← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
CitySpire
156 WEST 56TH STREET · BIN 1076177
💬 Discuss this project
1987Year Built
70Stories
RMBuilding Class
C6-6.5Zoning
698,686 sfGross Floor Area
340Units
LL97 CoveredRent Stabilized36 Active Violations 35 unresolved · 1 paperwork only 9 likely answered 19 old, status unconfirmed ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 24,237 sf lot · 28.83 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofCityspire5p · 2 filings · 20 docs
Floor 71Unit 71037p · 1 filing · 15 docs
Floor 70
Floor 69Unit 69021p · 1 filing · 7 docs
Floor 68RoomiesUnder Construction14p · 2 filings · 14 docs
Floor 67Roomies, Unit 6703Under Construction13p · 2 filings · 14 docs
Floor 66
Floor 65
Floor 64Unit 640414p · 2 filings · 17 docs
Floor 63Combine apartments 65th and 66th floors34p · 1 filing · 20 docs
Floor 62Combine apartments 65th and 66th floors33p · 1 filing · 20 docs
Floor 61Unit 61011 filing · 1 doc
Floor 60
Floor 59
Floor 58Unit 580410p · 1 filing · 11 docs
Floor 57
Floor 56Interior Alteration Base Building2p · 2 filings · 6 docs
Floor 55
Floor 54
Floor 53Unit 53068p · 1 filing · 18 docs
Floor 52Unit 5202Under Construction10p · 1 filing · 6 docs
Floor 51
Floor 50
Floor 49
Floor 48
Floor 47
Floor 46
Floor 45
Floor 44Unit 44013p · 1 filing · 7 docs
Floor 43
Floor 42
Floor 41
Floor 40
Floor 39
Floor 38
Floor 37
Floor 36
Floor 35
Floor 34
Floor 33Unit 33031 filing · 3 docs
Floor 32
Floor 31Unit 310811p · 1 filing · 7 docs
Floor 30
Floor 29
Floor 28Unit 28101 filing · 14 docs
Floor 27
Floor 26
Floor 25Cooling tower replacement, 25th floor3p · 3 filings · 8 docs
Floor 24Windels MarxUnder Construction41p · 1 filing · 20 docs
Floor 23Windels MarxUnder Construction42p · 1 filing · 20 docs
Floor 22Windels MarxUnder Construction41p · 1 filing · 20 docs
Floor 21Windels MarxUnder Construction42p · 1 filing · 20 docs
Floor 20Tishman Speyer Cityspire89p · 10 filings · 20 docs
Floor 19Tishman Speyer Cityspire17p · 4 filings · 19 docs
Floor 18Windels Marx, NYPD Emerald SocietyUnder Construction54p · 7 filings · 20 docs
Floor 17Tishman Speyer Cityspire37p · 5 filings · 20 docs
Floor 16Caleres11p · 3 filings · 20 docs
Floor 15Caleres8p · 2 filings · 17 docs
Floor 14Caleres11p · 3 filings · 20 docs
Floor 13
Floor 12Unit PH1067p · 8 filings · 20 docs
Floor 11Cityspire55p · 7 filings · 20 docs
Floor 10Tishman Speyer Cityspire18p · 3 filings · 20 docs
Floor 9Cityspire, NYPD Emerald Society74p · 16 filings · 20 docs
Floor 8Cityspire, R.J. O'brien & Associates83p · 13 filings · 20 docs
Floor 7NYPD Emerald Society66p · 7 filings · 20 docs
Floor 6Orsid9p · 1 filing · 4 docs
Floor 55p · 2 filings · 6 docs
Floor 4
Floor 3Plumbing modifications10p · 5 filings · 20 docs
Floor 2Cityspire16p · 8 filings · 20 docs
Floor 1Taim21p · 4 filings · 20 docs
CellarGmc Management9p · 2 filings · 20 docs
Sub-CellarGmc Management12p · 1 filing · 20 docs
Site & exteriorTaim12p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Tishman Speyer Properties56409/13/2026
Tower Realty5903/21/2026
Cityspire1803/22/2026
Chapman Consulting1404/09/2026
Second Pac Ltd C/O Shorenstein803/21/2026
Kallir Research Institute503/22/2026
West 56th Street Associates403/21/2026
