Office with commercial, 7-19 stories
205 WEST 28TH STREET
MANHATTAN · BIN 1014262
💬 Discuss this project
2020Year Built
12Stories
O6Building Class
M1-8A/R12Zoning
87,620 sfGross Floor Area
13Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Office with commercial, 7-19 stories · Owner of record: W 28th Development · 7,269 sf lot · 12.05 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projects1241 Broadway LLC2 filings
RoofGdsny5p · 4 filings · 14 docs
Floor 12W 28th Development LLC30p · 6 filings · 3 docs
Floor 11W28th Development LLC24p · 1 filing · 20 docs
Floor 10W28th Development LLC27p · 1 filing · 20 docs
Floor 9W28th Development LLC26p · 1 filing · 19 docs
Floor 8GDSNY33p · 4 filings
Floor 7GDSNY, FD Wellness50p · 4 filings
Floor 6W 28th Development LLC42p · 4 filings
Floor 5W28th Development LLC25p · 1 filing · 20 docs
Floor 4W28th Development LLC27p · 1 filing · 20 docs
Floor 3GDSNY11p · 1 filing · 13 docs
Floor 2GDSNY27p · 3 filings · 20 docs
Floor 1Joe and the Juice, GDSNY +124p · 10 filings · 20 docs
CellarGDSNY, Bliss Fasman28p · 8 filings · 20 docs
Site & exteriorJoe and the Juice, Haymarket10 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
W28TH Development28307/08/2026
1241 Broadway2807/08/2026
Met Tower Owner2407/08/2026
322-326 7th Ave Realty1703/21/2026
Titan Industrial Services503/22/2026
W 28th Renewal403/21/2026
GDSNY103/22/2026
Partner103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/18/2025$80.8M—W 28TH DEVELOPMENT LLC → 322 7TH AVE OWNER LLC$922/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Metropolis Group16803/21/2026
Louis Striar803/21/2026
Domani Consulting103/21/2026
Building Brothers403/21/2026
PCS Engineering103/21/2026
Structuretech NY103/21/2026
A1 Expediting Service1203/21/2026
Arra Architecture103/21/2026
AE Design Solution203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triton Construction CoGeneral Contractor4107/08/2026
TTM GroupFire Protection1807/08/2026
S&E Bridge & ScaffoldScaffold1307/08/2026
TT MechanicalPlumbing1207/08/2026
Sage BuildersGeneral Contractor1007/08/2026
Skyline Scaffolding GroupScaffold807/08/2026
Scientific Electl ContsGeneral Contractor503/22/2026
Red Hook Sign and ElectricSign hanger407/08/2026
Practical Plumbing & HeatingPlumbing307/08/2026
Titan Industrial ServiceScaffold303/21/2026
Structuretech New YorkScaffold203/21/2026
Active SignsSign hanger207/08/2026
Alchemy DevelopmentGeneral Contractor207/08/2026
TT MechanicalPlumbing107/08/2026
Delco ElectricalElectrical103/22/2026
Fogarty Finger ArchitectureGeneral Contractor103/22/2026
C.M. Richey Electrical ContractingElectrical103/22/2026
TT MechanicalGeneral Contractor103/22/2026
Nash Electric ServicesElectrical103/22/2026
AL-Lectric Elect'l ContractingElectrical103/22/2026
A&H Express Plumbing & HeatingPlumbing107/08/2026
Dependable MechanicalFire Protection107/08/2026
Practical Plumbing & HeatingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metric Consulting and Ins1803511/20/2025
Domani Inspection Service8436808/21/2025
PCS Engineering3745104/29/2021
Building Lifecycle
All (300)Filed (76)Permit Issued (67)Signed Off (59)Violation (7)Inspection (53)Objection (8)Special Inspection (30)
04/21/2026
Signed off — Alteration
Mechanical work on 1st floor per plans filed herewith. No change in use, egress or occupancy.
M01199726-S4
04/02/2026
Signed off — Alteration
Mechanical work on 1st floor per plans filed herewith. No change in use, egress or occupancy.
M01199726-S1
11/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
11/21/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
11/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/21/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
11/20/2025
Filed — Alteration
Mechanical work on 1st floor per plans filed herewith. No change in use, egress or occupancy.
M01199726-P1
11/19/2025
Special inspection requirement — Mechanical Systems
SAMI HAJJAR P.E
11/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
SAMI HAJJAR P.E
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
SAMI HAJJAR P.E
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMI HAJJAR P.E
11/19/2025
Special inspection requirement — Final
SAMI HAJJAR P.E
11/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
SAMI HAJJAR P.E
11/10/2025
Signed off — Alteration
Mechanical work on 1st floor per plans filed herewith. No change in use, egress or occupancy.
