← Back
Factory, heavy manufacturing, fireproof
Review Avenue Complex
28-90 REVIEW AVENUE · Sunnyside · BIN 4441727
💬 Discuss this project
2024Year Built
—Stories
F1Building Class
M3-1Zoning
654,615 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Factory, heavy manufacturing, fireproof · Owner of record: 28-90 REVIEW AVE PROPERTY OWNER LLC · 192,792 sf lot · 3.4 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionFire AlarmEquipmentCivilGeneralOther
Permit Issued — active, not yet Signed-off
RoofUnder Construction133p · 10 filings · 20 docs
Bulkhead1p · 1 filing · 9 docs
Floor 623p · 5 filings · 16 docs
Floor 5Under Construction182p · 10 filings · 20 docs
Floor 4Under Construction124p · 10 filings · 20 docs
Floor 3Under Construction261p · 12 filings · 20 docs
Floor 2Under Construction250p · 13 filings · 20 docs
Floor 1Under Construction246p · 14 filings · 20 docs
MezzanineUnder Construction160p · 3 filings · 20 docs
CellarUnder Construction26p · 1 filing · 20 docs
Site & exteriorUnder Construction283p · 11 filings · 20 docs
Filed — no permit issued13p · 4 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
28-90 REVIEW AVE PROPERTY OWNER9709/13/2026
MOORE GROUP4607/08/2026
28-90 REVIEW AVENUE OWNER, LLC803/21/2026
A F I GLASS ARCHITECTURAL METAL507/08/2026
EXPEDITE DEM INC503/22/2026
ALBA SERVICES407/08/2026
INNOVO PG103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/16/2022$66.0M—28-90 REVIEW AVENUE OWNER, LLC → 28-90 REVIEW AVE PROPERTY OWNER LLC— not available
06/23/2020$34.1M—— → —— not available
08/23/2016$24.9M—— → —— not available
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE CORP.4403/21/2026
A1 EXPEDITING SERVICE2803/21/2026
LOMBARDO PROFESSIONAL ENGINEERING303/21/2026
PATUXENT ENGINEERING1203/21/2026
LOMBARDO BUILDING CONSULTANTS1003/21/2026
HIERARCH-E1003/21/2026
JMG CONSULTANTS603/21/2026
KD DESIGNS403/21/2026
EXPEDITE DEM203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEEDING BUILDERS GROUP LLGeneral Contractor3707/08/2026
MOORE GROUP CORPORATIONGeneral Contractor1607/08/2026
S&E BRIDGE & SCAFFOLD LLC.General Contractor1507/08/2026
RAEL AUTOMATIC SPR.CO INCFire Protection907/08/2026
WALTER KNITTELElectrical503/21/2026
BUNLIN LLCGeneral Contractor507/03/2026
TITAN INDUSTRIAL SVC CORPGeneral Contractor504/09/2026
A.F.I. GLASS & ARCHITECTUGeneral Contractor407/08/2026
ARSENAL SCAFFOLD INCGeneral Contractor407/08/2026
REGAL RECONSTRUCTION CORP.General Contractor303/21/2026
FORWARD MECHANICAL CORPPlumbing307/08/2026
JCC CONSTRUCTION CORPPlumbing207/08/2026
ALBA SERVICES INCGeneral Contractor107/08/2026
SAMUEL PALACEElectrical103/21/2026
PALACE SAMUELElectrical103/21/2026
FSG ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DOMANI INSPECTION SERVICE8432106/02/2026
G. BLINN CONSULTING, LLC2894507/25/2025
RA ENGINEERING LLP6986109/20/2022
LANGAN ENG, ENV, SURVEYIN1265109/09/2022
Building Lifecycle
All (300)Filed (69)Permit Issued (78)Signed Off (33)Violation (22)Inspection (18)Objection (50)Special Inspection (30)
08/21/2026
Special inspection requirement — Final
08/20/2026
Filed — Alteration
Installation of twelve (12) dock levelers and restraints.
