/2026 |
| H Interior Design Construction | General Contractor | 2 | 03/21/2026 |
| WNW & Sons Plumbing & Heating | Fire Protection | 1 | 07/08/2026 |
| AUR0RA Electrical Contg | Electrical | 1 | 03/22/2026 |
| C. W. Greene | Electrical | 1 | 03/21/2026 |
| Sambar Electric | Electrical | 1 | 03/21/2026 |
| A/C Electric of New York | Electrical | 1 | 03/21/2026 |
| Platinum Electrical Contracting | Electrical | 1 | 03/21/2026 |
| Matros Automated Electrical | Electrical | 1 | 03/22/2026 |
| Noto Joseph | Electrical | 1 | 03/21/2026 |
| Patriot Electric | Electrical | 1 | 03/22/2026 |
| Allstate Electric | Electrical | 1 | 03/21/2026 |
| Team Electric | Electrical | 1 | 03/21/2026 |
| RX Electric | Electrical | 1 | 03/22/2026 |
| Team Electric | Electrical | 1 | 03/22/2026 |
| Tritech Electl & Data | Electrical | 1 | 03/22/2026 |
| Walton Electrical Construction | Electrical | 1 | 03/21/2026 |
| Weissberg Rudolph | Electrical | 1 | 03/21/2026 |
| Par Plumbing Co., Inc.o | Fire Protection | 1 | 03/21/2026 |
| Americon Construction | General Contractor | 1 | 07/08/2026 |
| Breffni Mechanical | specialty_contractor | 1 | 07/08/2026 |
| D.B. Demolition | specialty_contractor | 1 | 08/11/2026 |
| Global Holdings Management (US) | General Contractor | 1 | 07/08/2026 |
| Insea Group | General Contractor | 1 | 09/13/2026 |
| James E Fitzgerald | General Contractor | 1 | 07/08/2026 |
| Kle Construction | General Contractor | 1 | 07/08/2026 |
| Our Team Contracting | General Contractor | 1 | 04/09/2026 |
| Spring Scaffolding | Scaffold | 1 | 07/08/2026 |
| Unitech Design | Sign hanger | 1 | 07/08/2026 |
| Allstate Sprinkler | Fire Protection | 1 | 07/08/2026 |
| Avon Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Bedrock Mechanical | Fire Protection | 1 | 07/08/2026 |
| Case Plumbing | Fire Protection | 1 | 07/08/2026 |
| John Fitzgerald Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Metro Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Rightway Plumbing and Heating | Fire Protection | 1 | 10/17/2026 |
| Sean Coakley P & H | Fire Protection | 1 | 07/08/2026 |
| Sean Coakley P & H | Plumbing | 1 | 07/08/2026 |
| Standard Fire Protection | Fire Protection | 1 | 07/08/2026 |
| Universal Plumbing | Plumbing | 1 | 07/08/2026 |
| Watson's Plumbing, Heating, & Building | Plumbing | 1 | 10/09/2026 |
| Absolute Electrical Contracting of | Electrical | 1 | 03/22/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Saro Gumusyan Architect | 6437 | 91 | 09/01/2026 |
| Consulting and Testing SE | 6152 | 20 | 08/20/2026 |
| Amka & Associates | 8239 | 1 | 07/17/2026 |
| Delta Testing Labs | 687 | 56 | 06/09/2025 |
| Milrose Consultants | 2003 | 2 | 02/26/2025 |
| HT Engineering | 6274 | 1 | 11/26/2024 |
| MG Engineering | 8546 | 6 | 04/23/2024 |
| MEP Inspections | 1102 | 4 | 12/11/2023 |
| Longtin Solutions | 8320 | 4 | 10/25/2022 |
| NY Acom Engineering | 7061 | 4 | 04/21/2022 |
| Alan Margolin & Associates | 423 | 2 | 10/23/2020 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sprinklers | Permit Issued | Rightway Plumbing and Heating | 10/16/2026 |
| DOB NOW | Plumbing | Permit Issued | Watson's Plumbing, Heating, & Building | 10/08/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 09/17/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 09/16/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 09/16/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 09/16/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 09/16/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 09/16/2026 |
| DOB NOW | Plumbing | Permit Issued | A&A Plumbing | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | Structure Tone | 09/14/2026 |
| DOB NOW | General Construction | Permit Issued | Insea Group | 09/11/2026 |
| DOB NOW | Sprinklers | Permit Issued | Five Borough NYC | 09/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | Five Borough NYC | 09/04/2026 |
| DOB NOW | Sprinklers | Permit Issued | Five Borough NYC | 09/04/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Structure Tone | 09/03/2026 |
| DOB NOW | Structural | Signed-off | D.B. Demolition | 08/10/2026 |
| DOB NOW | General Construction | Signed-off | A & E General Painting | 06/16/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Arsenal Scaffold | 06/02/2026 |
| DOB NOW | General Construction | Permit Issued | A & E General Painting | 05/11/2026 |
| DOB NOW | Sprinklers | Signed-off | Evergreen Mechanical | 04/23/2026 |
| DOB NOW | Plumbing | Signed-off | Bedrock Plumbing & Heating | 03/13/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | Arsenal Scaffold | 03/05/2026 |
| DOB NOW | Sprinklers | Signed-off | Five Borough NYC | 02/24/2026 |
