← Back
BuildNYC
Elevator cooperative
176 WEST 87TH STREET
MANHATTAN · BIN 1032218
💬 Discuss this project
1918Year Built
13Stories
D4Building Class
C1-9Zoning
117,216 sfGross Floor Area
89Units
LL97 CoveredRent Stabilized14 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 176 West 87th St Owners Co. C/O BHS · 12,250 sf lot · 9.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsAkam Associates, INC.1 filing
RoofMain roof replacement and drain replacement1p · 1 filing · 3 docs
Floor 13Main roof replacement and drain replacement1 filing · 3 docs
Floor 12Unit 12A1 filing · 9 docs
Floor 11Unit 11C3 filings · 15 docs
Floor 10Unit 10F3 filings · 15 docs
Floor 9Unit 9B, Unit 9C, Unit 9F4 filings · 15 docs
Floor 8Unit 8H1p · 3 filings · 15 docs
Floor 7Unit 7B, Unit 7C1p · 4 filings · 15 docs
Floor 6Unit 6C2 filings · 15 docs
Floor 5
Floor 4Unit 4E1p · 2 filings · 15 docs
Floor 3
Floor 2Unit 1H, Unit 2C, Unit 2D3p · 3 filings · 15 docs
Floor 1Unit 1C, Unit 1H2p · 3 filings · 15 docs
BasementInterior fitout alterations for The Granola Bar Restaurant1p · 1 filing · 3 docs
Site & exteriorHeavy duty sidewalk shed installation2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
176 West 87th St Owners10303/22/2026
Willkie Farr & Gallagher403/21/2026
Gerard J Picaso403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates403/21/2026
DI Dio Architecture2203/21/2026
AE Design Solution403/21/2026
First Image Project Design303/21/2026
Milrose Consultants103/21/2026
Big Orange Expediting1203/21/2026
J.A.M. Associates1003/21/2026
Naphtali Deutsch Architecture503/21/2026
GC Expediting403/21/2026
J Callahan Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Premier Source ConstructionGeneral Contractor603/21/2026
Slon DevelopmentGeneral Contractor507/08/2026
D.M.A. General ContractingGeneral Contractor507/08/2026
Phoenix Sutton STRScaffold507/08/2026
Inter RenovationGeneral Contractor303/21/2026
Concept General ContractingGeneral Contractor307/08/2026
Acny DevelopersGeneral Contractor303/21/2026
Adi EastGeneral Contractor307/08/2026
Scuttari ConstructionGeneral Contractor303/21/2026
P.T. Construction GroupGeneral Contractor303/21/2026
KitchenbarnGeneral Contractor303/21/2026
Water Dynamic P & HPlumbing207/08/2026
Hamilton Air CompanyGeneral Contractor207/08/2026
Stanley Ruth CoGeneral Contractor203/21/2026
Demar MechanicalPlumbing207/08/2026
Prime Piping & HeatingPlumbing207/08/2026
Smart Plumbing & HeatingPlumbing207/08/2026
Superb Plumbing & HeatingPlumbing207/08/2026
Evolution InteriorsGeneral Contractor104/09/2026
Nice PlumbingPlumbing107/08/2026
Salzman Electric CoElectrical103/21/2026
Gold Star Electric ContractorsElectrical103/21/2026
Ohm's ElectricalElectrical103/21/2026
Elpo Electrical ContgElectrical103/22/2026
Denmar ElectricElectrical103/22/2026
Creggan ElectrialElectrical103/22/2026
P.E.S. Electric ServiceElectrical103/21/2026
Star Construction & DesGeneral Contractor107/08/2026
Trincity ElectricElectrical103/21/2026
Coastline Plumbing & HeatingPlumbing107/08/2026
P.S.I. MechanicalPlumbing107/08/2026
G. & S. Plumbing & Heating CoPlumbing107/08/2026
Marathon MechanicalPlumbing107/08/2026
New York Park Plumbing & Heating CoPlumbing107/08/2026
Shuir Electrical ContractorsElectrical103/22/2026
Y.S. ElectricElectrical103/21/2026
Paul's ElectricElectrical103/21/2026
Modern Trend Electrical ContractingElectrical103/22/2026
Mac Elect'l ContractingElectrical103/22/2026
Lights by Jay ElectricalElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Katz Architecture1371109/25/2026