Q01431417-P1
08/14/2026
Filed — Alteration
drive-in ramp
Q01442609-I1
08/14/2026
Filed — Alteration
drive-in ramp
Q01442609-S1
08/10/2026
Filed — Alteration
Installation of twelve (12) dock levelers and restraints.
Q01431417-S1
08/07/2026
Special inspection requirement — Final
SCOT MURDOCH
08/07/2026
Special inspection requirement — Final
08/04/2026
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01067569-I1
08/04/2026
Signed off — Alteration
Installation and use of temporary mini crane filed herein. No change in egress, use, and occupancy.
Q01054586-I1
08/04/2026
Signed off — Alteration
Installation and use of temporary side wall bracket filed herein. No change in egress, use, and occupancy.
Q01069718-I1
08/04/2026
Signed off — Alteration
Application for the installation and use of material platform as per plans filed herein. No change in egress, use or occupancy.
Q01081803-I1
08/04/2026
Signed off — Alteration
INSTALLATION AND USE OF TEMPORARY SUPPORTED SCAFFOLD AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01043605-I1
08/03/2026
Signed off — Alteration
ULMA Loading Platform as per dwgs filed herewith.
Q00990550-S1
08/03/2026
Signed off — New Building
Base Building Plumbing + Underground Plumbing work for NB #Q00763375-I1
Q00763375-S8
08/03/2026
Signed off — Alteration
ULMA Loading Platform as per dwgs filed herewith.
Q00990550-S2
08/03/2026
Signed off — Alteration
Q00783148-I1
08/03/2026
Signed off — Alteration
ULMA Loading Platform as per dwgs filed herewith.
Q00990550-I1
07/27/2026
Filed — Alteration
Installation of twelve (12) dock levelers and restraints.
Q01431417-I1
07/22/2026
Signed off — Alteration
Civil site work for a multi-level distribution facility.
Q07998010-S1
07/15/2026
Special inspection requirement — Final
SCOT MURDOCH
07/09/2026
Signed off — New Building
Base Building Plumbing + Underground Plumbing work for NB #Q00763375-I1
Q00763375-Z2
07/06/2026
Signed off — Alteration
INSTALLTION OF 2 POINT SUSPENDED SCAFFOLD IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01178983-I1
07/01/2026
Permit issued — Suspended Scaffold
Q01178983-I1-SC
06/30/2026
Signed off — New Building
Base Building Plumbing + Underground Plumbing work for NB #Q00763375-I1
Q00763375-Z3
06/29/2026
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLDING IN ACCORDANCE WITH NYC 2022 CHAPTER 33 BUILIDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01177942-I1
06/09/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Air barrier - visual inspection
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Vestibules
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Masonry
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Fenestration areas
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Energy Code Compliance Inspections
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Sprayed fire-resistant materials
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Lowest Floor Elevation
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Luminous Exit Path Markings
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Insulation placement and R values
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Protection of exposed foundation insulation
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Fenestration air leakage
JOHN MCMONAGLE