M01199726-S2
11/10/2025
Signed off — Alteration
Mechanical work on 1st floor per plans filed herewith. No change in use, egress or occupancy.
M01199726-I1
10/22/2025
Signed off — Alteration
Installation of Sprinkler heads on 10th floor. No change in Use Egress or Occupancy
M01118470-S2
10/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/05/2025
Signed off — Alteration
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY SIGN - IN PROPERTY LINES - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237373-I1
09/05/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237374-I1
09/05/2025
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - JOE & THE JUICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237371-I1
09/05/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 9TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01142677-S2
09/05/2025
Signed off — Alteration
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY SIGN - IN PROPERTY LINES - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237372-I1
08/29/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 9TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01142677-S3
08/29/2025
Permit issued — Sign
M01237372-I1-SG
08/29/2025
Permit issued — Sign
M01237374-I1-SG
08/29/2025
Permit issued — Sign
M01237371-I1-SG
08/29/2025
Permit issued — Sign
M01237373-I1-SG
08/22/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/21/2025
Filed — Alteration
Installation of Sprinkler heads on 10th floor. No change in Use Egress or Occupancy
M01118470-P1
08/21/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/19/2025
Filed — Alteration
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY SIGN - IN PROPERTY LINES - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237373-I1
08/19/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING DOUBLE-FACE PROJECTING ACCESSORY SIGN - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237374-I1
08/19/2025
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - JOE & THE JUICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237371-I1
08/19/2025
Filed — Alteration
INTERIOR ILLUMINATED NON-ADVERTISING ACCESSORY SIGN - IN PROPERTY LINES - (JOE & THE JUICE LOGO). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01237372-I1
08/18/2025
Special inspection requirement — Final
GHANENDRA MISHRA
08/14/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 9TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01142677-S1
08/14/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 9TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01142677-I1
08/14/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/06/2025
Permit issued — Sign
M01232269-I1-SG
08/06/2025
Permit issued — Sign
M01232291-I1-SG
08/06/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/05/2025
Signed off — Alteration
Removal and Installation of Plumbing Fixtures and Related piping on Cel, 001. No change in Use, Egress, or Occupancy.
M01050185-I1
08/04/2025
Signed off — Alteration
Modification of existing Sprinkler System on 11th floor. No change in Use Egress or Occupancy
M01079234-S1
08/04/2025
Signed off — Alteration
Modification of existing Sprinkler System on 11th floor. No change in Use Egress or Occupancy
M01079234-S3
07/30/2025
Signed off — Alteration
Installation of Sprinkler heads on 10th floor. No change in Use Egress or Occupancy
M01118470-S3
07/30/2025
Signed off — Alteration
INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON 4TH FLOOR AS PER PLANS FILED HEREWITH.
M01142693-S2
07/30/2025
Signed off — Alteration
INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON 4TH FLOOR AS PER PLANS FILED HEREWITH.
M01142693-S1
07/30/2025
Signed off — Alteration
INSTALLATION OF DUCTWORK, DIFFUSERS, FANS AND RELATED MECHANICAL PIPING ON 4TH FLOOR AS PER PLANS FILED HEREWITH.
M01142693-S3
07/30/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 5TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01150250-S3
07/30/2025
Signed off — Alteration
MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 5TH FLOOR. NO CHANGE IN USE , EGRESS, OR OCCUPANCY
M01150250-S2
07/30/2025
Signed off — Alteration
Installation of ductwork, diffusers, fans, and related Mechanical piping as per plans filed herewith. No change in use, egress or occupancy.