P.a.collins Inspections P2168304/23/2025
DI Dio Architecture9224403/28/2025
Lydon Associate5183108/27/2024
Philibert Engineering223102/28/2024
Capobianco Engineering GR6763102/28/2024
AA Building & Inspection1519110/06/2023
Milrose Consultants2003109/29/2023
Bruno Kearney Architects3065407/15/2023
Project Tactical Solution5859406/29/2023
Catalpa Special Inspectio2004208/11/2022
Structural Engineering Integ4174207/19/2022
Hamann Engineering4949207/19/2022
Gea Consulting Engineers945104/21/2022
SA-DA Architecture2640301/06/2022
JS Building Consulting4959201/20/2021
Building Lifecycle
All (300)Filed (56)Permit Issued (46)Signed Off (29)Facade (FISP) (11)Violation (55)Inspection (35)Objection (38)Special Inspection (30)
09/25/2026
Filed — Alteration
ADDITION OF FIRE-RATED TRASH ROOMS WITH FIRE-RATED DOORS ON ALL FLOORS. RELOCATION OF FIRE-RATED CORRIDOR DOORS. MODIFICATIONS TO FINISHES AS PER NEW LAYOUT.
M01452471-I1
09/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
David Katz
09/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Katz
08/27/2026
Special inspection requirement — Final
David Katz
05/20/2026
Signed off — Alteration
PROPOSED MECHANICAL WORK TO APARTMENT #11C, REPLACEMENT OF AIR CONDITIONING SYSTEM WITH NEW SPLIT UNIT A/C HANDLING UNITS, DUCTWORK, AND AIR DISTRIBUTION SYSTEM.
M01089119-I1
05/14/2026
Permit issued — Mechanical Systems
M01089119-I1-MS
05/13/2026
Signed off — Alteration
HEREBY FILING PLUMBING WORK AT 11TH FLOOR UNIT 11C AS PER PLANS. WORK TO INCLUDE NEW PLUMBING FIXTURES AND REMOVAL OF GAS PIPING.
M01089141-I1
12/23/2025
Signed off — Alteration
M01088794-I1
10/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/01/2025
Signed off — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-S1
09/29/2025
Signed off — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-I1
09/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/04/2025
Permit issued — General Construction
M01104225-I1-GC
05/14/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Collins
05/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Collins
05/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
04/23/2025
Filed — Alteration
HEREBY FILING PLUMBING WORK AT 11TH FLOOR UNIT 11C AS PER PLANS. WORK TO INCLUDE NEW PLUMBING FIXTURES AND REMOVAL OF GAS PIPING.
M01089141-P1
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
04/08/2025
Special inspection requirement — Final
LEILA COLBERT
04/08/2025
Special inspection requirement — Energy Code Compliance Inspections
LEILA COLBERT
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
04/08/2025
Special inspection requirement — Lighting in dwelling units
LEILA COLBERT
03/28/2025
Filed — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-P1
03/28/2025
Filed — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-P2
03/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Daniel DiDio
03/24/2025
Signed off — Alteration
M00971364-I1
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/13/2024
Signed off — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops.
M01014782-I1
10/30/2024
Permit issued — Mechanical Systems
M01089119-I1-MS
10/30/2024
Permit issued — Plumbing
M01089141-I1-PL
10/22/2024
Permit issued — Suspended Scaffold
M01014782-P1-SC
10/21/2024
Permit issued — Plumbing
M01104225-S1-PL
10/18/2024
Permit issued — General Construction
M01088794-I1-GC
10/16/2024
Permit issued — General Construction
M01104225-I1-GC
10/10/2024
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops.