The Shorenstein Co. East403/21/2026
Metrocity Construction Group110/04/2026
Citispeyer103/22/2026
Winsid Capital103/22/2026
Jay United Electricl Contracting103/22/2026
352 Park Avenue South103/21/2026
Area Interior Design103/21/2026
Minetta Lane Owners103/21/2026
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Omara OrganizationGeneral Contractor2207/08/2026
Munsey EnterprisesGeneral Contractor1007/08/2026
Evergreen Builders & Con*General Contractor1007/08/2026
James E FitzgeraldGeneral Contractor907/08/2026
Bern ConceptGeneral Contractor807/08/2026
Build NYC GroupGeneral Contractor707/08/2026
PSI PartnersFire Protection707/08/2026
Coyle ContractingGeneral Contractor603/21/2026
Skyline Scaffolding GroupScaffold603/21/2026
A&A PlumbingPlumbing507/08/2026
Arco Plumbing and HeatingPlumbing407/08/2026
Tristate Plumbing ServicesPlumbing407/08/2026
W.J. Regan & CompanyGeneral Contractor407/08/2026
Rosenwach Tank CoGeneral Contractor407/08/2026
Consolidated ScaffoldingScaffold303/21/2026
Icon InteriorsGeneral Contractor304/09/2026
Allstate SprinklerFire Protection307/08/2026
John Gallin & SonGeneral Contractor307/08/2026
JZ General ConstructionGeneral Contractor308/01/2026
Miter ConstructionGeneral Contractor307/08/2026
Tristate Plumbing ServicesFire Protection307/08/2026
Jay United Electrical ContngElectrical203/22/2026
Par Plumbing CoPlumbing207/08/2026
Asn Construction & RenovationGeneral Contractor203/21/2026
McCormack ContractingGeneral Contractor203/21/2026
Agir Electrical Ltd D/B/AElectrical203/22/2026
Denko MechanicalFire Protection207/08/2026
Keptech Builders GroupGeneral Contractor207/08/2026
Ariana ContractingPlumbing208/08/2026
Igon Construction & MaintenanceGeneral Contractor203/21/2026
Thomas MaintenanceGeneral Contractor204/09/2026
A&H Express Plumbing & HeatingPlumbing207/08/2026
N.Y. Sign ArtSign hanger207/08/2026
Zwicker Electric CoElectrical203/21/2026
Metro Fire ProtectionFire Protection207/08/2026
HI-Tech Plumbing & HeatingPlumbing107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Marathon MechanicalPlumbing107/08/2026
NYC Fire SprinklerFire Protection107/08/2026
PipestylistsPlumbing107/08/2026
Preferred Sprinkler and MechanicalFire Protection107/08/2026
RRP PlumbingFire Protection107/08/2026
RRP PlumbingPlumbing107/08/2026
Sirina Fire ProtectionFire Protection107/08/2026
Standard Fire ProtectionFire Protection107/08/2026
Sun MechanicalPlumbing103/22/2026
Testerman Plumbing & HeatingPlumbing109/19/2026
A.C. Morgan ElectricElectrical103/22/2026
William C. Gerakaris P&HPlumbing107/08/2026
Anco Electl ContctngElectrical103/22/2026
Asset ElectricElectrical103/22/2026
Off Shore ElectricElectrical103/21/2026
Control Electrical Cont'gElectrical103/21/2026
Eastern Electrical ConstructionElectrical103/21/2026
Lens ElectricElectrical103/22/2026
Pro ElectricElectrical103/21/2026
Moller & Moller Inc.d/B/AElectrical103/21/2026
Power Surge ElectricElectrical103/22/2026
Robert B. SamuelsElectrical103/22/2026
RX ElectricElectrical103/22/2026
Dal ElectricalElectrical103/21/2026
Graham Plumbing CoFire Protection103/21/2026
Par Plumbing Co., Inc.oFire Protection103/21/2026
Alchemy DevelopmentGeneral Contractor107/08/2026
Avid NYCGeneral Contractor109/12/2026