06/09/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
06/02/2026
Filed — New Building
Base Building Plumbing + Underground Plumbing work for NB #Q00763375-I1
Q00763375-B6
04/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/16/2026
Signed off — Alteration
TEMPORARY SUSPENDED SCAFFOLD AS PER DRAWINGS DURING NB CONST, FILED SEP. SUSPENDED SCAFFOLD SHALL COMPLY WITH CH 33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01145926-I1
04/15/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01243499-I1
04/15/2026
Signed off — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01243499-S1
04/15/2026
Signed off — Alteration
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
Q00974068-I1
04/15/2026
Signed off — Alteration
TEMPORARY SYSTEM SCAFFOLD STAIR TOWER AS PER DRAWINGS. SYSTEM SCAFFOLD STAIR TOWER SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01057761-I1
04/15/2026
Signed off — Alteration
TEMPORARY HOIST RUN-BACK STRUCTURE DURING NEW BLDG CONSTRUCTION, FILED SEPARATELY. HOIST RUN-BACK STRUCTURE SHALL COMPLY WITH CH#33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. HOIST & ELEVATOR APPLICATIONS
Q00974120-I1
04/15/2026
Signed off — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00895290-I1
04/03/2026
Permit issued — Mechanical Systems
Q00763375-S4-MS
03/30/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Signed off — Alteration
Q01270211-I1
Latest 60 of 300 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offBUNLIN LLC07/01/2026
DOB NOWMechanical SystemsSigned-offLEEDING BUILDERS GROUP LL04/03/2026
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL03/11/2026
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL02/17/2026
DOB NOWProtection and Mechanical MethodsSigned-offA.F.I. GLASS & ARCHITECTU01/08/2026
DOB NOWProtection and Mechanical MethodsSigned-offA.F.I. GLASS & ARCHITECTU01/08/2026
DOB NOWSidewalk ShedSigned-offS&E BRIDGE & SCAFFOLD LLC12/26/2025
DOB NOWStructuralPermit IssuedLEEDING BUILDERS GROUP LL12/23/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL12/17/2025
DOB NOWCurb CutSigned-offLEEDING BUILDERS GROUP LL11/06/2025
DOB NOWSprinklersSigned-offRAEL AUTOMATIC SPR.CO INC11/03/2025
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC11/03/2025
DOB NOWPlumbingSigned-offFORWARD HEATING CORP10/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offTITAN INDUSTRIAL SVC CORP10/01/2025
DOB NOWProtection and Mechanical MethodsSigned-offTITAN INDUSTRIAL SVC CORP10/01/2025
DOB NOWStructuralSigned-offTITAN INDUSTRIAL SVC CORP10/01/2025
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC09/30/2025
DOB NOWProtection and Mechanical MethodsSigned-offA.F.I. GLASS & ARCHITECTU09/30/2025
DOB NOWConstruction FenceSigned-offS&E BRIDGE & SCAFFOLD LLC09/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offARSENAL SCAFFOLD INC09/10/2025
DOB NOWProtection and Mechanical MethodsSigned-offARSENAL SCAFFOLD INC09/08/2025
DOB NOWStandpipeSigned-offRAEL AUTOMATIC SPR.CO INC09/08/2025
DOB NOWEarth WorkPermit IssuedLEEDING BUILDERS GROUP LL08/27/2025
DOB NOWPlumbingSigned-offJCC CONSTRUCTION CORP08/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E BRIDGE & SCAFFOLD LLC07/21/2025
DOB NOWSupported ScaffoldSigned-offARSENAL SCAFFOLD INC07/21/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP07/03/2025