M01014782-P1
09/25/2024
Filed — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-S1
09/25/2024
Filed — Alteration
RENOVATION OF EXISTING APARTMENT - 9C, NEW PARTITIONS, MODIFICATIONS TO EXISTING BATHROOM, MODIFICATIONS TO EXISTING KITCHEN.
M01104225-I1
09/20/2024
Signed off — Alteration
Apartment renovation with plumbing fixture changes.
M00890164-S1
09/20/2024
Signed off — Alteration
Apartment renovation with plumbing fixture changes.
M00890164-I1
08/29/2024
Filed — Alteration
HEREBY FILING PLUMBING WORK AT 11TH FLOOR UNIT 11C AS PER PLANS. WORK TO INCLUDE NEW PLUMBING FIXTURES AND REMOVAL OF GAS PIPING.
M01089141-I1
08/27/2024
Filed — Alteration
PROPOSED MECHANICAL WORK TO APARTMENT #11C, REPLACEMENT OF AIR CONDITIONING SYSTEM WITH NEW SPLIT UNIT A/C HANDLING UNITS, DUCTWORK, AND AIR DISTRIBUTION SYSTEM.
M01089119-I1
08/27/2024
Filed — Alteration
M01088794-I1
08/23/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2024
Signed off — Alteration
Application filed to renovate existing Apt #2D. Minor work to non load bearing partitions walls. Renew Kitchen and Bathroom layouts. No change in occupancy use or egress.
M00939107-S1
08/15/2024
Signed off — Alteration
Application filed to renovate existing Apt #2D. Minor work to non load bearing partitions walls. Renew Kitchen and Bathroom layouts. No change in occupancy use or egress.
M00939107-I1
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Collins
08/07/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Collins
08/07/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Collins
08/07/2024
Special inspection requirement — Maintenance information
Paul Collins
08/07/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Collins
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Collins
07/31/2024
Special inspection requirement — Final
Paul Collins
07/31/2024
Special inspection requirement — Mechanical Systems
Paul Collins
07/10/2024
Filed — Alteration
Apartment renovation with plumbing fixture changes.
M00890164-P2
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offHamilton Air Company05/14/2026
DOB NOWGeneral ConstructionSigned-offConcept General Contracting06/04/2025
DOB NOWMechanical SystemsSigned-offHamilton Air Company10/30/2024
DOB NOWPlumbingSigned-offCoastline Plumbing & Heating10/30/2024
DOB NOWSuspended ScaffoldPermit IssuedInter Renovation10/22/2024
DOB NOWPlumbingSigned-offDemar Mechanical10/21/2024
DOB NOWGeneral ConstructionSigned-offEvolution Interiors10/18/2024
DOB NOWGeneral ConstructionSigned-offConcept General Contracting10/16/2024
DOB NOWGeneral ConstructionSigned-offInter Renovation03/28/2024
DOB NOWSuspended ScaffoldSigned-offInter Renovation03/19/2024
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR03/04/2024
DOB NOWGeneral ConstructionSigned-offAdi East11/30/2023
DOB NOWPlumbingSigned-offP.S.I. Mechanical10/27/2023
DOB NOWGeneral ConstructionSigned-offStar Construction & Des10/25/2023
DOB NOWGeneral ConstructionSigned-offP.T. Construction Group10/13/2023
DOB NOWGeneral ConstructionSigned-offAdi East10/10/2023
DOB NOWPlumbingSigned-offDemar Mechanical08/30/2023
DOB NOWGeneral ConstructionSigned-offConcept General Contracting08/29/2023