Golden I ConstructionGeneral Contractor107/08/2026
Lake ContractingGeneral Contractor104/09/2026
MKNK Waste RemovalGeneral Contractor104/09/2026
Modern Citi GroupGeneral Contractor107/08/2026
Niche Waterproofingspecialty_contractor107/08/2026
Pyramid Restoration NYspecialty_contractor104/09/2026
Rfa HudsonGeneral Contractor107/08/2026
Rosembarg ContractingGeneral Contractor107/08/2026
PJP InstallersScaffold107/08/2026
Abco-Peerless SprinklerFire Protection107/08/2026
Anesis ServicesFire Protection107/08/2026
AP Plumbing & HVACPlumbing107/08/2026
A + SprinklerFire Protection107/08/2026
Bedrock Plumbing & HeatingPlumbing107/08/2026
Deangelis Plumbing & HeatingPlumbing107/08/2026
Dynamic Blue Water MechanicalPlumbing106/27/2026
Fast RepairPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Delta Testing Labs687207/31/2026
Eoc-NY6548207/13/2026
Coastal Construction Service3827503/20/2026
Ceylan Design and Consulting8422202/23/2026
KZ Engineering4665212/24/2025
Project Tactical Solution58592410/15/2025
EDG2578609/25/2025
Green River Environmental7841209/25/2025
Marco Giardina Architectu7882109/04/2025
Winton Group Architecture4343206/26/2025
Jock Deboer, AIA - Sia7008605/09/2025
SA-DA Architecture2640504/22/2025
Christian L. Martos Engineering5965304/22/2025
Studio Nyandak Architectu8378202/24/2025
A&B World Consulting5704211/20/2024
NYC Facade Architecture9035108/07/2024
Richard B. Kornblau, AIA3208302/05/2024
Catalpa Special Inspectio2004310/30/2023
MEP Inspections1102110/30/2023
NS Engineers1442209/12/2023
CDG Architects LLC /Dba1327206/14/2023
Philibert Engineering223104/05/2023
Milrose Consultants2003702/09/2023
Skyline Engineering2671502/01/2023
Sag Engineering & Consulting6082908/31/2022
Michael Zenreich Architects1724106/27/2022
Atlantic Engineeringlabor1381205/26/2021
Walter T. Gorman, P.E., P268110/24/2019
Rodman Paul Architects PL7162108/27/2019
Building Lifecycle
All (300)Filed (59)Permit Issued (50)Signed Off (36)Facade (FISP) (3)Violation (32)Inspection (40)Objection (50)Special Inspection (30)
10/15/2026
Filed — Alteration
FILING HEREWITH DRAWINGS TO REPLACE (1) EXISTING COOLING TOWER WITH NEW ONE (1) COOLING TOWER CWT RTCH-350A ON EXISTING DUNNAGE, IN-KIND, AT THE 25 FLOOR. THIS APP DO NOTREQUIRE ANEW OR AMENDED C OF O AS THERE IS NO CHANGE IN USE, EXISTS OR OCCPY.
M01474669-I1
10/14/2026
Special inspection requirement — Final
SEAN CUNNINGHAM
10/14/2026
Special inspection requirement — Mechanical Systems
10/03/2026
Filed — Alteration
INTERIOR RENOVATION OF APARTMENT#6101 ONLY, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01461314-I1
09/18/2026
Permit issued — Plumbing
M01413870-S1-PL
09/10/2026
Permit issued — General Construction
M01413870-I1-GC
08/10/2026
Signed off — Alteration
M00849823-I1
08/07/2026
Permit issued — Plumbing
M01246374-S1-PL
08/07/2026
Objection resolved — Addressed
08/07/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/06/2026
Objection resolved — Addressed
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Other
08/04/2026
Objection raised — Scope
07/31/2026
Filed — Alteration
Modification to existing plumbing fixtures related to apartment renovation. No change to occupancy, use or egress.