M01024347-S1
07/29/2025
Filed — No Work
M01254193-I1
07/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
07/25/2025
Special inspection requirement — Post-installed Anchors
JOHN MCMONAGLE
07/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/23/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offRed Hook Sign and Electric08/29/2025
DOB NOWSignSigned-offRed Hook Sign and Electric08/29/2025
DOB NOWSignSigned-offRed Hook Sign and Electric08/29/2025
DOB NOWSignSigned-offRed Hook Sign and Electric08/29/2025
DOB NOWSignPermit IssuedActive Signs08/06/2025
DOB NOWSignPermit IssuedActive Signs08/06/2025
DOB NOWSprinklersSigned-offDependable Mechanical07/14/2025
DOB NOWGeneral ConstructionSigned-offSage Builders06/11/2025
DOB NOWPlumbingSigned-offA&H Express Plumbing & Heating04/23/2025
DOB NOWMechanical SystemsSigned-offAlchemy Development04/15/2025
DOB NOWGeneral ConstructionSigned-offAlchemy Development04/14/2025
DOB NOWSprinklersSigned-offTTM Group03/17/2025
DOB NOWMechanical SystemsSigned-offTriton Construction Co03/13/2025
DOB NOWGeneral ConstructionSigned-offTriton Construction Co03/13/2025
DOB NOWPlumbingSigned-offTT Mechanical03/13/2025
DOB NOWSprinklersSigned-offTTM Group01/30/2025
DOB NOWPlumbingSigned-offTT Mechanical01/30/2025
DOB NOWPlumbingSigned-offTT Mechanical01/30/2025
DOB NOWSprinklersSigned-offTTM Group01/30/2025
DOB NOWMechanical SystemsSigned-offTriton Construction Co01/27/2025
DOB NOWGeneral ConstructionSigned-offTriton Construction Co01/27/2025
DOB NOWGeneral ConstructionSigned-offTriton Construction Co01/27/2025
DOB NOWMechanical SystemsSigned-offTriton Construction Co01/27/2025
DOB NOWMechanical SystemsSigned-offTriton Construction Co12/05/2024
DOB NOWSprinklersSigned-offTTM Group11/20/2024
DOB NOWPlumbingSigned-offTT Mechanical11/19/2024
DOB NOWGeneral ConstructionSigned-offTriton Construction Co11/12/2024
DOB NOWGeneral ConstructionSigned-offTriton Construction Co08/12/2024
DOB NOWSprinklersSigned-offTTM Group08/08/2024
DOB NOWPlumbingSigned-offTT Mechanical08/08/2024
DOB NOWMechanical SystemsSigned-offTriton Construction Co07/30/2024
DOB NOWMechanical SystemsSigned-offSage Builders07/11/2024
DOB NOWSprinklersSigned-offPractical Plumbing & Heating06/24/2024
DOB NOWGeneral ConstructionSigned-offSage Builders06/20/2024
DOB NOWPlumbingSigned-offPractical Plumbing & Heating06/18/2024
DOB NOWSprinklersSigned-offTTM Group06/13/2024
DOB NOWPlumbingSigned-offTT Mechanical06/13/2024
DOB NOWStructuralSigned-offSage Builders05/17/2024
DOB NOWMechanical SystemsSigned-offTriton Construction Co05/07/2024
DOB NOWGeneral ConstructionSigned-offTriton Construction Co05/06/2024
+ 60 more permits on file
18 projects · most recent 08/05/2025
General Wiring
FiledStatusContractorScope
08/05/2025CompleteTruephase Electrical ContractorsGeneral Wiring
07/17/2025CompleteDelco ElectricalGeneral Wiring
09/16/2024Permit IssuedAL-Lectric Elect'l ContractingGeneral Wiring
03/18/2024Permit IssuedAL-Lectric Elect'l ContractingGeneral Wiring
01/19/2024CompleteDelco ElectricalGeneral Wiring
02/24/2023CompleteDelco Electrical12 meters, 12 new_meters
03/22/2022CompleteC.M. Richey Electrical ContractingGeneral Wiring
02/08/2022CompleteC.M. Richey Electrical ContractingGeneral Wiring
02/08/2022CompleteC.M. Richey Electrical ContractingGeneral Wiring
02/08/2022CompleteC.M. Richey Electrical ContractingGeneral Wiring
07/30/2020CompleteJam Electrical—
05/15/2020CompleteNash Electric Services—
05/11/2020CompleteDelco Electrical—
05/11/2020CompleteDelco ElectricalGeneral Wiring
02/26/2020CompleteNash Electric Services—
▾Field Inspections (DOB CAP) — 53
DateTypeResultReport
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/14/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/23/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/22/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/17/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/08/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/25/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/02/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
05/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/24/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/21/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/24/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/03/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/09/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
Latest 25 of 53.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
11/21/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
11/21/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