DOB NOWProtection and Mechanical MethodsSigned-offA.F.I. GLASS & ARCHITECTU06/25/2025
DOB NOWSupported ScaffoldSigned-offBUNLIN LLC05/13/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL04/15/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL04/09/2025
DOB NOWMechanical SystemsSigned-offLEEDING BUILDERS GROUP LL04/01/2025
DOB NOWFoundationSigned-offLEEDING BUILDERS GROUP LL04/01/2025
DOB NOWFoundationSigned-offLEEDING BUILDERS GROUP LL04/01/2025
DOB NOWStructuralPermit IssuedLEEDING BUILDERS GROUP LL04/01/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL03/31/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL03/27/2025
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP03/14/2025
DOB NOWGeneral ConstructionPermit IssuedLEEDING BUILDERS GROUP LL02/20/2025
DOB NOWSuspended ScaffoldSigned-offS&E BRIDGE & SCAFFOLD LLC12/10/2024
+ 16 more permits on file
1 project · most recent 06/02/2026
Air Conditioning Systems Associated Ducts and Piping Heating and Air Conditioning Systems Heating Systems Refrigeration Systems
FiledStatusContractorScopeMake / Model / Capacity
06/02/2026Signed-offLEEDING BUILDERS GROUP LLAir Conditioning Systems, Associated Ducts and Piping, Heating and Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric PLFY-EP36NEMU-E, PLFY-EP15NEMU-E, PLFY-EP36NEMU-E, PEFY-P36NMAU-E4, PEFY-P36NMAU-E4 3 tons · Vrf Indoor ×30
PEFY-P24NMAU-E4, PEFY-P24NMAU-E4, PEFY-P24NMAU-E4 2 tons · Vrf Indoor ×18
PLFY-EP48NEMU1-E 1,200 CFM · Vrf Indoor ×18
PLFY-EP15NEMU-E, PLFY-EP15NEMU-E, PLFY-EP36NEMU-E, PEFY-P36NMAU-E4, PEFY-P36NMAU-E4 3 tons · Vrf Indoor ×15
PLFY-EP36NEMU-ER1, PLFY-EP15NEMU-E, PLFY-EP36NEMU-E, PEFY-P36NMAU-E4, PEFY-P36NMAU-E4 3 tons · Vrf Indoor ×15
PLFY-EP15NEMU-E, PEFY-P24NMAU-E4, PEFY-P24NMAU-E4, PEFY-P24NMAU-E4 800 CFM · Vrf Indoor ×12
PLFY-EP15NEMU-ER1.T, PEFY-P24NMAU-E4, PEFY-P24NMAU-E4, PEFY-P24NMAU-E4 1 tons · Vrf Indoor ×12
PLFY-EP48NEMU-E 1,230 CFM · Vrf Indoor ×9
PLFY-EP48NEMU-ER1, PLFY-EP48NEMU-E.TH, PLFY-EP48NEMU-ER1 1,230 CFM · Vrf Indoor ×9
PEFY-P36NMAU-E4 1,200 CFM · Vrf Indoor ×6
PLFY-EP30NEMU-ER1 800 CFM · Vrf Indoor ×6
PLFY-EP48NEMU1-E.TH, PLFY-EP48NEMU-E 1,230 CFM · Vrf Indoor ×6
Heat / Cool
Aaon RQ-004-3-V-E609-000 950 CFM · Rooftop Unit ×3
Heating
Johnson Air Rotation System AR-15.5SI-PLRM7.5D-EL40-XX-F9P1 12,500 CFM ×18
AR-15.5SI-PLRM7.5D-EL50-XX-F9P1 12,500 CFM ×6
Refrigeration
Mitsubishi Electric PUHY-EP96TNU-A1 8 tons · Vrf Outdoor ×30
PUHY-EP144TNU-A, PUHY-P72TNU-A, PUHY-P96TNU-A, PUHY-EP96TNU-A1, PUZ-A30NHA7 12 tons · Vrf Outdoor ×18
PUHY-P120TNU-A 10 tons · Vrf Outdoor ×6
SUZ-K18NAHZ.TH, PUHY-EP120TNU-A 12 tons · Vrf Outdoor ×6
PUHY-EP144TNU-A 12 tons · Vrf Outdoor ×3
PUHY-P72TNU-A 6 tons · Vrf Outdoor ×3
PUZ-A42NKA7 12 tons · Condensing Unit ×3
TUHYP0963AN40AN 8 tons · Condensing Unit ×3
Ducts & Piping
N/A N/A [EQ Efficiency/Units Not Applicable] Ductwork ×3
2 projects · most recent 10/14/2025
FiledStatusContractorScope
10/14/2025Signed-offRAEL AUTOMATIC SPR.CO INC3,131 heads, 9 outlets
09/06/2023Signed-offRAEL AUTOMATIC SPR.CO INC1 outlets
3 projects · most recent 06/02/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/02/2026Signed-offFORWARD MECHANICAL CORPStorm, Water/Sanitary
10/14/2025———
11/02/2023Signed-offJCC CONSTRUCTION CORPStorm, Water/Sanitary
11 projects · most recent 08/21/2026