M01413870-I1
07/31/2026
Filed — Alteration
Modification to existing plumbing fixtures related to apartment renovation. No change to occupancy, use or egress.
M01413870-S1
07/31/2026
Permit issued — General Construction
M01246374-I1-GC
07/13/2026
Filed — Alteration
M00849823-P1
07/13/2026
Special inspection requirement — Final
David Merabyan
07/13/2026
Special inspection requirement — Masonry
David Merabyan
07/13/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
07/13/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jacky Philibert
06/30/2026
Special inspection requirement — Final
David Merabyan
06/30/2026
Special inspection requirement — Post-installed Anchors
David Merabyan
06/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/30/2026
Special inspection requirement — Masonry
David Merabyan
06/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
David Merabyan
06/26/2026
Cycle 10 facade report signed — SAFE
06/25/2026
Violation issued (ECB, open)
Construction
06/25/2026
Violation issued (ECB, open)
Construction
06/25/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/03/2026
Cycle 10 facade report submitted
06/02/2026
Violation issued (HPD, open)
B
06/02/2026
Violation issued (HPD, open)
B
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
C
06/01/2026
Violation issued (HPD, open)
B
05/19/2026
Permit issued — General Construction
M00849823-I1-GC
05/12/2026
Cycle 10 facade inspection completed
04/14/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2026
Permit issued — Plumbing
M01358542-S2-PL
04/08/2026
Permit issued — Plumbing
M01361112-I1-PL
04/07/2026
Permit issued — Structural
M01358542-S4-ST
04/07/2026
Permit issued — Mechanical Systems
M01358542-S1-MS
04/07/2026
Permit issued — Sprinklers
M01358542-S3-EW-SP
04/07/2026
Permit issued — General Construction
M01358542-I1-GC
03/23/2026
Permit issued — General Construction
M01361093-I1-GC
03/20/2026
Filed — Alteration
Plumbing work as shown on plans
M01358542-S4
03/17/2026
Filed — Alteration
Plumbing work as shown on plans
M01358542-S3
03/11/2026
Filed — Alteration
Plumbing work as shown on plans
M01358542-S2
03/11/2026
Filed — Alteration
Plumbing work as shown on plans
M01358542-S1
03/11/2026
Filed — Alteration
Plumbing work as shown on plans
M01358542-I1
03/11/2026
Violation issued (HPD, open)
A
03/11/2026
Violation issued (HPD, open)
B
03/11/2026
Violation issued (HPD, open)
A
02/25/2026
Violation issued (HPD, open)
B
02/25/2026
Violation issued (HPD, open)
B
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTesterman Plumbing & Heating09/18/2026
DOB NOWGeneral ConstructionPermit IssuedAvid NYC09/10/2026
DOB NOWPlumbingPermit IssuedAriana Contracting08/07/2026
DOB NOWGeneral ConstructionPermit IssuedJZ General Construction07/31/2026
DOB NOWGeneral ConstructionSigned-offNiche Waterproofing05/19/2026
DOB NOWPlumbingPermit IssuedA&A Plumbing04/09/2026
DOB NOWPlumbingSigned-offSuper Plumbers04/08/2026
DOB NOWStructuralPermit IssuedIcon Interiors04/07/2026
DOB NOWSprinklersPermit IssuedPreferred Sprinkler and Mechanical04/07/2026
DOB NOWMechanical SystemsPermit IssuedIcon Interiors04/07/2026
DOB NOWGeneral ConstructionPermit IssuedIcon Interiors04/07/2026
DOB NOWGeneral ConstructionPermit IssuedMKNK Waste Removal03/23/2026
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co11/14/2025
DOB NOWSuspended ScaffoldSigned-offJC Santana Contracting Co11/13/2025
DOB NOWGeneral ConstructionPermit IssuedIgon Construction Maintenance09/18/2025
DOB NOWPlumbingPermit IssuedA&H Express Plumbing & Heating06/02/2025
DOB NOWGeneral ConstructionPermit IssuedModern Citi Group05/19/2025
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group05/15/2025
DOB NOWGeneral ConstructionPermit IssuedJZ General Construction05/13/2025
DOB NOWSprinklersSigned-offAbco-Peerless Sprinkler04/29/2025