DOB NOWGeneral ConstructionSigned-offScuttari Construction06/08/2023
DOB NOWPlumbingSigned-offMarathon Mechanical05/25/2023
DOB NOWGeneral ConstructionPermit IssuedKats, Jason05/17/2023
DOB NOWStructuralPermit IssuedKats, Jason05/17/2023
DOB NOWGeneral ConstructionSigned-offSlon Development05/16/2023
DOB NOWGeneral ConstructionSigned-offSlon Development05/16/2023
DOB NOWPlumbingSigned-offSuperb Plumbing & Heating02/07/2023
DOB NOWMechanical SystemsSigned-offStanley Ruth Co11/15/2022
DOB NOWPlumbingSigned-offNew York Park Plumbing & Heating Co10/18/2022
DOB NOWPlumbingSigned-offSmart Plumbing & Heating09/09/2022
DOB NOWPlumbingSigned-offSmart Plumbing & Heating09/02/2022
DOB NOWStructuralPermit IssuedKats, Jason08/23/2022
DOB NOWGeneral ConstructionSigned-offPremier Source Construction08/18/2022
DOB NOWGeneral ConstructionSigned-offSlon Development08/12/2022
DOB NOWGeneral ConstructionPermit IssuedKats, Jason08/10/2022
DOB NOWMechanical SystemsSigned-offSlon Development08/08/2022
DOB NOWPlumbingSigned-offNice Plumbing04/27/2022
DOB NOWGeneral ConstructionSigned-offAcny Developers04/25/2022
DOB NOWPlumbingSigned-offG. & S. Plumbing & Heating Co04/20/2022
DOB NOWGeneral ConstructionSigned-offPremier Source Construction03/25/2022
DOB NOWPlumbingSigned-offPrime Piping & Heating10/15/2021
DOB NOWPlumbingSigned-offHydro Plumbing & Heating09/14/2021
+ 56 more permits on file
1 project · most recent 07/19/2022
Water/Sanitary
FiledStatusContractorScope
07/19/2022Signed-offNew York Park Plumbing & Heating CoWater/Sanitary
25 projects · most recent 06/26/2026
General Wiring
FiledStatusContractorScope
06/26/2026Permit IssuedShuir Electrical ContractorsGeneral Wiring
04/21/2026CompleteRM Electric CoGeneral Wiring
09/14/2025Permit IssuedTM Select ElectricGeneral Wiring
06/16/2025Permit IssuedKings Electric CoGeneral Wiring
02/05/2025Permit IssuedElectl Contg Solutions CoGeneral Wiring
12/17/2024CompleteV.I.P. Electl ContractingGeneral Wiring
11/08/2024CompleteCreggan Electrial—
09/11/2024CompleteSmart Electric Services—
02/29/2024CompleteElpo Electrical Contg—
02/05/2024CompleteDenmar ElectricGeneral Wiring
11/03/2023CompleteJoseph Weinstein ElectricGeneral Wiring
11/02/2023Permit IssuedElectl Contg Solutions CoGeneral Wiring
10/10/2023CompleteElectl Contg Solutions CoGeneral Wiring
08/30/2023CompleteCreggan ElectrialGeneral Wiring
06/21/2023CompleteMac Elect'l ContractingGeneral Wiring
2 projects · most recent 07/19/2022
Steel
FiledStatusContractorScope
07/19/2022Permit IssuedD.M.A. General ContractingSteel
01/25/2022——Steel
▾Field Inspections (DOB CAP) — 35
DateTypeResultReport
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/23/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/30/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/03/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/19/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/13/2023Pass-Final General Construction Non-Directive 14PassView ↗
09/26/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/02/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/06/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 35.