General Wiring
FiledStatusContractorScope
08/21/2026Permit IssuedArcPoint Electrical LLCGeneral Wiring
07/27/2026Permit IssuedArcPoint Electrical LLCGeneral Wiring
11/20/2025CompleteNASH ELECTRIC SERVICES IN—
11/12/2025CompleteDENALI ELECTRIC CORP—
11/12/2025CompleteDENALI ELECTRIC CORP—
01/06/2025Permit IssuedFSG ELECTRIC INCGeneral Wiring
09/04/2024Permit IssuedFSG ELECTRIC INC—
08/22/2024Permit IssuedFSG ELECTRIC INCGeneral Wiring
08/07/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
08/07/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
12/10/2023CompleteNASH ELECTRIC SERVICES IN—
3 projects · most recent 08/20/2026
Concrete Steel
FiledStatusContractorScope
08/20/2026——Steel, Concrete
08/14/2026——Concrete
06/02/2026Signed-offLEEDING BUILDERS GROUP LLSteel, Concrete
1 project · most recent 08/19/2024
Scaffold
FiledStatusContractorScope
08/19/2024Signed-offMOORE GROUP CORPORATIONScaffold
1 project · most recent 07/31/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
07/31/2025Signed-offBUNLIN LLCSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/30/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
11/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/26/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
11/24/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/28/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
06/27/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
03/19/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/05/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/28/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/09/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/07/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
02/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 112
DateRequirementInspectorRole
08/21/2026Final—progress
08/07/2026Final—progress
08/07/2026FinalSCOT MURDOCHprogress
07/15/2026FinalSCOT MURDOCHprogress
06/09/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
06/09/2026Maintenance informationJOHN MCMONAGLEenergy_progress
06/09/2026Fenestration air leakageJOHN MCMONAGLEenergy_progress
06/09/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
06/09/2026Protection of exposed foundation insulationJOHN MCMONAGLEenergy_progress
06/09/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
06/09/2026VestibulesJOHN MCMONAGLEenergy_progress
06/09/2026Air barrier - visual inspectionJOHN MCMONAGLEenergy_progress
06/09/2026Insulation placement and R valuesJOHN MCMONAGLEenergy_progress
06/09/2026Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
06/09/2026Lowest Floor ElevationJOHN MCMONAGLEprogress
06/09/2026Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
06/09/2026Sprayed fire-resistant materialsJOHN MCMONAGLEspecial
06/09/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
06/09/2026MasonryJOHN MCMONAGLEspecial
06/09/2026Luminous Exit Path MarkingsJOHN MCMONAGLEspecial
06/09/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)JOHN MCMONAGLEspecial
06/09/2026Wall Panels, Curtain Walls, and VeneersJOHN MCMONAGLEspecial
06/09/2026Mastic and Intumescent Fire-resistant CoatingsJOHN MCMONAGLEspecial
06/09/2026Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
06/09/2026Lighting controlsJOHN MCMONAGLEenergy_progress
Latest 25 of 112.