DOB NOWPlumbingPermit IssuedAriana Contracting04/23/2025
DOB NOWMechanical SystemsSigned-offCoyle Contracting04/18/2025
DOB NOWGeneral ConstructionSigned-offCoyle Contracting04/18/2025
DOB NOWSuspended ScaffoldPermit IssuedJC Santana Contracting Co03/04/2025
DOB NOWGeneral ConstructionPermit IssuedMunsey Enterprises02/03/2025
DOB NOWMechanical SystemsSigned-offRosenwach Tank Co01/07/2025
DOB NOWSidewalk ShedPermit IssuedSkyline Scaffolding Group12/27/2024
DOB NOWMechanical SystemsSigned-offRosenwach Tank Co12/16/2024
DOB NOWGeneral ConstructionPermit IssuedMunsey Enterprises10/16/2024
DOB NOWGeneral ConstructionSigned-offPyramid Restoration NY09/09/2024
DOB NOWGeneral ConstructionSigned-offRosembarg Contracting09/06/2024
DOB NOWPlumbingPermit IssuedCrossfield Plumbing & Heating09/03/2024
DOB NOWStructuralSigned-offLake Contracting07/18/2024
DOB NOWGeneral ConstructionSigned-offMiter Construction07/16/2024
DOB NOWStructuralSigned-offThomas Maintenance07/12/2024
DOB NOWSprinklersSigned-offA + Sprinkler06/26/2024
DOB NOWPlumbingSigned-offWilliam C. Gerakaris P&H05/21/2024
DOB NOWGeneral ConstructionSigned-offMiter Construction05/15/2024
DOB NOWMechanical SystemsSigned-offMiter Construction05/15/2024
DOB NOWGeneral ConstructionPermit IssuedMunsey Enterprises04/12/2024
+ 60 more permits on file
4 projects · most recent 10/15/2026
Cooling Towers Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/15/2026——Cooling Towers
Cooling Tower
Cool Water Technologies RTCH-350A 350 tons · Cooling Tower ×1
01/19/2024——Cooling Towers
Cooling Tower
Cool Water Technologies RTCH-350A 350 tons · Cooling Tower ×1
12/23/2021Permit IssuedKeptech Builders GroupAir Conditioning Systems
Cooling
Islandaire EZ series 801 15,000 BTU · Ptac ×4
11/01/2019——Air Conditioning Systems, Heating Systems
Cooling
Water Furnace NXV095 3,200 CFM · Wshp ×1
5 projects · most recent 03/20/2026
Sprinkler System
FiledStatusContractorScope
03/20/2026Permit IssuedPreferred Sprinkler and Mechanical199 heads
10/30/2023——Sprinkler System
07/28/2023Permit IssuedRRP Plumbing—
01/23/2023Signed-offPSI Partners—
07/07/2021Permit IssuedAllstate Sprinkler—
14 projects · most recent 07/31/2026
Water/Sanitary Gas Plumbing-Sprinkler
FiledStatusContractorScope
07/31/2026Permit IssuedTesterman Plumbing & HeatingGas, Water/Sanitary
03/20/2026Permit IssuedA&A PlumbingWater/Sanitary
07/25/2025——Water/Sanitary
06/26/2025Permit IssuedAriana ContractingGas, Water/Sanitary
04/22/2025Permit IssuedAP Plumbing & HVACGas, Water/Sanitary
02/24/2025Permit IssuedA&H Express Plumbing & HeatingWater/Sanitary
06/27/2024——Water/Sanitary
05/13/2024Permit IssuedAriana ContractingGas, Water/Sanitary
02/05/2024Signed-offRRP PlumbingWater/Sanitary
06/14/2023Permit IssuedA&H Express Plumbing & HeatingGas, Plumbing-Sprinkler, Water/Sanitary
06/07/2023Signed-offT&T PlumbingGas, Water/Sanitary
05/26/2021Signed-offA&A PlumbingWater/Sanitary
09/12/2019——Water/Sanitary
08/27/2019Signed-offMarathon MechanicalWater/Sanitary
25 projects · most recent 09/25/2026
General Wiring
FiledStatusContractorScope
09/25/2026CompleteAsset ElectricGeneral Wiring
09/16/2026Permit IssuedTrinity Metro ElectricalGeneral Wiring
08/05/2026Permit IssuedVoltage Electric—
04/09/2026Permit IssuedP.E. StoneGeneral Wiring
03/11/2026Permit IssuedMac Elect'l ContractingGeneral Wiring
09/26/2025CompleteLippolis ElectricGeneral Wiring
07/24/2025Permit IssuedKnight Electrical ServiceGeneral Wiring
06/23/2025Permit IssuedVoltage ElectricGeneral Wiring
12/09/2024CancelledBrandl ElectricGeneral Wiring
08/13/2024Permit IssuedTop Shelf Electric—
06/13/2024CompleteEnnell Group ElectricGeneral Wiring
05/21/2024CompleteEnnell Group ElectricGeneral Wiring
03/13/2024CompleteAgir Electrical Ltd D/B/AGeneral Wiring
09/06/2023Permit IssuedA.C. Morgan ElectricGeneral Wiring
