Whole building & multi-floor projectsDorchester Towers CondominiumsUnder Construction1 filing
FACADE REPAIRS, INCLUDING BRICK REPLACEMENT, LINTEL CLEANING, LINTEL REPLACEMENT, AND COPING REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
RoofUpper Westspa, ORINOCO STUDIOSUnder Construction10p · 7 filings · 14 docs
ArchitectureEquipmentMechanical
Issued Permit Scope
General Construction · Mechanical Systems
Construction of new mechanical enclosure around mechanical equipment on existing roof. Aluminum enclosure with louvered openings for ventilation with green roof. All construction to occur only on 1st floor ROF setback. No change to use, egress, occupancy
On file for this project
3 documents · 1 drawing sheet
REMOVE AND REPLACE CIRCULAR CAR TURN AROUND, WALKWAYS, PLANTING BEDS, LOBBY ENTRANCE, LOBBY GLASS FACADE AND CANOPY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
INSTALLATION OF OUTRIGGERS FOR FACADE REPAIR AND INSPECTION
On file for this project
18 documents · 2 drawing sheets
Latest 3 of 7 filings on this floor.
Floor 29Unit 30AUnder Construction1 filing · 6 docs
Architecture
Issued Permit Scope
General Construction
APPLICATION FILED FOR INTERIOR RENOVATION &RELATED ELECTRICAL WORK OF APT 30A ON 29THFLOOR. NO PLUMBING WORK, NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THISAPPLICATION.
On file for this project
6 documents
Floor 28
Floor 271 filing · 2 docs
ArchitectureCivilElectricalMechanicalStructural
Issued Permit Scope
General Construction · Protection and Mechanical Methods
Installation of Greenhouse Overhead Protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
On file for this project
2 documents
Floor 26
Floor 25
Floor 24
Floor 23
Floor 22
Floor 216p · 2 filings · 10 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Plumbing low zone.
On file for this project
5 documents · 4 drawing sheets
PLUMBING HIGH ZONE
On file for this project
5 documents · 2 drawing sheets
Floor 20Unit 20342p · 2 filings · 14 docs
ArchitectureGeneralPlumbing
Issued Permit Scope
General Construction · Plumbing
Replacement of Plumbing fixtures in kitchen and bathroom of unit 2034
On file for this project
7 documents · 1 drawing sheet
Interior renovation of kitchen and bathroom unit 2034
On file for this project
8 documents · 1 drawing sheet
Floor 19Unit 2005Under Construction1 filing · 7 docs
Architecture
Issued Permit Scope
General Construction
APPLICATION FILED FOR INTERIOR RENOVATION &RELATED PLUMBING WORK OF APT 2005 ON 19th FLOOR. NO CHANGE IN USE, EGRESS OROCCUPANCY UNDER THIS APPLICATION.
On file for this project
7 documents
Floor 18
Floor 17
Floor 16Unit 1612, Unit 1614, Unit 1615Under Construction2 filings · 19 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUNCTION W/ COMBINING APARTMENT NUMBERS 1612 AND 1614/1615 ON THE 16TH FLOOR AS PER TPPN 3/97. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
On file for this project
19 documents
Combining apartment numbers 1614 and 1615 as per TPPN 3/97. No change in use, occupancy or egress.
On file for this project
26 documents
Floor 15
Floor 14Unit 14142 filings · 14 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
AT 14TH FLOOR APT 1414- INSTALLATION, REPLACEMENT AND RELOCATION OF PLUMBING FIXTURES. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
8 documents
AT 14TH FLOOR APT 1414- INTERIOR RENOVATION, REMOVAL AND INSTALLATION OF NON BEARING INTERIOR PARTITIONS AND RELATED ELECTRICAL WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
7 documents
Floor 13
Floor 12Unit 12141 filing · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING WORK IN CONJUNCTION W/ INTERIOR RENOVATION OF EXISTING DWELLING UNIT#1214 ON THE 12th FLOOR OF RESIDENTIAL BUILDING, NO CHANGE IN USE, OCCUPANCY, EGRESS, OR ZONING
On file for this project
6 documents
Floor 11
Floor 10
Floor 9
Floor 8Unit 830, Unit 8312 filings · 5 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF #831 ON 8TH FLOOR OF RESIDENTIAL BUILDING. NON-LOAD-BEARING, NON-RATED PARTITION WITH DOORS AS REQUIRED. ARCHITECTURAL WORK ONLY. NO CHANGE TO MECHANICAL, PLUMBING, ELECTRICAL OR STRUCTURE. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
On file for this project
2 documents
RENOVATING APARTMENT 830 AT 155 WEST 68TH STREET. NO CHANGE IN OCCUPANCY, USE, OR EGRESS.
On file for this project
3 documents
Floor 7Unit 706, Unit 707, Unit 7122 filings · 14 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Minor plumbing work in conjunction with the interior renovation of apartment number 712 on the seventh floor, replacing all existing plumbing fixtures with new ones and installing a new washer and dryer. No change in use, egress, or occupancy.
On file for this project
11 documents
ARCHITECTURAL TO COMBINE AND RENOVATE APARTMENTS #706 AND #707 ON THE 7TH FLOOR PER TPPN 3/97. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
9 documents
Floor 6Unit 6181 filing · 5 docs
Architecture
Issued Permit Scope
General Construction
INTERIOR RENOVATION OF #618 ON 6TH FLOOR AT 155 EAST 68 STREET . WORK INCLUDES NON-LOAD-BEARING, NON-RATED PARTITION WITH DOORS. ARCHITECTURAL WORK WITH MINOR ELECTRICAL AND PLUMBING. NO CHANGE TO MECHANICAL, STRUCTURE, USE, OCCUPANCY, OR EGRESS.