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
09/16/2026Tenant Protection Plan Compliance—special
09/08/2026Fire-Resistance Rated ConstructionDavid Katzprogress
09/04/2026Fire-Resistant Penetrations and JointsDavid Katzspecial
08/27/2026FinalDavid Katzprogress
05/08/2025HVAC-R and service water piping design and insulationPaul Collinsenergy_progress
05/08/2025Energy Code Compliance InspectionsPaul Collinsprogress
05/08/2025Fire-Resistant Penetrations and JointsPaul Collinsspecial
04/08/2025Lighting in dwelling unitsLEILA COLBERTenergy_progress
04/08/2025Fire-Resistant Penetrations and JointsDaniel DiDiospecial
04/08/2025FinalLEILA COLBERTprogress
04/08/2025Fire-Resistant Penetrations and JointsDaniel DiDiospecial
04/08/2025Energy Code Compliance InspectionsLEILA COLBERTprogress
03/28/2025Fire-Resistant Penetrations and JointsDaniel DiDiospecial
08/07/2024HVAC-R and service water heating system controlsPaul Collinsenergy_progress
08/07/2024Fire-Resistant Penetrations and JointsPaul Collinsspecial
08/07/2024Maintenance informationPaul Collinsenergy_progress
08/07/2024HVAC-R and service water piping design and insulationPaul Collinsenergy_progress
08/07/2024Energy Code Compliance InspectionsPaul Collinsprogress
08/07/2024HVAC-R and service water heating equipmentPaul Collinsenergy_progress
07/31/2024Mechanical SystemsPaul Collinsspecial
07/31/2024FinalPaul Collinsprogress
09/25/2023Tenant Protection Plan ComplianceYounes Abouyaalaspecial
09/25/2023Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/25/2023Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/25/2023Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
Latest 25 of 79.
▾Documents — 1,164 on file (BIS + DOB NOW)
▸Plans & Drawings58
▸DOB NOWPlans/Sketch44
10/04/2026M01452471-I1Request digital key ↗
09/02/2026M00716342-I1Request digital key ↗
09/02/2026M00716342-P1Request digital key ↗
Showing 3 of 44 on file for this type
▸DOB NOWPlans/Sketch - Plumbing8
09/04/2026M00333067-I1Request digital key ↗
09/03/2026M00459662-P1Request digital key ↗
09/03/2026M00459662-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/04/2026M00345665-P1Request digital key ↗
09/04/2026M00345665-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00345665-P1Request digital key ↗
09/04/2026M00345665-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/15/2026M00328632-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00451665-I1Request digital key ↗
▸Applications & Permits236
▸BISPLAN / WORK APPROVAL APPLICATION129
05/22/2023123254487Open ↗
05/11/2023123254487Open ↗
04/17/2023123254487Open ↗
Showing 3 of 129 on file for this type
▸BISWORK PERMIT APPLICATION106
09/30/2022123254487Open ↗
09/30/2022123254487Open ↗
09/14/2021123254487Open ↗
Showing 3 of 106 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications264
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION91
03/04/2020123570858Open ↗
02/25/2020123843555Open ↗
10/30/2019123697008Open ↗
Showing 3 of 91 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature54
10/04/2026M01452471-I1Open ↗
09/04/2026M00333067-P1Open ↗
09/04/2026M00333067-I1Open ↗
Showing 3 of 54 on file for this type
▸DOB NOWProgress Inspector Seal & Signature38
10/05/2026M01452471-I1Open ↗
09/02/2026M00767566-S2Open ↗
09/02/2026M01089119-I1Open ↗
Showing 3 of 38 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/05/2026M01452471-I1Open ↗
09/02/2026M00767566-S2Open ↗
09/02/2026M01089119-I1Open ↗
Showing 3 of 29 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT19
02/25/2020123843555Open ↗
Showing 1 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST15
02/25/2020123843555Open ↗
Showing 1 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY6
07/07/2020140911592Open ↗
Showing 1 of 6 on file for this type
▸Trade Schedules & Equipment92
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE35
04/20/2020123850822Open ↗
04/13/2020123850822Open ↗
10/18/2019123850822Open ↗
Showing 3 of 35 on file for this type
▸BISSCHEDULE B - PLUMBING29
05/22/2023123254487Open ↗
05/11/2023123254487Open ↗
04/17/2023123254487Open ↗
Showing 3 of 29 on file for this type
▸BISSELF-CERT PLUMBING NOTICE26