08/16/2023CompletePower Surge ElectricGeneral Wiring
3 projects · most recent 03/20/2026
Concrete Steel Wood
FiledStatusContractorScope
03/20/2026Permit IssuedA&A PlumbingConcrete
09/22/2025——Steel, Wood
10/04/2023——Concrete
1 project · most recent 03/04/2025
FiledStatusContractorScope
03/04/2025Permit IssuedJC Santana Contracting Co—
▾Field Inspections (DOB CAP) — 64
DateTypeResultReport
06/25/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/14/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
11/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/29/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/01/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/01/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/27/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/15/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/09/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/10/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/01/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/06/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/30/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/18/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
Latest 25 of 64.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
10/14/2026FinalSEAN CUNNINGHAMprogress
10/14/2026Mechanical Systems—special
07/13/2026Tenant Protection Plan ComplianceJacky Philibertspecial
07/13/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
07/13/2026FinalDavid Merabyanprogress
07/13/2026MasonryDavid Merabyanspecial
07/13/2026Post-installed AnchorsDavid Merabyanspecial
06/30/2026Tenant Protection Plan Compliance—special
06/30/2026Post-installed AnchorsDavid Merabyanspecial
06/30/2026FinalDavid Merabyanprogress
06/30/2026MasonryDavid Merabyanspecial
06/30/2026Structural Stability – Alterations of existing buildingsDavid Merabyanspecial
02/12/2026Maintenance informationJOSEPH FREGLETTEenergy_progress
02/12/2026Fire-Resistance Rated ConstructionJOSEPH FREGLETTEprogress
02/12/2026MeteringJOSEPH FREGLETTEenergy_progress
02/12/2026Post-installed AnchorsJOSEPH FREGLETTEspecial
02/12/2026HVAC-R and service water heating system controlsJOSEPH FREGLETTEenergy_progress
02/12/2026Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
02/12/2026Structural Stability – Alterations of existing buildingsJOSEPH FREGLETTEspecial
02/12/2026Duct leakage testing, insulation and designJOSEPH FREGLETTEenergy_progress
02/12/2026Interior lighting powerJOSEPH FREGLETTEenergy_progress
02/12/2026Post-installed AnchorsJOSEPH FREGLETTEspecial
02/12/2026Lighting controlsJOSEPH FREGLETTEenergy_progress
02/12/2026Post-installed AnchorsJOSEPH FREGLETTEspecial
02/12/2026Fire-Resistant Penetrations and JointsJOSEPH FREGLETTEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Windels MarxOfficeFloors 18, 21–24
Project M01358542 Alteration · Permit Entire · 03/11/2026
OrsidOfficeFloor 6
Project M01275978 Alteration · Permit Entire · 09/04/2025
RoomiesResidentialFloors 67, 68
Project M01246374 Alteration · Permit Entire · 06/26/2025
CaleresOfficeFloors 14–16
Project M00923334 Alteration · LOC Issued · 08/31/2023
Project M00296716 Alteration · LOC Issued · 02/18/2020
Project M00296973 Alteration · LOC Issued · 02/18/2020
TaimRestaurant / Food ServiceFloor 1
Project M08028615 Alteration · LOC Issued · 11/15/2022
Project M00705501 Alteration · Permit Entire · 06/27/2022
NYPD Emerald SocietyPrivate clubFloors 7, 9, 18
Project M07996067 Alteration · Permit Entire · 09/19/2022
Project M07996093 Alteration · LOC Issued · 09/19/2022
CityspireOfficeFloors 8, 11
Project M07994472 Alteration · LOC Issued · 09/16/2022
Project M07994443 Alteration · Permit Entire · 09/15/2022
Project M07994493 Alteration · LOC Issued · 09/15/2022
Project M07994505 Alteration · Permit Entire · 09/15/2022