On file for this project
5 documents
Floor 5Unit 515, Unit 5161 filing · 6 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
PLUMBING RENOVATIONS FOR APARTMENT 515/516 ON 5TH FLOOR. APARTMENT COMBINED PER TPPN 3/97 UNDER APPLICATION #102787227. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents
Floor 4Unit 414, Unit 4151 filing · 7 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
Herewith filing new alt2 application for plumbing work to be preformed in existing units 414/415 on the 4th floor. All in accordance with submitted plans. No changes to use, egress occupancy under this application.
On file for this project
7 documents
Floor 3
Floor 2
Floor 1Upper Westspa, ORINOCO STUDIOSUnder Construction13p · 16 filings · 14 docs
ArchitectureDMElectricalFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sign · Sprinklers · Structural
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS
On file for this project
6 documents · 2 drawing sheets
RENOVATION OF EXISTING COURTYARD. WORK INCLUDES CONSTRUCTION OF NEW CONCRETEPLANTERS AND A NEW STEEL-FRAMED CANOPY. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
On file for this project
3 documents · 1 drawing sheet
REMOVE AND REPLACE CIRCULAR CAR TURN AROUND, WALKWAYS, PLANTING BEDS, LOBBY ENTRANCE, LOBBY GLASS FACADE AND CANOPY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 2 drawing sheets
Latest 3 of 16 filings on this floor.
CellarDorchester Tower CondominiumUnder Construction24p · 14 filings · 20 docs
ArchitectureDMFire ProtectionMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Sprinklers
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS
On file for this project
6 documents · 1 drawing sheet
Plumbing low zone.
On file for this project
5 documents · 2 drawing sheets
CONCRETE SLAB REPAIRS WITH POLYMER-MODIFIED PATCHING MATERIAL. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
On file for this project
6 documents · 2 drawing sheets
Latest 3 of 14 filings on this floor.
Sub-CellarDorchester TowersUnder Construction8p · 7 filings · 20 docs
ArchitecturePlumbing
Issued Permit Scope
General Construction · Plumbing
REMOVAL AND INSTALLATION OF PLUMBING FIXTURES AND RELATED PIPING. THERE IS NO CHANGE IN OCCUPANCY, USE, OR EGRESS
On file for this project
6 documents · 1 drawing sheet
REMOVE AND REPLACE CIRCULAR CAR TURN AROUND, WALKWAYS, PLANTING BEDS, LOBBY ENTRANCE, LOBBY GLASS FACADE AND CANOPY. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
On file for this project
7 documents · 1 drawing sheet
PLUMBING HIGH ZONE
On file for this project
5 documents · 1 drawing sheet
Latest 3 of 7 filings on this floor.
BasementHVAC system and kitchen hood installation for supermarket18p · 9 filings · 20 docs
ArchitectureDMGeneralMechanicalPlumbing
Installation of HVAC system for supermarket, exhaust fans & associated ductwork as per plans filed herewith.Hood and duct work in the 1st floor kitchen working with commercial cooking equipment will be accepted at the FDNY. NoChangeToUseEgressOrOccupancy
On file for this project
23 documents · 3 drawing sheets
installation of plumbing fixtures including commercial gas burners as per plans filed herewith. no change to use egress or occupancy.
On file for this project
8 documents · 4 drawing sheets
proposed drainage for the marquee as per plans filed herewith. No change to use, egress or occupancy
On file for this project
3 documents · 1 drawing sheet
Latest 3 of 9 filings on this floor.
Sub-BasementHVAC system and kitchen hood installation for supermarket11 filings · 20 docs
ArchitectureMechanicalPlumbingStructural
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing · Structural
Installation of HVAC system for supermarket, exhaust fans & associated ductwork as per plans filed herewith.Hood and duct work in the 1st floor kitchen working with commercial cooking equipment will be accepted at the FDNY. NoChangeToUseEgressOrOccupancy
On file for this project
23 documents
Structural framing for installation of marquee as per plans filed herewith. No change to use, egress or occupancy.
On file for this project
3 documents
INSTALLATION OF 1 FOOT HIGH BY 40 FOOT WIDE MARQUEE AT BROADWAY SIDE OF BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. ASSOCIATED JOB #S M00819347,M00836862,M00836898,M00810494,M00810322,M00836765,M00836802
On file for this project
5 documents
Latest 3 of 11 filings on this floor.
Site & exteriorThe UPS StoreUnder Construction13 filings · 20 docs
ArchitectureElectricalEquipmentGeneralMechanicalPlumbingStructural
Issued Permit Scope
Construction Fence · General Construction · Mechanical Systems · Plumbing · Protection and Mechanical Methods · Sidewalk Shed · Sign · Structural
ILLUMINATED NON-ADVERTISING ACCESSORY CHANNEL LETTER SIGN THE UPS STORE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
On file for this project
4 documents
INSTALL EXTERIOR ILLUMINATED WALL SIGN (IVX HEALTH)
On file for this project
4 documents
INSTALL EXTERIOR ILLUMINATED WALL SIGN (IVX HEALTH)
On file for this project
4 documents
Latest 3 of 13 filings on this floor.