| DOB NOW | General Construction | Signed-off | Structure Tone | 02/10/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Structure Tone | 02/10/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Tulla Contracting | 01/29/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Tulla Contracting | 01/29/2026 |
| DOB NOW | General Construction | Signed-off | Tulla Contracting | 01/29/2026 |
| DOB NOW | Plumbing | Signed-off | Sean Coakley P & H | 01/22/2026 |
| DOB NOW | Sprinklers | Signed-off | Sean Coakley P & H | 01/22/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Prime Construction Management | 01/20/2026 |
| DOB NOW | General Construction | Signed-off | Prime Construction Management | 01/20/2026 |
| DOB NOW | Mechanical Systems | Signed-off | Breffni Mechanical | 01/14/2026 |
| DOB NOW | Plumbing | Permit Issued | Frankie Plumbing & Heating | 09/23/2025 |
| DOB NOW | General Construction | Signed-off | Tri-Star Construction | 09/12/2025 |
| DOB NOW | Sprinklers | Signed-off | Evergreen Mechanical | 09/05/2025 |
| DOB NOW | Plumbing | Signed-off | Avon Plumbing & Heating | 08/20/2025 |
| DOB NOW | General Construction | Signed-off | HD HVAC of NY | 08/18/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HD HVAC of NY | 08/12/2025 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/12/2024 | Permit Issued | Ransd Design | Air Conditioning Systems, Associated Ducts and Piping | Cooling Samsung AM192HXVAFH2AA 10,948 CFM · Vrf Outdoor ×3 AM072FXVAFH2AA 7,240 CFM · Vrf Outdoor ×2 AM144FXVAFH2AA 9,535 CFM · Vrf Outdoor ×2 AM195HXVAFH2AA 10,948 CFM · Vrf Outdoor ×1 |
| 10/17/2019 | Permit Issued | Tri-Star Construction | Air Conditioning Systems | Cooling |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | Five Borough NYC | — |
| 08/17/2026 | Permit Issued | Five Borough NYC | 129 heads |
| 07/29/2026 | Permit Issued | Five Borough NYC | 72 heads |
| 04/10/2026 | Signed-off | Five Borough NYC | 320 heads |
| 07/17/2025 | Signed-off | Evergreen Mechanical | 76 heads |
| 06/24/2025 | — | — | 18 heads |
| 09/05/2024 | Permit Issued | Standard Fire Protection | — |
| 08/02/2021 | Permit Issued | TMS Plumbing & Heating | 6 heads |
| 08/02/2021 | Permit Issued | Devo Fire Protection | — |
| 08/02/2021 | Signed-off | Devo Fire Protection | 112 heads |
| 08/02/2021 | Permit Issued | Full Capacity Fire | 5 heads |
| 03/09/2021 | Permit Issued | Devo Fire Protection | — |
| 01/24/2020 | Signed-off | Standard Fire Supp | 132 heads |
| 10/17/2019 | Permit Issued | Allstate Sprinkler | 212 heads |
| 09/18/2019 | Signed-off | Accurate Mechanical | 5 outlets |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | — | — | — |
| 08/17/2026 | — | — | — |
| 08/17/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 08/17/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 07/29/2026 | Permit Issued | A&A Plumbing | Water/Sanitary |
| 07/29/2026 | — | — | — |
| 04/10/2026 | Signed-off | Bedrock Plumbing & Heating | Water/Sanitary |
| 07/17/2025 | — | — | — |
| 06/24/2025 | — | — | — |
| 06/09/2025 | Permit Issued | Par Plumbing Co | Gas, Water/Sanitary |
| 02/20/2025 | Permit Issued | Arch Plumbing & Heating | Water/Sanitary |
| 01/21/2020 | Signed-off | Tristate Plumbing Services | Water/Sanitary |
| 01/21/2020 | Signed-off | City/Suburban Plumbing | Water/Sanitary |
| 12/17/2019 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2026 | Permit Issued | Empire State Electric Maintenance | General Wiring |
| 10/05/2026 | Permit Issued | Atmos Electric Svce | General Wiring |
| 09/28/2026 | Permit Issued | Empire State Electric Maintenance | — |
| 09/28/2026 | Permit Issued | Empire State Electric Maintenance | General Wiring |
| 09/18/2026 | Permit Issued | Lmec Electric | General Wiring, Lighting |
| 03/10/2026 | Permit Issued | Ennell Group Electric | General Wiring |
| 02/12/2026 | Complete | Solas Electrical | — |
| 01/16/2026 | Permit Issued | Matros Automated Electrical | General Wiring |
| 08/21/2025 | Complete | Y.S. Electric | General Wiring, Lighting |
| 01/09/2025 | Complete | Matros Automated Electrical | General Wiring |
| 12/12/2024 | Complete | Power Surge Electric | General Wiring |
| 10/30/2024 | Permit Issued | Team Electric | General Wiring |
| 10/23/2024 | Complete | Mer Electric | General Wiring |
| 08/13/2024 | Permit Issued | Matros Automated Electrical | General Wiring |
| 06/24/2024 | Permit Issued | Team Electric | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/17/2026 | Signed-off | D.B. Demolition | 1 scope_items |
| 06/28/2021 | Permit Issued | Tri-Star Construction | 1 scope_items |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/01/2026 | Signed-off | Arsenal Scaffold | Sidewalk Shed |