Project M00539408 Alteration · LOC Issued · 08/17/2021
Project M00539418 Alteration · LOC Issued · 08/17/2021
Project M00539430 Alteration · LOC Issued · 08/17/2021
Project M00539450 Alteration · LOC Issued · 08/17/2021
R.J. O'brien & AssociatesOfficeFloor 8
Project M00593650 Alteration · LOC Issued · 09/24/2021
Project M00593669 Alteration · LOC Issued · 09/24/2021
Project M00593707 Alteration · LOC Issued · 09/24/2021
Project M00593736 Alteration · LOC Issued · 09/24/2021
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 4,773 on file (BIS + DOB NOW)
▸Plans & Drawings157
▸DOB NOWPlans/Sketch121
10/20/2026M01474669-I1Request digital key ↗
10/16/2026M01474669-I1Request digital key ↗
09/03/2026M00511792-I1Request digital key ↗
Showing 3 of 121 on file for this type
▸DOB NOWPlans/Sketch - Plumbing11
09/05/2026M00207881-I1Request digital key ↗
09/05/2026M00211550-I1Request digital key ↗
09/05/2026M00211550-P1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler10
09/05/2026M00211521-I1Request digital key ↗
09/05/2026M00232005-I1Request digital key ↗
09/05/2026M00296973-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems9
09/05/2026M00207933-I1Request digital key ↗
09/05/2026M00211534-I1Request digital key ↗
09/05/2026M00232001-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
09/05/2026M00121383-I1Request digital key ↗
09/05/2026M00121383-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00135265-I1Request digital key ↗
09/04/2026M00428518-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
09/04/2026M00448850-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/05/2026M00233055-I1Request digital key ↗
▸Applications & Permits859
▸BISPLAN / WORK APPROVAL APPLICATION500
09/13/2024140680467Open ↗
04/12/2024104693431Open ↗
04/12/2024104567032Open ↗
Showing 3 of 500 on file for this type
▸BISWORK PERMIT APPLICATION355
03/26/2025140680467Open ↗
02/14/2025140680467Open ↗
10/04/2024140680467Open ↗
Showing 3 of 355 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Seals & Professional Certifications1,277
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION553
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 553 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature152
10/16/2026M01474669-I1Open ↗
10/07/2026M01461314-I1Open ↗
09/05/2026M00121383-I1Open ↗
Showing 3 of 152 on file for this type
▸DOB NOWProgress Inspector Seal & Signature148
10/19/2026M01474669-I1Open ↗
10/03/2026M00448850-I1Open ↗
10/03/2026M00448850-I1Open ↗
Showing 3 of 148 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature134
10/03/2026M00448850-I1Open ↗
09/29/2026M00876085-I1Open ↗
09/29/2026M00207933-I1Open ↗
Showing 3 of 134 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST104
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 104 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT90
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 90 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 71 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPC FULL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment398
▸BISSELF-CERT PLUMBING NOTICE133
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 133 on file for this type
▸BISSCHEDULE B - PLUMBING94
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 94 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE87
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 87 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA58
04/15/2024104896301Open ↗
05/10/2022104244417Open ↗
12/07/2021102555717Open ↗
Showing 3 of 58 on file for this type
▸BISSPRINKLER INSP REPORT : FP-8515
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 15 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection65
▸BISTenant Protection Plan and Notes43
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 43 on file for this type