11/21/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/21/2025FinalSAMI HAJJAR P.Eprogress
11/21/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/21/2025Mechanical SystemsSAMI HAJJAR P.Especial
11/19/2025Fire-Resistant Penetrations and JointsSAMI HAJJAR P.Especial
11/19/2025Mechanical SystemsSAMI HAJJAR P.Especial
11/19/2025HVAC-R and service water heating system controlsSAMI HAJJAR P.Eenergy_progress
11/19/2025FinalSAMI HAJJAR P.Eprogress
11/19/2025Energy Code Compliance InspectionsSAMI HAJJAR P.Eprogress
11/19/2025HVAC-R and service water heating equipmentSAMI HAJJAR P.Eenergy_progress
08/22/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/22/2025Post-installed AnchorsJOHN MCMONAGLEspecial
08/18/2025FinalGHANENDRA MISHRAprogress
08/06/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/06/2025Post-installed AnchorsJOHN MCMONAGLEspecial
07/25/2025Post-installed AnchorsJOHN MCMONAGLEspecial
07/25/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
07/21/2025FinalGHANENDRA MISHRAprogress
07/10/2025Public Assembly Emergency LightingJOHN MCMONAGLEprogress
06/11/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/11/2025Post-installed AnchorsJOHN MCMONAGLEspecial
05/28/2025FinalLEON SKVIRSKYprogress
05/06/2025Post-installed AnchorsJOHN MCMONAGLEspecial
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Joe and the JuiceRestaurant / Food ServiceFloor 1
Project M01237371 Alteration · LOC Issued · 08/19/2025
Project M01237372 Alteration · LOC Issued · 08/19/2025
Project M01237373 Alteration · LOC Issued · 08/19/2025
Project M01237374 Alteration · LOC Issued · 08/19/2025
Project M01199726 Alteration · LOC Issued · 04/01/2025
HaymarketRetailFloor 1
Project M01232291 Alteration · Permit Entire · 07/03/2025
GDSNYOfficeCellar, Floors 1–3, 7, 8
Project M01050192 Alteration · LOC Issued · 05/17/2024
Project M01050185 Alteration · LOC Issued · 05/16/2024
Project M01048813 Alteration · LOC Issued · 05/14/2024
Project M01024347 Alteration · LOC Issued · 04/16/2024
Project M00662521 Alteration · LOC Issued · 02/01/2022
Project M00662596 Alteration · LOC Issued · 02/01/2022
Bliss FasmanOfficeFloor 1
Project M00936885 Alteration · LOC Issued · 09/28/2023
FD WellnessOfficeFloor 7
Project M00651938 Alteration · LOC Issued · 01/28/2022
Project M00662549 Alteration · LOC Issued · 01/26/2022
Project M00662566 Alteration · LOC Issued · 01/26/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,014 on file (BIS + DOB NOW)
▸Plans & Drawings106
▸DOB NOWPlans/Sketch85
09/03/2026M00494344-I1Request digital key ↗
09/03/2026M00504432-I1Request digital key ↗
09/03/2026M00504432-P1Request digital key ↗
Showing 3 of 85 on file for this type
▸DOB NOWPlans/Sketch - Boiler Equipment4
09/04/2026M00350074-I1Request digital key ↗
09/03/2026M00350051-I1Request digital key ↗
Showing 2 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed3
09/05/2026M00123167-I1Request digital key ↗
09/04/2026M00347864-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
09/04/2026M00209286-P1Request digital key ↗
09/04/2026M00209286-P2Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Standpipe3
09/04/2026M00209286-P2Request digital key ↗
09/04/2026M00209286-P1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence3
09/05/2026M00135876-I1Request digital key ↗
09/03/2026M00236051-I1Request digital key ↗
Showing 2 of 3 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
09/04/2026M00395951-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00123172-I1Request digital key ↗
09/04/2026M00370374-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly1
09/03/2026M00629184-I1Request digital key ↗
▸Applications & Permits126
▸BISPLAN / WORK APPROVAL APPLICATION83
10/24/2025121205105Open ↗
08/01/2025121205105Open ↗
07/28/2025121205105Open ↗
Showing 3 of 83 on file for this type
▸BISWORK PERMIT APPLICATION43
11/24/2021121205105Open ↗
10/18/2021121205105Open ↗
11/23/2020121205105Open ↗
Showing 3 of 43 on file for this type
▸Zoning, Tax Lot & Property Records6
▸BISZONING DIAGRAM3
10/28/2024121205105Open ↗
07/17/2023121205105Open ↗
Showing 2 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/08/2022121205105Open ↗
▸Seals & Professional Certifications301
▸DOB NOWDPL-1: Design Professional Seal & Signature103
09/05/2026M00123167-I1Open ↗
09/05/2026M00135876-I1Open ↗
09/04/2026M00350074-I1Open ↗
Showing 3 of 103 on file for this type
▸DOB NOWProgress Inspector Seal & Signature65
09/27/2026M00350051-P1Open ↗
09/27/2026M00350051-P1Open ↗
09/25/2026M01199726-P1Open ↗
Showing 3 of 65 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature56