▾Documents — 324 on file (BIS + DOB NOW)
▸Plans & Drawings73
▸DOB NOWPlans/Sketch72
08/29/2026Q00013839-I1Request digital key ↗
08/26/2026Q00783148-I1Request digital key ↗
08/25/2026Q07998010-S1Request digital key ↗
Showing 3 of 72 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00424052-I1Request digital key ↗
▸Applications & Permits23
▸DOB NOWDEP Stormwater Construction Permit7
08/16/2026Q00763375-B6Open ↗
08/13/2026Q00763375-P1Open ↗
08/13/2026Q00763375-A2Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
07/15/2025440824084Open ↗
11/21/2024440739881Open ↗
08/31/2022440739881Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION4
07/13/2021421958643Open ↗
07/13/2021421958563Open ↗
07/02/2021421958563Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination3
08/13/2026Q00763375-S2Open ↗
Showing 1 of 3 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
08/07/2025440824084Open ↗
08/31/2022440739881Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
07/15/2025440824084Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZoning Exhibit form (1-5)3
08/16/2026Q00763375-B6Open ↗
08/13/2026Q00763375-I1Open ↗
08/13/2026Q00763375-B2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/16/2026Q00763375-B6Open ↗
08/13/2026Q00763375-I1Open ↗
08/13/2026Q00763375-B2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00763375-I1Open ↗
▸Seals & Professional Certifications127
▸DOB NOWDPL-1: Design Professional Seal & Signature75
08/29/2026Q00013839-I1Open ↗
08/27/2026Q00424052-I1Open ↗
08/26/2026Q00783148-I1Open ↗
Showing 3 of 75 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature27
09/27/2026Q00922941-I1Open ↗
09/25/2026Q01145926-I1Open ↗
09/02/2026Q00763375-Z2Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/01/2026Q00763375-S1Open ↗
09/01/2026Q00763375-S3Open ↗
08/31/2026Q00763375-S5Open ↗
Showing 3 of 19 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/15/2025440824084Open ↗
08/31/2022440739881Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
07/15/2025440824084Open ↗
08/31/2022440739881Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00763375-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist3
08/16/2026Q00763375-B6Open ↗
08/13/2026Q00763375-I1Open ↗
08/13/2026Q00763375-B2Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISSTREET TREE CHECKLIST1
07/30/2025440824084Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00763375-I1Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR5 Test Report2
08/13/2026Q00763375-S1Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs15
▸BISLETTERS - SUPPORTING DOCUMENTATION10
07/02/2021421958563Open ↗
07/02/2021421958563Open ↗
07/02/2021421958563Open ↗
Showing 3 of 10 on file for this type
▸BISLANDMARKS APPROVAL2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISNYS DEC TIDAL WETLANDS APPROVAL2
07/15/2025440824084Open ↗
08/31/2022440739881Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
02/06/2025440739881Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISDEPT OF FINANCE VERIFICATION2
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸Filing & Intake Forms11
▸BISBOROUGH INTAKE FORM3
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
04/23/2020421958643Open ↗
▸BISADDITIONAL INFORMATION3
12/11/2024440739881Open ↗
07/02/2021421958563Open ↗
07/02/2021421958643Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
07/15/2025440824084Open ↗
08/31/2022440739881Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026Q00974068-P2Open ↗
08/16/2026Q00974068-P1Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
08/31/2022440739881Open ↗
▸Other Documents47
▸BISBPP - SUPPORTING DOCUMENTATION10
07/30/2025440824084Open ↗
07/15/2025440824084Open ↗
07/15/2025440824084Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWCalculations8
08/13/2026Q01145926-P3Open ↗
08/13/2026Q01145926-P4Open ↗
08/13/2026Q01178983-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWManufacturer's Specifications8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/16/2026Q00763375-B6Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWSite Survey: Initial3
08/16/2026Q00763375-B6Open ↗
08/13/2026Q00763375-I1Open ↗
08/13/2026Q00763375-B2Open ↗
▸DOB NOWProperty Ownership Certification3
08/16/2026Q00763375-I1Open ↗
08/16/2026Q00763375-B6Open ↗
08/16/2026Q00763375-B2Open ↗
▸BISNYS DEC TIDAL WETLANDS MAP2
07/30/2025440824084Open ↗
08/31/2022440739881Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00763375-S2Open ↗
08/13/2026Q07998010-I1Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/30/2025440824084Open ↗
▸BISBPP: TRAFFIC ENG STDY-CC IN INTERSECTION1
07/30/2025440824084Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
07/30/2025440824084Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/30/2025440824084Open ↗
▸BISUnknown1
04/23/2020421958563Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026Q00763375-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026Q00763375-Z4Open ↗