| 03/04/2026 | Signed-off | Arsenal Scaffold | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/30/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/26/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 06/24/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 06/22/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/29/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/21/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/09/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/29/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 12/16/2025 | Certified Sprinkler - SP - Roughing | Certified | View ↗ |
| 12/05/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/03/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/21/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/21/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 09/05/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 09/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 09/03/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 09/03/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/13/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/13/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/07/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/02/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/23/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/09/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/26/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Saro Gumusyan | special |
| 08/12/2026 | Post-installed Anchors | Saro Gumusyan | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Saro Gumusyan | special |
| 08/12/2026 | HVAC-R and service water heating system controls | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water heating system controls | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | Saro Gumusyan | energy_progress |
| 08/12/2026 | Interior lighting power | Saro Gumusyan | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 08/12/2026 | Post-installed Anchors | Saro Gumusyan | special |
| 08/12/2026 | Maintenance information | Saro Gumusyan | energy_progress |
| 08/12/2026 | Post-installed Anchors | DANIEL CREIGHTON | special |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | Saro Gumusyan | special |
| 08/12/2026 | HVAC-R and service water heating equipment | Saro Gumusyan | energy_progress |
| 08/12/2026 | Metering | Saro Gumusyan | energy_progress |
| 08/12/2026 | Duct leakage testing, insulation and design | Saro Gumusyan | energy_progress |
| 08/12/2026 | Metering | Saro Gumusyan | energy_progress |
| 08/12/2026 | Fire-Resistant Penetrations and Joints | DANIEL CREIGHTON | special |
| 08/12/2026 | Maintenance information | Saro Gumusyan | energy_progress |
| 08/12/2026 | Electrical motors and elevators | Saro Gumusyan | energy_progress |
| 08/12/2026 | HVAC-R and service water piping design and insulation | Saro Gumusyan | energy_progress |
| 08/12/2026 | Post-installed Anchors | Saro Gumusyan | special |
| 08/12/2026 | HVAC-R and service water heating equipment | Saro Gumusyan | energy_progress |
| 08/12/2026 | Shutoff dampers | Saro Gumusyan | energy_progress |
| 08/12/2026 | Duct leakage testing, insulation and design | Saro Gumusyan | energy_progress |
| 08/12/2026 | Lighting controls | Saro Gumusyan | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Thoughtworks | Office | Floor 27 | Project M01441305 Project M01441308 Project M01441307 Project M01441303 |
| April | Office | Floor 35 | Project M01441805 Project M01441806 |
| Micasadeco | Restaurant / Food Service | Cellar, Floor 1 | Project M01349170 Project M01349113 Project M01349093 |
| Industrial Bank of Korea | Office | Floor 37 | Project M01227184 Project M01227192 Project M01227194 Project M01227200 |
| TransPerfect | Office | Floors 1–7 | Project M01214234 Project M01217322 Project M08003107 Project M00653046 Project M00653047 Project M00542117 |
| Varonis Systems | Office | Floor 28 | Project M01140967 |
| Elastic Search | Office | Floor 16 | Project M01114200 Project M01114202 Project M01114205 Project M01114212 |
| Jeong Yuk Jeom | Restaurant / Food Service | Floor 1 | Project M01006369 |
| Zillow Group | Office | Floors 8–13 | Project M01003224 Project M00593362 Project M00599502 Project M00212304 |
| Nana's Green Tea | Restaurant / Food Service | Floor 1 | Project M00912884 Project M00912907 Project M00913539 |
| Viant Technology | Office | Floor 29 | Project M08037389 Project M08037391 |
| Activision - Blizzard | Office | Floor 8 | Project M00753651 |
| Gunderson Dettmer | Office | Floors 20–24 | Project M00701843 Project M00645267 Project M00645270 Project M00645276 Project M00268682 Project M00268687 Project M00268689 |
| Tiger Sugar Logo | Restaurant / Food Service | Floor 1 | Project M00497535 Project M00497563 |
| Mastercard | Office | Floor 34 | Project M00393399 Project M00393448 |
| Girls Who Code | Office | Floor 17 | Project M00291350 Project M00291352 Project M00291357 |