▸DOB NOWTenant Protection Plan20
09/05/2026M00211550-I1Open ↗
09/05/2026M00211550-P1Open ↗
09/05/2026M00232001-I1Open ↗
Showing 3 of 20 on file for this type
▸BISTPP1: TENANT PROTECTION PLAN2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Environmental & Asbestos387
▸BISASBESTOS: CERTIFICATION (DEP ACP5)139
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 139 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report135
09/05/2026M00207881-I1Open ↗
09/05/2026M00211550-P1Open ↗
09/05/2026M00211550-I1Open ↗
Showing 3 of 135 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'111
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 111 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance293
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS152
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 152 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS58
06/14/2022140990854Open ↗
Showing 1 of 58 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY25
06/14/2022140990854Open ↗
Showing 1 of 25 on file for this type
▸BISTR8: Energy Code Progress Inspections13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.11
09/03/2026M00590292-I1Open ↗
09/03/2026M00593650-I1Open ↗
Showing 2 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)6
09/11/2024140680467Open ↗
05/24/2023122045438Open ↗
02/09/2022123585147Open ↗
Showing 3 of 6 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS4
09/11/2024140680467Open ↗
05/24/2023122045438Open ↗
05/24/2023122045438Open ↗
Showing 3 of 4 on file for this type
▸BISLIGHTING IN DWELLING UNITS2
09/11/2024140680467Open ↗
05/24/2023122045438Open ↗
▸BISNYCECC ANALYSIS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports48
▸BISTECHNICAL REPORT: RESPONSIBILITY41
02/06/2023102996885Open ↗
01/31/2023102996885Open ↗
01/31/2023102996885Open ↗
Showing 3 of 41 on file for this type
▸BISHYDRAULIC FLOW CALCULATIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸Approvals, Objections & Sign-offs333
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST214
09/19/2025140680467Open ↗
06/11/2025123585156Open ↗
04/18/2024104896301Open ↗
Showing 3 of 214 on file for this type
▸BISADMINISTRATIVE OBJECTIONS93
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 93 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION13
06/14/2023123691987Open ↗
12/15/2022123770268Open ↗
Showing 2 of 13 on file for this type
▸BISSUPERSEDING LETTER5
03/26/2025140680467Open ↗
Showing 1 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISFINAL3
05/24/2023122045438Open ↗
02/09/2022123585147Open ↗
02/09/2022123585156Open ↗
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership461
▸BISCOST AFFIDAVIT435
02/27/2023123531393Open ↗
02/06/2023102996885Open ↗
06/14/2022140990854Open ↗
Showing 3 of 435 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW323
09/18/2025140680467Open ↗
04/16/2024104896301Open ↗
05/24/2023122045438Open ↗
Showing 3 of 23 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Filing & Intake Forms423
▸BISEFILING COVER SHEET231
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 231 on file for this type
▸BISBOROUGH INTAKE FORM103
03/26/2025140680467Open ↗
03/13/2025140680467Open ↗
02/14/2025140680467Open ↗
Showing 3 of 103 on file for this type
▸BISADDITIONAL INFORMATION71
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 71 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸Other Documents48
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION22
04/12/2024104693431Open ↗
04/12/2024104567032Open ↗
04/12/2024104373438Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISPLOT DIAGRAM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWManufacturer's Specifications2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWIRA Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type