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 26 on file for this type
▸BISPLUMBING (PL) SIGNOFF1
04/21/2021123850822Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection25
▸BISTenant Protection Plan and Notes17
07/07/2020140911592Open ↗
04/24/2020123570858Open ↗
02/25/2020123843555Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWTenant Protection Plan8
09/04/2026M00345665-P1Open ↗
09/04/2026M00345665-I1Open ↗
09/03/2026M00287859-P1Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos91
▸DOB NOWDEP ACP-5: Asbestos Assessment Report48
10/04/2026M01452471-I1Open ↗
09/03/2026M00459662-P2Open ↗
09/03/2026M00459662-P1Open ↗
Showing 3 of 48 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)30
04/24/2020123570858Open ↗
10/30/2019123697008Open ↗
05/01/2019123850822Open ↗
Showing 3 of 30 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/07/2020140911592Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/04/2026M00333067-I1Open ↗
▸Energy Compliance98
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS45
02/25/2020123843555Open ↗
10/30/2019123697008Open ↗
10/15/2019123596572Open ↗
Showing 3 of 45 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS23
09/20/2021123697008Open ↗
06/09/2021123843555Open ↗
06/09/2021123570858Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY14
11/01/2022123290410Open ↗
09/24/2021140911592Open ↗
09/20/2021123697008Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS4
07/07/2020140911592Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis4
09/02/2026M00769786-I1Open ↗
08/14/2026M00679960-I1Open ↗
Showing 2 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
03/30/2023123290410Open ↗
09/24/2021140911592Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTR8: Energy Code Progress Inspections2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY23
03/16/2023123290410Open ↗
11/01/2022123290410Open ↗
09/24/2021140911592Open ↗
Showing 3 of 23 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: PILE DRIVING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSTRUCTURAL STEEL - WELDING1
03/27/2023123290410Open ↗
▸BISDEMOLITION1
03/27/2023123290410Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
03/27/2023123290410Open ↗
▸Approvals, Objections & Sign-offs57
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST29
04/18/2023123290410Open ↗
09/24/2021140911592Open ↗
09/20/2021123697008Open ↗
Showing 3 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION12
11/23/2020123697008Open ↗
05/01/2019123850822Open ↗
05/01/2019123850822Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISSUPERSEDING LETTER4
09/14/2021123254487Open ↗
01/15/2021140562004Open ↗
Showing 2 of 4 on file for this type
▸BISFINAL1
03/27/2023123290410Open ↗
▸BISLANDMARKS APPROVAL1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership80
▸BISCOST AFFIDAVIT75
09/24/2021140911592Open ↗
09/20/2021123697008Open ↗
07/16/2021140911592Open ↗
Showing 3 of 75 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
03/30/2023123290410Open ↗
03/29/2021140562004Open ↗
▸Filing & Intake Forms116
▸BISADDITIONAL INFORMATION40
04/19/2023123254487Open ↗
02/16/2021123850822Open ↗
02/08/2021140911592Open ↗
Showing 3 of 40 on file for this type
▸BISEFILING COVER SHEET37
03/04/2020123570858Open ↗
02/25/2020123843555Open ↗
10/30/2019123697008Open ↗
Showing 3 of 37 on file for this type
▸BISBOROUGH INTAKE FORM30
09/30/2022123254487Open ↗
09/30/2022123254487Open ↗
09/14/2021123254487Open ↗
Showing 3 of 30 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET9
07/07/2020140911592Open ↗
Showing 1 of 9 on file for this type
▸Other Documents15
▸BISPlot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDHCR Document3
08/13/2026M00939107-P1Open ↗
08/13/2026M00939107-S1Open ↗
08/13/2026M00939107-I1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/26/2026M01014782-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWCalculations2
08/26/2026M01014782-I1Open ↗
08/13/2026M01014782-P1Open ↗
▸BISDHCR DOCUMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISLOCAL LAW 58/1987 WAIVER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type