09/27/2026M00350051-P1Open ↗
09/25/2026M00936885-P2Open ↗
09/25/2026M01199726-P1Open ↗
Showing 3 of 56 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 35 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY10
11/05/2021141006033Open ↗
Showing 1 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
11/05/2021141006033Open ↗
Showing 1 of 10 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION10
11/05/2021141006033Open ↗
Showing 1 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸Trade Schedules & Equipment38
▸BISEQUIPMENT USE PERMITS21
08/02/2023121205105Open ↗
08/02/2023121205105Open ↗
12/10/2021121205105Open ↗
Showing 3 of 21 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT8
08/02/2023121205105Open ↗
12/10/2021121205105Open ↗
12/10/2021121205105Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING7
08/19/2021121205105Open ↗
05/11/2021121205105Open ↗
04/29/2021121205105Open ↗
Showing 3 of 7 on file for this type
▸BISSEWER CONNECTION: DEP SD1 & SD22
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection5
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTREET TREE CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISHPD: SRO MD CERTIFICATE OF NO HARASSMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos11
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance19
▸DOB NOWEN2: As Built Energy Analysis5
09/02/2026M00662596-I1Open ↗
09/02/2026M00662521-I1Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
11/19/2021121205105Open ↗
Showing 1 of 4 on file for this type
▸DOB NOWPreliminary Commissioning Report Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
03/10/2022121205105Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/10/2022121205105Open ↗
▸BISELECTRIC MOTORS1
03/10/2022121205105Open ↗
▸BISLIGHTING CONTROLS1
03/10/2022121205105Open ↗
▸Inspections & Test Reports53
▸BISTECHNICAL REPORT: RESPONSIBILITY32
01/18/2023140900513Open ↗
01/18/2023140900513Open ↗
01/17/2023140900513Open ↗
Showing 3 of 32 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISPRIOR TO NEXT TCO UPLOAD CORRECT DOCIN VIRTUAL FOLDER FOR CCD1. WHEN YOUOPEN THE CCD1 IT IS ACTUALLY ACONCRETE CONTROL INSPETION FORM.1
10/20/2022121205105Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/10/2022121205105Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
03/09/2022121205105Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
03/09/2022121205105Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/10/2022121205105Open ↗
▸Approvals, Objections & Sign-offs77
▸BISLETTERS - SUPPORTING DOCUMENTATION21
10/18/2021121205105Open ↗
Showing 1 of 21 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
01/29/2024140915160Open ↗
01/26/2024140915160Open ↗
01/18/2023140900513Open ↗
Showing 3 of 15 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
10/24/2025121205105Open ↗
08/01/2025121205105Open ↗
08/01/2025121205105Open ↗
Showing 3 of 15 on file for this type
▸BISSUPERSEDING LETTER11
10/18/2021121205105Open ↗
11/23/2020121205105Open ↗
11/23/2020121205105Open ↗
Showing 3 of 11 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISFINAL3
01/25/2024140915160Open ↗
01/12/2023140916070Open ↗
12/10/2021140889019Open ↗
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT19
11/05/2021141006033Open ↗
11/20/2020140890622Open ↗
11/20/2020140891408Open ↗
Showing 3 of 19 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE5
11/24/2021121205105Open ↗
Showing 1 of 5 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
11/23/2020121205105Open ↗
Showing 1 of 2 on file for this type
▸Filing & Intake Forms73
▸BISADDITIONAL INFORMATION38
10/28/2024121205105Open ↗
07/17/2023121205105Open ↗
07/17/2023121205105Open ↗
Showing 3 of 38 on file for this type
▸BISEFILING COVER SHEET16
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 16 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
11/05/2021141006033Open ↗
Showing 1 of 10 on file for this type
▸BISBOROUGH INTAKE FORM8
10/18/2021121205105Open ↗
Showing 1 of 8 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents124
▸DOB NOWDHCR Document95
09/03/2026M00504432-I1Open ↗
09/03/2026M00504432-P1Open ↗
09/03/2026M00236051-I1Open ↗
Showing 3 of 95 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION12
11/24/2021121205105Open ↗
09/23/2021123686528Open ↗
Showing 2 of 12 on file for this type
▸BISDHCR DOCUMENT11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
03/09/2022121205105Open ↗
▸BISVESTIBULES1
03/10/2022121205105Open ↗
▸BISMAINTENANCE INFORMATION1
03/10/2022121205105Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
03/10/2022121205105Open ↗